LCO Applicability 1i1 3.0 3.0 LCO APPLICABILITY (continued)
I LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition
- in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
- c. When an allowance is stated in the individual value, parameter, or
- 6ther Specification.
Tihis Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS 1may be returned to service under administrative control solely to perform test4ing required to demonstrate its OPERABILITY or the OPERABILITY'of other-equipment, This is an exception to LCO 3.0.2 for the system retuirn>d to servicejundeo administrative control to perform the testing required to.demonstrate OPE.RABILITY.
LCO 3.0.6 When a supported sydtmLCOls not met solely due to a support system LCO not being met, the C6f.nditions and Required Actions associated with this supported system are noti required to be entered. Only the support system LCO ACTIONS are reiuired to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.15, "Safety Function Determination Program (SFDP).\\" If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of saifety function exists are required to be entered.
When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported systern, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
(continued)
I COMANCHE PEAK - UNITS 1 AND 2 3.0-2 Amendment No. 64, 109
SR Applicability 3.0 3.0 SR APPLICABILITY (continued)
SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
COMANCHE PEAK - UNITS 1 AND 2 3.0-5 Amendment No. 92 109
PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.
MODES 1, 2 and 3 ACTIONS
Iv r----------------------------------------------------------------
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more Functions A.1 Restore required channel 30 days with one required channel to OPERABLE status.
B.
Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.8.
met.
(continued)
COMANCHE PEAK-UNITS 1 AND 2 3.3-35 Amendment No. 64, 109
Remote Shutdown System 3.3.4 3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 The Remote Shutdown System Functions in Table 3.3.4-1 and the required hot shutdown panel (HSP) controls shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3 ACTIONS
NOTE--------------------------------------------------------------
Separate Condition entry is allowed for each Function and required HSP control.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable.
and required HSP controls to OPERABLE OR status.
One or more required HSP controls inoperable.
B. Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COMANCHE PEAK - UNITS 1 AND 2 3.3-40 Amendment No. "
109
Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)
LCO 3.4.11 APPLICABILITY:
Each PORV and associated block valve shall be OPERABLE.
MODES 1, 2, and 3 ACTIONS K I ISF
~~~~~~~~~~~~~~~I~jtiJ I I 1r Separate Condition entry is allowed for each PORV.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more PORVs A.1 Close and maintain power 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable of to associated block being manually cycled.
valve.
B. One PORV inoperable and B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not capable of being valve.
manually cycled.
AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.
AND B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
(continued)
COMANCHE PEAK - UNITS 1 AND 2 3.4-23 Amendment No. 64, 109
LTOP SYSTEM 3.4.12 ACTIONS Lv u
r--------------------------------------------------------------
LCO 3.0.4.b is not applicable when entering MODE 4.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more safety A.1 Initiate action to verify a Immediately injection pumps capable of maximum of zero safety injecting into the RCS.
injection pumps are capable of injecting into the RCS.
B. Three charging pumps B.1 Initiate action to verify a Immediately capable of injecting into the maximum of two RCS.
charging pumps are capable of injecting into the RCS.
C. An accumulator not isolated C.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> when the accumulator accumulator.
pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
(continued)
Amendment No. 64, 109 COMANCHE PEAK-UNITS 1 AND 2 3.4-28
RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 APPLICABILITY:
The following RCS leakage detection instrumentation shall be OPERABLE:
- a. One Containment Sump Level and Flow Monitoring System;
- b. One containment atmosphere particulate radioactivity monitor; and
- c. One containment air cooler condensate flow rate monitor or one containment atmosphere radioactivity monitor (gaseous).
MODES 1, 2, 3, and 4 ACTIONS 1.Mx CONDITION REQUIRED ACTION COMPLETION TIME A. Required Containment A.1
NOTE-------------
Sump Level and Flow Not required until 12 Monitoring System hours after establishment inoperable.
of steady state operation.
Perform SR 3.4.13.1.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore Containment 30 days Sump Level and Flow Monitoring System to OPERABLE status.
(continued)
COMANCHE PEAK - UNITS 1 AND 2 3.4-40 Amendment No. 64, 109 -
RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 APPLICABILITY:
The specific activity of the reactor coolant shall be within limits.
MODES 1 and 2, MODE 3 with RCS average temperature (Tavg) 2 5000F ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131
Note--------------------
> 0.45 11Ci/gm.
LCO 3.0.4.c is applicable.
A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.16-1.
AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.
(continued)
COMANCHE PEAK - UNITS 1 AND 2 3.4-44 Amendment No. 4-02, log
ECCS-Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.
NOTE------------------------------------------------
An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
APPLICABILITY:
MODE 4 ACTIONS K IT LC_______ 3.b-is-not-applicabletoECSCentrV I
Pump subt---e_.
LCO 3.0.4.b is not applicable to ECCS Centrifugal Pump subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable.
subsystem to OPERABLE status.
B. Required ECCS Centrifugal B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Charging Pump subsystem Centrifugal Charging inoperable.
Pump subsystem to OPERABLE status.
C. Required Action and C.1 Be in MODE 5.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.
COMANCHE PEAK - UNITS 1 AND 2 3.5-8 Amendment No. 64, 109 '
Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Hydrogen Recombiners LCO 3.6.8 APPLICABILITY:
Two hydrogen recombiners shall be OPERABLE.
MODES 1 and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One hydrogen recombiner A.1 Restore hydrogen 30 days inoperable.
recombiner to OPERABLE status.
B. Two hydrogen recombiners B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
means that the hydrogen control function is AND maintained.
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one hydrogen 7 days recombiner to OPERABLE status.
(continued)
COMANCHE PEAK - UNITS 1 AND 2 3.6-22 Amendment No. 64, 109
ARVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Steam Generator Atmospheric Relief Valves (ARVs)
To LCO 3.7.4 APPLICABILITY:
Four ARV lines shall be OPERABLE.
MODES 1, 2, and 3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ARV line A.1 Restore required ARV 7 days inoperable.
line to OPERABLE status.
B. Two required ARV lines B.1 Restore at least one ARV 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable.
line to OPERABLE status.
C. Three or more required C.1 Restore at least two ARV 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ARV lines inoperable.
lines to OPERABLE status.
(continued)
COMANCHE PEAK - UNITS 1 AND 2 3.7-1 0 Amendment No. 64, 109
AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 APPLICABILITY:
Three AFW trains shall be OPERABLE.
MODES 1, 2, and 3 ACTIONS
-N LCO 3.0.4.b is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.
AND 10 days from discovery of failure to meet the LCO B. One AFW train inoperable B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for reasons other than OPERABLE status.
Condition A.
AND 10 days from discovery of failure to meet the LCO (continued)
COMANCHE PEAK-UNITS 1 AND 2 3.7-12 Amendment No. 664, 109
AC Sources -Operating 3.8.1 ACTIONS NOTE------------------------------------
LCO 3.0.4.b is not applicable to DGs.
- 1 CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite circuit inoperable.
A.1 Perform SR 3.8.1.1 for required OPERABLE offsite circuit.
AND NOTE-----------------
In MODES 1, 2 and 3, the TDAFW pump is considered a required redundant feature.
A.2 AND A.3 Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.
Restore required offsite circuit to OPERABLE status.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LCO OR 21 days for a one time preventive maintenance outage on Startup Transformer XST2 to be completed by February 28, 2002 (continued)
COMANCHE PEAK - UNITS 1 AND 2 3.8-2 Amendment No. 88, 109