Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23304A331 | 31 July 2023 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121516-NP, Rev. 1, Containment Vessel Ultimate Pressure Integrity | Hydrostatic Finite Element Analysis |
ML23304A336 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 4, TR-117605-NP, NuFuel-HTP2 Fuel and Control Rod Assembly Designs | Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
ML23304A323 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121353-NP, Comprehensive Vibration Assessment Program Analysis Technical Report | |
ML23304A325 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121354, Comprehensive Vibration Assessment Program Measurement and Inspection Plan Technical Report | Flow Induced Vibration |
ML23304A327 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121507, Pipe Rupture Hazards Analysis | Safe Shutdown Ultimate heat sink Mission time Safe Shutdown Earthquake |
ML23304A329 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121515-NP, US460 Module Seismic Analysis | Ultimate heat sink Earthquake |
ML23304A333 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, TR-121517-NP, Module Short-Term Transient Analysis | Safe Shutdown Safe Shutdown Earthquake Finite Element Analysis |
ML23304A384 | 31 December 2022 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 18, TR-130415-NP, Human Factors Engineering Verification and Validation Implementation Plan | |
ML23304A339 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 5, TR-118976-NP, Fluence Calculation Methodology and Results | B.5.b |
ML23304A341 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 5, TR-130877-NP, Pressure and Temperature Limits Methodology | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
ML23304A343 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 5, TR-130721-NP, Use of Austenitic Stainless Steel for Npm Lower Reactor Pressure Vessel | Anticipated operational occurrence Hydrostatic |
ML23304A346 | 31 December 2022 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 6, TR-123952-NP, Containment Leakage Integrity Assurance | Boric Acid Ultimate heat sink Hydrostatic Nondestructive Examination Unidentified leakage |
ML23304A380 | 31 December 2022 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 18, TR-130409-NP, Revision 0, Human Factors Engineering Operating Experience Review Implementation Plan | Ultimate heat sink Probabilistic Risk Assessment |
ML23304A382 | 31 December 2022 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 18, TR-130417-NP, Revision 0, Human Factors Engineering Human-System Interface Design Implementation Plan | Probabilistic Risk Assessment |
ML23304A383 | 31 December 2022 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 18, TR-130416-NP, Human Factors Engineering Treatment of Important Human Actions Results Summary Report | Anticipated operational occurrence Probabilistic Risk Assessment |