05000400/FIN-2008006-02: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Failure To Correctly Translate Design Requirements Into Plant Construction Details Of Masonry Block Walls
| title = Failure to Correctly Translate Design Requirements Into Plant Construction Details of Masonry Block Walls


| docket = 05000400
| docket = 05000400

Revision as of 20:36, 20 February 2018

02
Site: Harris Duke Energy icon.png
Report IR 05000400/2008006 Section 1R21
Date counted Jun 30, 2008 (2008Q2)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) R Berryman
R Lewis
C Even
B Desai
B Mooney
C Baron
J Leivo
INPO aspect
'