{{#Wiki_filter:10 CFR 50.55a LAMS Palo Verde Nuclear Generating Station A subsidiary of Pinnacle West Capital Corporation Thomas N. Weber Department Leader Tel. 623-393-5764 Regulatory Affairs Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06469-TNW/CJS February 07, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a LAMS Palo Verde Nuclear A subsidiaryof Pinnacle West CapitalCorporation Thomas N. Weber Department Leader             Tel. 623-393-5764 Mail Station 7636 PO Box 52034 Generating Station            Regulatory Affairs             Fax 623-393-5442           Phoenix, Arizona 85072-2034 102-06469-TNW/CJS February 07, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period: Owner's Activity Report Number U1 R16 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-I) for Unit 1 refueling outage 16 (U1 R1 6). The outage ended on November 28,2011.No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.Sincerely,'1~uj4q , -TNW/RAS/CJS/gat
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period:
Owner's Activity Report Number U1 R16 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report                                         '1 (Form OAR-I) for Unit 1 refueling outage 16 (U1 R1 6). The outage ended on November 28,2011.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, uj4q , -
TNW/RAS/CJS/gat


==Enclosure:==
==Enclosure:==
Unit 1 Sixteenth Refueling Outage Owner's Activity Report, Report U1R16 cc:      E. E. Collins Jr.      NRC    Region IV Regional Administrator B. K. Singal          NRC    NRR Project Manager for PVNGS J. R. Hall              NRC    NRR Senior Project Manager L. K. Gibson          NRC    NRR Project Manager M. A. Brown            NRC    Senior Resident Inspector for PVNGS A member of the  STARS    (Strategic Teaming and Resource Sharing) Alliance                              Cý)
Callaway 0 Comanche Peak
* Diablo Canyon 0 Palo Verde
* San Onofre 0 South Texas 0 Wolf Creek


Unit 1 Sixteenth Refueling Outage Owner's Activity Report, Report U1R16 cc: E. E. Collins Jr.B. K. Singal J. R. Hall L. K. Gibson M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Senior Project Manager NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cý)Callaway 0 Comanche Peak
ENCLOSURE Unit I Sixteenth Refueling Outage Owner's Activity Report Report UIRI6
* Diablo Canyon 0 Palo Verde
 
* San Onofre 0 South Texas 0 Wolf Creek ENCLOSURE Unit I Sixteenth Refueling Outage Owner's Activity Report Report UIRI6 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 1R16 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 1 (if applicable)
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number:                   1R16 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.:             1                   Commercial service date:                       Jan 28, 1986                 Refueling Outage No.:                   16 (if applicable)
Commercial service date: Jan 28, 1986 Refueling Outage No.: 16 Current inspection interval Current inspection period _3rd (1", 2'", 3"', 4'v, other)1st (1E' 2rao 3an)Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 09/14/2011  
Current inspection interval                                                                     3rd (1", 2'", 3"', 4 'v, other)
-Revision 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4 (if applicable)
Current inspection period                      _                                                1st (1E' 2rao 3an)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 1R16 conform to the requirements of Section XI.(refueling outage number)Bayless, John Signed D(Z07652)-Digitally signed by Bayless, John 1 D(Z07652)<DN: cn=Bayless, John D(Z07652)--Reason: I prepaired this document Date: 2012.01.26 14:01:42 -07'00'Date: CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 09/14/2011 - Revision 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans                                     Same Code Cases used: N-532-4 (if applicable)
f&#xfd; Digitally signed by Hogstrom, Robert Hogstrm, ::(YH2450)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made inthis report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 1R16                       conform to the requirements of Section XI.
H ogstrom, ,DN: cn=Hogstrom, Robert (YH2450)Robert (YH2450)" Rason: I have reviewed this Robet D" Date: 2012.01.2614:08:32  
(refueling outage number)
-07'00' Commissions NB 9685 "A, N, I, C" Az 264 (Inspector's Signature)
                                                              - Digitally signed by Bayless, John Bayless, John                                    1 D(Z07652)
National Board, State, Province, and Endorsements Date: _PV-E0796 Ver. 1 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 1 Refueling Outage 16 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description
                                                              <DN: cn=Bayless, John D(Z07652)
....... None 2 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 1 Refueling Outage 16 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number IJSIAPSV0469  
Signed        D(Z07652)                                        --Reason: I prepaired this document Date: 2012.01.26 14:01:42 -07'00'                     Date:
-A Train Shutdown 1/51 1 Replace 3/4" PSV nozzle & disc to correct seat leakage 10/25/11 Work Order # 3445578 Cooling Relief Valve to Reactor Drain Tank 2 1PSGEL005  
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                     Arizona                       and employed by                             HSB CT                     of Hartford, Connecticut                           have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
-Feedwater line to Steam Generator 2 Replace piping and fittings due to FAC 11/19/11 Work Order # 3048670 3 1 MDGAE05 -Diesel Generator A Jacket Water Cooler Base metal repair DG Jacket Water Heat Exchanger  
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
.10/26/11 Work Order# 3537930'I *1--*1- + *1-}}
Hogstrm,                  ::(YH2450) f&#xfd; Digitally signed by Hogstrom, Robert H ogstrom,                         ,DN: cn=Hogstrom, Robert (YH2450)
Robert     Robet*.      ,--,,*-/*curmont (YH2450)"               Rason: I have reviewed this Date: 2012.01.2614:08:32 -07'00' D"                                        Commissions                           NB 9685 "A, N, I, C" Az 264 (Inspector's Signature)                                                                           National Board, State, Province, and Endorsements Date:     _
PV-E0796 Ver. 1
 
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item                         Description                   Evaluation Category   Number                         of Work                       Description
            .......                         None 2
 
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 2 Abstract of repair/replacement activities required for continued service Item                                                 Description                             Date         Repair/Replacement Code Class                   Description                                               of Work                           Completed         Plan Number IJSIAPSV0469 - A Train Shutdown                                                                           1/51 1                                             Replace 3/4" PSV nozzle & disc to correct seat leakage     10/25/11     Work Order # 3445578 Cooling Relief Valve to Reactor Drain Tank 2       1PSGEL005 - Feedwater line to Steam Generator 2               Replace piping and fittings due to FAC             11/19/11     Work Order # 3048670 3     1MDGAE05 - Diesel Generator A Jacket Water Cooler       Base metal repair DG Jacket Water Heat Exchanger         .10/26/11     Work Order# 3537930
                                                              'I-                                                        1-            *1-
-                                                             *1-                                                         +             *1-}}

Latest revision as of 07:27, 12 November 2019

Letter to APS Third 10-Year Interval, First Period: Owner'S Activity Report Number U1R16
ML12060A266
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/07/2012
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06469-TNW/CJS
Download: ML12060A266 (5)


Text

10 CFR 50.55a LAMS Palo Verde Nuclear A subsidiaryof Pinnacle West CapitalCorporation Thomas N. Weber Department Leader Tel. 623-393-5764 Mail Station 7636 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06469-TNW/CJS February 07, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, Docket No. STN 50-528 Third 10-Year Interval, First Period:

Owner's Activity Report Number U1 R16 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report '1 (Form OAR-I) for Unit 1 refueling outage 16 (U1 R1 6). The outage ended on November 28,2011.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, uj4q , -

TNW/RAS/CJS/gat

Enclosure:

Unit 1 Sixteenth Refueling Outage Owner's Activity Report, Report U1R16 cc: E. E. Collins Jr. NRC Region IV Regional Administrator B. K. Singal NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cý)

Callaway 0 Comanche Peak

  • Diablo Canyon 0 Palo Verde
  • San Onofre 0 South Texas 0 Wolf Creek

ENCLOSURE Unit I Sixteenth Refueling Outage Owner's Activity Report Report UIRI6

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 1R16 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 1 Commercial service date: Jan 28, 1986 Refueling Outage No.: 16 (if applicable)

Current inspection interval 3rd (1", 2'", 3"', 4 'v, other)

Current inspection period _ 1st (1E' 2rao 3an)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plans 09/14/2011 - Revision 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made inthis report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 1R16 conform to the requirements of Section XI.

(refueling outage number)

- Digitally signed by Bayless, John Bayless, John 1 D(Z07652)

<DN: cn=Bayless, John D(Z07652)

Signed D(Z07652) --Reason: I prepaired this document Date: 2012.01.26 14:01:42 -07'00' Date:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Hogstrm,  ::(YH2450) fý Digitally signed by Hogstrom, Robert H ogstrom, ,DN: cn=Hogstrom, Robert (YH2450)

Robert Robet*. ,--,,*-/*curmont (YH2450)" Rason: I have reviewed this Date: 2012.01.2614:08:32 -07'00' D" Commissions NB 9685 "A, N, I, C" Az 264 (Inspector's Signature) National Board, State, Province, and Endorsements Date: _

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description

....... None 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 1 Refueling Outage 16 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number IJSIAPSV0469 - A Train Shutdown 1/51 1 Replace 3/4" PSV nozzle & disc to correct seat leakage 10/25/11 Work Order # 3445578 Cooling Relief Valve to Reactor Drain Tank 2 1PSGEL005 - Feedwater line to Steam Generator 2 Replace piping and fittings due to FAC 11/19/11 Work Order # 3048670 3 1MDGAE05 - Diesel Generator A Jacket Water Cooler Base metal repair DG Jacket Water Heat Exchanger .10/26/11 Work Order# 3537930

'I- 1- *1-