{{#Wiki_filter:May 15, 2013  
{{#Wiki_filter:UNITE D S TATE S
                            NUC LEAR RE GULATOR Y C OMMI S SI ON
EA-13-043  
                                                  R E G IO N I V
Louis P. Cortopassi, Site Vice President  
                                            1600 EAST LAMAR BLVD
Omaha Public Power District  
                                      AR L I NGTON , TEXAS 7 601 1- 4511
                                                May 15, 2013
EA-13-043
Louis P. Cortopassi, Site Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
Subject:        RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION
                REPORT 05000285/2013011
Dear Mr. Cortopassi:
Thank you for your letter dated April 24, 2013, in which you responded to NRC Inspection
Report 05000285/2013011 and Notice of Violation, dated March 11, 2013. The violation
involved the failure to classify the river sluice gates as Safety Class 3.
During our review of your response letter, we noted under Item 1, Reason for the Violation, in
the OPPD Response section of the letter, in which you state, OPPD initially denied the
original violation Our review of information on the docket show that you denied
VIO 05000285/2012002-03, Failure to Meet Design Basis Requirements for Design Basis
Flood Event, and did not deny VIO 05000285/2012002-02, Failure to Classify Intake Structure
Sluice Gates as Safety Class III.
We will review any further information about these violations and the implementation of your
corrective actions for the Notice of Violation during a future inspection to determine that full
compliance has been achieved and will be maintained.
                                                    Sincerely,
                                                    /RA/
                                                    Michael C. Hay, Chief
                                                    Project Branch F
                                                    Division of Reactor Projects
Docket No.: 50-285
License No.: DPR-40
cc w/ encl: Electronic Distribution


Fort Calhoun Station FC-2-4 
L. Cortopassi                               -2-
P.O. Box 550
Electronic Distribution by RIV:
 
Regional Administrator (Art.Howell@nrc.gov)
Fort Calhoun, NE  68023-0550
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)
 
DRP Director (Kriss.Kennedy@nrc.gov)
Subject: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2013011
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
Dear Mr. Cortopassi:
DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Thank you for your letter dated April 24, 2013, in which you responded to NRC Inspection Report 05000285/2013011 and Notice of Violation, dated March 11, 2013.  The violation
Senior Resident Inspector (John.Kirkland@nrc.gov)
involved the failure to classify the river sluice gates as Safety Class 3. 
Resident Inspector (Jacob.Wingebach@nrc.gov)
During our review of your response letter, we noted under Item 1, "Reason for the Violation," in
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
the "OPPD Response" section of the letter, in which you state, "OPPD initially denied the
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
original violation-"  Our review of information on the docket show that you denied 
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
VIO 05000285/2012002-03, "Failure to Meet Design Basis Requirements for Design Basis
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
Flood Event," and did not deny VIO 05000285/2012002-02, "Failure to Classify Intake Structure Sluice Gates as Safety Class III." 
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
We will review any further information about these violations and the implementation of your corrective actions for the Notice of Violation during a future inspection to determine that full
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
compliance has been achieved and will be maintained.
Project Manager (Lynnea.Wilkins@nrc.gov)
Sincerely,  /RA/  Michael C. Hay, Chief
RITS Coordinator (Marisa.Herrera@nrc.gov)
Project Branch F
ACES (R4Enforcement.Resource@nrc.gov)
Division of Reactor Projects
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Docket No.:  50-285
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
License No.:  DPR-40
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)
cc w/ encl:  Electronic Distribution
R:\_Reactors\FCS\2013\NOV Response IR 05000285/2013011.pdf ADAMS:ML13136A211
 
SUNSI Rev Compl. Yes  No ADAMS                 Yes  No Reviewer Initials   RWD
Publicly Avail.       Yes  No Sensitive       Yes  No Sens. Type Initials RWD
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
SPE:DRP/F       C:DRP/F
L. Cortopassi - 2 -  
RDeese         MHay
  Electronic Distribution by RIV
    /RA/               /RA/
: Regional Administrator (Art.Howell@nrc.gov)  
    5/14/13           5/16/13
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRP Deputy Director (Michael.Scott@nrc.gov)  
                                    OFFICIAL RECORD COPY
DRS Director (Tom.Blount@nrc.gov)  
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)  
Senior Resident Inspector (John.Kirkland@nrc.gov)  
Resident Inspector (Jacob.Wingebach@nrc.gov) Branch Chief, DRP/F (Michael.Hay@nrc.gov) Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)  
Project Engineer, DRP/F (Chris.Smith@nrc.gov)  
FCS Administrative Assistant (Janise.Schwee@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  
Project Manager (Lynnea.Wilkins@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)  
 
  R:\_Reactors\FCS\2013\NOV Response IR 05000285/2013011.pdf   ADAMS:ML13136A211 SUNSI Rev Compl. Yes  No ADAMS Yes  No Reviewer Initials RWD Publicly Avail. Yes  No Sensitive Yes  No Sens. Type Initials RWD SPE:DRP/F C:DRP/F   RDeese MHay   /RA/ /RA/   5/14/13 5/16/13   OFFICIAL RECORD COPY
}}
}}

Latest revision as of 19:02, 4 November 2019

Response to Notice of Violation and NRC Inspection Report 05000285/2013011
ML13136A211
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/15/2013
From: Hay M
NRC/RGN-IV/DRP
To: Cortopassi L
Omaha Public Power District
References
EA-13-043, IR-13-011
Download: ML13136A211 (2)


See also: IR 05000285/2013011

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

May 15, 2013

EA-13-043

Louis P. Cortopassi, Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

Subject: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000285/2013011

Dear Mr. Cortopassi:

Thank you for your letter dated April 24, 2013, in which you responded to NRC Inspection

Report 05000285/2013011 and Notice of Violation, dated March 11, 2013. The violation

involved the failure to classify the river sluice gates as Safety Class 3.

During our review of your response letter, we noted under Item 1, Reason for the Violation, in

the OPPD Response section of the letter, in which you state, OPPD initially denied the

original violation Our review of information on the docket show that you denied

VIO 05000285/2012002-03, Failure to Meet Design Basis Requirements for Design Basis

Flood Event, and did not deny VIO 05000285/2012002-02, Failure to Classify Intake Structure

Sluice Gates as Safety Class III.

We will review any further information about these violations and the implementation of your

corrective actions for the Notice of Violation during a future inspection to determine that full

compliance has been achieved and will be maintained.

Sincerely,

/RA/

Michael C. Hay, Chief

Project Branch F

Division of Reactor Projects

Docket No.: 50-285

License No.: DPR-40

cc w/ encl: Electronic Distribution

L. Cortopassi -2-

Electronic Distribution by RIV:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Janise.Schwee@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Doug.Huyck@nrc.gov)

R:\_Reactors\FCS\2013\NOV Response IR 05000285/2013011.pdf ADAMS:ML13136A211

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RWD

Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials RWD

SPE:DRP/F C:DRP/F

RDeese MHay

/RA/ /RA/

5/14/13 5/16/13

OFFICIAL RECORD COPY