{{#Wiki_filter:Exel nm Exelon Generation www.exeloncorp.com Nuclear Dresden Generating Station 6500 North Dresden Road Morris, IL 60450-9765 Tel 815-942-2920 SVPLTR: #10-0022 1 OCFR.54 May 15, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249  
{{#Wiki_filter:www.exeloncorp.com ExelNuclearnm Exelon Generation Dresden Generating Station 6500 North Dresden Road Morris, IL60450-9765 Tel 815-942-2920 SVPLTR: #10-0022                                                                       10CFR.54 May 15, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249


==Subject:==
==Subject:==
Revised Commitment for the Containment Leak Reduction  
Revised Commitment for the Containment Leak Reduction & Control Program for Gas Systems
& Control Program for Gas Systems  


==References:==
==References:==


(1) Commonwealth Edison letter from Cordell Reed and D.L. Peoples to the NRC-H.R. Denton dated November 21, 1979.(2) Commonwealth Edison letter from D.L. Peoples to the NRC -H.R. Denton'Lessons Learned Short Term Requirements' dated January 1, 1980.The purpose of this letter is to inform the NRC that Exelon Generation Company, LLC (EGC) is revising a commitment identified in References (1) and (2) for Dresden Nuclear Power Station (DNPS).In Reference (1) Commonwealth Edison proposed "Liquid systems will be visually inspected for leakage while systems are at approximate operating pressures.
(1) Commonwealth Edison letter from Cordell Reed and D.L. Peoples to the NRC-H.R. Denton dated November 21, 1979.
Gas systems will be evaluated using helium leak tests, pressure decay tests for specific tanks and metered make-up pressure tests." In Reference (2) Commonwealth Edison stated "the test inspection methods used are as follows": part b. "Gaseous systems are tested by a combination of pressure decay on specific tanks or by helium leakage tests." The gaseous systems in question are Standby Gas Treatment (SBGT) and Augmented Primary Containment Vent (APCV). Historically, EGC Dresden Station has been conducting visual inspections with the aid of smoke tubes, if needed, in order to identify leaks. These visual inspections remain the current method of testing, guided by procedure, and have been performed in lieu of helium testing.Helium testing provides no advantage over visual inspections.
(2) Commonwealth Edison letter from D.L. Peoples to the NRC - H.R. Denton
Helium testing cannot quantify the leakage, only identify the location.
                          'Lessons Learned Short Term Requirements' dated January 1, 1980.
The identification of a leak via visual inspection can be accomplished with the same rigor as helium testing.
The purpose of this letter is to inform the NRC that Exelon Generation Company, LLC (EGC) is revising a commitment identified in References (1) and (2) for Dresden Nuclear Power Station (DNPS).
May 15, 2010 U.S. Nuclear Regulatory Commission Page 2 of 2 As a result, the commitment to perform helium testing is being revised. In order to satisfy the Site Leak Reduction Program, visual inspections with the aid of smoke tubes, if needed, will continue to be performed.
In Reference (1) Commonwealth Edison proposed "Liquid systems will be visually inspected for leakage while systems are at approximate operating pressures. Gas systems will be evaluated using helium leak tests, pressure decay tests for specific tanks and metered make-up pressure tests."
The revised commitment is included as Attachment 1 to this letter.Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager at 815-416-2800.
In Reference (2) Commonwealth Edison stated "the test inspection methods used are as follows":
Respectfully, Tim Ha Site Vice President Dresden Nuclear Power Station  
part b. "Gaseous systems are tested by a combination of pressure decay on specific tanks or by helium leakage tests."
The gaseous systems in question are Standby Gas Treatment (SBGT) and Augmented Primary Containment Vent (APCV). Historically, EGC Dresden Station has been conducting visual inspections with the aid of smoke tubes, if needed, in order to identify leaks. These visual inspections remain the current method of testing, guided by procedure, and have been performed in lieu of helium testing.
Helium testing provides no advantage over visual inspections. Helium testing cannot quantify the leakage, only identify the location. The identification of a leak via visual inspection can be accomplished with the same rigor as helium testing.
 
May 15, 2010 U.S. Nuclear Regulatory Commission Page 2 of 2 As a result, the commitment to perform helium testing is being revised. In order to satisfy the Site Leak Reduction Program, visual inspections with the aid of smoke tubes, if needed, will continue to be performed. The revised commitment is included as Attachment 1 to this letter.
Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager at 815-416-2800.
Respectfully, Tim Ha Site Vice President Dresden Nuclear Power Station


==Attachment:==
==Attachment:==
Commitment for Site Leak Reduction Program cc:    Regional Administrator - NRC Region IIl NRC Senior Resident Inspector - Dresden Nuclear Power Station


Commitment for Site Leak Reduction Program cc: Regional Administrator
Attachment 1
-NRC Region IIl NRC Senior Resident Inspector
-Dresden Nuclear Power Station Attachment 1  


==SUMMARY==
==SUMMARY==
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the document represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the document represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)
COMMITTED
COMMITMETMDAlE-RE        COMMITTED     [COMMITMENT               TYPE COMMITMENT                         DATE OR         ONE-TIME ACTION     PROGRAMMATIC I " E(Yes/No)             (Yes/No)
[COMMITMENT TYPE COMMITMETMDAlE-RE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC I " E (Yes/No) (Yes/No)As part of the Site Leak Reduction Program, gas systems (Standby Gas Treatment and Augmented Primary Containment Vent) will be 8/02/2010 No Yes visually inspected, with the aid of smoke tubes, if needed, to identify leaks.}}
As part of the Site Leak Reduction Program, gas systems (Standby Gas Treatment and Augmented Primary Containment Vent) will be           8/02/2010             No                 Yes visually inspected, with the aid of smoke tubes, if needed, to identify leaks.}}

Latest revision as of 18:45, 13 November 2019

Revised Commitment for the Containment Leak Reduction & Control Program for Gas Systems
ML101450393
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/15/2010
From: Hanley T
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SVPLTR: #10-0022
Download: ML101450393 (3)


Text

www.exeloncorp.com ExelNuclearnm Exelon Generation Dresden Generating Station 6500 North Dresden Road Morris, IL60450-9765 Tel 815-942-2920 SVPLTR: #10-0022 10CFR.54 May 15, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Revised Commitment for the Containment Leak Reduction & Control Program for Gas Systems

References:

(1) Commonwealth Edison letter from Cordell Reed and D.L. Peoples to the NRC-H.R. Denton dated November 21, 1979.

(2) Commonwealth Edison letter from D.L. Peoples to the NRC - H.R. Denton

'Lessons Learned Short Term Requirements' dated January 1, 1980.

The purpose of this letter is to inform the NRC that Exelon Generation Company, LLC (EGC) is revising a commitment identified in References (1) and (2) for Dresden Nuclear Power Station (DNPS).

In Reference (1) Commonwealth Edison proposed "Liquid systems will be visually inspected for leakage while systems are at approximate operating pressures. Gas systems will be evaluated using helium leak tests, pressure decay tests for specific tanks and metered make-up pressure tests."

In Reference (2) Commonwealth Edison stated "the test inspection methods used are as follows":

part b. "Gaseous systems are tested by a combination of pressure decay on specific tanks or by helium leakage tests."

The gaseous systems in question are Standby Gas Treatment (SBGT) and Augmented Primary Containment Vent (APCV). Historically, EGC Dresden Station has been conducting visual inspections with the aid of smoke tubes, if needed, in order to identify leaks. These visual inspections remain the current method of testing, guided by procedure, and have been performed in lieu of helium testing.

Helium testing provides no advantage over visual inspections. Helium testing cannot quantify the leakage, only identify the location. The identification of a leak via visual inspection can be accomplished with the same rigor as helium testing.

May 15, 2010 U.S. Nuclear Regulatory Commission Page 2 of 2 As a result, the commitment to perform helium testing is being revised. In order to satisfy the Site Leak Reduction Program, visual inspections with the aid of smoke tubes, if needed, will continue to be performed. The revised commitment is included as Attachment 1 to this letter.

Should you have any questions concerning this letter, please contact Mr. Dennis Leggett, Regulatory Assurance Manager at 815-416-2800.

Respectfully, Tim Ha Site Vice President Dresden Nuclear Power Station

Attachment:

Commitment for Site Leak Reduction Program cc: Regional Administrator - NRC Region IIl NRC Senior Resident Inspector - Dresden Nuclear Power Station

Attachment 1

SUMMARY

OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the document represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)

COMMITMETMDAlE-RE COMMITTED [COMMITMENT TYPE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC I " E(Yes/No) (Yes/No)

As part of the Site Leak Reduction Program, gas systems (Standby Gas Treatment and Augmented Primary Containment Vent) will be 8/02/2010 No Yes visually inspected, with the aid of smoke tubes, if needed, to identify leaks.