ML120470486: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: WC First Exam Date:
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility:       WC                                       First Exam Date:       Jan 18, 2012 Written Exam Outline (N/A)
Jan 18, 2012 Written Exam Outline (N/A) Comment Resolution 1 N/A   Administrative JPM Outline (11/14/2011
Comment                                             Resolution 1   N/A Administrative JPM Outline (11/14/2011)
) Comment Resolution 1 Make sure E
Comment                                             Resolution Make sure E-plan classification is             Ok 1  different than what was given on last 2 NRC exams (Sep 2011, Aug 2009).
-plan classification is different than what was given on last 2 NRC exams (Sep 2011, Aug 2009).
2   Does JPM include PARs?                         Does not. Will review at exam validation.
Ok 2 Does JPM include PARs?
Consider other than nuclear                   Will look at for next exam.
Does not. Will review at exam validation.
classification - does WC have a toxic 3
3 Consider other than nuclear classification  
gas Abnormal Op Procedure /
- does WC have a toxic gas Abnormal Op Procedure / classification requirement?
classification requirement?
Will look at for next exam. 4 Only portion that is Time Critical is the notification portion  
Only portion that is Time Critical is the     Remove Time Critical identification for this 4  notification portion - is this a 2 part       JPM. Will remain a one part JPM and rewrite JPM?                                          Task Standard failure criteria of 15 minutes.
- is this a 2 part JPM? Remove Time Critical identification for this JPM. Will remain a one part JPM and rewrite Task Standard failure criteria of 15 minutes.
Consider adding narrative to outline           Ok 5
5 Consider adding narrative to outline submittal.
submittal.
Ok  Control Room / In
Control Room / In-Plant System JPM Outline (11/14/2011)
-Plant System JPM Outline (11/14/2011
Comment                                             Resolution Provide original JPM for all Modified         Ok.
) Comment Resolution 1 Provide original JPM for all Modified JPMs with Draft exam submittal.
1 JPMs with Draft exam submittal.
Ok. 2 S7 - not sure what "correct energize" means Will correct.
S7 - not sure what correct energize         Will correct.
3 Consider adding narrative to outline submittal.
2 means Consider adding narrative to outline           Ok.
Ok.
3 submittal.
Simulator Scenario Outline Comments (N/A) Comment Resolution 1 N/A}}
Simulator Scenario Outline Comments (N/A)
Comment                                             Resolution 1   N/A                                                             OBDI 202 - IOLE Process}}

Latest revision as of 08:09, 12 November 2019

WC-2012-01-Draft Outline Comments
ML120470486
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/18/2012
From:
Division of Reactor Safety IV
To:
References
Download: ML120470486 (1)


Text

DRAFT OUTLINE COMMENTS Facility: WC First Exam Date: Jan 18, 2012 Written Exam Outline (N/A)

Comment Resolution 1 N/A Administrative JPM Outline (11/14/2011)

Comment Resolution Make sure E-plan classification is Ok 1 different than what was given on last 2 NRC exams (Sep 2011, Aug 2009).

2 Does JPM include PARs? Does not. Will review at exam validation.

Consider other than nuclear Will look at for next exam.

classification - does WC have a toxic 3

gas Abnormal Op Procedure /

classification requirement?

Only portion that is Time Critical is the Remove Time Critical identification for this 4 notification portion - is this a 2 part JPM. Will remain a one part JPM and rewrite JPM? Task Standard failure criteria of 15 minutes.

Consider adding narrative to outline Ok 5

submittal.

Control Room / In-Plant System JPM Outline (11/14/2011)

Comment Resolution Provide original JPM for all Modified Ok.

1 JPMs with Draft exam submittal.

S7 - not sure what correct energize Will correct.

2 means Consider adding narrative to outline Ok.

3 submittal.

Simulator Scenario Outline Comments (N/A)

Comment Resolution 1 N/A OBDI 202 - IOLE Process