NUCLEAR ORGANIZATION                  SURVEILLANCE OPERATING INSTRUCTION      S023-3-3.27.2 UNITS 2 AND 3                        REVISION 15                              PAGE 7 OF 27 ATTACHMENT 1 2.0        ACCEPTANCE CRITERIA      (Continued) 2.4        4160 V Electrical Distribution:
NUCLEAR ORGANIZATION                  SURVEILLANCE OPERATING INSTRUCTION      S023-3-3.27.2 UNITS 2 AND 3                        REVISION 15                              PAGE 7 OF 27 ATTACHMENT 1 2.0        ACCEPTANCE CRITERIA      (Continued) 2.4        4160 V Electrical Distribution:
[SR 3.8.1.1, 3.8.9.1]
[SR 3.8.1.1, 3.8.9.1]
              ----.
I'A]lare  4160 V Bus Tie Breakers (2A0417, 2A0619, 3A0603 and 3A0416)
I'A]lare  4160 V Bus Tie Breakers (2A0417, 2A0619, 3A0603 and 3A0416)
Open, OPERABLE, and in AUTO.
Open, OPERABLE, and in AUTO.
Line 75: Line 74:
STEP PERFORMED BY (INITIALS) : jFb)(6)
STEP PERFORMED BY (INITIALS) : jFb)(6)
END OF SECTION 2.5                      ..      -.............
END OF SECTION 2.5                      ..      -.............
                                                                                                  .............
                                                                                                            ...
                                                                                                              ..
ATTACHMENT i      PAGE 4 OF 6
ATTACHMENT i      PAGE 4 OF 6
                                                                                                                       \
                                                                                                                       \

Latest revision as of 17:22, 10 March 2020

Surveillance Operating Instruction, Revision 15
ML11242A069
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/03/2008
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML11242A069 (6)


Text

NUCLEAR ORGANIZATION SURVEILLANCE:OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 4 OF 27 ATTACHMENT I WEEKLY ELECTRICAL BUS SURVEILLANCE - Both Units in Modes 1 thru 4 CONTINUOUS USE OBJECTIVE To verify Operability of the offsite transmission network, onsite Class 1E distribution system (except the diesel generators), and the onsite DC systems as required by the Technical Specification Sdrveillance requirements:

SR 3.8.1.1, SR 3.8.7.1, SR 3.8.9.1.

UNIT 2 MODE UNIT 3 MODE DATE 3_3--_

PERF. BY 1.0 PREREQUISITES INITIALS 1.1 VERIFY this document is current by checking a controlled (b)(6) copy or by using the method described in S0123-VI-0.9.

1.2 Determine performance requirements of this surveillance:

9 Scheduled Surveillance

[3 Post Maintenance: WAR #

[ Partial Scheduled Surveillance.

O Other (e.g. Defueled, SDC secured, etc.):

TEST COMPONENT(S)

O PERFORM 0 MARK N/A STEPS CIRCLE N/A FOR UNUSED STEPS (unuscd pg: -ay be diseurded) 1.2.1 Verify all steps in Section 1.0 are complete, and i(b)(6) all steps in Section 2.0 required to be circled N/A are correctly circled N/A.

Supv.

END OF SECTION 1.0 ATTACHMENT I PAGE 1 OF 6 3023-3-3.27.2

- I NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCtION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 5 OF 27 ATTACHMENT I 2.0 ACCEPTANCE CRITERIA NOTE If desired, the.n Attachment 3 may be used as an aid in performance of this attachment.

2.1 If any Step is answered NO, then IMMEDIATELY INFORM the SRO Ops. Supervisor, INITIATE a LCOAR or EDMR per applicable Tech.

Specs., and document in the COMMENTS section. If only One qualified circuit between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System is OPERABLE, then PERFORM S023-3-3.23, Attachment for A.C. Sources Verification.

2.2 Sync Circuit Check

[SR 3.8.1.1]

a Perform a Sync Circuit check per S023-6-2, Section for Checking Sync Circuit Operation, and verify that ALL of the following breakers are SAT:

(Circle N/A for any out of service breaker.)

2AO418, Res. Aux. Trans. 2XRI Supply BKR. UNSAT / NA 2A0417, Switchgear A04 Bus X-tie BKR. UNSAT / NA 3A0418, Res. Aux. Trans. 3XR1 Supply BKR. 0Z I--- UNSAT / NA 3A0416, Switchgear A04 Bus X-tie BKR. T UNSAT / NA 2A0618, Res. Aux. Trans. 2XRW Sup. BKR. UNSAT / NA 2A0619, Switchgear A06 Bus X-tie BKR. SAT UNSAT / NA 3A0618, Res. Aux. Trans. 3XR2 S4p. BKR. ýSAT UNSAT / NA 3A0603, Switchgear AO6 Bus X-tie BKR. UNSAT / NA Iff any Sync Circuit check is UNSAT, then REFER to Tech Spec. LCO 3.8.1 for the affected Unit and Declare the associated Train EDG INOPERABLE. The INOPERABLE EDG should not be placed in Maintenance Lockout as this would make the EDG unavailable for a real accident. The EDG is considered INOPERABLE because it may not fulfill its function to sync to the 1E bus for EDG Surveillance Runs or during recovery from Loss of Offsite Power event. (ARs 020501290, 01000894-2)

EO):O)

STEP PERFORMED BY (INITIALS)::

ATTACHMENT 1 PAGE 2 OF 6 023-3-3.27.2

NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 6 OF 27 ATTACHMENT 1 2.0 ACCEPTANCE CRITERIA (Continued) 2.3 230 kV Electrical Distribution:

[SR 3.8.1.1]

At least two (2) offsite transmission lines connected to the

,\IOE/DNA ,

offsite transmission network (switchyard) with at least one CB Closed on each OPERABLE 230 kV line (for independence, one line shall be from SCE andone line from SOG&E).

AND Unit 2: At least two (2) physically independent transmission circuits between the offsite transmission network (switchyard) and the onsite Class IE distribution system are OPERABLE.

AND f, Unit 3: At least two (2) physically independent transmission circuits between the offsite transmission network (switchyard) and the onsite Class IE distribution system are OPERABLE.

If NO, then REFER to Tech Spec. LCO 3.8.1 for both Units, and PERFORM the requirements of S023-3-3.23, Attachment for A.C. Sources Verification.

tDAW STEP PERFORMED BY (INITIALS):

CONTINUED ON NEXT PAGE ATTACHMENT I PAGE 3 OF 6 3023-3-3.27.2

NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 7 OF 27 ATTACHMENT 1 2.0 ACCEPTANCE CRITERIA (Continued) 2.4 4160 V Electrical Distribution:

[SR 3.8.1.1, 3.8.9.1]

I'A]lare 4160 V Bus Tie Breakers (2A0417, 2A0619, 3A0603 and 3A0416)

Open, OPERABLE, and in AUTO.

Y/NO/NA AND

  • UNIT 2: Both 2A04 and 2A06 are OPERABLE and energized from:

" Reserve Auxiliary Transformers 2XR1 through breaker 2AO418 and 2XR2 through breaker 2A0618.

AND

ý 2AO4 and 2A06 Indicated voltage is > 4145 V to < 4575 V.

AND a UNIT 3: Both 3A04 and 3A06 are OPERABLE and energized from:

0 Reserve Auxiliary Transformers 3XR1 through breaker 3A0418 and 3XR2 through breaker 3A0618.

AND 0 3A04 and 3A06 Indicated voltage Is > 4145 V to < 4575 V.

If NO, then REFER to Tech Spec. LCO 3.8.9 for both Units.

(b)(6)

STEP PERFORMED BY (INITIALS): -

2.5 480 V Electrical Distribution:

[SR 3.8.9.1]

/NOINA l 1E 480 V Load Centers (2804, 2B06, 3B04 and 3B06) are LJ #.OPERABLE and energized with indicated voltage between 445 V and 521 V with breakers properly aligned.

If NO, then REFER to Tech Spec LCO 3.8.9.

STEP PERFORMED BY (INITIALS) : jFb)(6)

END OF SECTION 2.5 .. -.............

ATTACHMENT i PAGE 4 OF 6

\

023-3-3.27.2

NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 8 OF 27 ATTACHMENT I 2.0 ACCEPTANCE CRITERIA (Continued) zr-\ 2.6 Vital AC Buses:

/1YE5A NOTE: Electrical Test Personnel are authorized to adjust Inverter Output Voltages after the "As-Found" Inverter SR 3.8.7.1 Output Voltages have been recorded.

M RECORD the "As-Found" Inverter Output Voltages obtained from Inverters and/or Electrical Test using a Fluke 187 V.O.M. or equivalent: (Enter N/A for voltage associated with any Out-Of-Service Inverter.)

SV*\,(p volts Z2Z.0 Volts -\2'2- Volts 1__-1__ Volts 2Y001 2Y002 2Y003 2Y004 12 ý1, Lf Volts

_____,_ Volts I?-.1 Volts Z1-'. Volts 3Y001 3Y002 3Y003 3Y004 a Lf any voltages are obtained from Electrical Test, then enter the name of the Technician:

Name of Electrical Test Tech DATE / TIME

,NO/NA [1 UNIT 2: All vital buses (2Y01, 2Y02, 2Y03 and 2Y04) are OPERABLE and energized by their associated inverters, with SR 3.8.9.1 the inverters powered from their respective DC buses and the Inverter Output Voltages are between 119.5 V and 125,0 V.

  • UNIT 3: All Vital buses (3Y01, 3Y02, 3Y03 and 3Y04) are OPERABLE and energized by their associated inverters, with the inverters powered from their respective DC buses 11nd the Inverter Output Voltages are between 119.5 V and 125.0 V.

[I] if NO, then Refer to Tech. Spec. LCO 3.8.7 and LCO 3.8.9.

If Inverter Output Voltage(s) are not between 119.5 V and 125.0 V, then:

a) Initiate a LCOAR.

b) Notify Electrical Test to adjust Inverter Output Voltages to obtain an "As-Left" voltage of between 121.0 V and 123.0 V.

c) Write an AR against the associated Inverter(s).

d) Document the LCOAR Number, ARlNumber, "As-Found", and "As-Left" Inverter Voltages in the Comments Section.

e) If the "As-Left" Inverter Voltage(s) are between 121.0 V and 123.0 V, then CLOSE Out the associated LCOAR.

'(b)(6)

STEP PERFORMED BY (INITIALS).-

ATTACHMENT 1 PAGE 5 OF 6 3023-3-3 .27 .2

NUCLEAR ORGANIZATION SURVEILLANCE OPERATING INSTRUCTION S023-3-3.27.2 UNITS 2 AND 3 REVISION 15 PAGE 9 OF 27 ATTACHMENT 1 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses:

(XE/NO/NA 0] UNIT 2: All DC buses (201, 2D2, 2D3 and 2D4) are OPERABLE

,1 [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned.

SR 3.8.9.1 AND 0 UNIT 3: All DC buses (3D1, 302, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage a 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.

[2] BOOX satisfies the battery requirements for bus 2(3)01 through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30)

[3) Lf NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, pr 2(3)D2 bus voltages are < 129 VDC, then also REFER to Tech. Spec.

LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). '(b)(6)

BY (INITbALS)(

STEP PERFORMED COMMENTS:

Surveillance completed "-3 - os / .2 0 and log entry made.

DATE TIME PERFORMED BY:

REVIEWED BY:

- 0~o v

..... 2c3030 DATE

- l - wL TIME FILE DISPOSITION: File per S0123-0-A3.

RVIEVIWED BY ATTACHMENT I PAGE 6 OF 6 MAR .4 20B (b)(6)

S023-3-3 .27.2