| Interim 10 CFR Part 21 Report Regarding Internal Pump Tolerances between the Impeller Hub and a Wear Ring This letter serves as an interim report in accordance with 1O CFR 21.21 pertaining to a potential deviation associated with a Flowserve pump model 6L-SVC back pull out assembly (p/n 11952230) that was supplied to the RE Ginna Nuclear Power Plant. A defect may exist with the assembly tolerances between the impeller hub and the wear ring. The tolerances should have been such that there was an interference fit, but during disassembly, which included removal of the wear ring locking set screws, the wear ring was able to be slid off the hub freely. | | Interim 10 CFR Part 21 Report Regarding Internal Pump Tolerances between the Impeller Hub and a Wear Ring This letter serves as an interim report in accordance with 10 CFR 21.21 pertaining to a potential deviation associated with a Flowserve pump model 6L-SVC back pull out assembly (p/n 11952230) that was supplied to the RE Ginna Nuclear Power Plant. A defect may exist with the assembly tolerances between the impeller hub and the wear ring. The tolerances should have been such that there was an interference fit, but during disassembly, which included removal of the wear ring locking set screws, the wear ring was able to be slid off the hub freely. |
| Evaluation of reportability in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due to a request from the Original Equipment Manufacturer (OEM) to have the impeller returned for their evaluation, which was not able to be fulfilled due to the subject impeller being lost in transit from the site to the OEM. The OEM has been requested to determine the impact of the deviation as the site does not have the specific hydraulic knowledge to determine if a substantial safety hazard exists. The evaluation of the identified defect will be performed by the OEM under their Corrective Action tracking number 309092, and will be completed by October 14, 2016. | | Evaluation of reportability in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due to a request from the Original Equipment Manufacturer (OEM) to have the impeller returned for their evaluation, which was not able to be fulfilled due to the subject impeller being lost in transit from the site to the OEM. The OEM has been requested to determine the impact of the deviation as the site does not have the specific hydraulic knowledge to determine if a substantial safety hazard exists. The evaluation of the identified defect will be performed by the OEM under their Corrective Action tracking number 309092, and will be completed by October 14, 2016. |
| If you have any questions or need any other clarifying information, please contact Thomas Harding, Regulatory Assurance Manager, at (315) 791-5219. | | If you have any questions or need any other clarifying information, please contact Thomas Harding, Regulatory Assurance Manager, at (315) 791-5219. |
| cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna}} | | cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna}} |
Latest revision as of 17:10, 10 November 2019
Similar Documents at Ginna |
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML20136A2552020-04-21021 April 2020 10 CFR Part 21 Report Notification for Curtiss Wright Scientech Certain RTL500 and RTL851 Modules ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16229A4452016-08-15015 August 2016 Interim Part 21 Report Regarding Internal Pump Tolerances Between the Impeller Hub and a Wear Ring ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML15205A2892015-07-24024 July 2015 Notification of Part 21 Report - Deviation in Nozzle Modeling Internal Reports ML15188A0662015-06-25025 June 2015 Part 21 Report - Deviation in Nozzle Modeling Internal Reports ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12075A1062012-03-14014 March 2012 Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks ML11186A9042011-06-30030 June 2011 Notification of Potential Part 21 Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus ML0930603952009-10-30030 October 2009 Transnuclear, Inc. - Submittal of Thirty Day Written Report of a Potential Deviation and Failure to Comply Associated with Unsubstantiated Certified Materials Test Reports for Certain Small Parts Utilized in Products Fabricated ML0927805882009-10-0101 October 2009 Transnuclear, Inc Part 21 Report Re Fasteners on Spent Fuel Storage Devices Not Meeting Standards ML0914904882009-05-28028 May 2009 Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0635201312006-12-14014 December 2006 Scientech LLC, Report 10 CFR Part 21 of Defect ML0511002852005-04-18018 April 2005 Part 21 Initial Notification and Preliminary Report - Cutler-Hammer A200 NEMA Size 1 Starters ML0403002542004-01-28028 January 2004 10CFR Part 21 Notification Regarding Wide Range Ion Chamber (Update) ML0236000232002-12-20020 December 2002 Notification of Existence of Defective in Component ML0226104942002-09-0909 September 2002 Rosemount Nuclear Instruments, Inc. Notification Under 10 CFR Part 21 for Model 1153 Differential Pressure Transmitters ML0221706072002-07-24024 July 2002 Rosemount Nuclear Instruments, Inc. Notification Under 10CFR21 for High Line Pressure Correction Methodology ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2020-04-21
[Table view] |
Text
Bill Carsky Plant Manager R.E. Ginna Nuclear Power Plant
) y Exelon Generation 1503 Lake Rd.
Ontario, NY 14519 315 791 5205 Office 215 605 9364 Mobile www.exeloncorp.com william.carsky@exeloncorp.com August 15, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244
Subject:
Interim 10 CFR Part 21 Report Regarding Internal Pump Tolerances between the Impeller Hub and a Wear Ring This letter serves as an interim report in accordance with 10 CFR 21.21 pertaining to a potential deviation associated with a Flowserve pump model 6L-SVC back pull out assembly (p/n 11952230) that was supplied to the RE Ginna Nuclear Power Plant. A defect may exist with the assembly tolerances between the impeller hub and the wear ring. The tolerances should have been such that there was an interference fit, but during disassembly, which included removal of the wear ring locking set screws, the wear ring was able to be slid off the hub freely.
Evaluation of reportability in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due to a request from the Original Equipment Manufacturer (OEM) to have the impeller returned for their evaluation, which was not able to be fulfilled due to the subject impeller being lost in transit from the site to the OEM. The OEM has been requested to determine the impact of the deviation as the site does not have the specific hydraulic knowledge to determine if a substantial safety hazard exists. The evaluation of the identified defect will be performed by the OEM under their Corrective Action tracking number 309092, and will be completed by October 14, 2016.
If you have any questions or need any other clarifying information, please contact Thomas Harding, Regulatory Assurance Manager, at (315) 791-5219.
cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna