ML16067A142: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~Entergy Nuclear Operations, Inc. | {{#Wiki_filter:~Entergy Nuclear Operations, Inc. | ||
Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth. | Er~t**Pilgrim Nuclear Power Station | ||
MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | -E nte--y 600 Rocky Hill Road Plymouth. MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014 | Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | ||
Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw | Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015. | ||
Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323. | |||
There are no regulatory commitments contained in this letter. | |||
Sincerely, Manager," Reguilatory'Assurnc EPP/mw | |||
==Enclosure:== | ==Enclosure:== | ||
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan | |||
Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station | |||
Program Plan (132 Pages) | Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan (132 Pages) | ||
~Entergy Nuclear Operations, Inc. | |||
Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth. | ~Entergy Nuclear Operations, Inc. | ||
MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | Er~t**Pilgrim Nuclear Power Station | ||
-E nte--y 600 Rocky Hill Road Plymouth. MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014 | Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | ||
Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw | Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015. | ||
Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323. | |||
There are no regulatory commitments contained in this letter. | |||
Sincerely, Manager," Reguilatory'Assurnc EPP/mw | |||
==Enclosure:== | ==Enclosure:== | ||
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan | |||
Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station | |||
Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan (132 Pages)}} | |||
Program Plan (132 Pages)}} |
Latest revision as of 23:06, 30 October 2019
ML16067A142 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 02/24/2016 |
From: | Perkins E Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2.16.014 | |
Download: ML16067A142 (3) | |
Text
~Entergy Nuclear Operations, Inc.
Er~t**Pilgrim Nuclear Power Station
-E nte--y 600 Rocky Hill Road Plymouth. MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014
Dear Sir or Madam:
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.
Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.
Sincerely, Manager," Reguilatory'Assurnc EPP/mw
Enclosure:
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan
Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan (132 Pages)
~Entergy Nuclear Operations, Inc.
Er~t**Pilgrim Nuclear Power Station
-E nte--y 600 Rocky Hill Road Plymouth. MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014
Dear Sir or Madam:
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.
Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.
Sincerely, Manager," Reguilatory'Assurnc EPP/mw
Enclosure:
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan
Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan (132 Pages)