| {{#Wiki_filter:June 8, 2009 | | {{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 June 8, 2009 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING WITH LUMINANT GENERATION COMPANY FACILITY: | | MEETING WITH LUMINANT GENERATION COMPANY FACILITY: Comanche Peak Steam Electric Station DOCKET: 50-445, 50-446 DATE AND TIME: June 30, 2009 6:00 p.m. (CDT) |
| Comanche Peak Steam Electric Station DOCKET: 50-445, 50-446 DATE AND TIME: | | LOCATION: Commissioners Court Room 107 NE Vernon St. |
| June 30, 2009 6:00 p.m. (CDT) LOCATION: | | Glen Rose, TX 76043 PURPOSE: This is the end-of-cycle public meeting between the NRC and Luminant Generation Company to present and discuss performance results of the Comanche Peak Steam Electric Station for the period of January 1 through December 31, 2008. |
| Commissioner's Court Room 107 NE Vernon St. Glen Rose, TX 76043 PURPOSE: This is the end-of-cycle public meeting between the NRC and Luminant Generation Company to present and discuss performance results of the Comanche Peak Steam Electric Station for the period of January 1 through December 31, 2008. CATEGORY 1:
| | CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned. |
| Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned. | | The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. |
| The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. PARTICIPANTS: | | PARTICIPANTS: NRC D. Chamberlain, Director, Division of Reactor Projects (DRP) |
| NRC D. Chamberlain, Director, Division of Reactor Projects (DRP) W. Walker, Chief, Project Branch A, DRP J. Kramer, Senior Resident Inspector, DRP B. Tindell, Resident Inspector, DRP UTILITY R. Flores, Senior Vice President & Chief Nuclear Officer M. Lucas, Site Vice President F. Madden, Director, Oversight and Regulatory Affairs D. Kross, Plant Manager T. Hope, Nuclear Licensing Manager MEETING CONTACT: Wayne C. Walker, NRC, RIV 817-860-8148 Wayne.Walker@nrc.gov UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Luminant Generation Company, LLC Rafael Flores, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043 Mike Blevins, Chief Operating Officer Luminant Generation Company LLC Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043 Mr. Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health P.O. Box 149347, Mail Code 2835 Austin, TX 78714-9347 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony Jones, Chief Boiler Inspector Texas Department of Licensing And Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Greg Doyle, Sheriff Somervell County 750 E. Gibbs Blvd. Glen Rose, TX 76043 The Honorable Pam Miller Mayor of Glen Rose P.O. Box 1949 Glen Rose, TX 76043 The Honorable Andy Rash Hood County Judge 100 E. Pearl Street Granbury, TX 76048 The Honorable Walter Maynard Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 The Honorable David Southern Mayor of Granbury P.O. Box 969 Granbury, TX 76048 | | W. Walker, Chief, Project Branch A, DRP J. Kramer, Senior Resident Inspector, DRP B. Tindell, Resident Inspector, DRP UTILITY R. Flores, Senior Vice President & Chief Nuclear Officer M. Lucas, Site Vice President F. Madden, Director, Oversight and Regulatory Affairs D. Kross, Plant Manager T. Hope, Nuclear Licensing Manager MEETING CONTACT: Wayne C. Walker, NRC, RIV 817-860-8148 Wayne.Walker@nrc.gov |
|
| |
|
| Luminant Generation Company, LLC Auburn Mitchell Environmental and Natural Resources Policy Director Office of the Governor State Capitol Building P. O. Box 12428 Austin, TX 78701 Barry Smitherman, Chairman Public Utility Commission William B. Travis Bldg. | | Luminant Generation Company, LLC Rafael Flores, Senior Vice President Ms. Susan M. Jablonski and Chief Nuclear Officer Office of Permitting, Remediation Luminant Generation Company LLC and Registration Comanche Peak Steam Electric Station Texas Commission on P.O. Box 1002 Environmental Quality Glen Rose, TX 76043 MC-122 P.O. Box 13087 Mike Blevins, Chief Operating Officer Austin, TX 78711-3087 Luminant Generation Company LLC Comanche Peak Steam Electric Station Anthony Jones, Chief Boiler Inspector P.O. Box 1002 Texas Department of Licensing Glen Rose, TX 76043 And Regulation Boiler Division Mr. Fred W. Madden, Director E.O. Thompson State Office Building Regulatory Affairs P.O. Box 12157 Luminant Generation Company LLC Austin, TX 78711 P.O. Box 1002 Glen Rose, TX 76043 Chief, Technological Hazards Branch Timothy P. Matthews, Esq. FEMA Region VI Morgan Lewis 800 North Loop 288 1111 Pennsylvania Avenue, NW Federal Regional Center Washington, DC 20004 Denton, TX 76209 County Judge Greg Doyle, Sheriff P.O. Box 851 Somervell County Glen Rose, TX 76043 750 E. Gibbs Blvd. |
| P.O. Box 13326 Austin, TX 78711-3326 Zak Covar Environmental and Natural Resources Policy Director Office of the Governor State Capitol Building P. O. Box 12428 Austin, TX 78701 William A Dub@ Taylor State Energy Conservation Office Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711-3528 David Featherson Director Infrastructure Reliability Division, PUC 1701 N. Congress Ave Austin, TX 78711-3326 Gene Mayo Sheriff, Hood County 400 N. Gordon Street Granbury, TX 76048 Dan Eden, Deputy Director, Office of Permitting, Remediation and Registration TCEQ MC-122 P.O. Box 13087 Austin, TX 78711-3087 | | Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control The Honorable Pam Miller Texas Department of Health Mayor of Glen Rose P.O. Box 149347, Mail Code 2835 P.O. Box 1949 Austin, TX 78714-9347 Glen Rose, TX 76043 Environmental and Natural The Honorable Andy Rash Resources Policy Director Hood County Judge Office of the Governor 100 E. Pearl Street P.O. Box 12428 Granbury, TX 76048 Austin, TX 78711-3189 The Honorable Walter Maynard Mr. Brian Almon Somervell County Judge Public Utility Commission P.O. Box 851 William B. Travis Building Glen Rose, TX 76043 P.O. Box 13326 Austin, TX 78711-3326 The Honorable David Southern Mayor of Granbury P.O. Box 969 Granbury, TX 76048 |
|
| |
|
| Jack Colley, State Coordinator Division of Emergency Management Texas Department of Public Safety 5805 North Lamar Blvd. | | Luminant Generation Company, LLC Auburn Mitchell Dan Eden, Deputy Director, Environmental and Natural Office of Permitting, Remediation Resources Policy Director and Registration TCEQ Office of the Governor MC-122 State Capitol Building P.O. Box 13087 P. O. Box 12428 Austin, TX 78711-3087 Austin, TX 78701 Jack Colley, State Coordinator Barry Smitherman, Chairman Division of Emergency Management Public Utility Commission Texas Department of Public Safety William B. Travis Bldg. 5805 North Lamar Blvd. |
| Austin, TX 78773-4087 Institute of Nuclear Power Operations (INPO) Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 | | P.O. Box 13326 Austin, TX 78773-4087 Austin, TX 78711-3326 Institute of Nuclear Power Operations Zak Covar (INPO) |
| | Environmental and Natural Records Center Resources Policy Director 700 Galleria Parkway SE, Suite 100 Office of the Governor Atlanta, GA 30339 State Capitol Building P. O. Box 12428 Austin, TX 78701 William ADub@ Taylor State Energy Conservation Office Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711-3528 David Featherson Director Infrastructure Reliability Division, PUC 1701 N. Congress Ave Austin, TX 78711-3326 Gene Mayo Sheriff, Hood County 400 N. Gordon Street Granbury, TX 76048 |
|
| |
|
| Luminant Generation Company, LLC Electronic Distribution: NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource) | | Luminant Generation Company, LLC Electronic Distribution: |
| Leigh Trocine, OEDO RIV Coordinator OEMAIL, D/OE Amy Powell, OCA Kevin Williams, NSIR/DPR/EP Robert Kahler, NSIR/DPR/EP Jenny Weil, Congressional Affairs Officer mortensengk@INPO.org Balwant Singal, Project Manager, NRR Wayne Walker, Branch Chief, PB/A Clyde Osterholtz, Senior Project Engineer, PB/A John Kramer, Senior Resident Inspector Brian Tindell, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Dana Lackey, Region IV DRP Secretary Sue Sanner, Site Secretary Kimberly Brewton, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Deborah Harrison, Region IV DRS Secretary Earnestine Clay, DRMA, TL Denise Freeman, Region IV DNMS Secretary Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\CP EOC MN 06-30-09.doc ADAMS ML091590563 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials WCWPublicly Avail Yes No Sensitive Yes No Sens. Type Initials WCWRIV/SPE:DRP/A PAO RSLO C:DRP/A CCOsterholtz VLDricks WAMaier WCWalker /RA/ /RA/ /RA/ /RA/ | | NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource) |
| 06/3/2009 06/4/2009 06/4/2009 06/5/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} | | Leigh Trocine, OEDO RIV Coordinator OEMAIL, D/OE Amy Powell, OCA Kevin Williams, NSIR/DPR/EP Robert Kahler, NSIR/DPR/EP Jenny Weil, Congressional Affairs Officer mortensengk@INPO.org Balwant Singal, Project Manager, NRR Wayne Walker, Branch Chief, PB/A Clyde Osterholtz, Senior Project Engineer, PB/A John Kramer, Senior Resident Inspector Brian Tindell, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Dana Lackey, Region IV DRP Secretary Sue Sanner, Site Secretary Kimberly Brewton, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Deborah Harrison, Region IV DRS Secretary Earnestine Clay, DRMA, TL Denise Freeman, Region IV DNMS Secretary Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\CP EOC MN 06-30-09.doc ADAMS ML091590563 SUNSI Rev Compl. 9 Yes No ADAMS 9Yes No Reviewer Initials WCW Publicly Avail 9Yes No Sensitive Yes 9No Sens. Type Initials WCW RIV/SPE:DRP/A PAO RSLO C:DRP/A CCOsterholtz VLDricks WAMaier WCWalker |
| | /RA/ /RA/ /RA/ /RA/ |
| | 06/3/2009 06/4/2009 06/4/2009 06/5/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} |
06/30/2009 Notice of Public Meeting with Luminant Generation to Discuss Performance Results of the Comanche Peak Steam Electric Station for the Period of January 1 Through December 31, 2008ML091590563 |
Person / Time |
---|
Site: |
Comanche Peak |
---|
Issue date: |
06/08/2009 |
---|
From: |
Webb Patricia Walker NRC/RGN-IV/DRP/RPB-A |
---|
To: |
|
---|
References |
---|
Download: ML091590563 (4) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1652023-08-0404 August 2023 August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12048A8612012-02-17017 February 2012 Notice of Meeting to Discuss the Scope of Plant Modifications Being Implemented for Comanche Peak Nuclear Power Plant - Fire Protection Modifications ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1112406132011-05-0404 May 2011 Notice of *Errata* Public Meeting with Luminant Generation Company, LLC, to Discuss Performance Results for the Period of 01/01/10 - 12/31/10 ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1035702882010-12-23023 December 2010 Notice of Regulatory Conference with Luminant Generation Company, LLC ML1011210342010-04-22022 April 2010 Notice of Meeting with Luminant Generation Company, LLC to Discuss Issues Related to Comanche Peak Nuclear Power Plant ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0915905632009-06-0808 June 2009 Notice of Public Meeting with Luminant Generation to Discuss Performance Results of the Comanche Peak Steam Electric Station for the Period of January 1 Through December 31, 2008 ML0814400882008-05-23023 May 2008 Notice of Closed Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 ML0814106622008-05-20020 May 2008 Notice of Meeting to Discuss End-of-cycle Public Meeting Between the NRC & Luminant Generation Company, LLC to Present & Discuss Performance Results of the Comanche, Units 1 & 2, Facility for the Period of January 1 Though December 31, 200 ML0813001312008-05-0909 May 2008 Notice of Significant Licensee Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 & 2 ML0812800772008-05-0606 May 2008 Notice of Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 June 8, 2009
SUBJECT:
MEETING WITH LUMINANT GENERATION COMPANY FACILITY: Comanche Peak Steam Electric Station DOCKET: 50-445, 50-446 DATE AND TIME: June 30, 2009 6:00 p.m. (CDT)
LOCATION: Commissioners Court Room 107 NE Vernon St.
Glen Rose, TX 76043 PURPOSE: This is the end-of-cycle public meeting between the NRC and Luminant Generation Company to present and discuss performance results of the Comanche Peak Steam Electric Station for the period of January 1 through December 31, 2008.
CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: NRC D. Chamberlain, Director, Division of Reactor Projects (DRP)
W. Walker, Chief, Project Branch A, DRP J. Kramer, Senior Resident Inspector, DRP B. Tindell, Resident Inspector, DRP UTILITY R. Flores, Senior Vice President & Chief Nuclear Officer M. Lucas, Site Vice President F. Madden, Director, Oversight and Regulatory Affairs D. Kross, Plant Manager T. Hope, Nuclear Licensing Manager MEETING CONTACT: Wayne C. Walker, NRC, RIV 817-860-8148 Wayne.Walker@nrc.gov
Luminant Generation Company, LLC Rafael Flores, Senior Vice President Ms. Susan M. Jablonski and Chief Nuclear Officer Office of Permitting, Remediation Luminant Generation Company LLC and Registration Comanche Peak Steam Electric Station Texas Commission on P.O. Box 1002 Environmental Quality Glen Rose, TX 76043 MC-122 P.O. Box 13087 Mike Blevins, Chief Operating Officer Austin, TX 78711-3087 Luminant Generation Company LLC Comanche Peak Steam Electric Station Anthony Jones, Chief Boiler Inspector P.O. Box 1002 Texas Department of Licensing Glen Rose, TX 76043 And Regulation Boiler Division Mr. Fred W. Madden, Director E.O. Thompson State Office Building Regulatory Affairs P.O. Box 12157 Luminant Generation Company LLC Austin, TX 78711 P.O. Box 1002 Glen Rose, TX 76043 Chief, Technological Hazards Branch Timothy P. Matthews, Esq. FEMA Region VI Morgan Lewis 800 North Loop 288 1111 Pennsylvania Avenue, NW Federal Regional Center Washington, DC 20004 Denton, TX 76209 County Judge Greg Doyle, Sheriff P.O. Box 851 Somervell County Glen Rose, TX 76043 750 E. Gibbs Blvd.
Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control The Honorable Pam Miller Texas Department of Health Mayor of Glen Rose P.O. Box 149347, Mail Code 2835 P.O. Box 1949 Austin, TX 78714-9347 Glen Rose, TX 76043 Environmental and Natural The Honorable Andy Rash Resources Policy Director Hood County Judge Office of the Governor 100 E. Pearl Street P.O. Box 12428 Granbury, TX 76048 Austin, TX 78711-3189 The Honorable Walter Maynard Mr. Brian Almon Somervell County Judge Public Utility Commission P.O. Box 851 William B. Travis Building Glen Rose, TX 76043 P.O. Box 13326 Austin, TX 78711-3326 The Honorable David Southern Mayor of Granbury P.O. Box 969 Granbury, TX 76048
Luminant Generation Company, LLC Auburn Mitchell Dan Eden, Deputy Director, Environmental and Natural Office of Permitting, Remediation Resources Policy Director and Registration TCEQ Office of the Governor MC-122 State Capitol Building P.O. Box 13087 P. O. Box 12428 Austin, TX 78711-3087 Austin, TX 78701 Jack Colley, State Coordinator Barry Smitherman, Chairman Division of Emergency Management Public Utility Commission Texas Department of Public Safety William B. Travis Bldg. 5805 North Lamar Blvd.
P.O. Box 13326 Austin, TX 78773-4087 Austin, TX 78711-3326 Institute of Nuclear Power Operations Zak Covar (INPO)
Environmental and Natural Records Center Resources Policy Director 700 Galleria Parkway SE, Suite 100 Office of the Governor Atlanta, GA 30339 State Capitol Building P. O. Box 12428 Austin, TX 78701 William ADub@ Taylor State Energy Conservation Office Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711-3528 David Featherson Director Infrastructure Reliability Division, PUC 1701 N. Congress Ave Austin, TX 78711-3326 Gene Mayo Sheriff, Hood County 400 N. Gordon Street Granbury, TX 76048
Luminant Generation Company, LLC Electronic Distribution:
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)
Leigh Trocine, OEDO RIV Coordinator OEMAIL, D/OE Amy Powell, OCA Kevin Williams, NSIR/DPR/EP Robert Kahler, NSIR/DPR/EP Jenny Weil, Congressional Affairs Officer mortensengk@INPO.org Balwant Singal, Project Manager, NRR Wayne Walker, Branch Chief, PB/A Clyde Osterholtz, Senior Project Engineer, PB/A John Kramer, Senior Resident Inspector Brian Tindell, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannenbaum, Region IV DRP Secretary Dana Lackey, Region IV DRP Secretary Sue Sanner, Site Secretary Kimberly Brewton, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Deborah Harrison, Region IV DRS Secretary Earnestine Clay, DRMA, TL Denise Freeman, Region IV DNMS Secretary Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\CP EOC MN 06-30-09.doc ADAMS ML091590563 SUNSI Rev Compl. 9 Yes No ADAMS 9Yes No Reviewer Initials WCW Publicly Avail 9Yes No Sensitive Yes 9No Sens. Type Initials WCW RIV/SPE:DRP/A PAO RSLO C:DRP/A CCOsterholtz VLDricks WAMaier WCWalker
/RA/ /RA/ /RA/ /RA/
06/3/2009 06/4/2009 06/4/2009 06/5/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax