{{#Wiki_filter:MO NIH November 1978 DAY AVERAGE DAILY POWER LEVEL I 2 3 4 5 6 7 8 9 10 11 12 13 14 15. 16 Pg. 2 of 14 8.1-7.Rl (MWe-NET) 0 0 0 0 0 0 0 0 0 0 0 0 112 556 752 .. 676 DJCKET NO. 50-272 UN IT Salem # 1 DATE December 11, 1978 CQvfPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY Prnff.R LEVEL 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 (j>Il'iE-NET) . .,-__ I 984 1,102 995 965 978 1,097 1,105 1,120 1,036 1,101 191 0 0 406 ---
{{#Wiki_filter:DJCKET NO. 50-272
i.* TJnit Nane:. Salem #1 Notes: .. 2. P.eport:l.nq Period:_*
                                                            ~~~~~~~~-
_N_o_vernbe..;..*
UN IT Salem # 1 DATE December 11, 1978 CQvfPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 MONIH    November 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY Prnff.R LEVEL (MWe-NET)                      (j>Il'iE-NET)
__ r_l_9_7_8
I               0            17                    984 2                0            18                1,102 3                0            19                    995 4                0            20                    965 5                0            21                    978 6                0            22                1,097 7                0            23                1,105 8                0            24                1,120 0            25                1,036 9
______ _ 3. . r.; censed 'llleml Pa..er (M'it) :
0                              1,101 10                            26 11                0            27                    191 12                0           28                      0 13            112            29                      0 14            556            30                    406
_______ _ 4. NaIIep.late Ra.t:!.nq (GJ:Css. me1: ____ 1;:;.;-l:;.;;-3;;.;;:5::..__
: 15.            752 ..        31                  - - -
_____ _ s. Cesign* Electrical..
676 16
Rating: (Net: l-lie): 1090 6. . Maxlmlm* Dependable Capa.c:i:l:y (Gross. l-lie) : 1124 1. Ma..vinnm-Cependable*
                                        .
capacity* (Net !-H!): -,-, .,,..io.,.7""'9-_:--.  
I
--*
                                          .,-__
50-272 CATE*: December 11, 19 7 8 SY: L. K. Miller 609-365-7000 X507 a. If Changes OccJr ill Capacity Ra.tings <Item* Ntm:er* 3 Throa;h 7} SJ.nee Last P.eport,.
Pg. 2 of 14 8.1-7.Rl
Giw Reason: NONE 9. Power Leval 'lb Mlich
 
* If Aey* (Net l-lie) :.
                                                                                                                                  *
: 10. Rea.sons For Restricti.cns,.
                                                                                                                                ~ID.: :__...;..;.....=~-.....,,....,,.--,,.~
u* ________ N_O_NE ____ -____________
50-272 CATE*:          December 11, 19 7 8
_ ll. Ei:lurs. In P.eportinq Period 12.. Numer Of Hours Reactor Was CritiCal
                                                                                                                              ~ SY:                    L. K. Miller
                                                                                                                                  ~:                  609-365-7000 X507 i.* TJnit Nane:. Salem #1                                                                                 Notes: ..
_ _r_l_9_7_8_ _ _ _ _ __
: 2. P.eport:l.nq Period:_*_N_o_vernbe..;..*
: 3. . r.; censed 'llleml Pa..er (M'it) : _3~3_3_8_______ _
: 4. NaIIep.late Ra.t:!.nq (GJ:Css. me1: ____1;:;.;-l:;.; -3;;.; :5: . ___ _ _ _ __
: s. Cesign* Electrical.. Rating: (Net: l-lie):                             1090
: 6. . Maxlmlm* Dependable Capa.c:i:l:y (Gross. l-lie) :                       1124
: 1. Ma..vinnm- Cependable* capacity* (Net !-H!):                       -,-,.,,..io.,.7""'9-_:--.- -
: a. If Changes OccJr ill Capacity Ra.tings <Item* Ntm:er* 3 Throa;h 7} SJ.nee Last P.eport,.                                         Giw         Reason:
NONE
: 9. Power Leval 'lb Mlich * ~cted, If Aey* (Net l-lie) :. *--..::.:N~ONE=-----------------
: 10. Rea.sons   For Restricti.cns,. u* ~ ________N_O_NE                                                    _ _ _ _- _ _ _ _ _ _ _ _ _ _ _ __
Year to Date                Qm1lat'ive 720                    8,016                    12,457 ll. Ei:lurs. In P.eportinq Period 12.. Numer Of Hours Reactor Was CritiCal                                                                   377.2                  4 I 557
* 0.              7I100
* 2
                                                                                                                                                        -------.,..-~-
* l3.
* l3.
* Reactor Reserve Shutdown
* Reactor Reserve Shutdown ~urs                                                                            0.0                        0. 0                        0.0 aours Generator On-Line,                                                                                                   *4,344~~P.                6,774.6 14.
: 14. aours Generator On-Line, . 15. unit Reserve Shutdown Hours l6. . Gross 'IheJ:mal Energy-Generated (Mm) 17. Gross Electtical EMrgy Generated cz.HI) 18. Net Generated(!-H!)*
. 15. unit   Reserve Shutdown Hours                                                                         o.o                      . 0.0        --------          0.0 l6. . Gross 'IheJ:mal Energy- Generated (Mm)                                                   1,002,926                  12,714,590                19,409,810
: 19. crnit.ServiceFactor*
: 17. Gross Electtical EMrgy Generated cz.HI)                                                     '331,770                  4,251,130                6,437,440
20 *. Unit\AvailahHity
: 18. Net Electrical~ Generated(!-H!)*                                                             *311,316                  4,020,141                6,078,359
_Factor . 21. Unit capacity Factor (Using' MCC Net) Unit capa.city Factor (Us:lnq CER Net) . 720 377.2 0.0 o.o 1,002,926
: 19. crnit.ServiceFactor*                                                                                  49.8                      54.2                       54.4 49.8                       54.2                      54.4 20 *. Unit\AvailahHity _Factor
'331,770 *311,316 49.8 49.8 40.l 39.7 23. Unit :E'Orced*
: 21. Unit capacity Factor (Using' MCC Net)
Outage Rate 50
                                                            .
* 2 Year to Date Qm1lat'ive 8,016 12,457 4 I 557
40.l                                    -------
* 0. 7I100
_ _ _ _._4;;.,;6;,, ,;.__5_____._..._4.;;,,,;5;..;*. ;. 2__
* 2
22~  Unit capa.city Factor (Us:lnq CER Net) .                                                              39.7 50
: 0. 0 0.0 6,774.6 --------. 0.0 0.0 12,714,590 19,409,810 4,251,130 6,437,440 4,020,141 6,078,359 54.2 54.4 54.2 54.4 -------____ ._4;;.,;6;,,,,;.
* 2 46.0 45.8 .      -------        44.8 37.3 23.
__ 5 ___ __._..._4.;;,,,;5;..;
24.
* ..;..2 __ 46.0 44.8 -------45.8 . 37.3 -------24. Sht.tt:dcwns Scheduled Oller NeXt: 6 (Type, Date, arid Duration 0&#xa3; Each) : Unit Refueling 3/31/79:-6/23/79 25.
Unit :E'Orced* Outage Rate Sht.tt:dcwns Scheduled Oller NeXt: 6 ~ths (Type, Date,                                        arid Duration 0&#xa3; Each) :
* If Shut D::lwn At Ecd of. Report Period! Estimated oate .of* Startup: . 26. emits rn* Test StatlJs(Ptior to a-l-7.R2 Pg.;3 of 14 Forecast* . 9/30/76 11/01/76 12/20/76 Achieved 12/11/76 12/25/76 6/30/77 NO. .78-252 78-253 78-255 78-257 78-261 78-268 78-277 DATE 10/21/78 11/13/78 11/13/78 11/14/78 11/15/78 11/19/78 11/27/78 Page 4 Of 14 B-1-7.Rl TYPE 1 F F F F F F F OORATION (HOURS) 290.7 A 3.5 A 0.0 B 0.0 B o.o B 0.0 B 67.1 A UNIT SllUTIXMNS 1\ND PCMER REDUCl'IONS REPORI' MJNrH Noveniber METHOD I OF SHUIT'ING LicENSE SYS'J.'EM a:MPONEm' IXMN EVENT CODE4 CODES REAC'IDR REPORT # 4B ----CB PUMP XX 3 --HI HTEXCH
                                                                                                                                                        -------
* 4A ----EB zzzzzz 4A ----:IE zzzzzz 4A ----IE zzzzzz. -4A ----HH FILTER 3 ----EB GENERA l I " i I I DOCKET NO.
Unit Refueling 3/31/79:- 6/23/79
UNIT 'NAME: _S_a_l_em
: 25.
__
* If Shut D::lwn At Ecd of. Report Period! Estimated                                    oate    .of* Startup: - - - - - - - - - - - - - - - -
___ _ DATE: December 11, 1978 COMPLETED BY: L.K. Miller TELEPHONE:
. 26. emits rn* Test StatlJs(Ptior to Camercial,~tion):
609-365-7000 X507 CAUSE AND CORRECTIVE ACTION 'ID PREVENT ROCURRENCE Failure of Seals on 13 RCP #14 Steam Generator High Level Safe-Guard Errergency Control Flux Mapping Surveillance Flux Mapping Surveillance
Forecast*                 Achieved
#11 Steam Generator Feed Pump Strainer lB Vital Instrurrent Inverter Failure -* '  
                                                                                                                              . 9/30/76                   12/11/76 11/01/76                   12/25/76 a-l-7.R2 Pg.;3 of        14                                                                                                          12/20/76                    6/30/77
. MAJOR PLANT . 'REPORT MONTH November, 197-3 *DCR NO. PRINCIPLE SYSTEM PD-0128 s. G. Feed (115VAC)
 
* DESIGN CHANGE REQUEST 8-1-7.Rl & Cond. DOCKET NO.: 50-272 NAME: Salem #1 DATE: December 11, 1978 COMPLETED TELEPHONE:
UNIT SllUTIXMNS 1\ND PCMER REDUCl'IONS DOCKET NO. =~5~0~--2_._72~-----
609-365-7000 x 507 SUBJECT Relocate 115VAC Governor Control Power Supply Page 5 of 14   
REPORI' MJNrH    Noveniber                      UNIT 'NAME:    _S_a_l_em
.MAJOR PLANT REPORT MONTH November, 197-8 *DCR NO. lOCFRS0.59.
__~#_l_ _ __
PD-0128 This design change does not operation.
DATE: December 11, 1978 COMPLETED BY: L.K. Miller TELEPHONE: 609-365-7000 X507 I
It will increase
METHOD OF OORATION   SHUIT'ING    LicENSE      SYS'J.'EM a:MPONEm'            CAUSE AND CORRECTIVE NO.       DATE    TYPE1 (HOURS)  ~  IXMN        EVENT      CODE4      CODES                  ACTION 'ID REAC'IDR    REPORT #                                      PREVENT ROCURRENCE
* DESIGN CH_Z\NGE REQUEST DOCKET NO.: 50-272 UN-NAME: Salem #1 DATE: December 11, 1978 COMPLETED BY: L. K. Miller TELEPHONE:
.78-252  10/21/78    F    290.A 4B        -  - - -        CB      PUMP XX  Failure of Seals on 13 RCP 78-253  11/13/78    F        3.5  A  3          -  -            HI       HTEXCH * #14 Steam Generator High Level 78-255  11/13/78    F        0.0  B  4A         - - -       -   EB      zzzzzz   Safe-Guard Errergency Control 78-257  11/14/78    F        0.0  B  4A         - - -       -   :IE      zzzzzz    Flux Mapping Surveillance 78-261  11/15/78    F        o.o  B  4A        - - -
609-365-7000 x 507 SAFETY EVALUATION functionall change the system system reliability.
                                                            ~
Page 6 of 14 DOCKET NO.: 50-272 Sylv'.!MAR:l OF SAFETY RELATE.INTENANCE DEP A,RT:V.i.ENT Maintenance/Perforrnahce REPORT MONTH November 1978 UNIT ,.ME: Salem #1 =TE: December 11, 1978 L. K. Miller 1 j I t-' I ! WOR...1< ORDER NO. MD-3206 OD-10697 OP-0495 OP-0479 EQUIPMENT I FAILURE 100' Elev.* Air Ibck Worn Inner Door Bearings.
                                                              -   IE      zzzzzz. - Flux Mapping Surveillance 78-268  11/19/78    F        0.0  B  4A        - - -       -   HH      FILTER    #11 Steam Generator Feed Pump Strainer 78-277 11/27/78    F      67.1  A  3          - - -       -  EB      GENERA    lB Vital Instrurrent Inverter Failure l
12 Safety Injection Internally Damaged. Pump 11 & 12 Containment Low Flow., Sump Pumps !Valve _lONT031 Install Valve per DCR PD-0125. CORRECTIVE ACTION Replaced Bearings.
                                                                                                                                  -*
Replaced Pump. Cleaned Suction Strainers.
I
Installed Valve. ---**-1c12sv--Bat.*tel:y Rcx:>m rnOperable.
                                                        "
Repaired Centrifical Switch. OD-10576 PD-5141 OD-10742 OD-10813 OD-10697 OD-10732 *OD.,...10865 OD-10612 Page 7 of 14 8-1-7.Rl Verit Fan. Kralve 12SW092 tRMS 1R13E !Valve 10CV018 Valve 10PR002 13 Service Water Pump. 14 Service Water Pump Service Water Pump Strainer.  
i I
-
                                                                                                                        '
Not Close. Erroneous Alarm. No Open Indication.
I Page 4 Of 14 B-1-7.Rl
Valve Does Not Close. Motor Bearing Cooler Malfunctioning.
 
Replaced Diaphragm.
DOCKET NO.:   50-272
Replaced Bistable Drawer. Adjusted Limit Switch. Replaced SV-760. Replaced Cooler. High Temperature Alarm From Replaced Cooler Coil and Upper. MotGr Bearing Cooler. Bearings.
. MAJOR PLANT MODIFI~IONS .            U~ NAME:     Salem #1
Shear Pin Broken. Replaced Distributor Barrel Seals, & Shear Key. [4 Steam Generator Packing Leaking on Pressure Replaced Valve. Tap Valve.
'REPORT MONTH    November, 197-3 DATE:   December 11, 1978 COMPLETED BY:~L~*~K_.~M_i_l_l_e_r~~-
DOCKET NO.: . 50-272 OF SF..FETY DEF j\RTMENT Maintenance/Performance REPORT MONTH November 1978 UNIT 1* .. M.E;_S_a_l_ern
TELEPHONE:   609-365-7000 x 507
__ #_l _______ _ TE: December 11, 1978 L. K. Miller ' i r i WORK ORDER NO. OD-10853 PD-5182 OD-10743 OP-0437 OD-10864 OD-10845 OD-10147 OD-10895 OD-10921 OD-10670 ' MD-3225 PD-5175 PD-5205 OD-10481 Page 8 of 14 8-1-7.Rl EQUIPMENT Valve 10CV056 Channel N42 NIS 1LC500 B/J Valve 10CV078 Valve 11SW024 Valve 10WL099 Channel lC $ *. El. C. Valve llMS171 Valve 14BF019 Valve 14SW065 Channel lC S.E.C. Solenoid Valve SV398. Channel N43 NIS 15 Service Water Purrp. TELEPHONE:
    *DCR NO.      PRINCIPLE SYSTEM              SUBJECT PD-0128    s. G. Feed & Cond. Relocate 115VAC Governor (115VAC)              Control Power Supply
609-365-7000 X507 FAILURE DESCrtIPTION CORREC:TIVE
* DESIGN CHANGE REQUEST                        Page 5 of 14 8-1-7.Rl
.?.CT ION I r Packing Leak. Repacked Valve. I Out Of Spec. Adjusted Isolation A:rrp Gains. Level Deviation Alann ... Replaced Capacitors.
 
DOCKET NO.: 50-272
.MAJOR PLANT MODIFI~IONS                                    Salem #1 UN- NAME:
REPORT MONTH     November, 197-8                           December 11, 1978 DATE:
COMPLETED BY:  L. K. Miller TELEPHONE:  609-365-7000 x 507
  *DCR NO.       lOCFRS0.59.               SAFETY EVALUATION PD-0128   This design change does not functionall change the system operation. It will increase system reliability.
Page 6 of 14
* DESIGN CH_Z\NGE REQUEST
 
DOCKET NO.:       50-272 Sylv'.!MAR:l OF SAFETY RELATE.INTENANCE UNIT  ,.ME: ~-=.:~:...:...='--~~~~~~~~
Salem #1
                                                                                      =TE:    December 11, 1978 DEP A,RT:V.i.ENT Maintenance/Perforrnahce                                   ~~~~~~~_:._~~~~~
L. K. Miller REPORT MONTH         November 1978 WOR...1< ORDER            EQUIPMENT                  FAILURE    DESC~!PTION      CORRECTIVE ACTION NO.
I MD-3206             100' Elev.*   Air   Ibck Worn Inner Door Bearings.          Replaced Bearings.
OD-10697            12 Safety Injection           Internally Damaged.           Replaced Pump.
Pump OP-0495            11 & 12 Containment Low Flow.,                             Cleaned Suction Strainers.
Sump Pumps OP-0479            !Valve _lONT031               Install Valve per DCR         Installed Valve.
PD-0125.
                    --- **-1c12sv--Bat.*tel:y Rcx:>m   rnOperable.                   Repaired Centrifical Switch.
Verit Fan.
OD-10576           Kralve 12SW092            - ~Will Not Close.              Replaced Diaphragm.
1j I
t-'
PD-5141             tRMS 1R13E                  Erroneous Alarm.              Replaced Bistable Drawer.
OD-10742           !Valve 10CV018              No Open Indication.            Adjusted Limit Switch.
OD-10813           Valve 10PR002                Valve Does Not Close.          Replaced SV-760.
I
!    OD-10697            13 Service Water Pump.
Motor Bearing Cooler Malfunctioning.
Replaced Cooler.
OD-10732            14 Service Water             High Temperature Alarm From Replaced Cooler Coil and Pump                   Upper. MotGr Bearing Cooler.         Bearings.
    *OD.,...10865        ~4  Service Water            Shear Pin Broken.             Replaced Distributor Barrel Pump Strainer.                                           Seals, & Shear Key.
OD-10612            [4 Steam Generator          Packing Leaking on Pressure    Replaced Valve.
Tap Valve.
Page      7 of 14 8-1-7.Rl
 
DOCKET NO.: . 50-272
                                                                                -'-----------~---
UNIT 1*..M.E;_S_a_l_ern
__#_l_ _ _ _ _ _ __
S~~.!M?~~Y OF SF..FETY RELATE~INT~NANCE TE:    December 11, 1978 DEF j\RTMENT Maintenance/Performance                                ----------~~~
L. K. Miller REPORT MONTH      November 1978 TELEPHONE:      609-365-7000 X507 WORK  ORDER        EQUIPMENT              FAILURE DESCrtIPTION        CORREC:TIVE .?.CT ION NO.
I OD-10853        Valve 10CV056             Packing Leak.                Repacked Valve.
r I
PD-5182          Channel N42 NIS         Out Of Spec.                  Adjusted Isolation A:rrp Gains.
OD-10743        1LC500 B/J               Level Deviation Alann     ... Replaced Capacitors.
Not Accuated.
Not Accuated.
Valve Leaking. Seal Welded Diaphragm.
OP-0437        Valve 10CV078            Valve Leaking.               Seal Welded Diaphragm.
Leaks Through. Replaced Diaphragm.
OD-10864        Valve 11SW024            Leaks Through.               Replaced Diaphragm.
Does Not Close . Repaired Solenoid Valve. . -Alarm Will Not Reset. Replaced Logic Card. Petcock Valve is Leaking. Replaced Petcock Valve. -.. Bezel Indicator in Control Equalized Transmitters.
OD-10845        Valve 10WL099            Does Not Close .             Repaired Solenoid Valve.
OD-10147        Channel lC $ *.El. C. . - Alarm Will Not Reset.         Replaced Logic Card.
'
ri OD-10895        Valve llMS171            Petcock Valve is Leaking. Replaced Petcock Valve.         - ..
OD-10921        Valve 14BF019            Bezel Indicator in Control   Equalized Transmitters.
Room swinging.
Room swinging.
Flange Leaks. Welded Flange. Will Not Reset. Replaced Printed CircUit Cards. Rework Solenoid.
OD-10670        Valve 14SW065            Flange Leaks.                 Welded Flange.
Rebuilt Solenoid Valve. Upper Flux Recorder Out of Adjusted Isolation Anp. Spec. Flex Hose Leak. Replaced with Copper Tubing.
          '
i MD-3225          Channel lC S.E.C.        Will Not Reset.               Replaced Printed CircUit Cards.
PD-5175        Solenoid Valve            Rework Solenoid.             Rebuilt Solenoid Valve.
SV398.
PD-5205        Channel N43 NIS          Upper Flux Recorder Out of   Adjusted Isolation Anp.
Spec.
OD-10481        15 Service Water          Flex Hose Leak.               Replaced with Copper Tubing.
Purrp.
Page 8 of 14 8-1-7.Rl
 
                                                                  - -DOCKET NO. : _;.J.J50u::...2""'7'"""'2~-------
SV.M..1'1A...~Y OF S?..FETY RELATE~~INTENANCE
                                                      '
                                                                            .TE: __
TJNIT 1Ti1..ME: Salem #1 D_e_c_e_mb_e_r__l_l_,_1_9_7_8~~-
DEP A.RT.MENT Maintenance/Perfgrrrance COM.PLETED BY:_L_._K_.__Mi_'_l_le_r________
REPORT MONTH      November 1978 TELEPHONE:      609-365-7000 X507 WORK ORDER              EQUIPMENT            FAILURE DESCRIPTION            CORRE~TIVE        ACTION NO.                                                                  I                                          I I
i OP-519              Containment Fan          Perform Work I.A.W. DCR          Completed DCR.
Coil Units.              lEC-0448.
MD-3221            125VDC lB BUS            F'aulty *Ground.*                Tightened Loose Brush Holder.
OD-11053            Valve 13SW167            Handwheel Cannnot Be Locked. Replaced Set Screw.
OD-11068            Valve 10CV057            Reach Rod Inoperable.            Replaced Pin.
OD-10657            1B Diesel                Ruptured Jacket Water --        Replace Both Heaters, Repaired Heater & Shorted Pre-Lube        Motor & Tenp. Controller.
Oil Pump Motor.
OD-11009            !Valves 12 & 14 MS168 Leaking.                            Furrnanited.
                                            . -
                                                                          ..
i-OD-11010            fJalve 12MS131          Leaking.                        Furrnanited.
                                                                                                                      -
'                                                                                                                      .
MD-3246            Valve 11 HW211          Leaking.                        Repacked Valve.
OD-11030            valve 10CV059          Will Not Close.                  Replaced Stem & Handwheel.
                                                                              '
MD-3108            valve 12SW025            Leaking.                        Weld Repair.
l I
I RE-196              il.FA0118                Out of Spec.                    Calibrated.
OD-10898            LLAS424IC              Channel D Level Indicator        Calibrated Indicator.
Out of Spec.
OD-10740            llFIT157A              Lo Flow Indicator Pegged        Cleaned Indicator.
High.                                                                    I OD-10571            il.FT416                Several Bistable  Spikes~      Replaced Bistable.
i


OF S?..FETY
__
--DOCKET NO. :
S~ETY
TJNIT 1Ti1..ME:
                                                                      ----nocxEmT.~N~a~.-:-_--=5~....
Salem #1 .TE: __ D_e_c_e_mb_e_r
o~-~2::1::2::~~~~~~~~::~~----*--~-==
__
I SlJMMARY OF                   RELATE.l\INTE?:JANCE UNIT IME:       Salem #1.
' COM.PLETED BY:_L_._K_.
_TE: December 11, 1978 DEP ]?.RTMENT    Maintenance/Perfo.r:rnance CO.MYLETED BY:         L. K. Miller REPORT MONTH           November 1978                                           ~~~~~~~~~~~~-
__ Mi_'_l_le_r
TELEPHONE:       609-365-7000 X507 WOR..1< ORDER I
_______ _ DEP A.RT.MENT Maintenance/Perfgrrrance REPORT MONTH November 1978 TELEPHONE:
EQUIPMENT              F;.~ILURE  '~scnpm10N
609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION I
_,r.. _, __ l -   j  CORRE~TIVE          ACTION NO.
ACTION I NO. I i OP-519 Containment Fan Perform Work I.A.W. DCR Completed DCR. Coil Units. lEC-0448.
I I
MD-3221 125VDC lB BUS F'aulty
PD-5217             1LC527C                 Corrparator Out of Spec.           I Replaced Comparator.                           I PD-5218             1 Air Particulate       Seized Pump.                         Replaced Pump.
* Ground.* Tightened Loose Brush Holder. OD-11053 Valve 13SW167 Handwheel Cannnot Be Locked. Replaced Set Screw. OD-11068 Valve 10CV057 Reach Rod Inoperable.
Detector.
Replaced Pin. OD-10657 1B Diesel Ruptured Jacket Water --Replace Both Heaters, Repaired Heater & Shorted Pre-Lube Motor & Tenp. Controller.
PD-5231             Channel N41 NIS         Functional Testing of NM-             Adjusted Isolation Amps.
Oil Pump Motor. OD-11009 !Valves 12 & 14 MS168 Leaking. Furrnanited. . -.. i-OD-11010 fJalve 12MS131 Leaking. Furrnanited.  
306 & NM307 OD-11129           *.1LT460                 Reading 10% High.*                   Recalibrated.
' -. MD-3246 Valve 11 HW211 Leaking. Repacked Valve. OD-11030 valve 10CV059 Will Not Close. Replaced Stem & Handwheel.
OD-11114             lB Vital Instrurrent Visible Srroke.                         Replaced Resistor R3 & Output:
' MD-3108 valve 12SW025 Leaking. Weld Repair. l I RE-196 il.FA0118 Out of Spec. Calibrated.
Inverter.                                                     Transformer 781118.
I OD-10898 LLAS424IC Channel D Level Indicator Calibrated Indicator.
  . PD-5232             _l'IC530A/B
Out of Spec. OD-10740 llFIT157A Lo Flow Indicator Pegged Cleaned Indicator.
High. I OD-10571 il.FT416 Several Bistable Replaced Bistable.
i I SlJMMARY OF RELATE.l\INTE?:JANCE DEP ]?.RTMENT Maintenance/Perfo.r:rnance
.... __
UNIT IME: Salem #1. _TE: December 11, 1978 CO.MYLETED BY: L. K. Miller REPORT MONTH November 1978 TELEPHONE:
609-365-7000 X507 ORDER I EQUIPMENT j
ACTION WOR..1< _,r.. _, __ l -NO. I PD-5217 1LC527C Corrparator Out of Spec. I Replaced Comparator.
PD-5218 1 Air Particulate Seized Pump. Replaced Pump. Detector.
PD-5231 Channel N41 NIS Functional Testing of NM-Adjusted Isolation Amps. 306 & NM307 OD-11129 *.1LT460 Reading 10% High.* Recalibrated.
OD-11114 lB Vital Instrurrent Visible Srroke. Replaced Resistor R3 & Output: Inverter.
Transformer 781118. . PD-5232 _l'IC530A/B
* Out of Spec
* Out of Spec
* calibrated.
* calibrated.
l PD:-:5224
                                              . -
::.IBS539A OD-11130 *Page 10 of 14 8-1-7.:Rl lL Service Water Pump. . -Out of Spec. *Adjusted.
l PD:-:5224           ::.IBS539A               Out of Spec.                         *Adjusted.
Upper Bearing Motor Cooler Replace Pipe Leaking. I I --*
                                                                                                                                  - -*
11-1 thru 11-11 11-12 11-13 11-14 11-15 11-16 SALEM UNIT I OPERATING  
OD-11130            lL Service Water        Upper Bearing Motor Cooler           Replace Pipe       Fitting~
Pump.                  Leaking.
    *Page    10 of 14 8-1-7.:Rl
 
SALEM UNIT I OPERATING  


==SUMMARY==
==SUMMARY==
NOVEMBER, 1978 The unit has been shutdown due to inspection and replacement of #13 RCP No. l Seal and routine plant maintenance activities.
 
The Reactor was critical at 1750. Two Reactor trips occured before 2400 hours due to low and high steam generator water levels. The first trip occured at 2105. The unit then went critical at 2225 and tripped at 2340. The Reactor was critical at 0028 and tripped at 0251 from 12% power due to a high steam generator water level. Reactor was critical at 0340 and on line at 0621. Power increased to 15% by 0700. A load increase was commenced at 1525 at 3% per hour. At 2400, the unit load was 44%. Load is being increased at 3% per hour. At 0800, the unit load was 63%. Unit load was increased to 65% by 0900 and maintained at 65%.until 1130. Load was increased at 3% per hour to 70% by 1320. Load was held at 70% while maintenance was being performed on the circulating water pumps.for the remainder of the day. Load is being held at 70% due to maintenance activities on the traveling screens of the circulating water system. At 0350, the load was reduced to 61% due to a decrease in vacuum in th main condenser.
NOVEMBER, 1978 11-1      The unit has been shutdown due to inspection and thru      replacement of #13 RCP No. l Seal and routine plant 11-11 maintenance activities.
Vacuum was restored and load increased to 70% by 0525. Load was held at 70% for the remainder of the day.for maintenance activities ori the circulating water system and in preparation of three>>flux*
11-12    The Reactor was critical at 1750. Two Reactor trips occured before 2400 hours due to low and high steam generator water levels. The first trip occured at 2105. The unit then went critical at 2225 and tripped at 2340.
maps to be taken for incore/excore calibration data. Unit load is being held at 70% while flux maps are being taken and plant conditions for the flux maps are Page 11 of 14 11-16 (can't) 11-17 11-18 11-19 11-20 11-21 thru 11-23
11-13    The Reactor was critical at 0028 and tripped at 0251 from 12% power due to a high steam generator water level.
Reactor was critical at 0340 and on line at 0621. Power increased to 15% by 0700. A load increase was commenced at 1525 at 3% per hour. At 2400, the unit load was 44%.
11-14    Load is being increased at 3% per hour. At 0800, the unit load was 63%. Unit load was increased to 65% by 0900 and maintained at 65%.until 1130. Load was increased at 3%
per hour to 70% by 1320. Load was held at 70% while maintenance was being performed on the circulating water pumps.for the remainder of the day.
11-15    Load is being held at 70% due to maintenance activities on the traveling screens of the circulating water system. At 0350, the load was reduced to 61% due to a decrease in vacuum in th main condenser. Vacuum was restored and load increased to 70% by 0525. Load was held at 70% for the remainder of the day.for maintenance activities ori the circulating water system and in preparation of three>>flux*
maps to be taken for incore/excore calibration data.
11-16    Unit load is being held at 70% while flux maps are being taken and plant conditions for the flux maps are Page 11 of 14
 
11-16 (can't)
* established.
* established.
1
* The f 1 ux mapping was completed by 0915 and the axial flux restored with+/-n:the target band by 1050. Load increase was commenced at 1105 from 71%,
* The f ux mapping was completed by 0915 and the axial flux restored with+/-n:the target band by 1050. Load increase was commenced at 1105 from 71%, but limited due to axial flux difference considerations.
but limited due to axial flux difference considerations.
At 1830, load was increased at 2% per hour. The unit load was 84.8% at 2400. Unit load is being increased but limited due to axial flux difference considerations for the previous .day's testing. By 0800, unit load was 94%. At 1230, unit load reached 98% and remained greater than 98% for the remainder of the day. Unit load remained greater than 98% until 2025 when a load reduction was made to 95.5%. The load reduction was made, after 13B Circulator had an emergency trip, in order to limit condenser back pressure.
At 1830, load was increased at 2% per hour.     The unit load was 84.8% at 2400.
Unit load was restored to greater than 98% by 2155 and remained so for the remainder of the day. Unit load was maintained at greater than 99% until 1330. A unit load reduction was commenced at 1300 at 3% per hour to allow cleaning of 11 & 12 Generator Feedwater Pump Suction Strainers.
11-17    Unit load is being increased but limited due to axial flux difference considerations for the previous .day's testing. By 0800, unit load was 94%. At 1230, unit load reached 98% and remained greater than 98% for the remainder of the day.
At 2400, unit load was 62%. Unit load is being reduced to approximately 50% to allow *the cleaning of #11 & #12 Steam Generator Feedwater Pump Suction Strainers.
11-18    Unit load remained greater than 98% until 2025 when a load reduction was made to 95.5%. The load reduction was made, after 13B Circulator had an emergency trip, in order to limit condenser back pressure.     Unit load was restored to greater than 98% by 2155 and remained so for the remainder of the day.
Unit load was reduced to 52.'5% by 0200 and is *being held while the steam generator feedwater pump suction strainers are being cleaned. Load increase commenced at 0400 at 3% per hour. By 1705, the unit load was 98%oand remained at 98% for the remainder of the day. Unit load remained greater than 99%. Page 12 of 14
11-19    Unit load was maintained at greater than 99% until 1330.
, 11-24 11-25 thru 11-26. 11-27 11-28 11-29 11-30 *
A unit load reduction was commenced at 1300 at 3% per hour to allow cleaning of 11 & 12 Generator Feedwater Pump Suction Strainers.     At 2400, unit load was 62%.
* Unit load was greater than 99% until 0640 when load was reduced to 98% due to axial flux difference alarm. The instrumentation was corrected by the Performance Department and load increased to greater than 99% by 0905. Unit load remained greater than 99% for the remainder of the day. Unit load remained greater than 98%. Unit load remained greater than 99% until 0445 when the Reactor tripped after the failure of Vital Bus lB Inverter.
11-20    Unit load is being reduced to approximately 50% to allow
Unit remained shutdown for the remainder of the day. Unit shutdown for maintenance.
          *the cleaning of #11 & #12 Steam Generator Feedwater Pump Suction Strainers.     Unit load was reduced to 52.'5% by 0200 and is *being held while the steam generator feedwater pump suction strainers are being cleaned.     Load increase commenced at 0400 at 3% per hour. By 1705, the unit load was 98%oand remained at 98% for the remainder of the day.
The Reactor went critical at 1458, .. and on line at 2350. Load was held below 10% for the remainder of the day. Load increase above 10% commenced at 0010 at a rate of 3% per hour. At 1030, load was stabilized at approximately 46%. At 1520, load increased to approximately 52%. At 2130, a load increase was commenced at 3% per hour. By 2400, the unit load was 59%. Page 13 of 14
11-21    Unit load remained greater than 99%.
thru 11-23 Page 12 of 14
 
,
11-24
                    *
* Unit load was greater than 99% until 0640 when load was reduced to 98% due to axial flux difference alarm. The instrumentation was corrected by the Performance Department and load increased to greater than 99% by 0905. Unit load remained greater than 99% for the remainder of the day.
11-25      Unit load remained greater than 98%.
thru 11-26.
11-27      Unit load remained greater than 99% until 0445 when the Reactor tripped after the failure of Vital Bus lB Inverter.
Unit remained shutdown for the remainder of the day.
11-28      Unit shutdown for maintenance.
11-29      The Reactor went critical at 1458, .. and on line at 2350.
Load was held below 10% for the remainder of the day.
11-30      Load increase above 10% commenced at 0010 at a rate of 3%
per hour. At 1030, load was stabilized at approximately 46%. At 1520, load increased to approximately 52%. At 2130, a load increase was commenced at 3% per hour. By 2400, the unit load was 59%.
Page 13 of 14
 
..
..
* INFORMATIO
                              *         .RE~UELING    INFORMATIO*
* DOCKET NO.: 5 o-2 12 UNIT: Salem #1 DATE: December 11, 1978 COMPLETED BY: L. K. Miller TELEPHONE:
DOCKET NO.: 5 o- 2 12
609-365-7000 Ext. 507 MONTH: November, 1978
                                                                                  ...-...-~...-~...-~~
: l. Refueling information has changed from last month: YES X NO ---2. Scheduled date of next refueling:
UNIT: Salem #1 DATE: December 11, 1978 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 Ext. 507 MONTH:         November, 1978
March. 31;. 1979 3 *. Scheduled date for restart: following.
            ~~..---..-..----...-..-..-..-...-~..-...--
refueling:
: l. Refueling information has changed from last month:
June 23, 1979 4. A.. Will Technical Specification changes or other license
YES X     NO
* amendments be-required?
                                                                        ---
YES** NO -----NOT" DETERMINED TO-DATE November, 1978 B. Has the reload*: fuel design been reviewed by the Station Operating Review Committee?
: 2. Scheduled date of next refueling:                       March. 31;. 1979 3 * . Scheduled date for restart: following. refueling:                   June 23, 1979
YES NO X ---If no, when is it scheduled?
: 4. A.. Will Technical Specification changes or other license
February 1979 5. Scheduled date(s) for submitting*
* amendments be- required?                   YES**     NO
proposed licensing action: March, 1979 if reguired.
                                                                        -----
NOT" DETERMINED TO-DATE November, 1978 B.     Has the reload*: fuel design been reviewed by the Station Operating Review Committee?                         YES       NO   X If no, when is it scheduled?
                                                                        ---
February 1979
: 5. Scheduled date(s) for submitting* proposed licensing action:
March, 1979   if reguired.
6.. Importan.t licensing consid13rations associated with refueling:
6.. Importan.t licensing consid13rations associated with refueling:
NONE 7. Number of Fuel Assemblies:
NONE
A. B. In-Core In Spent Fuel Storage* 8. Present licensed spent fuel storage capacity:
: 7. Number of Fuel Assemblies:
1 0 264 Future spent fuel storage capacity:
A.     In-Core         .~                                                1 B.      In Spent Fuel Storage*                                               0
1, 170 ..--------..--..--..-..--
: 8. Present licensed spent fuel storage capacity:                             264 Future spent fuel storage capacity:                                   1, 170
: 9. Date of last refueling that can be. discharged to the spent fuel pool*assuming the present licensed capacity:
                                                                        ..--------..--..--..-..--
Page 14 of 14 8-l-7.R4 April, 1982}}
: 9. Date of last refueling that can be. discharged to the spent fuel pool*assuming the present licensed capacity:                       April, 1982 Page 14 of 14 8-l-7.R4}}

Revision as of 16:46, 21 October 2019

Monthly Oper Rept for Nov 1978
ML18078A503
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/11/1978
From: Miller L
Public Service Enterprise Group
To:
Shared Package
ML18078A502 List:
References
NUDOCS 7812150244
Download: ML18078A503 (13)


Text

DJCKET NO. 50-272

~~~~~~~~-

UN IT Salem # 1 DATE December 11, 1978 CQvfPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 MONIH November 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY Prnff.R LEVEL (MWe-NET) (j>Il'iE-NET)

I 0 17 984 2 0 18 1,102 3 0 19 995 4 0 20 965 5 0 21 978 6 0 22 1,097 7 0 23 1,105 8 0 24 1,120 0 25 1,036 9

0 1,101 10 26 11 0 27 191 12 0 28 0 13 112 29 0 14 556 30 406

15. 752 .. 31 - - -

676 16

.

I

.,-__

Pg. 2 of 14 8.1-7.Rl

~ID.: :__...;..;.....=~-.....,,....,,.--,,.~

50-272 CATE*: December 11, 19 7 8

~ SY: L. K. Miller

~: 609-365-7000 X507 i.* TJnit Nane:. Salem #1 Notes: ..

_ _r_l_9_7_8_ _ _ _ _ __

2. P.eport:l.nq Period:_*_N_o_vernbe..;..*
3. . r.; censed 'llleml Pa..er (M'it) : _3~3_3_8_______ _
4. NaIIep.late Ra.t:!.nq (GJ:Css. me1: ____1;:;.;-l:;.; -3;;.; :5: . ___ _ _ _ __
s. Cesign* Electrical.. Rating: (Net: l-lie): 1090
6. . Maxlmlm* Dependable Capa.c:i:l:y (Gross. l-lie) : 1124
1. Ma..vinnm- Cependable* capacity* (Net !-H!): -,-,.,,..io.,.7""'9-_:--.- -
a. If Changes OccJr ill Capacity Ra.tings <Item* Ntm:er* 3 Throa;h 7} SJ.nee Last P.eport,. Giw Reason:

NONE

9. Power Leval 'lb Mlich * ~cted, If Aey* (Net l-lie) :. *--..::.:N~ONE=-----------------
10. Rea.sons For Restricti.cns,. u* ~ ________N_O_NE _ _ _ _- _ _ _ _ _ _ _ _ _ _ _ __

Year to Date Qm1lat'ive 720 8,016 12,457 ll. Ei:lurs. In P.eportinq Period 12.. Numer Of Hours Reactor Was CritiCal 377.2 4 I 557

  • 0. 7I100
  • 2

.,..-~-

  • l3.
  • Reactor Reserve Shutdown ~urs 0.0 0. 0 0.0 aours Generator On-Line, *4,344~~P. 6,774.6 14.

. 15. unit Reserve Shutdown Hours o.o . 0.0 -------- 0.0 l6. . Gross 'IheJ:mal Energy- Generated (Mm) 1,002,926 12,714,590 19,409,810

17. Gross Electtical EMrgy Generated cz.HI) '331,770 4,251,130 6,437,440
18. Net Electrical~ Generated(!-H!)* *311,316 4,020,141 6,078,359
19. crnit.ServiceFactor* 49.8 54.2 54.4 49.8 54.2 54.4 20 *. Unit\AvailahHity _Factor
21. Unit capacity Factor (Using' MCC Net)

.

40.l -------

_ _ _ _._4;;.,;6;,, ,;.__5_____._..._4.;;,,,;5;..;*. ;. 2__

22~ Unit capa.city Factor (Us:lnq CER Net) . 39.7 50

  • 2 46.0 45.8 . ------- 44.8 37.3 23.

24.

Unit :E'Orced* Outage Rate Sht.tt:dcwns Scheduled Oller NeXt: 6 ~ths (Type, Date, arid Duration 0£ Each) :


Unit Refueling 3/31/79:- 6/23/79

25.
  • If Shut D::lwn At Ecd of. Report Period! Estimated oate .of* Startup: - - - - - - - - - - - - - - - -

. 26. emits rn* Test StatlJs(Ptior to Camercial,~tion):

Forecast* Achieved

. 9/30/76 12/11/76 11/01/76 12/25/76 a-l-7.R2 Pg.;3 of 14 12/20/76 6/30/77

UNIT SllUTIXMNS 1\ND PCMER REDUCl'IONS DOCKET NO. =~5~0~--2_._72~-----

REPORI' MJNrH Noveniber UNIT 'NAME: _S_a_l_em

__~#_l_ _ __

DATE: December 11, 1978 COMPLETED BY: L.K. Miller TELEPHONE: 609-365-7000 X507 I

METHOD OF OORATION SHUIT'ING LicENSE SYS'J.'EM a:MPONEm' CAUSE AND CORRECTIVE NO. DATE TYPE1 (HOURS) ~ IXMN EVENT CODE4 CODES ACTION 'ID REAC'IDR REPORT # PREVENT ROCURRENCE

.78-252 10/21/78 F 290.7 A 4B - - - - CB PUMP XX Failure of Seals on 13 RCP 78-253 11/13/78 F 3.5 A 3 - - HI HTEXCH * #14 Steam Generator High Level 78-255 11/13/78 F 0.0 B 4A - - - - EB zzzzzz Safe-Guard Errergency Control 78-257 11/14/78 F 0.0 B 4A - - - - :IE zzzzzz Flux Mapping Surveillance 78-261 11/15/78 F o.o B 4A - - -

~

- IE zzzzzz. - Flux Mapping Surveillance 78-268 11/19/78 F 0.0 B 4A - - - - HH FILTER #11 Steam Generator Feed Pump Strainer 78-277 11/27/78 F 67.1 A 3 - - - - EB GENERA lB Vital Instrurrent Inverter Failure l

-*

I

"

i I

'

I Page 4 Of 14 B-1-7.Rl

DOCKET NO.: 50-272

. MAJOR PLANT MODIFI~IONS . U~ NAME: Salem #1

'REPORT MONTH November, 197-3 DATE: December 11, 1978 COMPLETED BY:~L~*~K_.~M_i_l_l_e_r~~-

TELEPHONE: 609-365-7000 x 507

  • DCR NO. PRINCIPLE SYSTEM SUBJECT PD-0128 s. G. Feed & Cond. Relocate 115VAC Governor (115VAC) Control Power Supply
  • DESIGN CHANGE REQUEST Page 5 of 14 8-1-7.Rl

DOCKET NO.: 50-272

.MAJOR PLANT MODIFI~IONS Salem #1 UN- NAME:

REPORT MONTH November, 197-8 December 11, 1978 DATE:

COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 x 507

  • DCR NO. lOCFRS0.59. SAFETY EVALUATION PD-0128 This design change does not functionall change the system operation. It will increase system reliability.

Page 6 of 14

  • DESIGN CH_Z\NGE REQUEST

DOCKET NO.: 50-272 Sylv'.!MAR:l OF SAFETY RELATE.INTENANCE UNIT ,.ME: ~-=.:~:...:...='--~~~~~~~~

Salem #1

=TE: December 11, 1978 DEP A,RT:V.i.ENT Maintenance/Perforrnahce ~~~~~~~_:._~~~~~

L. K. Miller REPORT MONTH November 1978 WOR...1< ORDER EQUIPMENT FAILURE DESC~!PTION CORRECTIVE ACTION NO.

I MD-3206 100' Elev.* Air Ibck Worn Inner Door Bearings. Replaced Bearings.

OD-10697 12 Safety Injection Internally Damaged. Replaced Pump.

Pump OP-0495 11 & 12 Containment Low Flow., Cleaned Suction Strainers.

Sump Pumps OP-0479 !Valve _lONT031 Install Valve per DCR Installed Valve.

PD-0125.

--- **-1c12sv--Bat.*tel:y Rcx:>m rnOperable. Repaired Centrifical Switch.

Verit Fan.

OD-10576 Kralve 12SW092 - ~Will Not Close. Replaced Diaphragm.

1j I

t-'

PD-5141 tRMS 1R13E Erroneous Alarm. Replaced Bistable Drawer.

OD-10742 !Valve 10CV018 No Open Indication. Adjusted Limit Switch.

OD-10813 Valve 10PR002 Valve Does Not Close. Replaced SV-760.

I

! OD-10697 13 Service Water Pump.

Motor Bearing Cooler Malfunctioning.

Replaced Cooler.

OD-10732 14 Service Water High Temperature Alarm From Replaced Cooler Coil and Pump Upper. MotGr Bearing Cooler. Bearings.

  • OD.,...10865 ~4 Service Water Shear Pin Broken. Replaced Distributor Barrel Pump Strainer. Seals, & Shear Key.

OD-10612 [4 Steam Generator Packing Leaking on Pressure Replaced Valve.

Tap Valve.

Page 7 of 14 8-1-7.Rl

DOCKET NO.: . 50-272

-'-----------~---

UNIT 1*..M.E;_S_a_l_ern

__#_l_ _ _ _ _ _ __

S~~.!M?~~Y OF SF..FETY RELATE~INT~NANCE TE: December 11, 1978 DEF j\RTMENT Maintenance/Performance ----------~~~

L. K. Miller REPORT MONTH November 1978 TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCrtIPTION CORREC:TIVE .?.CT ION NO.

I OD-10853 Valve 10CV056 Packing Leak. Repacked Valve.

r I

PD-5182 Channel N42 NIS Out Of Spec. Adjusted Isolation A:rrp Gains.

OD-10743 1LC500 B/J Level Deviation Alann ... Replaced Capacitors.

Not Accuated.

OP-0437 Valve 10CV078 Valve Leaking. Seal Welded Diaphragm.

OD-10864 Valve 11SW024 Leaks Through. Replaced Diaphragm.

OD-10845 Valve 10WL099 Does Not Close . Repaired Solenoid Valve.

OD-10147 Channel lC $ *.El. C. . - Alarm Will Not Reset. Replaced Logic Card.

'

ri OD-10895 Valve llMS171 Petcock Valve is Leaking. Replaced Petcock Valve. - ..

OD-10921 Valve 14BF019 Bezel Indicator in Control Equalized Transmitters.

Room swinging.

OD-10670 Valve 14SW065 Flange Leaks. Welded Flange.

'

i MD-3225 Channel lC S.E.C. Will Not Reset. Replaced Printed CircUit Cards.

PD-5175 Solenoid Valve Rework Solenoid. Rebuilt Solenoid Valve.

SV398.

PD-5205 Channel N43 NIS Upper Flux Recorder Out of Adjusted Isolation Anp.

Spec.

OD-10481 15 Service Water Flex Hose Leak. Replaced with Copper Tubing.

Purrp.

Page 8 of 14 8-1-7.Rl

- -DOCKET NO. : _;.J.J50u::...2""'7'"""'2~-------

SV.M..1'1A...~Y OF S?..FETY RELATE~~INTENANCE

'

.TE: __

TJNIT 1Ti1..ME: Salem #1 D_e_c_e_mb_e_r__l_l_,_1_9_7_8~~-

DEP A.RT.MENT Maintenance/Perfgrrrance COM.PLETED BY:_L_._K_.__Mi_'_l_le_r________

REPORT MONTH November 1978 TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRE~TIVE ACTION NO. I I I

i OP-519 Containment Fan Perform Work I.A.W. DCR Completed DCR.

Coil Units. lEC-0448.

MD-3221 125VDC lB BUS F'aulty *Ground.* Tightened Loose Brush Holder.

OD-11053 Valve 13SW167 Handwheel Cannnot Be Locked. Replaced Set Screw.

OD-11068 Valve 10CV057 Reach Rod Inoperable. Replaced Pin.

OD-10657 1B Diesel Ruptured Jacket Water -- Replace Both Heaters, Repaired Heater & Shorted Pre-Lube Motor & Tenp. Controller.

Oil Pump Motor.

OD-11009 !Valves 12 & 14 MS168 Leaking. Furrnanited.

. -

..

i-OD-11010 fJalve 12MS131 Leaking. Furrnanited.

-

' .

MD-3246 Valve 11 HW211 Leaking. Repacked Valve.

OD-11030 valve 10CV059 Will Not Close. Replaced Stem & Handwheel.

'

MD-3108 valve 12SW025 Leaking. Weld Repair.

l I

I RE-196 il.FA0118 Out of Spec. Calibrated.

OD-10898 LLAS424IC Channel D Level Indicator Calibrated Indicator.

Out of Spec.

OD-10740 llFIT157A Lo Flow Indicator Pegged Cleaned Indicator.

High. I OD-10571 il.FT416 Several Bistable Spikes~ Replaced Bistable.

i

__

S~ETY


nocxEmT.~N~a~.-:-_--=5~....

o~-~2::1::2::~~~~~~~~::~~----*--~-==

I SlJMMARY OF RELATE.l\INTE?:JANCE UNIT IME: Salem #1.

_TE: December 11, 1978 DEP ]?.RTMENT Maintenance/Perfo.r:rnance CO.MYLETED BY: L. K. Miller REPORT MONTH November 1978 ~~~~~~~~~~~~-

TELEPHONE: 609-365-7000 X507 WOR..1< ORDER I

EQUIPMENT F;.~ILURE '~scnpm10N

_,r.. _, __ l - j CORRE~TIVE ACTION NO.

I I

PD-5217 1LC527C Corrparator Out of Spec. I Replaced Comparator. I PD-5218 1 Air Particulate Seized Pump. Replaced Pump.

Detector.

PD-5231 Channel N41 NIS Functional Testing of NM- Adjusted Isolation Amps.

306 & NM307 OD-11129 *.1LT460 Reading 10% High.* Recalibrated.

OD-11114 lB Vital Instrurrent Visible Srroke. Replaced Resistor R3 & Output:

Inverter. Transformer 781118.

. PD-5232 _l'IC530A/B

  • Out of Spec
  • calibrated.

. -

l PD:-:5224  ::.IBS539A Out of Spec. *Adjusted.

- -*

OD-11130 lL Service Water Upper Bearing Motor Cooler Replace Pipe Fitting~

Pump. Leaking.

  • Page 10 of 14 8-1-7.:Rl

SALEM UNIT I OPERATING

SUMMARY

NOVEMBER, 1978 11-1 The unit has been shutdown due to inspection and thru replacement of #13 RCP No. l Seal and routine plant 11-11 maintenance activities.

11-12 The Reactor was critical at 1750. Two Reactor trips occured before 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> due to low and high steam generator water levels. The first trip occured at 2105. The unit then went critical at 2225 and tripped at 2340.

11-13 The Reactor was critical at 0028 and tripped at 0251 from 12% power due to a high steam generator water level.

Reactor was critical at 0340 and on line at 0621. Power increased to 15% by 0700. A load increase was commenced at 1525 at 3% per hour. At 2400, the unit load was 44%.

11-14 Load is being increased at 3% per hour. At 0800, the unit load was 63%. Unit load was increased to 65% by 0900 and maintained at 65%.until 1130. Load was increased at 3%

per hour to 70% by 1320. Load was held at 70% while maintenance was being performed on the circulating water pumps.for the remainder of the day.

11-15 Load is being held at 70% due to maintenance activities on the traveling screens of the circulating water system. At 0350, the load was reduced to 61% due to a decrease in vacuum in th main condenser. Vacuum was restored and load increased to 70% by 0525. Load was held at 70% for the remainder of the day.for maintenance activities ori the circulating water system and in preparation of three>>flux*

maps to be taken for incore/excore calibration data.

11-16 Unit load is being held at 70% while flux maps are being taken and plant conditions for the flux maps are Page 11 of 14

11-16 (can't)

  • established.
  • The f 1 ux mapping was completed by 0915 and the axial flux restored with+/-n:the target band by 1050. Load increase was commenced at 1105 from 71%,

but limited due to axial flux difference considerations.

At 1830, load was increased at 2% per hour. The unit load was 84.8% at 2400.

11-17 Unit load is being increased but limited due to axial flux difference considerations for the previous .day's testing. By 0800, unit load was 94%. At 1230, unit load reached 98% and remained greater than 98% for the remainder of the day.

11-18 Unit load remained greater than 98% until 2025 when a load reduction was made to 95.5%. The load reduction was made, after 13B Circulator had an emergency trip, in order to limit condenser back pressure. Unit load was restored to greater than 98% by 2155 and remained so for the remainder of the day.

11-19 Unit load was maintained at greater than 99% until 1330.

A unit load reduction was commenced at 1300 at 3% per hour to allow cleaning of 11 & 12 Generator Feedwater Pump Suction Strainers. At 2400, unit load was 62%.

11-20 Unit load is being reduced to approximately 50% to allow

  • the cleaning of #11 & #12 Steam Generator Feedwater Pump Suction Strainers. Unit load was reduced to 52.'5% by 0200 and is *being held while the steam generator feedwater pump suction strainers are being cleaned. Load increase commenced at 0400 at 3% per hour. By 1705, the unit load was 98%oand remained at 98% for the remainder of the day.

11-21 Unit load remained greater than 99%.

thru 11-23 Page 12 of 14

,

11-24

  • Unit load was greater than 99% until 0640 when load was reduced to 98% due to axial flux difference alarm. The instrumentation was corrected by the Performance Department and load increased to greater than 99% by 0905. Unit load remained greater than 99% for the remainder of the day.

11-25 Unit load remained greater than 98%.

thru 11-26.

11-27 Unit load remained greater than 99% until 0445 when the Reactor tripped after the failure of Vital Bus lB Inverter.

Unit remained shutdown for the remainder of the day.

11-28 Unit shutdown for maintenance.

11-29 The Reactor went critical at 1458, .. and on line at 2350.

Load was held below 10% for the remainder of the day.

11-30 Load increase above 10% commenced at 0010 at a rate of 3%

per hour. At 1030, load was stabilized at approximately 46%. At 1520, load increased to approximately 52%. At 2130, a load increase was commenced at 3% per hour. By 2400, the unit load was 59%.

Page 13 of 14

..

  • .RE~UELING INFORMATIO*

DOCKET NO.: 5 o- 2 12

...-...-~...-~...-~~

UNIT: Salem #1 DATE: December 11, 1978 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 Ext. 507 MONTH: November, 1978

~~..---..-..----...-..-..-..-...-~..-...--

l. Refueling information has changed from last month:

YES X NO

---

2. Scheduled date of next refueling: March. 31;. 1979 3 * . Scheduled date for restart: following. refueling: June 23, 1979
4. A.. Will Technical Specification changes or other license
  • amendments be- required? YES** NO

NOT" DETERMINED TO-DATE November, 1978 B. Has the reload*: fuel design been reviewed by the Station Operating Review Committee? YES NO X If no, when is it scheduled?

---

February 1979

5. Scheduled date(s) for submitting* proposed licensing action:

March, 1979 if reguired.

6.. Importan.t licensing consid13rations associated with refueling:

NONE

7. Number of Fuel Assemblies:

A. In-Core .~ 1 B. In Spent Fuel Storage* 0

8. Present licensed spent fuel storage capacity: 264 Future spent fuel storage capacity: 1, 170

..--------..--..--..-..--

9. Date of last refueling that can be. discharged to the spent fuel pool*assuming the present licensed capacity: April, 1982 Page 14 of 14 8-l-7.R4