| PIF # : A2000-04281 ORIGINATOR Title: Failed Circ Water Blowdown Vacuum Breaker Caused Unplanned Flooding Outside of the Power Block Event Date: 11/06/2000 Event Time: 02:30 PM Discovery Date: 11/06/2000 Discovery Time: 03:00 PM Unit: 0o Unit Mode: 1 % Power : System: bW EPN; OCW135,OCW136 Location: OTHER | | PIF # : A2000-04281 ORIGINATOR |
| | |
| | ==Title:== |
| | Failed Circ Water Blowdown Vacuum Breaker Caused Unplanned Flooding Outside of the Power Block Event Date: 11/06/2000 Event Time: 02:30 PM Discovery Date: 11/06/2000 Discovery Time: 03:00 PM Unit: 0o Unit Mode: 1 % Power : System: bW EPN; OCW135,OCW136 Location: OTHER |
| .OCCUREDIDISCOVERED WHILE PERFORMING: | | .OCCUREDIDISCOVERED WHILE PERFORMING: |
| AR I: WR 4: WRTASK#: | | AR I: WR 4: WRTASK#: |
|
---|
Category:Report
MONTHYEARRS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed BW240017, EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements2024-04-0303 April 2024 EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements ML24094A2702024-04-0303 April 2024 MDMP Deviation Form ML24071A1152024-03-31031 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites BW240007, Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations2024-02-29029 February 2024 Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations ML24057A3062024-02-24024 February 2024 Attachment 4: BW-SDP-006 Rev. 0 - Braidwood 2B AF Pump Fuel Oil Leak SOP Sensitivities ML24057A3042024-01-22022 January 2024 Attachment 2: EC 640630 Rev. 000 - Documentation of Test Results with Diluted Lube Oil from Fuel In-Leakage - 28 AF Diesel Engine Past Operability ML24057A3052023-12-12012 December 2023 Attachment 3: EC 640287 Rev. 000 - Past Operability Test Plan Acceptance Related to 2AF01PB-K ML23321A0452023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood BW230054, Attachment 2: MDMP Deviation Form2023-11-17017 November 2023 Attachment 2: MDMP Deviation Form RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 BW220062, Pressure and Temperature Limits Report (Ptlr), Revision 92022-10-20020 October 2022 Pressure and Temperature Limits Report (Ptlr), Revision 9 NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML21349A1062021-12-15015 December 2021 Justification for the Deviation from MRP 2019-008, Technical Evaluation 635273 BW210065, Pressure and Temperature Limits Report, Revision 82021-10-27027 October 2021 Pressure and Temperature Limits Report, Revision 8 RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections BW210047, ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval2021-06-30030 June 2021 ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-20-154, Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections2020-12-16016 December 2020 Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20195B1622020-06-30030 June 2020 Attachment 11 - SG-SGMP-17-25-NP, Revision 1, Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020 ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18348A9792018-12-14014 December 2018 Transmittal of 10 CFR 50.59 Summary Report ML18348A9722018-12-12012 December 2018 Submittal of Analytical Evaluation in Accordance with ASME Code Section XI RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 RS-16-223, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-12-0707 December 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-174, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review...2016-11-0303 November 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review... ML16356A0202016-10-0707 October 2016 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17360A1742016-10-0707 October 2016 Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary) ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-099, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16250A5182016-04-30030 April 2016 Technical Evaluation Report Related to the Exelon Generation Company, LLC, License Amendment Request to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink. Docket Nos. Stn 50-456 & 457 RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds2016-03-15015 March 2016 Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds ML16014A1882016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review of Insights ML15344A1592015-12-10010 December 2015 Submittal of Pressure and Temperature Limits Reports (Ptlrs), Revision 8 and Braidwood, Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision 7 ML15322A3172015-11-18018 November 2015 Record of Decision ML15237A3822015-10-15015 October 2015 Pressure and Temperature Limits Report for Measurement Uncertainty Recapture Power Uprate RS-15-259, Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge.2015-09-30030 September 2015 Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge. RS-15-129, Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 20152015-04-30030 April 2015 Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 2015 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application 2024-05-28
[Table view] Category:Miscellaneous
MONTHYEARRS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed ML24094A2702024-04-0303 April 2024 MDMP Deviation Form ML24057A3052023-12-12012 December 2023 Attachment 3: EC 640287 Rev. 000 - Past Operability Test Plan Acceptance Related to 2AF01PB-K BW230054, Attachment 2: MDMP Deviation Form2023-11-17017 November 2023 Attachment 2: MDMP Deviation Form ML23321A0452023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML21349A1062021-12-15015 December 2021 Justification for the Deviation from MRP 2019-008, Technical Evaluation 635273 RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 RS-16-174, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review...2016-11-0303 November 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review... RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-099, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML16014A1882016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review of Insights ML15344A1592015-12-10010 December 2015 Submittal of Pressure and Temperature Limits Reports (Ptlrs), Revision 8 and Braidwood, Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision 7 ML15322A3172015-11-18018 November 2015 Record of Decision ML15237A3822015-10-15015 October 2015 Pressure and Temperature Limits Report for Measurement Uncertainty Recapture Power Uprate RS-15-129, Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 20152015-04-30030 April 2015 Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 2015 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application ML14349A6572014-12-15015 December 2014 CFR 50.59 Changes, Tests, and Experiments, Paragraph (d)(2), Summary Report ML14141A1332014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14101A3522014-06-0404 June 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14101A4452014-06-0404 June 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac No. MF0095) ML14127A1742014-05-0707 May 2014 Startup Report for the Measurement Uncertainty Recapture Power Uprate ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses ML14066A4792014-03-0404 March 2014 Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event ML14059A1242014-02-28028 February 2014 Pressure and Temperature Limits Reports (Ptlrs) IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12349A3632012-12-14014 December 2012 10 CFR 50.59 Summary Report for June 19, 2010 Through June 18, 2012 ML12339A2212012-11-16016 November 2012 12Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 4 of 5 ML12339A2202012-11-16016 November 2012 12Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 3 of 5 ML12339A2192012-11-16016 November 2012 12Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 2 of 5 2024-05-28
[Table view] |
Text
% Create anolhor Now Issue t::o Creale anothier Issue from '00428Pn Print oed'vlindovJ Close
-;AS REQUIRED, PRINT ISSUE REPORT AND PROVIDE TO YOUR SUPERVISOR**
Note: This is your only notice. You will not have an opportunity to print this confirmation later.
Exelon Nuclear Issue -Statement of Confirmation Issue It: 0042C806 Originator: ALLAN Ri-IAEGER Submil Date: November 30, 2005 Basic Information C~(z Qt~ cuirek/7 1¶ ,
Atfected Facility: f3raidwood i-Ltv TY VJO 04) -
Dscv Date: 111D0/2005 11:50
-0 C=M(L~c-- foo-l.
How Discovered Codfo: 1102 Event Date: 11130/2005 11:50 Affected Unit: 00 Affected Sys:
Subject:
ELEVATED TRITIUM LEVELS IN ON-SITE MONITORING WELLS Required Information Condition
Description:
Elevated levels of tritium have recently been identified in certain on-sito groundwater sampligrig wltts.
iie exact source has not been located nor has theisource boon letermined to be active or historical.
Immediate actions taken: An issue management team has been formed loaddross this Iisturi.T1w, team will address characterization of tIhe extent of Ih iclovated trilium levels, Including the potential for 6levaltec levels off-
.site: ktcntiticvitibn ancl elimination of tlue source il still activo; ronmediationl of lliu allected areas; communriications wilh govenimntil agencies antl any potenitially flectld menithers ol lile public; andl reilulatory Interface.
nelcommncilalion for nction: The issues inanagemenl team will address tIe Iminediale aciions requiretl for Ihis Issue. A rool cause should be initiatod to document the Immediate actions, as well as.to capture thecatiso, addilional extent
.of rondition investigations, and correclive aclions lodlirevent r6cuirren'ce. Also, the stalion's documentation of provious teaks in accordance with 10 cl-rA 50.75(g) noeds to be reviewud.
Supervisor Verbally John Moser Contacted Optional Additional Information What activities, processes, or Theoleovated Ievels were dis-overcd in monitoringj wolls thlit wore recontily instatlled o provide procedures were Involved? enhanced ground water monitoring capability.
.Vlly did IIt(e condiltion
- Unkiiowin. It Is believoetlIhe source may be from historical vacuuin breal:er leaks, but this noeds lo he 1appem? r*confirmed.
Whai are tc conr equencs? UindOesired elevated IritiLori levels on silo property. Potential for tlhso eColited levels to have fnic rated ofl-site.'
Any proceduiral requirements None.
.impacted? -
Identify any advers& physical As described above.
conditions:
List of K~nowledgeable John Moser Indivicimmzls: Jim Gosnell Dale Ambler Is thtis a repeal or sImilar The discovery is part ot an expanded sampling programn as discussed above.
condition?.
hIIlp://CCCtn1%'O I.ceC(o'.coim:61I23/cniliscr-vlciIOi-it-iinator-ScrvIc 4 I1302 H/30/2005
1 I/2Ca/05
(,CRQz kcLCL%' [eA1L /eCAQ V VIA Nfedtvqa -I 'I o! 2 Iac L-.4 A (Cbf Cfl I V: Al.4il32d 4to NC E R RCR Rnop- ()IA rtl-lMeO s- @
tsff-TiIIe : OW Lk1wdowii Vacuum IBreakor L.oeak EicnmLt Dto 12/0!1/1998 t vesl.The: 1 1:003 AM' Diecovery D-cAG: ?JOI-/io9fl .l svsTiws^ 11:00sIAM ii: co Wilt frsocla: 1 . Pr<co 1ooJ c Wo-al FR1N oc Woom 03o ICl0l: OFISITE AR <:: Wfl V: Wl T/'Ist t:
VAo-i27T-A
<; IF.VCb: 153wI 0;'
Os i:~,: PCE CV:-
O'l l I4 It, CiPTt' POND OF WNfsrilr-r FOUNI ON 11OPERTY, WlTH STAIIDING WATER IN ROAD DITCH-ALONG SMIALRM R n.
I II .owlnlr U rI '
t~i - NS tiCImcwc I rfivlErf lI IE ACTION rTA! tEC All wn'1TEI MIONiDAY AFTEH11 SOUTI 1EN'1 DIV. PR CGOlf-FACTED Ely l lEIr-lhlBorl. SFt SIrrnED LEAKIING VAC:UUM 13'EAI EHl rfl TITHF SOUTIh WIA UNAWARE 0 THE VONDT-r l1O~lI. Cl IF'l"TfY (OOWTACuTrH)
-iEN\'frhnMlrw^J l {. IER~tiVICE:t.nAP. s u CI-ItC.EI) TO i i..I I)UE TO r OS rIJlrE:El Ir irrlvI iAr! \'OLu. rio!.
A\RV : ¶I,-rh2Titi -NF wa viiri rz*.I~
HOJY L7.~V IUt-'LCT TAG 1!
m r)fl: 2;E8J~ DTiso,r: S,1E TiclU OpliICAITiET IDJATEk: 1210519p,
)tWnO3()/\CLJUM L4E.AlvIR FAILLYEV' CAUSING VAL.VEJ P1I [TO FILl. LP A1ND OVEiit KrLOTO TIlE IL: GROC)U1 Xr,'lW IT HAPPiEN'ED UNKINOW14!
4
- r ir 'Cicn "-- 'V-.Wvf '0"4,VUVA a,~j~r -
. . . I--
PIF # : A2000-04281 ORIGINATOR
Title:
Failed Circ Water Blowdown Vacuum Breaker Caused Unplanned Flooding Outside of the Power Block Event Date: 11/06/2000 Event Time: 02:30 PM Discovery Date: 11/06/2000 Discovery Time: 03:00 PM Unit: 0o Unit Mode: 1 % Power : System: bW EPN; OCW135,OCW136 Location: OTHER
.OCCUREDIDISCOVERED WHILE PERFORMING:
AR I: WR 4: WRTASK#:
SURV #: RWP # ORI/RIN #t:
OOS #: PCE #: OTHER* Followup inspection OTHER DESCRIPTION Circ Water blowdown corridor-east of plant PROBLEM DESCRIPTION I RECEIVED A CALL FROM THE ILLINOIS ENVIRONMENATAL PROTECTION AGENCY (BILL PAPADAKIS) ABOUT A REPORT OF WATER STANDING IN THE DITCH AT SMILEY FROAD. HE SAID THIS HAS BEEN THERE FOR A WHILE AND WE HAVEN'T HAD ANY RAIN UNTIL TODAY. HE ASKED IF I HAD ANY IDEA WHERE IT MIGHT BE COMING FROM. I SAID I DIDNT KNOW BUT WOULD LOOK INTO IT AND GET BACK TO HIM.. I NOTIFIED CAL WALRATH (2202) OF THE CALL AND SAID I WAS GOING OUT TO LOOK, AND THAT I SUSPECTED IT MAY BE A VACUUM BREAKER PROBLEM ON THE BLOWDOWN LINE, WHEN I APPROACHED THE VACUUM BREAKER (CONTAINING VALVES OCW135 &0CW136),' I NOTICED WATER POURING OUT FROM THE MANHOLE COVER. THE ENTIRE AREA WAS SATURATED. UPON ARRIVAL BACK AT THE PLANT, I UPDATED THE OCC WITH THE RESULTS. ARRANGEMENT BEGAN TO PUT TOGETHER THE APPROPRIATE WORK PACKAGES AND OPERATING BEGAN LOOKING INTO ISOLATION OF THE BLOWDOWN FLOW.
KNOWLEDGEABLE PERSONS: Louis Rhoden,n C Carl D Dunn, M Mark T , I Bill Vdndermyde Trushelm, IMMEDIATE ACTION TAKEN I NOTIFIED BILL POPADAKIS (IEPA) OF WHAT I HAD FOUND. I EXPLAINED THE SOURCE OF THE WATER AND A DESCRIPTION OF THE AREA. HE STATED THAT HE WOULD NOT NEED.ANYWRITTEN FOLLOW UP AT THIS TIME AND SINCE THE WATERWAS CONTAINED IN THE DITCH, WE DID NOT NEED TO SAMPLE. THERE WERE NO NPDES PROBLEMS. I TOLD HIM I WOULD UPDATE HIM WEDNESDAY MORNING. OPERATING FOLLOWED UP BY SHUTTING DOWN BLOWDOWN FLOW.
AR #: WR Rt: WR TASK#:
PROCEDURE# ER #:
TIF/TRR #:
HOLD TAG hi: REJECT TAG # :
ORIGINATOR: Joseph Tidmore EXT: '2299 DEPT: OCH ORIGINATED DATE: 11107100