IR 05000416/2015402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 24: Line 24:


==Dear Mr. Mulligan:==
==Dear Mr. Mulligan:==
On February 17, 2016, the NRC completed its end-of-cycle performance review of Grand Gulf Nuclear Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
On February 17, 2016, the NRC completed its end-of-cycle performance review of Grand Gulf Nuclear Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Line 34: Line 34:
Sincerely,
Sincerely,
/RA/
/RA/
Mark S. Haire, Chief  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Enclosure:
Inspection Plan ML16056A178 Letter w/encl.


Plant Support Branch 1 Division of Reactor Safety
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
 
By: MHaire Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Letter w/o encl.
Docket No. 50-416 License No. NPF-29
 
Enclosure: Inspection Plan
 
ML16056A178 Letter w/encl. SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl.
 
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 C:DRP/C C:PSB1 NAME MHaire/dch GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/ DATE 2/18/16 2/21/16 3/2/16 Letter to Kevin Mulligan from Mark S. Haire, dated March 2, 2016 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000416/2015402)


SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: MHaire Yes No Non-Publicly Available Sensitive RGN-002 OFFICE C:PSB1 C:DRP/C C:PSB1 NAME MHaire/dch GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/
DATE 2/18/16 2/21/16 3/2/16 Letter to Kevin Mulligan from Mark S. Haire, dated March 2, 2016 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000416/2015402)
Distribution w/enclosure:
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)  
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
 
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)
 
DRS Director (Anton.Vegel@nrc.gov)
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)
 
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Vacant)
Resident Inspector (Neil.Day@nrc.gov)
Administrative Assistant (Vacant)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)  
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
 
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)  
Distribution w/o enclosure:
 
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)  
Project Manager (Alan.Wang@nrc.gov)
 
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov) R4Allegation Resource SAIC (Gayle.Walker@nrc.gov)  
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)
 
R4Allegation Resource SAIC (Gayle.Walker@nrc.gov)
RSLO (Bill.Maier@nrc.gov)  
RSLO (Bill.Maier@nrc.gov)
 
RidsOeMailCenter Resource
RidsOeMailCenter Resource
}}
}}

Latest revision as of 23:42, 30 October 2019

Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2015402)
ML16056A178
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/02/2016
From: Mark Haire
Plant Support Branch-1
To: Kevin Mulligan
Entergy Operations
References
IR 2015402
Download: ML16056A178 (4)


Text

rch 2, 2016

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000416/2015402)

Dear Mr. Mulligan:

On February 17, 2016, the NRC completed its end-of-cycle performance review of Grand Gulf Nuclear Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Enclosure:

Inspection Plan ML16056A178 Letter w/encl.

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: MHaire Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Letter w/o encl.

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: MHaire Yes No Non-Publicly Available Sensitive RGN-002 OFFICE C:PSB1 C:DRP/C C:PSB1 NAME MHaire/dch GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/

DATE 2/18/16 2/21/16 3/2/16 Letter to Kevin Mulligan from Mark S. Haire, dated March 2, 2016 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000416/2015402)

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Senior Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Neil.Day@nrc.gov)

Administrative Assistant (Vacant)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Distribution w/o enclosure:

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)

R4Allegation Resource SAIC (Gayle.Walker@nrc.gov)

RSLO (Bill.Maier@nrc.gov)

RidsOeMailCenter Resource