{{#Wiki_filter:Page | {{#Wiki_filter:Page 1 of 2 | ||
GERLACH*ROSEY M | |||
TO: | MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481 | ||
USER INFORMATION: | |||
GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 | |||
TRANSMITTAL INFORMATION: | |||
TO: GERLACH*ROSEY M 11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | |||
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | ||
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | ||
l.\JUV. L;0 1 L;UL;..:> | TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
Page | |||
REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023 | |||
ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023 | |||
CATEGORY: DOCUMENTS TYPE: TSB2 l.\\JUV. L;0 1 L;UL;..:> | |||
Page 2 of 2 | |||
ID: TEXT 3.6.1.4 REMOVE: REV: 2 | |||
ADD: REV: 3 | |||
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. | |||
SSES MANUAL | |||
Manual Name: TSB2 | |||
.nual | |||
. | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
Table Of Contents Issue Date: 11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019 | |||
==Title:== | ==Title:== | ||
LIST OF EFFECTIVE SECTIONS TEXT TOC | LIST OF EFFECTIVE SECTIONS | ||
TEXT TOC 25 03/05/2019 | |||
==Title:== | ==Title:== | ||
TABLE OF CONTENTS TEXT 2 .1.1 | TABLE OF CONTENTS | ||
TEXT 2.1.1 7 03/30/2023 | |||
==Title:== | ==Title:== | ||
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2 .1. 2 | SAFETY LIMITS (SLS) REACTOR CORE SLS | ||
TEXT 2.1. 2 1 | |||
EXT 3.0 5 | |||
==Title:== | ==Title:== | ||
LIMITING CONDITION FOR 01/15/2023 TEXT 3 .1.4 | LIMITING CONDITION FOR | ||
01/15/2023 | |||
TEXT 3.1.4 5 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES ' | REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES ' | ||
TEXT 3 .1. 5 | |||
TEXT 3.1. 5 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3 .1. 6 | REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS | ||
TEXT 3.1. 6 6 01/15/2023 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1 | REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL | ||
Page 1 of 8 Report Date: 11/27/23 SSES MANUAL | |||
Manual Name: TSB2 | |||
Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
* TEXT 3.1. 7 5 01/05/2023 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEX'+. 3 .1. 8 | REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM | ||
TEX'+. 3.1. 8 4 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 | REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES | ||
TEXT 3.2.1 6 03/31/2021 | |||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR} | POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR} | ||
TEXT 3.2.2 | |||
TEXT 3.2.2 6 03/30/2023 | |||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | ||
TEXT 3.2.3 | |||
TEXT 3.2.3 4 03/31/2021 | |||
==Title:== | ==Title:== | ||
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 | POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR | ||
TEXT 3.3.1.1 7 01/05/2023 * | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 | INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION | ||
TEXT 3.3.1.2 4 01/23/2018 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 | INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION | ||
TEXT 3.3.2.1 6 01/15/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 | INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION | ||
TEXT 3.3.2.2 4 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION FEEDWATER | INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION | ||
TEXT 3.3.3.1 9 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 | INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION | ||
TEXT 3.3.3.2 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 | INSTRUMENTATION REMOTE SHUTDOWN SYSTEM | ||
TEXT 3.3.4.1 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION. | INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION. | ||
SSES MANUAL Manual Name: | Page 2 of 8 Report Date: 11/27/23 SSES MANUAL | ||
Manual Name: TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
TEXT 3.3.4.2 2 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 | INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION | ||
TEXT 3.3.5.1 8 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 | INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION | ||
TEXT 3.3.5.2 3 03/18/2021 | |||
==Title:== | ==Title:== | ||
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 | REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION | ||
TEXT 3.3.5.3 1 01/05/2023 | |||
==Title:== | ==Title:== | ||
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES TEXT 3.3.6.1 | UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES | ||
TEXT 3.3.6.1 10 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION | INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION | ||
.EXT 3.3.6.2 | |||
.EXT 3.3.6.2 6 03/05/2019 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 | INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION | ||
TEXT 3.3.7.1 4 03/05/2019 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 | INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION | ||
TEXT 3.3.8.1 7 01/05/2023 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 | INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION | ||
TEXT 3.3.8.2 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 | INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING | ||
TEXT 3.4.1 6 03/31/2021 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 | REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING | ||
TEXT 3.4.2 4 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 | REACTOR COOLANT SYSTEM (RCS) JET PUMPS | ||
TEXT 3.4.3 3 01/13/2012 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | ||
SSES MANUAL Manual Name: | Page 3 of 8 Report Date: 11/27/23 SSES MANUAL | ||
Manual Name: TSB2 | |||
Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
TEXT 3.4.4 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 | REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE | ||
TEXT 3.4.5 3 03/10/2010 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 | REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE | ||
TEXT 3.4.6 5 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 | REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION | ||
TEXT 3.4.7 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 | REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY | ||
TEXT 3.4.8 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM | REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM | ||
- HOT SHUTDOWN TEXT 3.4.9 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM | REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM * | ||
- COLD SHUTDOWN | |||
TEXT 3.4.10 6 05/14/2019 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 | REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS | ||
TEXT 3.4.11 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 | REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE | ||
TEXT 3.5.1 9 01/05/2023 | |||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 06/09/2022 | ||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 01/05/2023 | ||
==Title:== | ==Title:== | ||
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING Page 4 | EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING | ||
Page 4 of 8 Report Date: 11/27/23 SSES MANUAL | |||
Manual Name: TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
TEXT 3.6.1.1 6 11/16/2016 | |||
==Title:== | ==Title:== | ||
PRIMARY CONTAINMENT TEXT 3.6.1.2 | PRIMARY CONTAINMENT | ||
TEXT 3.6.1.2 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK | ||
TEXT 3.6.1.3 20 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS) | ||
TEXT 3.6.1.4 | |||
TEXT 3.6.1.4 3 11/27/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 | CONTAINMENT SYSTEMS CONTAINMENT PRESSURE | ||
TEXT 3.6.1.5 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE | CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE | ||
.EXT 3.6.1.6 | |||
.EXT 3.6.1.6 2 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 | CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS | ||
TEXT 3.6.2.1 3 11/16/2016 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 | CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE | ||
TEXT 3.6.2.2 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 | CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL | ||
TEXT 3.6.2.3 3 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 | CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING | ||
TEXT 3.6.2.4 2 01/05/2023 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 | CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY | ||
TEXT 3.6.3.1 2 06/13/2006 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS | CONTAINMENT SYSTEMS INTENTIONALLY LEFT BLANK | ||
TEXT 3.6.3.2 4 08/02/2021 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 | CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM | ||
Page 5 of 8 Report Date: 11/27/23 SSES MANUAL | |||
Manual Name: TSB2 | |||
Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
TEXT 3.6.3.3 3 09/2~/2017 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 | CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION | ||
TEXT 3.6.4.1 17 12/16/2020 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 | CONTAINMENT SYSTEMS SECONDARY CONTAINMENT | ||
TEXT 3.6.4.2 14 03/05/2019 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS) | CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS) | ||
TEXT 3.6.4.3 | |||
TEXT 3.6.4.3 7 03/05/2019 | |||
==Title:== | ==Title:== | ||
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT | CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM | ||
TEXT 3.7.1 10 01/05/2023 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS) | PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS) | ||
TEXT 3.7.2 | TEXT 3.7.2 6 01/05/2023 | ||
==Title:== | ==Title:== | ||
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 | PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM | ||
* TEXT 3.7.3 4 03/05/2019 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM TEXT 3.7.4 | PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM | ||
TEXT 3.7.4 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 | PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM | ||
TEXT 3.7.5 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS MAIN CONDENSER ~FFGAS TEXT 3.7.6 | PLANT SYSTEMS MAIN CONDENSER ~FFGAS | ||
TEXT 3.7.6 4 11/i6/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 | PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM | ||
TEXT 3.7.7 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 | PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL | ||
TEXT 3.7.8 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6 | MAINE TURBINE PRESSURE REGULATION SYSTEM | ||
Page 6 of 8 Report Date: 11/27/23 SSES MANUAL | |||
Manual Name: TSB2 | |||
.anual | .anual | ||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
TEXT 3.8.1 17 01/05/2023 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS AC SOURCES | ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING | ||
TEXT 3.8.2 2 03/18/2021 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3 | ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN | ||
TEXT 3.8.3 7 08/07/2019 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3. 8 .4 | ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR | ||
TEXT 3. 8.4 5 01/05/2023 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 | ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING | ||
TEXT 3.8.5 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN | ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN | ||
.EXT 3.8.6 | |||
.EXT 3.8.6 2 11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS | |||
TEXT 3.8.7 9 01/05/2023 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 | ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING | ||
TEXT 3.8.8 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS | ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN | ||
TEXT 3.9.1 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 | REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS | ||
TEXT 3.9.2 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 | REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK | ||
TEXT 3.9.3 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 | REFUELING OPERATIONS CONTROL ROD POSITION | ||
TEXT 3.9.4 0 11/18/2002 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 | REFUELING OPERATIONS CONTROL ROD POSITION INDICATION | ||
Page 7 of 8 Report Date: 11/27/23 SSES MANUAL | |||
Manual Name: TSB2 | |||
Manual | |||
==Title:== | ==Title:== | ||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5 | TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL | ||
* TEXT 3.9.5 1 | |||
* 11/16/2016 | * 11/16/2016 | ||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 | REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING | ||
TEXT 3.9.6 2 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 | REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL | ||
TEXT 3.9.7 l 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) | REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL | ||
TEXT 3.9.8 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) | REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL | ||
TEXT 3.10.1 2 03/05/2019 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3 .10 .2 | SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION | ||
TEXT 3.10.2 1 11/16/2016 * | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 | SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING | ||
TEXT 3.10.3 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 | SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN | ||
TEXT 3.10.4 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 | SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN | ||
TEXT 3.10.5 l 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 | SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING | ||
TEXT 3.10.6 1 11/16/2016 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL | SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING | ||
TEXT 3.10.7 2 03/31/2021 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS CONTROL ROD TESTING | SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING | ||
3.10.8 4 03/31/2021 | |||
==Title:== | ==Title:== | ||
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8 | SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING | ||
* Page 8 of 8 Report Date: 11/27/23 Rev. 3 Containment Pressure B 3.6.1.4 | |||
* B 3.6 CONTAINMENT SYSTEMS | |||
B 3.6.1.4 Containment Pressure | |||
BASES | |||
BACKGROUND The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA). | |||
APPLICABLE Primary containment performance is evaluated for the entire spectrum of SAFETY break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is ANALYSES the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable. | |||
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ). | |||
* The minimum containment pressure occurs during an inadvertent spray | |||
actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1) | |||
Containment pressure satisfies Criterion 2 of the NRC Policy Statement. | Containment pressure satisfies Criterion 2 of the NRC Policy Statement. | ||
(Ref. 2) | (Ref. 2) | ||
LCO | |||
LCO In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure. | |||
(Ref. 1) | (Ref. 1) | ||
Rev. 3 Containment Pressure B 3.6.1.4 BASES ACTIONS With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour. | APPLICABILITY In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5. | ||
8.1 and 8.2 If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. | SUSQUEHANNA - UNIT 2 3.6-40 Rev. 3 Containment Pressure B 3.6.1.4 | ||
REFERENCES | BASES ACTIONS | ||
: 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132) . | |||
With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour. | |||
8.1 and 8.2 | |||
If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours and to MODE 4 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. | |||
SURVEILLANCE SR 3.6.1.4.1 REQUIREMENTS | |||
* Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program. | |||
REFERENCES 1. FSAR, Section 6.2. | |||
: 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132). | |||
SUSQUEHANNA - UNIT 2 3.6-41 Rev. 3 Containment Pressure B 3.6.1.4 | |||
BASES | |||
THIS PAGE INTENTIONALLY LEFT BLANK | |||
SUSQUEHANNA - UNIT 2 3.6-42}} | |||
Revision as of 00:32, 6 October 2024
| ML23345A067 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/28/2023 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML23345A067 (1) | |
Text
Page 1 of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2023-14481
USER INFORMATION:
GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194
TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 11/28/2023 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
REMOVE MANUAL TABLE OF CONTENTS DATE: 11/02/2023
ADD MANUAL TABLE OF CONTENTS DATE: 11/27/2023
CATEGORY: DOCUMENTS TYPE: TSB2 l.\\JUV. L;0 1 L;UL;..:>
Page 2 of 2
ID: TEXT 3.6.1.4 REMOVE: REV: 2
ADD: REV: 3
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
Manual Name: TSB2
.nual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
Table Of Contents Issue Date: 11/27/2023 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/2019
Title:
LIST OF EFFECTIVE SECTIONS
TEXT TOC 25 03/05/2019
Title:
TABLE OF CONTENTS
TEXT 2.1.1 7 03/30/2023
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS
TEXT 2.1. 2 1
EXT 3.0 5
Title:
LIMITING CONDITION FOR
01/15/2023
TEXT 3.1.4 5 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES '
TEXT 3.1. 5 2 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS
TEXT 3.1. 6 6 01/15/2023
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL
Page 1 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
- TEXT 3.1. 7 5 01/05/2023
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM
TEX'+. 3.1. 8 4 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES
TEXT 3.2.1 6 03/31/2021
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR}
TEXT 3.2.2 6 03/30/2023
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 4 03/31/2021
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR
TEXT 3.3.1.1 7 01/05/2023 *
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION
TEXT 3.3.1.2 4 01/23/2018
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION
TEXT 3.3.2.1 6 01/15/2023
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION
TEXT 3.3.2.2 4 01/05/2023
Title:
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION
TEXT 3.3.3.1 9 11/16/2016
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
TEXT 3.3.3.2 2 11/16/2016
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM
TEXT 3.3.4.1 3 01/05/2023
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION.
Page 2 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
TEXT 3.3.4.2 2 01/05/2023
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION
TEXT 3.3.5.1 8 01/05/2023
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION
TEXT 3.3.5.2 3 03/18/2021
Title:
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION
TEXT 3.3.5.3 1 01/05/2023
Title:
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES
TEXT 3.3.6.1 10 01/05/2023
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
.EXT 3.3.6.2 6 03/05/2019
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION
TEXT 3.3.7.1 4 03/05/2019
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION
TEXT 3.3.8.1 7 01/05/2023
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION
TEXT 3.3.8.2 1 11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING
TEXT 3.4.1 6 03/31/2021
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING
TEXT 3.4.2 4 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS
TEXT 3.4.3 3 01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
Page 3 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
TEXT 3.4.4 1 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE
TEXT 3.4.5 3 03/10/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE
TEXT 3.4.6 5 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION
TEXT 3.4.7 3 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY
TEXT 3.4.8 3 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN TEXT 3.4.9 2 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM *
- COLD SHUTDOWN
TEXT 3.4.10 6 05/14/2019
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS
TEXT 3.4.11 1 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE
TEXT 3.5.1 9 01/05/2023
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7 06/09/2022
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7 01/05/2023
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING
Page 4 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
TEXT 3.6.1.1 6 11/16/2016
Title:
TEXT 3.6.1.2 3 01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK
TEXT 3.6.1.3 20 01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 3 11/27/2023
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE
TEXT 3.6.1.5 2 11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE
.EXT 3.6.1.6 2 01/05/2023
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS
TEXT 3.6.2.1 3 11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE
TEXT 3.6.2.2 2 03/05/2019
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL
TEXT 3.6.2.3 3 01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING
TEXT 3.6.2.4 2 01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY
TEXT 3.6.3.1 2 06/13/2006
Title:
CONTAINMENT SYSTEMS INTENTIONALLY LEFT BLANK
TEXT 3.6.3.2 4 08/02/2021
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM
Page 5 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
TEXT 3.6.3.3 3 09/2~/2017
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION
TEXT 3.6.4.1 17 12/16/2020
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT
TEXT 3.6.4.2 14 03/05/2019
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 7 03/05/2019
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT SYSTEM
TEXT 3.7.1 10 01/05/2023
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 6 01/05/2023
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM
- TEXT 3.7.3 4 03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY {CREOAS) SYSTEM
TEXT 3.7.4 2 03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM
TEXT 3.7.5 2 11/16/2016
Title:
PLANT SYSTEMS MAIN CONDENSER ~FFGAS
TEXT 3.7.6 4 11/i6/2016
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM
TEXT 3.7.7 2 11/16/2016
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL
TEXT 3.7.8 1 11/16/2016
Title:
MAINE TURBINE PRESSURE REGULATION SYSTEM
Page 6 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
.anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
TEXT 3.8.1 17 01/05/2023
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING
TEXT 3.8.2 2 03/18/2021
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN
TEXT 3.8.3 7 08/07/2019
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR
TEXT 3. 8.4 5 01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING
TEXT 3.8.5 2 03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN
.EXT 3.8.6 2 11/16/2016 Ti.tle: ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS
TEXT 3.8.7 9 01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING
TEXT 3.8.8 2 03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN
TEXT 3.9.1 1 11/16/2016
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS
TEXT 3.9.2 2 11/16/2016
Title:
REFUELING OPE~TIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK
TEXT 3.9.3 1 11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD POSITION
TEXT 3.9.4 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION
Page 7 of 8 Report Date: 11/27/23 SSES MANUAL
Manual Name: TSB2
Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
- TEXT 3.9.5 1
- 11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING
TEXT 3.9.6 2 11/16/2016
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL
TEXT 3.9.7 l 11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL
TEXT 3.9.8 1 11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL
TEXT 3.10.1 2 03/05/2019
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION
TEXT 3.10.2 1 11/16/2016 *
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING
TEXT 3.10.3 1 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN
TEXT 3.10.4 1 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN
TEXT 3.10.5 l 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING
TEXT 3.10.6 1 11/16/2016
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING
TEXT 3.10.7 2 03/31/2021
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING
3.10.8 4 03/31/2021
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING
- Page 8 of 8 Report Date: 11/27/23 Rev. 3 Containment Pressure B 3.6.1.4
- B 3.6 CONTAINMENT SYSTEMS
B 3.6.1.4 Containment Pressure
BASES
BACKGROUND The containment pressure is limited during normal operations to preserve the initial conditions assumed in the accident analysis for a Design Basis Accident (OBA) or loss of coolant accident (LOCA).
APPLICABLE Primary containment performance is evaluated for the entire spectrum of SAFETY break sizes for postulated LOCAs (Ref. 1 ). Among the inputs to the OBA is ANALYSES the initial primary containment internal pressure (Ref. 1 ). Analyses assume an initial containment pressure of-1.0 to 2.0 psig. This limitation ensures that the safety analysis remains valid by maintaining the expected initial conditions and ensures that the peak LOCA contain merit internal pressure does not exceed the maximum allowable.
The maximum calculated containment pressure occurs during the reactor blowdown phase of the OBA, which assumes an instantaneous recirculation line break. The calculated peak containment pressure for this limiting event is 48.6 psig (Ref. 1 ).
- The minimum containment pressure occurs during an inadvertent spray
actuation. The calculated minimum drywell pressure for this limiting event is -4.72 psig. (Ref. 1)
Containment pressure satisfies Criterion 2 of the NRC Policy Statement.
(Ref. 2)
LCO In the event of a OBA, with an initial containment pressure -1.0 to 2.0 psig, the resultant peak containment accident pressure will be maintained below the containment design pressure. The containment pressure is defined to include both the drywell pressure and the suppression chamber pressure.
(Ref. 1)
APPLICABILITY In MODES 1, 2, and 3, a OBA-could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, maintaining containment pressure within limits is not required in MODE 4 or 5.
SUSQUEHANNA - UNIT 2 3.6-40 Rev. 3 Containment Pressure B 3.6.1.4
BASES ACTIONS
With containment pressure not within the limit of the LCO, containment pressure must be restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The Required Action is necessary to return operation to within the bounds of the primary containment analysis. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1.1, "Primary Containment," which requires that primary containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
8.1 and 8.2
If containment pressure cannot be restored to within limit within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.1.4.1 REQUIREMENTS
- Verifying that containment pressure is within limit ensures that unit operation remains within the limit assumed in the primary containmer:it analysis. The Surveillance Frequency is controlled under the Surveiliance Frequency Control Program.
REFERENCES 1. FSAR, Section 6.2.
- 2. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 3.6-41 Rev. 3 Containment Pressure B 3.6.1.4
BASES
THIS PAGE INTENTIONALLY LEFT BLANK
SUSQUEHANNA - UNIT 2 3.6-42