ML101100759: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
 
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  


==SUBJECT:==
==SUBJECT:==
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==


During the period of May 10 - 14, 2010, the NRC will conduct baseline radiation safety inspection activities at your Plant St. Lucie site. The inspection will focus on the Occupational Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124.01. In addition, the site's implementation of the Industry Ground Water Protection Voluntary Initiative will be reviewed using Temporary Instruction (TI) 2515/173.
During the period of May 10 - 14, 2010, the NRC will conduct baseline radiation safety inspection activities at your Plant St. Lucie site. The inspection will focus on the Occupational Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124.01. In addition, the sites implementation of the Industry Ground Water Protection Voluntary Initiative will be reviewed using Temporary Instruction (TI) 2515/173.
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has requested that the subject informational material be made available to the NRC staff by May 3, 2010, to allow preparation for the upcoming inspection We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. D. Cecchett of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system


Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has requested that the subject informational material be made available to the NRC staff by May 3, 2010, to allow preparation for the upcoming inspection We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. D. Cecchett of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658.
FP&L                                     2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC
Sincerely,
's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system FP&L 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
                                          /Rebecca Nease RA for/
Sincerely, /Rebecca Nease RA for/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 389, License Nos.: DPR-67 and NPF-16
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 389, License Nos.: DPR-67 and NPF-16  


==Enclosure:==
==Enclosure:==
Occupational Radiation Protection Inspection Document Request cc w/encl: (See page 3)  
Occupational Radiation Protection Inspection Document Request cc w/encl: (See page 3)


_________________________
FP&L                                                    2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
G  SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP RII:DRS    SIGNATURE GBK /RA/ MDS /RA/ RBR /RA/    NAME KUZO MSYKES BONSER    DATE 04/19/2010 04/19/2010 04/19/2010    E-MAIL COPY?    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO FP&L 3  cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution
Sincerely,
                                                                  /Rebecca Nease RA for/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 389, License Nos.: DPR-67 and NPF-16


Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
==Enclosure:==
Occupational Radiation Protection Inspection Document Request cc w/encl: (See page 3)
X PUBLICLY AVAILABLE                G NON-PUBLICLY AVAILABLE                      G SENSITIVE        X NON-SENSITIVE ADAMS: G Yes    ACCESSION NUMBER:_________________________                        G SUNSI REVIEW COMPLETE OFFICE            RII:DRS          RII:DRP          RII:DRS SIGNATURE          GBK /RA/          MDS /RA/          RBR /RA/
NAME              KUZO              MSYKES            BONSER DATE                  04/19/2010        04/19/2010        04/19/2010 E-MAIL COPY?        YES          NO  YES          NO  YES          NO YES        NO  YES      NO  YES      NO  YES  NO OFFICIAL    RECORD      COPY        DOCUMENT        NAME:      G:\DRSII\PSB1\INFORMATION  REQUEST  LETTERS\ST LUCIE\2010003_PSL_INFOREQUEST(REV1).DOC


Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
FP&L                                3 cc w/encl:                            William A. Passetti Richard L. Anderson                    Chief Site Vice President                    Florida Bureau of Radiation Control St. Lucie Nuclear Plant                Department of Health Electronic Mail Distribution          Electronic Mail Distribution Robert J. Hughes                      Ruben D. Almaguer Plant General Manager                  Director St. Lucie Nuclear Plant                Division of Emergency Preparedness Electronic Mail Distribution          Department of Community Affairs Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support          J. Kammel Florida Power & Light Company          Radiological Emergency Planning Electronic Mail Distribution          Administrator Department of Public Safety Ronnie Lingle                          Electronic Mail Distribution Operations Manager St. Lucie Nuclear Plant                Mano Nazar Electronic Mail Distribution          Executive Vice President and Chief Nuclear Officer Eric Katzman                           Florida Power & Light Company Licensing Manager                     P. O. Box 14000 St. Lucie Nuclear Plant               Juno Beach, FL 33408 Electronic Mail Distribution Senior Resident Inspector Larry Nicholson                        St. Lucie Nuclear Plant Director                              U.S. Nuclear Regulatory Commission Licensing                              P.O. Box 6090 Florida Power & Light Company          Jensen Beach, FL 34957-2010 Electronic Mail Distribution Seth B. Dunston Alison Brown                          Training Manager Nuclear Licensing                      St. Lucie Nuclear Plant Florida Power & Light Company          Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Mitch S. Ross                          County Administrator Vice President and Associate General  St. Lucie County Counsel                                Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          Jack Southard Director Marjan Mashhadi                        Public Safety Department Senior Attorney                        St. Lucie County Florida Power & Light Company          Electronic Mail Distribution Electronic Mail Distribution


Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution
FP&L                                     4 Letter to Mano Nazar from Brian Bonser dated April 20, 2010
 
Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution
 
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL  33408
 
Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL  34957-2010
 
Seth B. Dunston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
 
FP&L 4   Letter to Mano Nazar from Brian Bonser dated April 20, 2010  


==SUBJECT:==
==SUBJECT:==
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource  
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource
 
Enclosure OCCUPATIONAL RADIATION SAFETY CORNERSTONE INSPECTION INFORMATION REQUEST SITE:    Plant St. Lucie  05000335,389/2010003
 
PRE-INSPECTION VISIT:          Not Applicable INSPECTION DATES:            May 10-14, 2010 NRC INSPECTORS:            George B. Kuzo, George.Kuzo@NRC.GOV            N. Jeff Griffis,    Jeff.Griffis@NRC.GOV
 
ACCOMPANYING PERSONNEL    IDENTIFIED LICENSEE CONTACTS: Radiation Controls - Christopher Martin, RPM/Brent Robinson (772 467-7501/7308); ALARA  - Keith Mourning (x7310); Remote Monitoring/Instrumentation  - Barry Robinson (x7269); Groundwater Protection Initiative - Bruce Vogel (x3986);  Dosimetry - Brent Robinson (x7308); and Licensing/Compliance - Don Cecchett (x7155). 


Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and           Exposure Controls               TI 2515/173    Review of the Implementation of the Industry           Ground Water Protection Voluntary Initiative (Revision 1)
OCCUPATIONAL RADIATION SAFETY CORNERSTONE INSPECTION INFORMATION REQUEST SITE:    Plant St. Lucie                05000335,389/2010003 PRE-INSPECTION VISIT:                  Not Applicable INSPECTION DATES:                      May 10-14, 2010 NRC INSPECTORS:                        George B. Kuzo, George.Kuzo@NRC.GOV N. Jeff Griffis, Jeff.Griffis@NRC.GOV ACCOMPANYING PERSONNEL IDENTIFIED LICENSEE CONTACTS: Radiation Controls - Christopher Martin, RPM/Brent Robinson (772 467-7501/7308); ALARA - Keith Mourning (x7310); Remote Monitoring/Instrumentation - Barry Robinson (x7269); Groundwater Protection Initiative - Bruce Vogel (x3986); Dosimetry - Brent Robinson (x7308); and Licensing/Compliance - Don Cecchett (x7155).
Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing prior to the on-site inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word or searchable "pdf" files on CDROM or USB drive. Please provide two copies of each electronic media device submitted.) Information in the "document lists" should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector can answer questions regarding questions on specific information needs with licensee staff and may request additional documents.
Inspection Procedures:         IP 71124.01     Radiological Hazard Assessment and Exposure Controls TI 2515/173    Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative (Revision 1)
GENERAL INFORMATION NEEDED Organization Charts and Contact Phone Numbers for: - Radiation Protection - Chemistry Procedure for issuing Condition Report (CR) documents and assessing issues for risk significance and follow-up actions. Updated Final Safety Analysis Report Chapters 11, Effluents/Radwaste; and Chapter 12 Radiation Protection Current version/revision of the Offsite Dose Calculation Manual (ODCM) Enclosure Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 08 and CY 09  Annual Radiological Effluent Release Report (ARERR) documents for CY 2008 and CY 2009  Current Part 61 Analysis Results for Dry Active Waste (DAW)  Outage schedule of major activities (Gantt chart if available).
Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing prior to the on-site inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word or searchable pdf files on CDROM or USB drive. Please provide two copies of each electronic media device submitted.) Information in the document lists should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector can answer questions regarding questions on specific information needs with licensee staff and may request additional documents.
GENERAL INFORMATION NEEDED Organization Charts and Contact Phone Numbers for:
        - Radiation Protection
        - Chemistry Procedure for issuing Condition Report (CR) documents and assessing issues for risk significance and follow-up actions.
Updated Final Safety Analysis Report Chapters 11, Effluents/Radwaste; and Chapter 12 Radiation Protection Current version/revision of the Offsite Dose Calculation Manual (ODCM)
Enclosure


OCCUPATIONAL DOSE ASSESSMENT [71124.04]
2 Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 08 and CY 09 Annual Radiological Effluent Release Report (ARERR) documents for CY 2008 and CY 2009 Current Part 61 Analysis Results for Dry Active Waste (DAW)
Provide Procedures/Guidance Documents for: - external dose monitoring, i.e., dosimetry issuance and use. The documents should     include:           guidance for multi-badging; monitoring in steep/highly variable dose rate gradients;     personnel contamination events; storage/care of personal dosimeters; use of     electronic dosimeters including evaluation of any biases identified relative to TLD     monitoring
Outage schedule of major activities (Gantt chart if available).
- internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling         capabilities. The documents should include guidance for calibration/QC and use of     whole body counter (WBC); release of contaminated individuals, use of passive     monitoring as screening method for evaluations, and special in vitro sample collection     and analysis, and actions for declared pregnant workers.       List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to or exceeding 10 millirem since April 1, 2009. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in- depth review during the on-site inspection]           List of all personnel contamination events, dispersed contamination/discrete particles,             identified since April 1, 2009. [Note: only a listing should be provided for use by the             inspectors to select a sample of issues for in- depth review during the on site inspection] Copies of all audits, self-assessments, and/or reviews related to internal or external dosimetry issues generated since January 1, 2009. The documents provided should to include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/ or corporate calibration facilities. Provide a list of Condition Report (CR) documents generated since April 1, 2009, for Internal or external dosimetry issues/events. [Note: only titles/summary statement should be provide for use by the inspectors to select a sample of issues for in-depth review]
OCCUPATIONAL DOSE ASSESSMENT [71124.04]
Provide Procedures/Guidance Documents for:
    - external dose monitoring, i.e., dosimetry issuance and use. The documents should include:
guidance for multi-badging; monitoring in steep/highly variable dose rate gradients; personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters including evaluation of any biases identified relative to TLD monitoring
    - internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling capabilities. The documents should include guidance for calibration/QC and use of whole body counter (WBC); release of contaminated individuals, use of passive monitoring as screening method for evaluations, and special in vitro sample collection and analysis, and actions for declared pregnant workers.
List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to or exceeding 10 millirem since April 1, 2009.
[Note: only a listing should be provided for use by the inspectors to select a sample of issues for in- depth review during the on-site inspection]
List of all personnel contamination events, dispersed contamination/discrete particles, identified since April 1, 2009. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in- depth review during the on site inspection]
Copies of all audits, self-assessments, and/or reviews related to internal or external dosimetry issues generated since January 1, 2009. The documents provided should to include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/ or corporate calibration facilities.
Provide a list of Condition Report (CR) documents generated since April 1, 2009, for Internal or external dosimetry issues/events. [Note: only titles/summary statement should be provide for use by the inspectors to select a sample of issues for in-depth review]
REVIEW OF THE IMPLEMENTATION OF THE INDUSTRY GROUNDWATER PROTECTION VOLUNTARY INITIATIVE [TI 2515/173 Rev.1]
REVIEW OF THE IMPLEMENTATION OF THE INDUSTRY GROUNDWATER PROTECTION VOLUNTARY INITIATIVE [TI 2515/173 Rev.1]
Provide procedures/guidance documents for groundwater monitoring program including:     Sample collection and frequency     NEI Groundwater Protection Initiative (GPI) compliance including communication protocols Processes for remediation (as applicable) Record keeping Quality Assurance  
Provide procedures/guidance documents for groundwater monitoring program including:
Sample collection and frequency NEI Groundwater Protection Initiative (GPI) compliance including communication protocols Processes for remediation (as applicable)
Record keeping Quality Assurance Enclosure


3 Enclosure  All 30-day reports, special reports, or voluntary/informal communication reports since January 1, 2008 ODCM [Note: provided as part of the General Information Request and do not need to be duplicated Current maps showing locations of all groundwater monitoring / remediation wells Most current site hydrology/geology report Any revisions to UFSAR or ODCM made as a result of the groundwater monitoring program List of Structures, Systems, and Components (SSCs) ranked according to risk for release of contaminated liquid Current 50.75(g) decomissioning files (do not make copies - only access to appropriate hardcopy or electronic files)}}
3 All 30-day reports, special reports, or voluntary/informal communication reports since January 1, 2008 ODCM [Note: provided as part of the General Information Request and do not need to be duplicated Current maps showing locations of all groundwater monitoring / remediation wells Most current site hydrology/geology report Any revisions to UFSAR or ODCM made as a result of the groundwater monitoring program List of Structures, Systems, and Components (SSCs) ranked according to risk for release of contaminated liquid Current 50.75(g) decomissioning files (do not make copies - only access to appropriate hardcopy or electronic files)
Enclosure}}

Latest revision as of 20:41, 13 November 2019

Notification of Inspection and Request for Information
ML101100759
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/20/2010
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Nazar M
Florida Power & Light Co
References
Download: ML101100759 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Nazar:

During the period of May 10 - 14, 2010, the NRC will conduct baseline radiation safety inspection activities at your Plant St. Lucie site. The inspection will focus on the Occupational Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124.01. In addition, the sites implementation of the Industry Ground Water Protection Voluntary Initiative will be reviewed using Temporary Instruction (TI) 2515/173.

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has requested that the subject informational material be made available to the NRC staff by May 3, 2010, to allow preparation for the upcoming inspection We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. D. Cecchett of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system

FP&L 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/Rebecca Nease RA for/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 389, License Nos.: DPR-67 and NPF-16

Enclosure:

Occupational Radiation Protection Inspection Document Request cc w/encl: (See page 3)

FP&L 2 (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/Rebecca Nease RA for/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 389, License Nos.: DPR-67 and NPF-16

Enclosure:

Occupational Radiation Protection Inspection Document Request cc w/encl: (See page 3)

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE GBK /RA/ MDS /RA/ RBR /RA/

NAME KUZO MSYKES BONSER DATE 04/19/2010 04/19/2010 04/19/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\INFORMATION REQUEST LETTERS\ST LUCIE\2010003_PSL_INFOREQUEST(REV1).DOC

FP&L 3 cc w/encl: William A. Passetti Richard L. Anderson Chief Site Vice President Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Robert J. Hughes Ruben D. Almaguer Plant General Manager Director St. Lucie Nuclear Plant Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support J. Kammel Florida Power & Light Company Radiological Emergency Planning Electronic Mail Distribution Administrator Department of Public Safety Ronnie Lingle Electronic Mail Distribution Operations Manager St. Lucie Nuclear Plant Mano Nazar Electronic Mail Distribution Executive Vice President and Chief Nuclear Officer Eric Katzman Florida Power & Light Company Licensing Manager P. O. Box 14000 St. Lucie Nuclear Plant Juno Beach, FL 33408 Electronic Mail Distribution Senior Resident Inspector Larry Nicholson St. Lucie Nuclear Plant Director U.S. Nuclear Regulatory Commission Licensing P.O. Box 6090 Florida Power & Light Company Jensen Beach, FL 34957-2010 Electronic Mail Distribution Seth B. Dunston Alison Brown Training Manager Nuclear Licensing St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Mitch S. Ross County Administrator Vice President and Associate General St. Lucie County Counsel Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Jack Southard Director Marjan Mashhadi Public Safety Department Senior Attorney St. Lucie County Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution

FP&L 4 Letter to Mano Nazar from Brian Bonser dated April 20, 2010

SUBJECT:

PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource

OCCUPATIONAL RADIATION SAFETY CORNERSTONE INSPECTION INFORMATION REQUEST SITE: Plant St. Lucie 05000335,389/2010003 PRE-INSPECTION VISIT: Not Applicable INSPECTION DATES: May 10-14, 2010 NRC INSPECTORS: George B. Kuzo, George.Kuzo@NRC.GOV N. Jeff Griffis, Jeff.Griffis@NRC.GOV ACCOMPANYING PERSONNEL IDENTIFIED LICENSEE CONTACTS: Radiation Controls - Christopher Martin, RPM/Brent Robinson (772 467-7501/7308); ALARA - Keith Mourning (x7310); Remote Monitoring/Instrumentation - Barry Robinson (x7269); Groundwater Protection Initiative - Bruce Vogel (x3986); Dosimetry - Brent Robinson (x7308); and Licensing/Compliance - Don Cecchett (x7155).

Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls TI 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative (Revision 1)

Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing prior to the on-site inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word or searchable pdf files on CDROM or USB drive. Please provide two copies of each electronic media device submitted.) Information in the document lists should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector can answer questions regarding questions on specific information needs with licensee staff and may request additional documents.

GENERAL INFORMATION NEEDED Organization Charts and Contact Phone Numbers for:

- Radiation Protection

- Chemistry Procedure for issuing Condition Report (CR) documents and assessing issues for risk significance and follow-up actions.

Updated Final Safety Analysis Report Chapters 11, Effluents/Radwaste; and Chapter 12 Radiation Protection Current version/revision of the Offsite Dose Calculation Manual (ODCM)

Enclosure

2 Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 08 and CY 09 Annual Radiological Effluent Release Report (ARERR) documents for CY 2008 and CY 2009 Current Part 61 Analysis Results for Dry Active Waste (DAW)

Outage schedule of major activities (Gantt chart if available).

OCCUPATIONAL DOSE ASSESSMENT [71124.04]

Provide Procedures/Guidance Documents for:

- external dose monitoring, i.e., dosimetry issuance and use. The documents should include:

guidance for multi-badging; monitoring in steep/highly variable dose rate gradients; personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters including evaluation of any biases identified relative to TLD monitoring

- internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling capabilities. The documents should include guidance for calibration/QC and use of whole body counter (WBC); release of contaminated individuals, use of passive monitoring as screening method for evaluations, and special in vitro sample collection and analysis, and actions for declared pregnant workers.

List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to or exceeding 10 millirem since April 1, 2009.

[Note: only a listing should be provided for use by the inspectors to select a sample of issues for in- depth review during the on-site inspection]

List of all personnel contamination events, dispersed contamination/discrete particles, identified since April 1, 2009. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in- depth review during the on site inspection]

Copies of all audits, self-assessments, and/or reviews related to internal or external dosimetry issues generated since January 1, 2009. The documents provided should to include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/ or corporate calibration facilities.

Provide a list of Condition Report (CR) documents generated since April 1, 2009, for Internal or external dosimetry issues/events. [Note: only titles/summary statement should be provide for use by the inspectors to select a sample of issues for in-depth review]

REVIEW OF THE IMPLEMENTATION OF THE INDUSTRY GROUNDWATER PROTECTION VOLUNTARY INITIATIVE [TI 2515/173 Rev.1]

Provide procedures/guidance documents for groundwater monitoring program including:

Sample collection and frequency NEI Groundwater Protection Initiative (GPI) compliance including communication protocols Processes for remediation (as applicable)

Record keeping Quality Assurance Enclosure

3 All 30-day reports, special reports, or voluntary/informal communication reports since January 1, 2008 ODCM [Note: provided as part of the General Information Request and do not need to be duplicated Current maps showing locations of all groundwater monitoring / remediation wells Most current site hydrology/geology report Any revisions to UFSAR or ODCM made as a result of the groundwater monitoring program List of Structures, Systems, and Components (SSCs) ranked according to risk for release of contaminated liquid Current 50.75(g) decomissioning files (do not make copies - only access to appropriate hardcopy or electronic files)

Enclosure