ML21105A360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:MIT* NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENI'AL CENTER
{{#Wiki_filter:}}
  . John P. Foster                              Mail Stop: NWU-116A                      Phone: 617 253-4211
* ** Director of Reactor Operations                138 Albany Street                      Fax: 617 324-0042
* Cambridge, MA 02139                      Email: jpfostermit.edu April 7, 2021 U. S. Nuclear Regulatory Commission Washington, DC i0555 Attn: Document Control Desk Subj~_: Duties of Reactor Superintendent
 
==Dear Sir or Madam:==
 
The following is provided as an item or'information. Mr. Marshall Wade has been named Reactor Superinten~ent fut the MIT Research Reactor effective April '1, 2021. He was in this position on _an interim basis and succeeds Ms. Sarah Don who has accepted a position outside_ of MIT_. Mr. Wade's education and .
experience exceed the requirements of MITR Technical Specification No. 7.1.4 (2):
Sincerely,
                    ~ * .
Director of Reactor Operations Cc:        USNRC - Senior Reactor Inspector Research and Test Reactors Section NRR/DRIP/RNRP .
USNRC - Senior Project Manager NRR/DRIP/RNRP}}

Revision as of 18:54, 8 September 2021

Duties of Reactor Superintendent
ML21105A360
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 04/07/2021
From: Foster J
Massachusetts Institute of Technology (MIT)
To:
Office of Nuclear Reactor Regulation
References
Download: ML21105A360 (1)


Text