{{#Wiki_filter:AC Sources -Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources -Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE: a. Two qualified circuits between the offsite transmission network and the onsite Class 1 E AC Electrical Power Distribution System;b. Two diesel generators (DGs) capable of supplying the onsite Class 1 E power distribution subsystem(s);
{{#Wiki_filter:AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources -Operating LCO 3.8.1           The following AC electrical sources shall be OPERABLE:
and c. Automatic load sequencers for Train A and Train B.APPLICABILITY:
: a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System;
MODES 1, 2, 3, and 4--------------------------------------------
: b. Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and
NOTE----------------------------------------------
: c. Automatic load sequencers for Train A and Train B.
One DG may be synchronized with the offsite power source under administrative controls for the purpose of surveillance testing.COMANCHE PEAK -UNITS 1 AND 2 3.8-1 Amendment No. 64 124 AC Sources -Operating 3.8.1 ACTIONS-NOTE-LCO 3.0.4.b is not applicable to DGs.-- ---- ---- ---- ---- ----- ---- ---- ---- ----- ---- ---- ---- ----- ---- ---- ---.- --CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour inoperable.
APPLICABILITY:     MODES 1, 2, 3, and 4
required OPERABLE offsite circuit. AND Once per 8 hours thereafter AND---------------
                    -------------------------------------------- NOTE----------------------------------------------
NOTE-----------------
One DG may be synchronized with the offsite power source under administrative controls for the purpose of surveillance testing.
In MODES 1, 2 and 3, the TDAFW pump is considered a required redundant feature.A.2 Declare required 24 hours from feature(s) with no offsite discovery of no power available offsite power to one inoperable when its train concurrent with redundant required inoperability of feature(s) is inoperable.
COMANCHE PEAK - UNITS 1 AND 2                       3.8-1                                 Amendment No. 64 124
redundant required feature(s)
 
AND A.3 Restore required offsite 72 hours circuit to OPERABLE status. AND 6 days from discovery of failure to meet LCO (continued) l COMANCHE PEAK -UNITS 1 AND 2 3.8-2 Amendment No. 4-G9 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources - Operating 3.8.1 ACTIONS
SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains 2 1440 gal of fuel oil. 31 days SR 3.8.1.5 Check for and remove accumulated water from each day 31 days tank.SR 3.8.1.6 Verify the fuel oil transfer system operates to 92 days automatically transfer fuel oil from storage tank to the day tank.SR 3.8.1.7 --------------------------------
                                                                  -NOTE-LCO 3.0.4.b is not applicable to DGs.
NOTE-----------------------------------
    -- --- - - - -- - - -- - - -- - - - -- - - -- - - --   - - --   - - - -- - - -- - - -- - - -- - - - --   - - -- - - -- - --.- - -
All DG starts may be preceded by an engine prelube period.Verify each DG starts from standby condition and 184 days achieves: a. in < 10 seconds, voltage 2 6480 V and frequency 58.8 Hz; and b. steady state, voltage 6480 V and < 71 50V, and frequency 2 58.8 Hz and < 61.2 Hz.SR 3.8.1.8 --------------------------------
CONDITION                                   REQUIRED ACTION                             COMPLETION TIME A. One required offsite circuit                   A.1             Perform SR 3.8.1.1 for                   1 hour inoperable.                                                   required OPERABLE offsite circuit.                       AND Once per 8 hours thereafter AND
NOTE-----------------------------------
                                                        ---------------NOTE-----------------
This Surveillance shall nDt normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify automatic and manual transfer of AC power 18 months sources from the normal offsite circuit to each alternate required offsite circuit.I (continued)
In MODES 1, 2 and 3, the TDAFW pump is considered a required redundant feature.
I COMANCHE PEAK -UNITS 1 AND 2 3.8-8 Amendment No. 66 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
A.2             Declare required                       24 hours from feature(s) with no offsite             discovery of no power available                       offsite power to one inoperable when its                   train concurrent with redundant required                     inoperability of feature(s) is inoperable.               redundant required feature(s)
SURVEILLANCE FREQUENCY SR 3.8.1.9--------------------------------
AND A.3             Restore required offsite               72 hours circuit to OPERABLE status.                                 AND 6 days from discovery of failure to       l meet LCO (continued)
NOTE--------------------------------
COMANCHE PEAK - UNITS 1 AND 2                                     3.8-2                                       Amendment No. 4-G9 124
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify each DG rejects a load greater than or equal to its associated single largest post-accident load, and: a. Following load rejection, the frequency is < 66.75 Hz;and b. Within 3 seconds following load rejection, the voltage is > 6480 V and < 7150 V.18 months SR 3.8.1.10 Verify each DG does not trip and voltage is maintained 18 months I< 8280 V during and following a load rejection of 2 6300 kW and < 7000 kW.(continued)
 
COMANCHE PEAK -UNITS 1 AND 2 3.8-9 Amendment No. 64 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE I FREQUENCY SR 3.8.1.11-------------------------------
SURVEILLANCE                                               FREQUENCY SR 3.8.1.4 Verify each day tank contains 2 1440 gal of fuel oil.                     31 days SR 3.8.1.5 Check for and remove accumulated water from each day                       31 days tank.
NOTES----------------------------------
SR 3.8.1.6 Verify the fuel oil transfer system operates to                           92 days automatically transfer fuel oil from storage tank to the day tank.
: 1. All DG starts may be preceded by an engine prelube period.2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify on an actual or simulated loss of offsite power signal: a. De-energization of emergency buses;b. Load shedding from emergency buses;c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in 10 seconds, 2. energizes auto-connected shutdown loads through automatic load sequencer, 3. maintains steady state voltage 2 6480 V and<7150V, 4. maintains steady state frequency 2 58.8 Hz and< 61.2 Hz, and 5. supplies permanently connected and auto-connected shutdown loads for 2 5 minutes.1 8 months (continued)
SR 3.8.1.7 -------------------------------- NOTE-----------------------------------
COMANCHE PEAK -UNITS 1 AND 2 3.8-1 0 Amendment No. 64 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
All DG starts may be preceded by an engine prelube period.
SURVEILLANCE FREQUENCY t SR 3.8.1.12---------------------
Verify each DG starts from standby condition and                           184 days achieves:
NOTES----------------------------------
: a. in < 10 seconds, voltage 2 6480 V and frequency
All DG starts may be preceded by prelube period.I Verify on an actual or simulated Safety Injection (SI)actuation signal each DG auto-starts from standby condition and: a. In < 10 seconds after auto-start and during tests, achieves voltage 2 6480 V and frequency 58.8 Hz;b. Achieves steady state voltage 2 6480 V and< 7150 V and frequency 58.8 Hz and < 61.2 Hz;c. Operates for 2 5 minutes;18 months SR 3.8.1.13--------------------------
                  &#x17d; 58.8 Hz; and
- IJi It: -------------  
: b. steady state, voltage &#x17d; 6480 V and < 71 50V, and frequency 2 58.8 Hz and < 61.2 Hz.
----------  
SR 3.8.1.8 -------------------------------- NOTE-----------------------------------
----------
This Surveillance shall nDt normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
For Unit 2, testing need only be performed for LOOP concurrent with SI until startup following 2RFO5.I Verify each DG's automatic trips are bypassed on actual or simulated (i) loss of voltage signal on the emergency bus, and (ii) SI actuation signal, except: a. Engine overspeed; and b. Generator differential current.18 months (continued)
Verify automatic and manual transfer of AC power                           18 months sources from the normal offsite circuit to each alternate required offsite circuit.
COMANCHE PEAK -UNITS 1 AND 2 3.8-1 1 Amendment No. 6-8 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
I (continued) I COMANCHE PEAK - UNITS 1 AND 2                   3.8-8                                 Amendment No. 66 124
SURVEILLANCE FREQUENCY 1-SR 3.8.1.14----------------------------
 
NOTES--------------------------------
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
Momentary transients outside the load and power factor ranges do not invalidate this test.Verify each DG operates for 24 hours: a. For 2 2 hours loaded 2 6900 kW and < 7700 kW;and b. For the remaining hours of the test loaded 2 6300 kW and < 7000 kW.18 months SR 3.8.1.15------------
SURVEILLANCE                                           FREQUENCY SR 3.8.1.9 -------------------------------- NOTE--------------------------------
NOTES---------------------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 2 hours loaded 2 6300 kW and< 7000 kW. Momentary transients outside of load range do not invalidate this test.2. All DG starts may be preceded by an engine prelube period.Verify each DG starts and achieves: a. in < 10 seconds, voltage 2 6480 V and frequency 2 58.8 Hz; and b. steady state, voltage 2 6480 V, and < 7150 V and frequency 2 58.8 Hz and < 61.2 Hz.18 months (continued)
Verify each DG rejects a load greater than or equal to its             18 months associated single largest post-accident load, and:
COMANCHE PEAK -UNITS 1 AND 2 3.8-12 Amendment No. 66 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
: a. Following load rejection, the frequency is < 66.75 Hz; and
SURVEILLANCE FREQUENCY SR 3.8.1.16--------------
: b. Within 3 seconds following load rejection, the voltage is > 6480 V and < 7150 V.
NOTE-----------------------------------
SR 3.8.1.10 Verify each DG does not trip and voltage is maintained                 18 months           I
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.-- -- -- -- --- -- -- -- --- -- -- -- --- -- -- -- --- -- ---.-Verify each DG: a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;b. Transfers loads to offsite power source; and c. Returns to ready-to-load operation.
            < 8280 V during and following a load rejection of 2 6300 kW and < 7000 kW.
18 months SR 3.8.1.17 This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify, with a DG operating in test mode and connected to its bus, an actual or simulated SI actuation signal overrides the test mode by: a. Returning DG to ready-to-load operation; and b. Automatically energizing the emergency load from offsite power.18 months (continued)
(continued)
COMANCHE PEAK -UNITS 1 AND 2 3.8-1 3 Amendment No. 64 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
COMANCHE PEAK - UNITS 1 AND 2                     3.8-9                             Amendment No. 64 124
SURVEILLANCE FREQUENCY SR 3.8.1.18 ---------------------------
 
NOTE-----------------------------------
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify interval between each sequenced load block is 18 months within +/- 10% of design interval for each automatic load sequencer.(continued)
SURVEILLANCE                                           I   FREQUENCY SR 3.8.1.11 ------------------------------- NOTES----------------------------------
COMANCHE PEAK -UNITS 1 AND 2 3.8-1 4 Amendment No. 64 124 AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
: 1. All DG starts may be preceded by an engine prelube period.
SURVEILLANCE IFREQUENCY SR 3.8.1.19----------------
: 2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
NOTES---------------------------------
Verify on an actual or simulated loss of offsite power                     18 months signal:
: 1. All DG starts may be preceded by an engine prelube period.2. This Surveillance shall not normally be performed in MODE I or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated SI actuation signal: a. De-energization of emergency buses;b. Load shedding from emergency buses; and c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in< 10 seconds, 2. energizes auto-connected emergency loads through load sequencer, 3. achieves steady state voltage 2 6480 V and<7150V, 4. achieves steady state frequency 2 58.8 Hz and< 61.2 Hz, and 5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.18 months (continued)
: a. De-energization of emergency buses;
COMANCHE PEAK -UNITS 1 AND 2 3.8-15 Amendment No. 64 124}}
: b. Load shedding from emergency buses;
: c. DG auto-starts from standby condition and:
: 1. energizes permanently connected loads in
* 10 seconds,
: 2. energizes auto-connected shutdown loads through automatic load sequencer,
: 3. maintains steady state voltage 2 6480 V and
                      <7150V,
: 4. maintains steady state frequency 2 58.8 Hz and
                      < 61.2 Hz, and
: 5. supplies permanently connected and auto-connected shutdown loads for 2 5 minutes.
(continued)
COMANCHE PEAK - UNITS 1 AND 2                   3.8-1 0                                 Amendment No. 64 124
 
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                           FREQUENCY t
SR 3.8.1.12       --------------------- NOTES----------------------------------
All DG starts may be preceded by prelube period.
I Verify on an actual or simulated Safety Injection (SI)                       18 months actuation signal each DG auto-starts from standby condition and:
: a. In < 10 seconds after auto-start and during tests, achieves voltage 2 6480 V and frequency
                        &#x17d; 58.8 Hz;
: b. Achieves steady state voltage 2 6480 V and
                      < 7150 V and frequency &#x17d; 58.8 Hz and < 61.2 Hz;
: c. Operates for 2 5 minutes; SR 3.8.1.13 --------------------------       IJiIt:       -------------
                                                                  ---------- ----------
For Unit 2, testing need only be performed for LOOP concurrent with SI until startup following 2RFO5.                                                 I Verify each DG's automatic trips are bypassed on                             18 months actual or simulated (i) loss of voltage signal on the emergency bus, and (ii) SI actuation signal, except:
: a. Engine overspeed; and
: b. Generator differential current.
(continued)
COMANCHE PEAK - UNITS 1 AND 2                       3.8-1 1                               Amendment No. 6-8 124
 
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                               FREQUENCY 1-SR 3.8.1.14 ---------------------------- NOTES--------------------------------
Momentary transients outside the load and power factor ranges do not invalidate this test.
Verify each DG operates for &#x17d; 24 hours:                                18 months
: a. For 2 2 hours loaded 2 6900 kW and < 7700 kW; and
: b. For the remaining hours of the test loaded 2 6300 kW and < 7000 kW.
SR 3.8.1.15                             NOTES---------------------------------
                                                  ------------
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 2 hours loaded 2 6300 kW and
                  < 7000 kW. Momentary transients outside of load range do not invalidate this test.
: 2. All DG starts may be preceded by an engine prelube period.
Verify each DG starts and achieves:                                    18 months
: a. in < 10 seconds, voltage 2 6480 V and frequency 2 58.8 Hz; and
: b. steady state, voltage 2 6480 V, and < 7150 V and frequency 2 58.8 Hz and < 61.2 Hz.
(continued)
COMANCHE PEAK - UNITS 1 AND 2                 3.8-12                                 Amendment No. 66 124
 
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                 FREQUENCY SR 3.8.1.16                                   NOTE-----------------------------------
                                                            --------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
                    -- ---- -- - -- -- -- -- - -- -- -- -- - -- -- -- -- - -- -- ---.-
Verify each DG:                                                                18 months
: a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;
: b. Transfers loads to offsite power source; and
: c. Returns to ready-to-load operation.
SR 3.8.1.17 This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify, with a DG operating in test mode and                                   18 months connected to its bus, an actual or simulated SI actuation signal overrides the test mode by:
: a. Returning DG to ready-to-load operation; and
: b. Automatically energizing the emergency load from offsite power.
(continued)
COMANCHE PEAK - UNITS 1 AND 2                         3.8-1 3                               Amendment No. 64 124
 
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                               FREQUENCY SR 3.8.1.18 --------------------------- NOTE-----------------------------------
This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify interval between each sequenced load block is                 18 months within +/- 10% of design interval for each automatic load sequencer.
(continued)
COMANCHE PEAK - UNITS 1 AND 2               3.8-1 4                               Amendment No. 64 124
 
AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                         IFREQUENCY SR 3.8.1.19 -       --------------- NOTES---------------------------------
: 1. All DG starts may be preceded by an engine prelube period.
: 2. This Surveillance shall not normally be performed in MODE I or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Verify on an actual or simulated loss of offsite power           18 months signal in conjunction with an actual or simulated SI actuation signal:
: a. De-energization of emergency buses;
: b. Load shedding from emergency buses; and
: c. DG auto-starts from standby condition and:
: 1. energizes permanently connected loads in
                      < 10 seconds,
: 2. energizes auto-connected emergency loads through load sequencer,
: 3. achieves steady state voltage 2 6480 V and
                      <7150V,
: 4. achieves steady state frequency 2 58.8 Hz and
                      < 61.2 Hz, and
: 5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.
(continued)
COMANCHE PEAK - UNITS 1 AND 2           3.8-15                               Amendment No. 64 124}}

Revision as of 22:03, 23 November 2019

Technical Specification Pages Re EDG Surveillance
ML060750452
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/15/2006
From:
Office of Nuclear Reactor Regulation
To:
Thadani M
Shared Package
ML060750048 List:
References
TAC MC4912, TAC MC4913
Download: ML060750452 (10)


Text

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources -Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System;
b. Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and
c. Automatic load sequencers for Train A and Train B.

APPLICABILITY: MODES 1, 2, 3, and 4


NOTE----------------------------------------------

One DG may be synchronized with the offsite power source under administrative controls for the purpose of surveillance testing.

COMANCHE PEAK - UNITS 1 AND 2 3.8-1 Amendment No. 64 124

AC Sources - Operating 3.8.1 ACTIONS

-NOTE-LCO 3.0.4.b is not applicable to DGs.

-- --- - - - -- - - -- - - -- - - - -- - - -- - - -- - - -- - - - -- - - -- - - -- - - -- - - - -- - - -- - - -- - --.- - -

CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. required OPERABLE offsite circuit. AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND


NOTE-----------------

In MODES 1, 2 and 3, the TDAFW pump is considered a required redundant feature.

A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no offsite discovery of no power available offsite power to one inoperable when its train concurrent with redundant required inoperability of feature(s) is inoperable. redundant required feature(s)

AND A.3 Restore required offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE status. AND 6 days from discovery of failure to l meet LCO (continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-2 Amendment No. 4-G9 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains 2 1440 gal of fuel oil. 31 days SR 3.8.1.5 Check for and remove accumulated water from each day 31 days tank.

SR 3.8.1.6 Verify the fuel oil transfer system operates to 92 days automatically transfer fuel oil from storage tank to the day tank.

SR 3.8.1.7 -------------------------------- NOTE-----------------------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition and 184 days achieves:

a. in < 10 seconds, voltage 2 6480 V and frequency

Ž 58.8 Hz; and

b. steady state, voltage Ž 6480 V and < 71 50V, and frequency 2 58.8 Hz and < 61.2 Hz.

SR 3.8.1.8 -------------------------------- NOTE-----------------------------------

This Surveillance shall nDt normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify automatic and manual transfer of AC power 18 months sources from the normal offsite circuit to each alternate required offsite circuit.

I (continued) I COMANCHE PEAK - UNITS 1 AND 2 3.8-8 Amendment No. 66 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.9 -------------------------------- NOTE--------------------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify each DG rejects a load greater than or equal to its 18 months associated single largest post-accident load, and:

a. Following load rejection, the frequency is < 66.75 Hz; and
b. Within 3 seconds following load rejection, the voltage is > 6480 V and < 7150 V.

SR 3.8.1.10 Verify each DG does not trip and voltage is maintained 18 months I

< 8280 V during and following a load rejection of 2 6300 kW and < 7000 kW.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-9 Amendment No. 64 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE I FREQUENCY SR 3.8.1.11 ------------------------------- NOTES----------------------------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power 18 months signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses;
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in
  • 10 seconds,
2. energizes auto-connected shutdown loads through automatic load sequencer,
3. maintains steady state voltage 2 6480 V and

<7150V,

4. maintains steady state frequency 2 58.8 Hz and

< 61.2 Hz, and

5. supplies permanently connected and auto-connected shutdown loads for 2 5 minutes.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-1 0 Amendment No. 64 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY t

SR 3.8.1.12 --------------------- NOTES----------------------------------

All DG starts may be preceded by prelube period.

I Verify on an actual or simulated Safety Injection (SI) 18 months actuation signal each DG auto-starts from standby condition and:

a. In < 10 seconds after auto-start and during tests, achieves voltage 2 6480 V and frequency

Ž 58.8 Hz;

b. Achieves steady state voltage 2 6480 V and

< 7150 V and frequency Ž 58.8 Hz and < 61.2 Hz;

c. Operates for 2 5 minutes; SR 3.8.1.13 -------------------------- IJiIt: -------------

----------

For Unit 2, testing need only be performed for LOOP concurrent with SI until startup following 2RFO5. I Verify each DG's automatic trips are bypassed on 18 months actual or simulated (i) loss of voltage signal on the emergency bus, and (ii) SI actuation signal, except:

a. Engine overspeed; and
b. Generator differential current.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-1 1 Amendment No. 6-8 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY 1-SR 3.8.1.14 ---------------------------- NOTES--------------------------------

Momentary transients outside the load and power factor ranges do not invalidate this test.

Verify each DG operates for Ž 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: 18 months

a. For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 6900 kW and < 7700 kW; and
b. For the remaining hours of the test loaded 2 6300 kW and < 7000 kW.

SR 3.8.1.15 NOTES---------------------------------


1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 6300 kW and

< 7000 kW. Momentary transients outside of load range do not invalidate this test.

2. All DG starts may be preceded by an engine prelube period.

Verify each DG starts and achieves: 18 months

a. in < 10 seconds, voltage 2 6480 V and frequency 2 58.8 Hz; and
b. steady state, voltage 2 6480 V, and < 7150 V and frequency 2 58.8 Hz and < 61.2 Hz.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-12 Amendment No. 66 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.16 NOTE-----------------------------------


This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

-- ---- -- - -- -- -- -- - -- -- -- -- - -- -- -- -- - -- -- ---.-

Verify each DG: 18 months

a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;
b. Transfers loads to offsite power source; and
c. Returns to ready-to-load operation.

SR 3.8.1.17 This Surveillance shall not normally be performed in MODE 1 or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify, with a DG operating in test mode and 18 months connected to its bus, an actual or simulated SI actuation signal overrides the test mode by:

a. Returning DG to ready-to-load operation; and
b. Automatically energizing the emergency load from offsite power.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-1 3 Amendment No. 64 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.18 --------------------------- NOTE-----------------------------------

This Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify interval between each sequenced load block is 18 months within +/- 10% of design interval for each automatic load sequencer.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-1 4 Amendment No. 64 124

AC Sources- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE IFREQUENCY SR 3.8.1.19 - --------------- NOTES---------------------------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE I or 2. However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Verify on an actual or simulated loss of offsite power 18 months signal in conjunction with an actual or simulated SI actuation signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses; and
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in

< 10 seconds,

2. energizes auto-connected emergency loads through load sequencer,
3. achieves steady state voltage 2 6480 V and

<7150V,

4. achieves steady state frequency 2 58.8 Hz and

< 61.2 Hz, and

5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.8-15 Amendment No. 64 124