ML23345A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Page     1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481 USER INFORMATION:
{{#Wiki_filter:Page 1 of 2
GERLACH*ROSEY M         EMPL#:028401   CA#: 0363 Address: NUCSA2 Phone#:   542-3194 TRANSMITTAL INFORMATION:
 
TO:     GERLACH*ROSEY M     11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481
 
USER INFORMATION:
GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194
 
TRANSMITTAL INFORMATION:
 
TO: GERLACH*ROSEY M 11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS  DATE: 11/02/2023 ADD    MANUAL TABLE OF CONTENTS  DATE: 11/27/2023 CATEGORY: DOCUMENTS  TYPE: TSB2


l.\JUV. L;0 1 L;UL;..:>
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
Page         2       of     2 ID: TEXT 3.6.1.4 REMOVE:   REV: 2 ADD:   REV: 3 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
 
REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023
 
ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023
 
CATEGORY: DOCUMENTS TYPE: TSB2 l.\\JUV. L;0 1 L;UL;..:>
 
Page 2 of 2
 
ID: TEXT 3.6.1.4 REMOVE: REV: 2
 
ADD: REV: 3
 
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:  TSB2
.nual
. n u a l


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date:         11/27/2023 Procedure Name                   Rev   Issue Date       Change ID   Change Number TEXT LOES                       138   01/03/2019
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
Table Of Contents Issue Date: 11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019


==Title:==
==Title:==
LIST OF EFFECTIVE SECTIONS TEXT TOC                         25   03/05/2019
LIST OF EFFECTIVE SECTIONS
 
TEXT TOC 25 03/05/2019


==Title:==
==Title:==
TABLE OF CONTENTS TEXT 2 .1.1                     7     03/30/2023
TABLE OF CONTENTS
 
TEXT 2.1.1 7 03/30/2023


==Title:==
==Title:==
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2 .1. 2                     1 EXT 3.0                         5
SAFETY LIMITS (SLS) REACTOR CORE SLS
 
TEXT 2.1. 2 1
 
EXT 3.0 5


==Title:==
==Title:==
LIMITING CONDITION FOR 01/15/2023 TEXT 3 .1.4                       5     11/16/2016
LIMITING CONDITION FOR
 
01/15/2023
 
TEXT 3.1.4 5 11/16/2016


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES '
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES '
TEXT 3 .1. 5                     2     11/16/2016
 
TEXT 3.1. 5 2 11/16/2016


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3 .1. 6                     6     01/15/2023
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS
 
TEXT 3.1. 6 6 01/15/2023


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1     of 8                                                       Report Date: 11/27/23
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL
 
Page 1 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:    TSB2 Manual
Manual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL 01/05/2023 TEXT 3 .1. 7                     5
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
* TEXT 3.1. 7 5 01/05/2023


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEX'+. 3 .1. 8                   4     11/16/2016
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM
 
TEX'+. 3.1. 8 4 11/16/2016


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1                       6     03/31/2021
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES
 
TEXT 3.2.1 6 03/31/2021


==Title:==
==Title:==
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR}
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR}
TEXT 3.2.2                       6     03/30/2023
 
TEXT 3.2.2 6 03/30/2023


==Title:==
==Title:==
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3                       4     03/31/2021
 
TEXT 3.2.3 4 03/31/2021


==Title:==
==Title:==
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1                     7     01/05/2023
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR
 
TEXT 3.3.1.1 7 01/05/2023 *


==Title:==
==Title:==
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2                     4     01/23/2018
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION
 
TEXT 3.3.1.2 4 01/23/2018


==Title:==
==Title:==
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1                     6     01/15/2023
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION
 
TEXT 3.3.2.1 6 01/15/2023


==Title:==
==Title:==
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2                     4     01/05/2023
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION
 
TEXT 3.3.2.2 4 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION FEEDWATER   MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1                     9     11/16/2016
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION
 
TEXT 3.3.3.1 9 11/16/2016


==Title:==
==Title:==
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2                     2     11/16/2016
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
 
TEXT 3.3.3.2 2 11/16/2016


==Title:==
==Title:==
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1                     3     01/05/2023
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM
 
TEXT 3.3.4.1 3 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION.
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION.
Page 2        of  8                                                      Report Date: 11/27/23


SSES MANUAL Manual Name:     TSB2
Page 2 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2
 
.anual
.anual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2                       2     01/05/2023
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
TEXT 3.3.4.2 2 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1                       8     01/05/2023
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION
 
TEXT 3.3.5.1 8 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2                       3     03/18/2021
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION
 
TEXT 3.3.5.2 3 03/18/2021


==Title:==
==Title:==
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3                       1     01/05/2023
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION
 
TEXT 3.3.5.3 1 01/05/2023


==Title:==
==Title:==
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES TEXT 3.3.6.1                       10   01/05/2023
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES
 
TEXT 3.3.6.1 10 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
.EXT 3.3.6.2                         6     03/05/2019
 
.EXT 3.3.6.2 6 03/05/2019


==Title:==
==Title:==
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1                       4     03/05/2019
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION
 
TEXT 3.3.7.1 4 03/05/2019


==Title:==
==Title:==
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1                       7     01/05/2023
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION
 
TEXT 3.3.8.1 7 01/05/2023


==Title:==
==Title:==
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2                       1   11/16/2016
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION
 
TEXT 3.3.8.2 1 11/16/2016


==Title:==
==Title:==
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1                         6     03/31/2021
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING
 
TEXT 3.4.1 6 03/31/2021


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2                         4     11/16/2016
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING
 
TEXT 3.4.2 4 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3                         3     01/13/2012
REACTOR COOLANT SYSTEM (RCS) JET PUMPS
 
TEXT 3.4.3 3 01/13/2012


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
Page 3      of  8                                                        Report Date: 11/27/23


SSES MANUAL Manual Name:   TSB2 Manual
Page 3 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2
 
Manual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4                       1     11/16/2016
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
TEXT 3.4.4 1 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5                       3     03/10/2010
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE
 
TEXT 3.4.5 3 03/10/2010


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6                       5     11/16/2016
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE
 
TEXT 3.4.6 5 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7                       3     11/16/2016
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION
 
TEXT 3.4.7 3 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8                       3     11/16/2016
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY
 
TEXT 3.4.8 3 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
              - HOT SHUTDOWN TEXT 3.4.9                       2     11/16/2016
- HOT SHUTDOWN TEXT 3.4.9 2 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM *
              - COLD SHUTDOWN TEXT 3.4.10                       6     05/14/2019
- COLD SHUTDOWN
 
TEXT 3.4.10 6 05/14/2019


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11                       1     11/16/2016
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS
 
TEXT 3.4.11 1 11/16/2016


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1                         9     01/05/2023
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE
 
TEXT 3.5.1 9 01/05/2023


==Title:==
==Title:==
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2                         7     06/09/2022
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 06/09/2022


==Title:==
==Title:==
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3                       7     01/05/2023
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 01/05/2023


==Title:==
==Title:==
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING Page 4     of   8                                                       Report Date: 11/27/23
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING
 
Page 4 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:  TSB2
.anual
.anual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1                     6     11/16/2016
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
TEXT 3.6.1.1 6 11/16/2016


==Title:==
==Title:==
PRIMARY CONTAINMENT TEXT 3.6.1.2                     3     01/05/2023
PRIMARY CONTAINMENT
 
TEXT 3.6.1.2 3 01/05/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3                     20     01/05/2023
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK
 
TEXT 3.6.1.3 20 01/05/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4                     3     11/27/2023
 
TEXT 3.6.1.4 3 11/27/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5                     2     11/16/2016
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE
 
TEXT 3.6.1.5 2 11/16/2016


==Title:==
==Title:==
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE
.EXT 3.6.1.6                         2     01/05/2023
 
.EXT 3.6.1.6 2 01/05/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1                     3     11/16/2016
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS
 
TEXT 3.6.2.1 3 11/16/2016


==Title:==
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2                     2     03/05/2019
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE
 
TEXT 3.6.2.2 2 03/05/2019


==Title:==
==Title:==
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3                     3     01/05/2023
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL
 
TEXT 3.6.2.3 3 01/05/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4                     2     01/05/2023
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING
 
TEXT 3.6.2.4 2 01/05/2023


==Title:==
==Title:==
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1                     2     06/13/2006
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY
 
TEXT 3.6.3.1 2 06/13/2006


==Title:==
==Title:==
CONTAINMENT SYSTEMS     INTENTIONALLY LEFT BLANK TEXT 3.6.3.2                     4     08/02/2021
CONTAINMENT SYSTEMS INTENTIONALLY LEFT BLANK
 
TEXT 3.6.3.2 4 08/02/2021


==Title:==
==Title:==
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5     of 8                                                         Report Date: 11/27/23
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM
 
Page 5 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:    TSB2 Manual
Manual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3                     3     09/2~/2017
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
TEXT 3.6.3.3 3 09/2~/2017


==Title:==
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1                     17   12/16/2020
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION
 
TEXT 3.6.4.1 17 12/16/2020


==Title:==
==Title:==
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2                     14   03/05/2019
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT
 
TEXT 3.6.4.2 14 03/05/2019


==Title:==
==Title:==
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3                     7     03/05/2019
 
TEXT 3.6.4.3 7 03/05/2019


==Title:==
==Title:==
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT       SYSTEM TEXT 3.7.1                       10   01/05/2023
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM
 
TEXT 3.7.1 10 01/05/2023


==Title:==
==Title:==
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2                       6     01/05/2023
TEXT 3.7.2 6 01/05/2023


==Title:==
==Title:==
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3                       4     03/05/2019
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM
* TEXT 3.7.3 4 03/05/2019


==Title:==
==Title:==
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM TEXT 3.7.4                       2     03/05/2019
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM
 
TEXT 3.7.4 2 03/05/2019


==Title:==
==Title:==
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5                       2     11/16/2016
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM
 
TEXT 3.7.5 2 11/16/2016


==Title:==
==Title:==
PLANT SYSTEMS MAIN CONDENSER ~FFGAS TEXT 3.7.6                       4     11/i6/2016
PLANT SYSTEMS MAIN CONDENSER ~FFGAS
 
TEXT 3.7.6 4 11/i6/2016


==Title:==
==Title:==
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7                       2     11/16/2016
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM
 
TEXT 3.7.7 2 11/16/2016


==Title:==
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8                       1     11/16/2016
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL
 
TEXT 3.7.8 1 11/16/2016


==Title:==
==Title:==
MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6     of 8                                                       Report Date: 11/27/23
MAINE TURBINE PRESSURE REGULATION SYSTEM
 
Page 6 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:    TSB2
.anual
.anual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1                         17   01/05/2023
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
 
TEXT 3.8.1 17 01/05/2023


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS AC SOURCES     OPERATING TEXT 3.8.2                         2     03/18/2021
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING
 
TEXT 3.8.2 2 03/18/2021


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3                         7     08/07/2019
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN
 
TEXT 3.8.3 7 08/07/2019


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3. 8 .4                       5     01/05/2023
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR
 
TEXT 3. 8.4 5 01/05/2023


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5                         2     03/05/2019
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING
 
TEXT 3.8.5 2 03/05/2019


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN
.EXT 3.8.6                           2     11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7                         9     01/05/2023
 
.EXT 3.8.6 2 11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS
 
TEXT 3.8.7 9 01/05/2023


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8                         2     03/05/2019
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING
 
TEXT 3.8.8 2 03/05/2019


==Title:==
==Title:==
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS     SHUTDOWN TEXT 3.9.1                         1     11/16/2016
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN
 
TEXT 3.9.1 1 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2                         2     11/16/2016
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS
 
TEXT 3.9.2 2 11/16/2016


==Title:==
==Title:==
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3                         1     11/16/2016
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK
 
TEXT 3.9.3 1 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4                         0     11/18/2002
REFUELING OPERATIONS CONTROL ROD POSITION
 
TEXT 3.9.4 0 11/18/2002


==Title:==
==Title:==
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7     of 8                                                       Report Date: 11/27/23
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION
 
Page 7 of 8 Report Date: 11/27/23 SSES MANUAL
 
Manual Name: TSB2


SSES MANUAL Manual Name:    TSB2 Manual
Manual


==Title:==
==Title:==
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5                       1
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
* TEXT 3.9.5 1
* 11/16/2016
* 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6                       2     11/16/2016
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING
 
TEXT 3.9.6 2 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7                       l     11/16/2016
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL
 
TEXT 3.9.7 l 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8                       1     11/16/2016
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL
 
TEXT 3.9.8 1 11/16/2016


==Title:==
==Title:==
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1                     2     03/05/2019
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL
 
TEXT 3.10.1 2 03/05/2019


==Title:==
==Title:==
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3 .10 .2                   1     11/16/2016
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION
 
TEXT 3.10.2 1 11/16/2016 *


==Title:==
==Title:==
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3                       1     11/16/2016
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING
 
TEXT 3.10.3 1 11/16/2016


==Title:==
==Title:==
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4                       1     11/16/2016
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN
 
TEXT 3.10.4 1 11/16/2016


==Title:==
==Title:==
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5                       l     11/16/2016
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN
 
TEXT 3.10.5 l 11/16/2016


==Title:==
==Title:==
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6                       1     11/16/2016
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING
 
TEXT 3.10.6 1 11/16/2016


==Title:==
==Title:==
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL   REFUELING TEXT 3.10.7                       2     03/31/2021
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING
 
TEXT 3.10.7 2 03/31/2021


==Title:==
==Title:==
SPECIAL OPERATIONS CONTROL ROD TESTING   OPERATING 3.10.8                     4     03/31/2021
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING
 
3.10.8 4 03/31/2021


==Title:==
==Title:==
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8     of   8                                                       Report Date: 11/27/23
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING
* Page 8 of 8 Report Date: 11/27/23 Rev. 3 Containment Pressure B 3.6.1.4
* B 3.6 CONTAINMENT SYSTEMS
 
B 3.6.1.4 Containment Pressure
 
BASES
 
BACKGROUND The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA).
 
APPLICABLE Primary containment performance is evaluated for the entire spectrum of SAFETY break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is ANALYSES the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable.
 
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ).
* The minimum containment pressure occurs during an inadvertent spray
 
actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1)


Rev. 3 Containment Pressure B 3.6.1.4 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.4 Containment Pressure BASES BACKGROUND          The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA).
APPLICABLE          Primary containment performance is evaluated for the entire spectrum of SAFETY              break sizes for postulated LOCAs (Ref. 1). Among the inputs to the OBA is ANALYSES            the initial primary containment internal pressure (Ref. 1). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable.
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1).
The minimum containment pressure occurs during an inadvertent spray actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1)
Containment pressure satisfies Criterion 2 of the NRC Policy Statement.
Containment pressure satisfies Criterion 2 of the NRC Policy Statement.
(Ref. 2)
(Ref. 2)
LCO                 In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure.
 
LCO In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure.
(Ref. 1)
(Ref. 1)
APPLICABILITY      In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5 .
* SUSQUEHANNA - UNIT 2                        3.6-40


Rev. 3 Containment Pressure B 3.6.1.4 BASES ACTIONS With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour.
APPLICABILITY In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5.
8.1 and 8.2 If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SUSQUEHANNA - UNIT 2 3.6-40 Rev. 3 Containment Pressure B 3.6.1.4
* SURVEILLANCE REQUIREMENTS SR 3.6.1.4.1 Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program.
 
REFERENCES     1. FSAR, Section 6.2.
BASES ACTIONS
: 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132) .
 
* SUSQUEHANNA - UNIT 2                   3.6-41
With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour.
 
8.1 and 8.2
 
If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
 
SURVEILLANCE SR 3.6.1.4.1 REQUIREMENTS
* Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program.
 
REFERENCES 1. FSAR, Section 6.2.
: 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
 
SUSQUEHANNA - UNIT 2 3.6-41 Rev. 3 Containment Pressure B 3.6.1.4
 
BASES
 
THIS PAGE INTENTIONALLY LEFT BLANK


Rev. 3 Containment Pressure B 3.6.1.4 BASES
SUSQUEHANNA - UNIT 2 3.6-42}}
* THIS PAGE INTENTIONALLY LEFT BLANK
* SUSQUEHANNA - UNIT 2         3.6-42}}

Revision as of 00:32, 6 October 2024

Technical Specifications Bases Manual
ML23345A067
Person / Time
Site: Susquehanna 
Issue date: 11/28/2023
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23345A067 (1)


Text

Page 1 of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481

USER INFORMATION:

GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194

TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023

ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023

CATEGORY: DOCUMENTS TYPE: TSB2 l.\\JUV. L;0 1 L;UL;..:>

Page 2 of 2

ID: TEXT 3.6.1.4 REMOVE: REV: 2

ADD: REV: 3

ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL

Manual Name: TSB2

.nual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

Table Of Contents Issue Date: 11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS

TEXT TOC 25 03/05/2019

Title:

TABLE OF CONTENTS

TEXT 2.1.1 7 03/30/2023

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS

TEXT 2.1. 2 1

EXT 3.0 5

Title:

LIMITING CONDITION FOR

01/15/2023

TEXT 3.1.4 5 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES '

TEXT 3.1. 5 2 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS

TEXT 3.1. 6 6 01/15/2023

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL

Page 1 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

  • TEXT 3.1. 7 5 01/05/2023

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM

TEX'+. 3.1. 8 4 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES

TEXT 3.2.1 6 03/31/2021

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR}

TEXT 3.2.2 6 03/30/2023

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 4 03/31/2021

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR

TEXT 3.3.1.1 7 01/05/2023 *

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION

TEXT 3.3.1.2 4 01/23/2018

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION

TEXT 3.3.2.1 6 01/15/2023

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION

TEXT 3.3.2.2 4 01/05/2023

Title:

INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION

TEXT 3.3.3.1 9 11/16/2016

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION

TEXT 3.3.3.2 2 11/16/2016

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM

TEXT 3.3.4.1 3 01/05/2023

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION.

Page 2 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

.anual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

TEXT 3.3.4.2 2 01/05/2023

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION

TEXT 3.3.5.1 8 01/05/2023

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION

TEXT 3.3.5.2 3 03/18/2021

Title:

REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION

TEXT 3.3.5.3 1 01/05/2023

Title:

UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES

TEXT 3.3.6.1 10 01/05/2023

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION

.EXT 3.3.6.2 6 03/05/2019

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION

TEXT 3.3.7.1 4 03/05/2019

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION

TEXT 3.3.8.1 7 01/05/2023

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION

TEXT 3.3.8.2 1 11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING

TEXT 3.4.1 6 03/31/2021

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING

TEXT 3.4.2 4 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS

TEXT 3.4.3 3 01/13/2012

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

Page 3 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

TEXT 3.4.4 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE

TEXT 3.4.5 3 03/10/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE

TEXT 3.4.6 5 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION

TEXT 3.4.7 3 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY

TEXT 3.4.8 3 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 2 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM *

- COLD SHUTDOWN

TEXT 3.4.10 6 05/14/2019

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS

TEXT 3.4.11 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE

TEXT 3.5.1 9 01/05/2023

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 06/09/2022

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 01/05/2023

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING

Page 4 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

.anual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

TEXT 3.6.1.1 6 11/16/2016

Title:

PRIMARY CONTAINMENT

TEXT 3.6.1.2 3 01/05/2023

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK

TEXT 3.6.1.3 20 01/05/2023

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 3 11/27/2023

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE

TEXT 3.6.1.5 2 11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE

.EXT 3.6.1.6 2 01/05/2023

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS

TEXT 3.6.2.1 3 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE

TEXT 3.6.2.2 2 03/05/2019

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL

TEXT 3.6.2.3 3 01/05/2023

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING

TEXT 3.6.2.4 2 01/05/2023

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY

TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS INTENTIONALLY LEFT BLANK

TEXT 3.6.3.2 4 08/02/2021

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM

Page 5 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

TEXT 3.6.3.3 3 09/2~/2017

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION

TEXT 3.6.4.1 17 12/16/2020

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT

TEXT 3.6.4.2 14 03/05/2019

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 7 03/05/2019

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM

TEXT 3.7.1 10 01/05/2023

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 6 01/05/2023

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM

  • TEXT 3.7.3 4 03/05/2019

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM

TEXT 3.7.4 2 03/05/2019

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM

TEXT 3.7.5 2 11/16/2016

Title:

PLANT SYSTEMS MAIN CONDENSER ~FFGAS

TEXT 3.7.6 4 11/i6/2016

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM

TEXT 3.7.7 2 11/16/2016

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL

TEXT 3.7.8 1 11/16/2016

Title:

MAINE TURBINE PRESSURE REGULATION SYSTEM

Page 6 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

.anual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

TEXT 3.8.1 17 01/05/2023

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING

TEXT 3.8.2 2 03/18/2021

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN

TEXT 3.8.3 7 08/07/2019

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR

TEXT 3. 8.4 5 01/05/2023

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING

TEXT 3.8.5 2 03/05/2019

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN

.EXT 3.8.6 2 11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS

TEXT 3.8.7 9 01/05/2023

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING

TEXT 3.8.8 2 03/05/2019

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN

TEXT 3.9.1 1 11/16/2016

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS

TEXT 3.9.2 2 11/16/2016

Title:

REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK

TEXT 3.9.3 1 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD POSITION

TEXT 3.9.4 0 11/18/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION

Page 7 of 8 Report Date: 11/27/23 SSES MANUAL

Manual Name: TSB2

Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL

  • TEXT 3.9.5 1
  • 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING

TEXT 3.9.6 2 11/16/2016

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL

TEXT 3.9.7 l 11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL

TEXT 3.9.8 1 11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL

TEXT 3.10.1 2 03/05/2019

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION

TEXT 3.10.2 1 11/16/2016 *

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING

TEXT 3.10.3 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN

TEXT 3.10.4 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN

TEXT 3.10.5 l 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING

TEXT 3.10.6 1 11/16/2016

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING

TEXT 3.10.7 2 03/31/2021

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING

3.10.8 4 03/31/2021

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING

  • Page 8 of 8 Report Date: 11/27/23 Rev. 3 Containment Pressure B 3.6.1.4
  • B 3.6 CONTAINMENT SYSTEMS

B 3.6.1.4 Containment Pressure

BASES

BACKGROUND The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA).

APPLICABLE Primary containment performance is evaluated for the entire spectrum of SAFETY break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is ANALYSES the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable.

The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ).

  • The minimum containment pressure occurs during an inadvertent spray

actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1)

Containment pressure satisfies Criterion 2 of the NRC Policy Statement.

(Ref. 2)

LCO In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure.

(Ref. 1)

APPLICABILITY In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5.

SUSQUEHANNA - UNIT 2 3.6-40 Rev. 3 Containment Pressure B 3.6.1.4

BASES ACTIONS

With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

8.1 and 8.2

If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.4.1 REQUIREMENTS

  • Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program.

REFERENCES 1. FSAR, Section 6.2.

2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).

SUSQUEHANNA - UNIT 2 3.6-41 Rev. 3 Containment Pressure B 3.6.1.4

BASES

THIS PAGE INTENTIONALLY LEFT BLANK

SUSQUEHANNA - UNIT 2 3.6-42