Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:December 6, 2006Southern Nuclear Operating Company, Inc.ATTN:Mr. H. L. SumnerVice PresidentP. O. Box 1295 Birmingham, AL 35201 | | {{#Wiki_filter:December 6, 2006 Southern Nuclear Operating Company, Inc. |
| | ATTN: Mr. H. L. Sumner Vice President P. O. Box 1295 Birmingham, AL 35201 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 21: |
Line 22: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - JOSEPH M. FARLEY NUCLEAR PLANT - DOCKET NOS. 50-348 AND 50-364 | | - JOSEPH M. FARLEY NUCLEAR PLANT - |
| | DOCKET NOS. 50-348 AND 50-364 |
|
| |
|
| ==Dear Mr. Sumner:== | | ==Dear Mr. Sumner:== |
|
| |
|
| This refers to the meeting conducted at your staff's request at the Region II Office in Atlanta,Georgia on November 29, 2006, at 1:00 p.m. The meeting's purpose was to discuss various management initiatives at the Farley Nuclear Plant. Enclosed is a list of attendees. Information presented during the meeting is available from the NRC's document system (ADAMS) as accession number ML0633400006.The discussions included the following topics: current operational performance; performanceindicator margins; engineering support reorganization; pandemic flu plan; 4 kilo-volt breaker replacement program; containment sump modifications; pressurizer surge line weld overlay; and main steam line/main steam isolation valve vibration. The meeting was candid and informative and provided useful insight into your staff's understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | | This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia on November 29, 2006, at 1:00 p.m. The meetings purpose was to discuss various management initiatives at the Farley Nuclear Plant. Enclosed is a list of attendees. Information presented during the meeting is available from the NRCs document system (ADAMS) as accession number ML0633400006. |
| ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this meeting, please contact me at (404) 562-4521.Sincerely, | | The discussions included the following topics: current operational performance; performance indicator margins; engineering support reorganization; pandemic flu plan; 4 kilo-volt breaker replacement program; containment sump modifications; pressurizer surge line weld overlay; and main steam line/main steam isolation valve vibration. The meeting was candid and informative and provided useful insight into your staffs understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions. |
| /RA Curtis Rapp for/Scott M. Shaeffer, ChiefReactor Projects Branch 2 Division of Reactor Projects | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Should you have any questions concerning this meeting, please contact me at (404) 562-4521. |
| | Sincerely, |
| | /RA Curtis Rapp for/ |
| | Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated Docket Nos.: 50-348, 50-364License Nos.: NPF-2, NPF-8cc w/encls: (See page 2) | | As Stated Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 cc w/encls: (See page 2) |
|
| |
|
| _ML063410157 OFFICERII:DRPRII:DRPSIGNATURECWR /RA/CWR RA forNAMECRappSShafferDATE12/ /200612/ /200612/ /200612/ /200612/ /200612/ /200612/ /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO 2 SNCcc w/encl:B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc. | | _ML063410157 OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ CWR RA for NAME CRapp SShaffer DATE 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| Electronic Mail DistributionJ. R. JohnsonGeneral Manager, Farley Plant Southern Nuclear Operating Company, Inc. | | |
| Electronic Mail DistributionJ. T. GasserExecutive Vice President Southern Nuclear Operating Company, Inc. | | SNC 2 cc w/encl: |
| Electronic Mail DistributionBentina C. TerrySouthern Nuclear Operating Company, Inc. | | B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc. |
| Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295State Health OfficerAlabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017M. Stanford BlantonBalch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201William D. OldfieldQuality ssurance Supervisor Southern Nuclear Operating Company Electronic Mail DistributionDistribution w/encls: (See page 3) 3 SNCLetter to H. L. Sumner from Scott M. Shaeffer dated December 6, 2006 | | Electronic Mail Distribution J. R. Johnson General Manager, Farley Plant Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Bentina C. Terry Southern Nuclear Operating Company, Inc. |
| | Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 State Health Officer Alabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality ssurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Distribution w/encls: (See page 3) |
| | |
| | SNC 3 Letter to H. L. Sumner from Scott M. Shaeffer dated December 6, 2006 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 42: |
Line 54: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - JOSEPH M. FARLEY NUCLEAR PLANT - DOCKET NOS. 50-348 AND 50-364Distribution w/encl | | - JOSEPH M. FARLEY NUCLEAR PLANT - |
| :K. Cotton, NRR R. Martin, NRR C. Evans L. Slack, RII EICS RIDSNRRDIRS OE Mail PUBLIC LIST OF ATTENDEESNuclear Regulatory CommissionV. McCree, Deputy Regional Administrator, Region II (RII)C. Casto, Director, Division of Reactor Projects (DRP), RII J. Shea, Director, Division of Reactor Safety, RII S. Shaeffer, Branch Chief, Reactor Projects Branch 2, DRP, RII E. Crowe, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII C. Patterson, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII G. Williams, Project Engineer, Reactor Projects Branch 2, DRP, RII K. Cotton, Project Manager, Nuclear Reactor RegulationSouthern Nuclear Operating Company - Joseph M. Farley Nuclear Plant L. Sumner, Vice President - Farley ProjectR. Johnson, General Manager S. Bargeron, Assistant General Manager B. George, Nuclear Licensing Manager D. McKinney, Farley Licensing Manager P. Hayes, Farley Support Manager}}
| | DOCKET NOS. 50-348 AND 50-364 Distribution w/encl: |
| | K. Cotton, NRR R. Martin, NRR C. Evans L. Slack, RII EICS RIDSNRRDIRS OE Mail PUBLIC |
| | |
| | LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Deputy Regional Administrator, Region II (RII) |
| | C. Casto, Director, Division of Reactor Projects (DRP), RII J. Shea, Director, Division of Reactor Safety, RII S. Shaeffer, Branch Chief, Reactor Projects Branch 2, DRP, RII E. Crowe, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII C. Patterson, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII G. Williams, Project Engineer, Reactor Projects Branch 2, DRP, RII K. Cotton, Project Manager, Nuclear Reactor Regulation Southern Nuclear Operating Company - Joseph M. Farley Nuclear Plant L. Sumner, Vice President - Farley Project R. Johnson, General Manager S. Bargeron, Assistant General Manager B. George, Nuclear Licensing Manager D. McKinney, Farley Licensing Manager P. Hayes, Farley Support Manager Enclosure 1}} |
|
---|
Category:Letter
MONTHYEARNL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0235, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0221, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 NL-24-0123, for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML24061A1692024-03-22022 March 2024 PM Reassignment Letter Farley March 2024 NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 2024-09-05
[Table view] |
Text
December 6, 2006 Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner Vice President P. O. Box 1295 Birmingham, AL 35201
SUBJECT:
PUBLIC MEETING
SUMMARY
- JOSEPH M. FARLEY NUCLEAR PLANT -
DOCKET NOS. 50-348 AND 50-364
Dear Mr. Sumner:
This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia on November 29, 2006, at 1:00 p.m. The meetings purpose was to discuss various management initiatives at the Farley Nuclear Plant. Enclosed is a list of attendees. Information presented during the meeting is available from the NRCs document system (ADAMS) as accession number ML0633400006.
The discussions included the following topics: current operational performance; performance indicator margins; engineering support reorganization; pandemic flu plan; 4 kilo-volt breaker replacement program; containment sump modifications; pressurizer surge line weld overlay; and main steam line/main steam isolation valve vibration. The meeting was candid and informative and provided useful insight into your staffs understanding and resolution of the discussed topics. The meeting did not result in specific action items or decisions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4521.
Sincerely,
/RA Curtis Rapp for/
Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects
Enclosure:
As Stated Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 cc w/encls: (See page 2)
_ML063410157 OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ CWR RA for NAME CRapp SShaffer DATE 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 12/ /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC 2 cc w/encl:
B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. R. Johnson General Manager, Farley Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bentina C. Terry Southern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 State Health Officer Alabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality ssurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Distribution w/encls: (See page 3)
SNC 3 Letter to H. L. Sumner from Scott M. Shaeffer dated December 6, 2006
SUBJECT:
PUBLIC MEETING
SUMMARY
- JOSEPH M. FARLEY NUCLEAR PLANT -
DOCKET NOS. 50-348 AND 50-364 Distribution w/encl:
K. Cotton, NRR R. Martin, NRR C. Evans L. Slack, RII EICS RIDSNRRDIRS OE Mail PUBLIC
LIST OF ATTENDEES Nuclear Regulatory Commission V. McCree, Deputy Regional Administrator, Region II (RII)
C. Casto, Director, Division of Reactor Projects (DRP), RII J. Shea, Director, Division of Reactor Safety, RII S. Shaeffer, Branch Chief, Reactor Projects Branch 2, DRP, RII E. Crowe, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII C. Patterson, Senior Resident Inspector - Farley, Reactor Projects Branch 2, DRP, RII G. Williams, Project Engineer, Reactor Projects Branch 2, DRP, RII K. Cotton, Project Manager, Nuclear Reactor Regulation Southern Nuclear Operating Company - Joseph M. Farley Nuclear Plant L. Sumner, Vice President - Farley Project R. Johnson, General Manager S. Bargeron, Assistant General Manager B. George, Nuclear Licensing Manager D. McKinney, Farley Licensing Manager P. Hayes, Farley Support Manager Enclosure 1