| title = Final - RO & SRO - Section a Operating
| title = Final - RO & SRO - Section a Operating
| author name = Myers L W
| author name = Myers L
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name = Conte R J
| addressee name = Conte R
| addressee affiliation = NRC/RGN-I/DRS/OSB
| addressee affiliation = NRC/RGN-I/DRS/OSB
| docket = 05000412
| docket = 05000412
| license number = NPF-073
| license number = NPF-073
| contact person = Conte R J
| contact person = Conte R
| case reference number = -RFPFR, 05000412/01-301
| case reference number = -RFPFR, 05000412/01-301
| document report number = 05000412/01-301
| document report number = 05000412/01-301
Line 20: Line 20:
FENOC BVPS Unit 2 Date of Examination:
FENOC BVPS Unit 2 Date of Examination:
5/29/01 Examination Level (circle one): RO Operating Test Number: 2LOT3 Administrative Describe method of evaluation:
5/29/01 Examination Level (circle one): RO Operating Test Number: 2LOT3 Administrative Describe method of evaluation:
Topic/Subject  
Topic/Subject
: 1. ONE Administrative JPM, OR Description  
: 1. ONE Administrative JPM, OR Description
: 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 3.7 Conduct of Perform an ECP Calculation  
: 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 3.7 Conduct of Perform an ECP Calculation
[JPM] Operations K/A 192008 K1.07 3.5 A.2 Equipment Prepare a Clearance Tagout [JPM] Control K/A 2.2.13 3.6 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.5 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 2.6 A.4 Emergency Knowledge of Emergency Plan [Q] Preparedness K/A 2.4.29 2.6 Knowledge of Emergency Plan [Q] K/A 2.4.29 2.6 2LOT3 Rev. 3 Administrative Topics Outline Form ES-301-1 ES-301 Facility:
[JPM] Operations K/A 192008 K1.07 3.5 A.2 Equipment Prepare a Clearance Tagout [JPM] Control K/A 2.2.13 3.6 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.5 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 2.6 A.4 Emergency Knowledge of Emergency Plan [Q] Preparedness K/A 2.4.29 2.6 Knowledge of Emergency Plan [Q] K/A 2.4.29 2.6 2LOT3 Rev. 3 Administrative Topics Outline Form ES-301-1 ES-301 Facility:
FENOC BVPS Unit 2 Date of Examination:
FENOC BVPS Unit 2 Date of Examination:
5/29/01 Examination Level (circle one): SRO Operating Test Number: 2LOT3 Administrative Describe method of evaluation:
5/29/01 Examination Level (circle one): SRO Operating Test Number: 2LOT3 Administrative Describe method of evaluation:
Topic/Subject  
Topic/Subject
: 1. ONE Administrative JPM, OR Description  
: 1. ONE Administrative JPM, OR Description
: 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 4.4 Conduct of Review Estimated Critical Position Calculation  
: 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 4.4 Conduct of Review Estimated Critical Position Calculation
[JPM] Operations K/A 2.1.7 4.4 A.2 Equipment Review a Clearance Tagout [JPM] Control K/A 2.2.13 3.8 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.9 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 3.0 A.4 Emergency Determine Protective Action Recommendation (PAR) [JPM] Preparedness K/A 2.4.44 4.0 2LOT3 Rev. 3 Form ES-301-1 ES-301 Administrative Tonics Outline RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION:
[JPM] Operations K/A 2.1.7 4.4 A.2 Equipment Review a Clearance Tagout [JPM] Control K/A 2.2.13 3.8 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.9 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 3.0 A.4 Emergency Determine Protective Action Recommendation (PAR) [JPM] Preparedness K/A 2.4.44 4.0 2LOT3 Rev. 3 Form ES-301-1 ES-301 Administrative Tonics Outline RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION:
4a K/A  
4a K/A  
Line 34: Line 34:
==REFERENCE:==
==REFERENCE:==


2.1.7 3.7/4.4 TASK ID: 0061-009-01-013 JPM APPLICATION:  
2.1.7 3.7/4.4 TASK ID: 0061-009-01-013 JPM APPLICATION:
[] REQUALIFICATION I INITIAL EXAM -TRAINING -FAULTED JPM ] ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
[] REQUALIFICATION I INITIAL EXAM -TRAINING -FAULTED JPM ] ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
TYPE: ADMINISTERED BY: Fý Perform [E Plant Site 1-- Annual Requal Exam [1] BVT -- Simulate N Simulator Z Initial Exam M NRC F-- Classroom  
TYPE: ADMINISTERED BY: Fý Perform [E Plant Site 1-- Annual Requal Exam [1] BVT -- Simulate N Simulator Z Initial Exam M NRC F-- Classroom  
-] OJT/TPE -- Other: -Training _] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time F--' Yes Allotted 15 minutes [Actual minutes Critical:  
-] OJT/TPE -- Other: -Training _] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time F--' Yes Allotted 15 minutes [Actual minutes Critical:
[ No Time: Time: 1E]SAT JPM RESULTS: E A M E S UNSAT (Comments required for UNSAT evaluation)
[ No Time: Time: 1E]SAT JPM RESULTS: E A M E S UNSAT (Comments required for UNSAT evaluation)
Comments:
Comments:
Line 61: Line 61:
ICP leak g System .es are margin JPM"1.
ICP leak g System .es are margin JPM"1.
RTL#A5.640U 1/2-ADM-1303 .F02 Page 4 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate the RCS Subcooling Margin J-PM REVISION:
RTL#A5.640U 1/2-ADM-1303 .F02 Page 4 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate the RCS Subcooling Margin J-PM REVISION:
4a STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U ,/ iiii 'i lSTART TIME: Setup: Initialize IC-177. Place YCT on SPDS, PSMS Plant Computer, 2RCS*YOO 1 (VB-B) 2RCS*YRO01 (VB-B) & 2RCS*Y152E (VB-B). 1. Obtain RCS hot leg wide range 1.1 Candidate locates RCS hot leg wide range temperature indication temperature.  
4a STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U ,/ iiii 'i lSTART TIME: Setup: Initialize IC-177. Place YCT on SPDS, PSMS Plant Computer, 2RCS*YOO 1 (VB-B) 2RCS*YRO01 (VB-B) & 2RCS*Y152E (VB-B). 1. Obtain RCS hot leg wide range 1.1 Candidate locates RCS hot leg wide range temperature indication temperature.
[2RCS-TR4131.
[2RCS-TR4131.
Simulator value: SIMULATED CUE: Recorder indicates 575°F. 575 0 F (Range 570 -580 0 F) _________________
Simulator value: SIMULATED CUE: Recorder indicates 575°F. 575 0 F (Range 570 -580 0 F) _________________
COMMENTS:  
COMMENTS:
: 2. Obtain RCS pressure and convert to 2.1 Candidate locates PRZR pressure indication. (Either wide or psia. narrow range). Simulator values: SIMULATED CUE: Indicator shows 2140 psig NR (2155 psia). S2140 psig (NR) (2155 psia) COMMENTS:  
: 2. Obtain RCS pressure and convert to 2.1 Candidate locates PRZR pressure indication. (Either wide or psia. narrow range). Simulator values: SIMULATED CUE: Indicator shows 2140 psig NR (2155 psia). S2140 psig (NR) (2155 psia) COMMENTS:  
-2150 psig (WR) (2165 psia)
-2150 psig (WR) (2165 psia)
Line 111: Line 111:
Evaluator may elect to provide Curve Book.2. Candidate obtains the BV-2 Curve Book.COMMENTS: 1 EVALUATOR NOTE: After Candidate locates the procedure, provide a copy of DATA SHEET 1 (FORM ECP-1) with the following data entered: "* Column I, PRIOR TO SHUTDOWN: Boron Concentration SPower > Control Rod Position "* Column II, EXPECTED AT CRITICALITY:  
Evaluator may elect to provide Curve Book.2. Candidate obtains the BV-2 Curve Book.COMMENTS: 1 EVALUATOR NOTE: After Candidate locates the procedure, provide a copy of DATA SHEET 1 (FORM ECP-1) with the following data entered: "* Column I, PRIOR TO SHUTDOWN: Boron Concentration SPower > Control Rod Position "* Column II, EXPECTED AT CRITICALITY:  
-Control Rod Position m r I RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IJPM REVISION:
-Control Rod Position m r I RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IJPM REVISION:
5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 3. Record (review) the given information  
5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 3. Record (review) the given information 3.1 Candidate reviews data in Column I, PRIOR TO SHUTDOWN:
 
===3.1 Candidate===
 
reviews data in Column I, PRIOR TO SHUTDOWN:
in Part A, Critical Data. Boron Concentration SPower SControl Rod Position 3.2 Candidate reviews data in Column II, EXPECTED AT CRITICALITY:  
in Part A, Critical Data. Boron Concentration SPower SControl Rod Position 3.2 Candidate reviews data in Column II, EXPECTED AT CRITICALITY:  
> Control Rod Position COMMENTS:  
> Control Rod Position COMMENTS:
: 4. Complete Part A, Critical Data, Column 4.1 Candidate refers to Figure CB-12 to estimate Xenon percent.
: 4. Complete Part A, Critical Data, Column 4.1 Candidate refers to Figure CB-12 to estimate Xenon percent.
I, PRIOR TO SHUTDOWN.
I, PRIOR TO SHUTDOWN.
 
4.2 Candidate refers to Figure CB-22 to estimate Samarium percent.
===4.2 Candidate===
COMMENTS:
 
refers to Figure CB-22 to estimate Samarium percent.
COMMENTS:  
: 5. Complete Part A, Critical Data, Column 5.1 Candidate refers to Figure CB-23 to estimate Xenon percent.
: 5. Complete Part A, Critical Data, Column 5.1 Candidate refers to Figure CB-23 to estimate Xenon percent.
II, EXPECTED AT CRITICALITY.
II, EXPECTED AT CRITICALITY.
 
5.2 Candidate refers to Figure CB-22 to estimate Samarium percent.
===5.2 Candidate===
 
refers to Figure CB-22 to estimate Samarium percent.
COMMENTS:
COMMENTS:
RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 6 of 11 Revision 1 JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION:
RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 6 of 11 Revision 1 JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION:
5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 6. Determine Part B. 1, Power Reactivity  
5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 6. Determine Part B. 1, Power Reactivity 6.1 Candidate refers to Figure CB-21 to determine the power Defect. reactivity defect and enters value in Part B, Column I, Line 1. COMMENTS:
 
: 7. Determine Part B.2, Control Rod 7.1 Candidate refers to Figure CB-24B to estimate integral rod worth Reactivity Defect. prior to shutdown.
===6.1 Candidate===
7.2 Candidate refers to Figure CB-24B to estimate integral rod worth expected at criticality.
 
COMMENTS:
refers to Figure CB-21 to determine the power Defect. reactivity defect and enters value in Part B, Column I, Line 1. COMMENTS:  
: 8. Determine Part B.3, Xenon Reactivity 8.1 Candidate refers to Figure CB-23 to estimate Xenon worth prior Defect. to shutdown.
: 7. Determine Part B.2, Control Rod 7.1 Candidate refers to Figure CB-24B to estimate integral rod worth Reactivity Defect. prior to shutdown.
8.2 Candidate refers to Figure CB-23 to estimate Xenon worth expected at criticality.
 
===7.2 Candidate===
 
refers to Figure CB-24B to estimate integral rod worth expected at criticality.
COMMENTS:  
: 8. Determine Part B.3, Xenon Reactivity  
 
===8.1 Candidate===
 
refers to Figure CB-23 to estimate Xenon worth prior Defect. to shutdown.
 
===8.2 Candidate===
 
refers to Figure CB-23 to estimate Xenon worth expected at criticality.
COMMENTS:
COMMENTS:
RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION:
5 1 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/T 9. Determine Part B.4, Samariutn  
5 1 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/T 9. Determine Part B.4, Samariutn 9.1 Candidate refers to Figure CB-22 to estimate Samarium worth Reactivity Defect. prior to shutdown.
 
9.2 Candidate refers to Figure CB-22 to estimate Samarium worth expected at criticality.
===9.1 Candidate===
COMMENTS:
 
refers to Figure CB-22 to estimate Samarium worth Reactivity Defect. prior to shutdown.
 
===9.2 Candidate===
 
refers to Figure CB-22 to estimate Samarium worth expected at criticality.
COMMENTS:  
: 10. Calculate Part B.5, Reactivity Change. 10.1 For each Part B defect, Candidate subtracts Column I from Column II and enters the value in Column III. 10.2 Candidate sums all Part B, Column III values and enters the value in Part B, Line 5. COMMENTS:
: 10. Calculate Part B.5, Reactivity Change. 10.1 For each Part B defect, Candidate subtracts Column I from Column II and enters the value in Column III. 10.2 Candidate sums all Part B, Column III values and enters the value in Part B, Line 5. COMMENTS:
RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMEIBER:
RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMEIBER:
Line 184: Line 153:


192008 K1.07 3.6 TASK ID: 1340-007-03-023 2.1.7 4.4 JPM APPLICATION:  
192008 K1.07 3.6 TASK ID: 1340-007-03-023 2.1.7 4.4 JPM APPLICATION:  
-- REQUALIFICATION  
-- REQUALIFICATION
[ INITIAL EXAM [] TRAINING I FAULTED JPM N ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
[ INITIAL EXAM [] TRAINING I FAULTED JPM N ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
TYPE: ADMINISTERED BY: M Perform [] Plant Site [] Annual Requal Exam E] BVT F- Simulate f-- Simulator I Initial Exam I NRC I Classroom  
TYPE: ADMINISTERED BY: M Perform [] Plant Site [] Annual Requal Exam E] BVT F- Simulate f-- Simulator I Initial Exam I NRC I Classroom  
Line 214: Line 183:
RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION:
4b STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U MOO iii ~ "'ii/i/li! "START TIME: EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet and completed DATA SHEET 1 (FORM ECP-1). EVALUATOR NOTE: This step is optional.
4b STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U MOO iii ~ "'ii/i/li! "START TIME: EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet and completed DATA SHEET 1 (FORM ECP-1). EVALUATOR NOTE: This step is optional.
Evaluator may elect to provide procedure.
Evaluator may elect to provide procedure.
: 1. Obtain 20M-50.4.F, Performing An 1. Candidate locates procedure 20M-50.4.F.
: 1. Obtain 20M-50.4.F, Performing An 1. Candidate locates procedure 20M-50.4.F.
Estimated Critical Position Calculation.
Estimated Critical Position Calculation.
COMMENTS:
COMMENTS:
EVALUATOR NOTE: This step is optional.
EVALUATOR NOTE: This step is optional.
Evaluator may elect to provide the Curve Book. 2. Obtain BV-2 Plant Curve Book. 2. Candidate obtains the BV-2 Curve Book. COMMENTS:  
Evaluator may elect to provide the Curve Book. 2. Obtain BV-2 Plant Curve Book. 2. Candidate obtains the BV-2 Curve Book. COMMENTS:
: 3. Verify the information in Part A, 3.1 Candidate verifies data in Column I, PRIOR TO SHUTDOWN:
: 3. Verify the information in Part A, 3.1 Candidate verifies data in Column I, PRIOR TO SHUTDOWN:
Column I. > Boron Concentration from ECP Initial Conditions Data Sheet.  >Power from ECP Initial Conditions Data Sheet. SXenon percent from Figure CB-12 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS:
Column I. > Boron Concentration from ECP Initial Conditions Data Sheet.  >Power from ECP Initial Conditions Data Sheet. SXenon percent from Figure CB-12 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS:
RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I PM REVISION:
RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I PM REVISION:
4b STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 4. Verify the information in Part A, 3.2 Candidate verifies data in Column II, EXPECTED AT Column II. CRITICALITY:
4b STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 4. Verify the information in Part A, 3.2 Candidate verifies data in Column II, EXPECTED AT Column II. CRITICALITY:
SXenon percent from Figure CB-23 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS:  
SXenon percent from Figure CB-23 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS:
: 5. Part B. 1, Power Reactivity Defect. 5.1 Candidate verifies data from Figure CB-21 for the power reactivity defect equals the value entered in Part B, Column I, Line 1. COMMENTS:  
: 5. Part B. 1, Power Reactivity Defect. 5.1 Candidate verifies data from Figure CB-21 for the power reactivity defect equals the value entered in Part B, Column I, Line 1. COMMENTS:
: 6. Part B.2, Control Rod Reactivity  
: 6. Part B.2, Control Rod Reactivity 6.1 Candidate verifies data from Figure CB-24B equals the value for Defect. estimated integral rod worth prior to shutdown.
 
7.2 Candidate verifies data from Figure CB-24B equals the value for estimated integral rod worth expected at criticality.
===6.1 Candidate===
 
verifies data from Figure CB-24B equals the value for Defect. estimated integral rod worth prior to shutdown.
 
===7.2 Candidate===
 
verifies data from Figure CB-24B equals the value for estimated integral rod worth expected at criticality.
COMMENTS:
COMMENTS:
RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation IJPM REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation IJPM REVISION:
4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)z: S/U 7. Part B.3, Xenon Reactivity Defect. 7.1 Candidate verifies data from Figure CB-23 equals the value entered for Xenon worth prior to shutdown.
4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)z: S/U 7. Part B.3, Xenon Reactivity Defect. 7.1 Candidate verifies data from Figure CB-23 equals the value entered for Xenon worth prior to shutdown.
 
7.2 Candidate verifies data for Xenon worth expected at criticality equals the value determined in procedure step IV.B.3. COMMENTS:
===7.2 Candidate===
: 8. Part B.4, Samarium Reactivity Defect. 9.1 Candidate verifies data from Figure CB-22 equals the value for Samarium worth prior to shutdown.
 
9.2 Candidate verifies data for Samarium worth expected at criticality equals the value determined in procedure step IV.B.4. COMMENTS:
verifies data for Xenon worth expected at criticality equals the value determined in procedure step IV.B.3. COMMENTS:  
: 8. Part B.4, Samarium Reactivity Defect. 9.1 Candidate verifies data from Figure CB-22 equals the value for Samarium worth prior to shutdown.
 
===9.2 Candidate===
 
verifies data for Samarium worth expected at criticality equals the value determined in procedure step IV.B.4. COMMENTS:
RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION:
4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 9.C Part B.5, Reactivity Change. 9.1 For each Part B defect, Candidate verifies the correct value entered in Column III. 9.2.C Candidate determines that the value entered in Part B, Line 5 is NOT correct.
4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 9.C Part B.5, Reactivity Change. 9.1 For each Part B defect, Candidate verifies the correct value entered in Column III. 9.2.C Candidate determines that the value entered in Part B, Line 5 is NOT correct.
Line 258: Line 214:
1000 ppm Control Rod Position Prior to Shutdown:
1000 ppm Control Rod Position Prior to Shutdown:
CB 'D' at 200 s Control Rod Position Expected at Criticality:
CB 'D' at 200 s Control Rod Position Expected at Criticality:
CB 'D' at 120 s ,ith MVD/MTU) teps teps Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 13 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET 1 FORM ECP-1 A. Critical Data (I) (II) PRIOR TO SHUTDOWN EXPECTED AT CRITICALITY Date ./_./. Time 0 .0 Date _)/(IJ) Time _.0hrS, Boron Conc. +/-0 0 ppm Power 50 % Xenon Th5 % Xenon % (Use Fig CB-12 or N/A) (Use Fig CB-23 or N/A) Samarium 100 % Samarium %_ _ (Use Fig CB-22 or N/A) (Use Fig CB-22 or N/A) Control Rod Position Control Rod Position A 2."0 C _2_?0Q A 2 30 C 2j0 D 00 B 230 D 120 B. Reactivity Balance -(Record absolute values in Columns I and II) Reactivity Defects Prior to Expected at (11 -I) Shutdown Criticality Difference  
CB 'D' at 120 s ,ith MVD/MTU) teps teps Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 13 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET 1 FORM ECP-1 A. Critical Data (I) (II) PRIOR TO SHUTDOWN EXPECTED AT CRITICALITY Date ./_./. Time 0 .0 Date _)/(IJ) Time _.0hrS, Boron Conc. +/-0 0 ppm Power 50 % Xenon Th5 % Xenon % (Use Fig CB-12 or N/A) (Use Fig CB-23 or N/A) Samarium 100 % Samarium %_ _ (Use Fig CB-22 or N/A) (Use Fig CB-22 or N/A) Control Rod Position Control Rod Position A 2."0 C _2_?0Q A 2 30 C 2j0 D 00 B 230 D 120 B. Reactivity Balance -(Record absolute values in Columns I and II) Reactivity Defects Prior to Expected at (11 -I) Shutdown Criticality Difference
: 1. Power (Fig CB-21) (OR Consult RX ENGR) 6!5 pcm 0 (zero) pcm (-) S(!5 pcm 2. Control Rods (Circle Fig. used (Fig. CB-24A, Q 24C OR Consult RX ENGR) 120 pcm 6 15 pcm 6q 5 pcm 3. Xenon (Fig. CB-23) pcm 26. 1 pcm (+/-) 207MB pcm 4. Samarium (Fig. CB-22) 61 pcm Tq, 2 pcm (+ I2.'.Z pcm 5. Reactivity Change (Sum of 1-4) = W (-) (5oq. pcm Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 14 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET I (continued)
: 1. Power (Fig CB-21) (OR Consult RX ENGR) 6!5 pcm 0 (zero) pcm (-) S(!5 pcm 2. Control Rods (Circle Fig. used (Fig. CB-24A, Q 24C OR Consult RX ENGR) 120 pcm 6 15 pcm 6q 5 pcm 3. Xenon (Fig. CB-23) pcm 26. 1 pcm (+/-) 207MB pcm 4. Samarium (Fig. CB-22) 61 pcm Tq, 2 pcm (+ I2.'.Z pcm 5. Reactivity Change (Sum of 1-4) = W (-) (5oq. pcm Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 14 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET I (continued)
FORM ECP-1 C. Critical Boron Concentration D. Estimated Rod Position Correction r'
FORM ECP-1 C. Critical Boron Concentration D. Estimated Rod Position Correction r'
Beaver Valley Power Station Unit 2 20M-504F Station Startup Revision 2 Operating Procedures Page F 4 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION  
Beaver Valley Power Station Unit 2 20M-504F Station Startup Revision 2 Operating Procedures Page F 4 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION
: 2. For the control rod positions listed on Data Sheet 1(2), Part A (Critical Data) determine and record the control rod reactivity defect for Part B, Columns I and II as follows: a. BV-2 Curve Book Figure 24A, 24B, or 24C, "Integral Rod Worth vs. Steps Withdrawn Banks D and C Moving with Overlap".
: 2. For the control rod positions listed on Data Sheet 1(2), Part A (Critical Data) determine and record the control rod reactivity defect for Part B, Columns I and II as follows: a. BV-2 Curve Book Figure 24A, 24B, or 24C, "Integral Rod Worth vs. Steps Withdrawn Banks D and C Moving with Overlap".
OR b. Have the Reactor Engineer provide the current value using either the PC version of the Nuclear Design Report (PCNDR) or other NRC approved nuclear design codes.3. Determine Xenon worth for Data Sheet 1, Part B, Columns I and II as follows: a. If BV-2 Curve Book Figure CB-12 and/or CB-23, were used in Steps IV.A.1.e and IV.A.2.c, perform the following calculations and record the value obtained in Column C below on Data Sheet 1, Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A B C Percent Equil. Xenon Equilibrium Xenon Col. A x Col. B/1 00% Part A Critical Data BOL, MOL, or EOL Xenon Worth CB-12 or CB-23 2692 pcm U1 2-pcm 0YT .6 pcm 26. 1 pcm OR b. Have the Reactor Engineer provide Xenon values in pcm using a computer program that approximates Xenon worth.
OR b. Have the Reactor Engineer provide the current value using either the PC version of the Nuclear Design Report (PCNDR) or other NRC approved nuclear design codes.3. Determine Xenon worth for Data Sheet 1, Part B, Columns I and II as follows: a. If BV-2 Curve Book Figure CB-12 and/or CB-23, were used in Steps IV.A.1.e and IV.A.2.c, perform the following calculations and record the value obtained in Column C below on Data Sheet 1, Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A B C Percent Equil. Xenon Equilibrium Xenon Col. A x Col. B/1 00% Part A Critical Data BOL, MOL, or EOL Xenon Worth CB-12 or CB-23 2692 pcm U1 2-pcm 0YT .6 pcm 26. 1 pcm OR b. Have the Reactor Engineer provide Xenon values in pcm using a computer program that approximates Xenon worth.
Beaver Valley Power Station Station Startup Operating Procedures Unit 2 20M-50.4.
Beaver Valley Power Station Station Startup Operating Procedures Unit 2 20M-50.4.
F Revision 2 Page F 5 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION
F Revision 2 Page F 5 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION
: 4. Determine Samarium worth for Data Sheet 1(2), Part B, Columns I and I1 as follows: a. If BV-2 Curve Book, Figure CB-22, was used in Step IV.A.2.d, perform the following calculations and record the value obtained in Column C below on Data Sheet 1(2), Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A Percent Equil. Samarium Part A Critical Data B Equilibrium Samarium BOL, MOL, or EOL CB-22 616 ncmr (c00( n I 120 161(K pcm Col. Ax Ciol. B/100% Samarium Worth 6I16 pcm 7 .Z pcm OR b. Have the Reactor Engineer provide Samarium values in pcm using a computer program that approximates Samarium worth. 5. Calculate the reactivity change as follows: a. On Data Sheet 1(2), Part B, "Reactivity Balance", subtract Column I from Column II for each line. b. Enter the results in Column III, "Difference".
: 4. Determine Samarium worth for Data Sheet 1(2), Part B, Columns I and I1 as follows: a. If BV-2 Curve Book, Figure CB-22, was used in Step IV.A.2.d, perform the following calculations and record the value obtained in Column C below on Data Sheet 1(2), Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A Percent Equil. Samarium Part A Critical Data B Equilibrium Samarium BOL, MOL, or EOL CB-22 616 ncmr (c00( n I 120 161(K pcm Col. Ax Ciol. B/100% Samarium Worth 6I16 pcm 7 .Z pcm OR b. Have the Reactor Engineer provide Samarium values in pcm using a computer program that approximates Samarium worth. 5. Calculate the reactivity change as follows: a. On Data Sheet 1(2), Part B, "Reactivity Balance", subtract Column I from Column II for each line. b. Enter the results in Column III, "Difference".
: c. Sum all the values in Column III and enter on Line 5. d. Record this value on Data Sheet 1(2), Part C, Column I, Line 1. C. Critical Boron Concentration for Startup 1. Data Sheet 1 Calculations
: c. Sum all the values in Column III and enter on Line 5. d. Record this value on Data Sheet 1(2), Part C, Column I, Line 1. C. Critical Boron Concentration for Startup 1. Data Sheet 1 Calculations
: a. Using BV-2 Curve Book, Figure CB-20, "HZP Differential Boron Worth vs. Boron Concentration", AND the Boron Concentration from Part A, Column I, enter the Differential Boron Worth on Data Sheet 1, Part C, Column II, Line 1. b. -:"Divide the Reactivity Change (Column I, Line 1) by the Differential Boron Worth (Column II, Line 1) and enter the value on Data Sheet 1, Part C, Column Ill, Line 1. Be cautious of signs. c. Enter the Boron Concentration from Part A, Column I onrData Sheet 1, Part C, Column IV, Line 1.-- I I C IIEIFUTIV.
: a. Using BV-2 Curve Book, Figure CB-20, "HZP Differential Boron Worth vs. Boron Concentration", AND the Boron Concentration from Part A, Column I, enter the Differential Boron Worth on Data Sheet 1, Part C, Column II, Line 1. b. -:"Divide the Reactivity Change (Column I, Line 1) by the Differential Boron Worth (Column II, Line 1) and enter the value on Data Sheet 1, Part C, Column Ill, Line 1. Be cautious of signs. c. Enter the Boron Concentration from Part A, Column I onrData Sheet 1, Part C, Column IV, Line 1.-- I I C IIEIFUTIV.
Line 310: Line 266:
2L0T3 -NewMJPM TITLE: Prepare a Clearance Tagout STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)ý S/U 2.C. Review clearance points for adequacy and report results.EVALUATOR NOTE: Provide JPM handout with tagout forms and Op Manual figures.
2L0T3 -NewMJPM TITLE: Prepare a Clearance Tagout STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)ý S/U 2.C. Review clearance points for adequacy and report results.EVALUATOR NOTE: Provide JPM handout with tagout forms and Op Manual figures.
Candidate verifies appropriate clearance points are selected.
Candidate verifies appropriate clearance points are selected.
2.2.C Candidate identifies the following tagout errors: 2.2.1 480V breaker tag type is listed as "No Tag" (correct type is "Danger Tag"). 2.2.2 Valve 2SWC-45 is incorrectly listed in the "OPEN" position for tag placement.
2.2.C Candidate identifies the following tagout errors: 2.2.1 480V breaker tag type is listed as "No Tag" (correct type is "Danger Tag"). 2.2.2 Valve 2SWC-45 is incorrectly listed in the "OPEN" position for tag placement.
 
2.2.3 Valve 2SWC-39 is incorrectly listed in the "SHUT" position for tag restoration.
====2.2.3 Valve====
2.3. Reports that the tagout is NOT correct as wxritten based on the errors noted. COMMENTS: STOP TIME: I I 2W10-29 -CDS-003 05/17/2001 Beaver Valley Power Sta. 2B VP-01-1 Page 1 Equipment ID: 2CDS-SP22B  
2SWC-39 is incorrectly listed in the "SHUT" position for tag restoration.
 
===2.3. Reports===
that the tagout is NOT correct as wxritten based on the errors noted. COMMENTS: STOP TIME: I I 2W10-29 -CDS-003 05/17/2001 Beaver Valley Power Sta. 2B VP-01-1 Page 1 Equipment ID: 2CDS-SP22B  


==
==
Line 333: Line 285:
==REFERENCE:==
==REFERENCE:==


2.2.13 3.8 TASK ID: 1310-003-03-023 JPM APPLICATION:  
2.2.13 3.8 TASK ID: 1310-003-03-023 JPM APPLICATION:
[] REQUALIFICATION INITIAL EXAM -] TRAINING Z FAULTED JPM [Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
[] REQUALIFICATION INITIAL EXAM -] TRAINING Z FAULTED JPM [Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
TYPE: ADMINISTERED BY: Z Perform [] Plant Site -- Annual Requal Exam -- BVT -] Simulate [j Simulator Z Initial Exam Z NRC Z Classroom  
TYPE: ADMINISTERED BY: Z Perform [] Plant Site -- Annual Requal Exam -- BVT -] Simulate [j Simulator Z Initial Exam Z NRC Z Classroom  
Line 365: Line 317:
For the purpose of the JPM, inform the Candidate to report the results of the tagout review in lieu of signing the tagout form. EVALUATOR NOTE: This step is optional and may not be omitted by the Candidate.
For the purpose of the JPM, inform the Candidate to report the results of the tagout review in lieu of signing the tagout form. EVALUATOR NOTE: This step is optional and may not be omitted by the Candidate.
Mark step N/A if not performed.
Mark step N/A if not performed.
Evaluator may elect to provide procedure.
Evaluator may elect to provide procedure.
: 1. Locates procedure NPDAP-3.4.
: 1. Locates procedure NPDAP-3.4.
: 1. Candidate locates procedure NPDAP-3.4.
: 1. Candidate locates procedure NPDAP-3.4.
COMMENTS:
COMMENTS:
iTLiA5.640U 1/2-ADM- 1303.F02 Page 5 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 -New JPM TITLE: Review a Clearance Tagout J PM REVISION:
iTLiA5.640U 1/2-ADM- 1303.F02 Page 5 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 -New JPM TITLE: Review a Clearance Tagout J PM REVISION:
0 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 2.C. Review clearance points for adequacy EVALUATOR NOTE: After Candidate locates and reports results. procedure, provide attached tagout forms and OP Manual figures.
0 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 2.C. Review clearance points for adequacy EVALUATOR NOTE: After Candidate locates and reports results. procedure, provide attached tagout forms and OP Manual figures.
 
2.1 Candidate verifies appropriate clearance points are selected.
===2.1 Candidate===
2.2.C Candidate identifies the following tagout errors: 2.2.1 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for tag placement (listed as Open). 2.2.2 No tag is included for the pump benchboard control switch for tag placement.
 
2.2.3 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for restoration (listed as Open). 2.3. Reports that the tagout is NOT correct as written based on the errors noted. EVALUATOR NOTE: Candidate may also identify that the tagout may be enhanced by altering the sequence of tags. This is not required to satisfactorily complete the JPM. COMMENTS: STOP TIME:
verifies appropriate clearance points are selected.
2.2.C Candidate identifies the following tagout errors: 2.2.1 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for tag placement (listed as Open). 2.2.2 No tag is included for the pump benchboard control switch for tag placement.
 
====2.2.3 Valve====
2CHS-98 is NOT correctly tagged in the Locked Shut position for restoration (listed as Open). 2.3. Reports that the tagout is NOT correct as written based on the errors noted. EVALUATOR NOTE: Candidate may also identify that the tagout may be enhanced by altering the sequence of tags. This is not required to satisfactorily complete the JPM. COMMENTS: STOP TIME:
2W01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 Equipment ID: 2CHS-P22A  
2W01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 Equipment ID: 2CHS-P22A  


Line 390: Line 337:
Attribute Attribute Description Value Equipment Required For Mode Change Po : estored/Removed Prior to Mode OWER OPERATION ESF Clearance Required No Tagout Type Non-Outage Clearance Type Danger Status Description User Verification Date repared Prepared By Unit 2 NCO 05/01/2001 09:29 eviewed eviewed By Unit 2 NCO 05/01/2001 09:30 econd Reviewed Second Reviewed By 00/00/0000 00:00 ýpproved pproved By 00/00/0000 00:00 issued for Work Issued for Work By 00/00/0000 00:00 Restoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized Removal Authorized By 00/00/0000 00:00 learance Closed Clearance Closed By 00/00/0000 00:00 Tag List for "01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 05/ '2001 09:31 Parle 1 of 1 Component Annotations 2CHS-98 Com KEY REQUIRED [SR-2] Component Print Numberm Equipment ID Equipment Equipment Tag Tag Place. Place. Rest. Rest. Notes Description Location Serial Type Config. Seq. Config. Seq. MCC-2-E13-3F MOTOR STARTER FOR BORIC ACID 2-MSCV-735--
Attribute Attribute Description Value Equipment Required For Mode Change Po : estored/Removed Prior to Mode OWER OPERATION ESF Clearance Required No Tagout Type Non-Outage Clearance Type Danger Status Description User Verification Date repared Prepared By Unit 2 NCO 05/01/2001 09:29 eviewed eviewed By Unit 2 NCO 05/01/2001 09:30 econd Reviewed Second Reviewed By 00/00/0000 00:00 ýpproved pproved By 00/00/0000 00:00 issued for Work Issued for Work By 00/00/0000 00:00 Restoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized Removal Authorized By 00/00/0000 00:00 learance Closed Clearance Closed By 00/00/0000 00:00 Tag List for "01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 05/ '2001 09:31 Parle 1 of 1 Component Annotations 2CHS-98 Com KEY REQUIRED [SR-2] Component Print Numberm Equipment ID Equipment Equipment Tag Tag Place. Place. Rest. Rest. Notes Description Location Serial Type Config. Seq. Config. Seq. MCC-2-E13-3F MOTOR STARTER FOR BORIC ACID 2-MSCV-735--
Danger OPEN 1 CLOSED 7 TRANSFER PUMP 2CHS-P22A 2CHS-73 BORIC ACID PP 22A SUCT ISOL 2-AXLB-755-P22A CUB -757 Danger SHUT 2 OPEN 6 2CHS-98 PRI WTR TO BORIC ACID PP 22A 2-AXLB-755-P22A CUB -758 Danger OPEN 3 OPEN 5 2CHS-77 BORIC ACID TK 21A RECIRC ISOL 2-AXLB-755-P22A CUB -759 Danger SHUT 4 OPEN 4 2CHS-79 BORIC ACID PP 22A TO BORIC ACID 2-AXLB-755-P22A CUB -759 Danger SHUT 5 OPEN 3 FILTER 2CHS-868 BORIC ACID TRANSFER PUMP 22A 2-AXLB-755-P22A CUB -756 Danger OPEN 6 SHUT 2 CASING DRAIN 2CHS-625 BORIC ACID PP 22A SUCT STR TEST 2-AXLB-755-P22A CUB -757 Danger OPEN SHUT 1 QUESTION:
Danger OPEN 1 CLOSED 7 TRANSFER PUMP 2CHS-P22A 2CHS-73 BORIC ACID PP 22A SUCT ISOL 2-AXLB-755-P22A CUB -757 Danger SHUT 2 OPEN 6 2CHS-98 PRI WTR TO BORIC ACID PP 22A 2-AXLB-755-P22A CUB -758 Danger OPEN 3 OPEN 5 2CHS-77 BORIC ACID TK 21A RECIRC ISOL 2-AXLB-755-P22A CUB -759 Danger SHUT 4 OPEN 4 2CHS-79 BORIC ACID PP 22A TO BORIC ACID 2-AXLB-755-P22A CUB -759 Danger SHUT 5 OPEN 3 FILTER 2CHS-868 BORIC ACID TRANSFER PUMP 22A 2-AXLB-755-P22A CUB -756 Danger OPEN 6 SHUT 2 CASING DRAIN 2CHS-625 BORIC ACID PP 22A SUCT STR TEST 2-AXLB-755-P22A CUB -757 Danger OPEN SHUT 1 QUESTION:
A.3.1.1 a. After signing onto the RWP for the Safeguards Area to manually operate the AFW throttle valves, how can you determine the path of entry that will result in the lowest radiation exposure?  
A.3.1.1 a. After signing onto the RWP for the Safeguards Area to manually operate the AFW throttle valves, how can you determine the path of entry that will result in the lowest radiation exposure?
: b. Assume that a LOCA has occurred, the Control Room is working through the EOP's having just verified transfer to the Recirculation Mode, and the Emergency Preparedness Plan has been entered with all facilities currently activated.
: b. Assume that a LOCA has occurred, the Control Room is working through the EOP's having just verified transfer to the Recirculation Mode, and the Emergency Preparedness Plan has been entered with all facilities currently activated.
How would you now access this area and what dose considerations, if any, now exist? Answer: a. By reviewing the posted area dose maps, OR obtaining a Health Physics Technician briefing.
How would you now access this area and what dose considerations, if any, now exist? Answer: a. By reviewing the posted area dose maps, OR obtaining a Health Physics Technician briefing.
: b. With the EPP facilities activated, access to this area must be made through the Radiological Operations Center (ROC). Dose considerations will now include the increases from the recirculation piping, which passes through the safeguards building, with the potential for large and quickly changing radiation doses.Technical Reference(s):
: b. With the EPP facilities activated, access to this area must be made through the Radiological Operations Center (ROC). Dose considerations will now include the increases from the recirculation piping, which passes through the safeguards building, with the potential for large and quickly changing radiation doses.Technical Reference(s):
Learning Objective:
Learning Objective:
Line 398: Line 345:
QUESTION:
QUESTION:
A.3.1.2 Several days following a large break LOCA, the plant has been stabilized in Mode 5, and Health Physics has resurveyed the entire plant to update the radiological conditions and postings.
A.3.1.2 Several days following a large break LOCA, the plant has been stabilized in Mode 5, and Health Physics has resurveyed the entire plant to update the radiological conditions and postings.
You have been sent to the VCT cubicle, to check instrumentation, and found on the RWP that the dose rates inside the cubicle can be as high as 2499 mR/hour.
You have been sent to the VCT cubicle, to check instrumentation, and found on the RWP that the dose rates inside the cubicle can be as high as 2499 mR/hour.
: a. What radiation protection controls would you expect to find at the VCT access point? b. What Technical Specification requirements must be met for you to enter the cubicle? Answer: a. The door [barricade]
: a. What radiation protection controls would you expect to find at the VCT access point? b. What Technical Specification requirements must be met for you to enter the cubicle? Answer: a. The door [barricade]
shall be conspicuously posted [as a high radiation area] and locked, [with the keys maintained under administrative control of the on duty NSS and/or a facility radiation protection supervisor.]  
shall be conspicuously posted [as a high radiation area] and locked, [with the keys maintained under administrative control of the on duty NSS and/or a facility radiation protection supervisor.]
: b. To gain entry requires issuance of an RWP, which must be signed on, and at least one of the following:  
: b. To gain entry requires issuance of an RWP, which must be signed on, and at least one of the following:  
"* A radiation monitoring device which continuously indicates dose rate in the area, or "* A radiation monitoring device which continuously integrates the radiation dose in the area and alarms when a preset integrated dose is received, or " An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device, is responsible for positive control over activities in the area.  []bracketed information not required for full credit. Technical Reference(s):
"* A radiation monitoring device which continuously indicates dose rate in the area, or "* A radiation monitoring device which continuously integrates the radiation dose in the area and alarms when a preset integrated dose is received, or " An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device, is responsible for positive control over activities in the area.  []bracketed information not required for full credit. Technical Reference(s):
Line 419: Line 366:
==REFERENCE:==
==REFERENCE:==


2.4.44 4.0 TASK ID: 1350-007-03-023 JPM APPLICATION:  
2.4.44 4.0 TASK ID: 1350-007-03-023 JPM APPLICATION:
[] REQUALIFICATION H INITIAL EXAM E TRAINING [E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
[] REQUALIFICATION H INITIAL EXAM E TRAINING [E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION:
TYPE: ADMINISTERED BY: Z Perform -- Plant Site E] Annual Requal Exam E] BVT F-1 Simulate E] Simulator Z Initial Exam Z NRC HZ Classroom  
TYPE: ADMINISTERED BY: Z Perform -- Plant Site E] Annual Requal Exam E] BVT F-1 Simulate E] Simulator Z Initial Exam Z NRC HZ Classroom  
-] OJT/TPE E] Other: E] Training _---] Other: EVALUATION RESULTS Performer Name: Performer S SN: Time F--' Yes Allotted 15mntsActualmiue Critical: No[ Time: 1miueTime:miue  
-] OJT/TPE E] Other: E] Training _---] Other: EVALUATION RESULTS Performer Name: Performer S SN: Time F--' Yes Allotted 15mntsActualmiue Critical: No[ Time: 1miueTime:miue
[JSAT JPM RESULTS: E A SI'] UNSAT (Comments required for UNSAT evaluation)
[JSAT JPM RESULTS: E A SI'] UNSAT (Comments required for UNSAT evaluation)
Comments:
Comments:
Line 455: Line 402:
After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator.
After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator.
RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation ( JPM REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation ( JPM REVISION:
a (A STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/U ... .. START TIME:__ ______ 1. Locate procedure EPP/IP 4.1. 1.1 Candidate locates EPP/IP 4.1. EVALUATOR CUE: You DO NOT need to fill out an Initial Notification Form (EPP/IP 1.1 Attachment  
a (A STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/U ... .. START TIME:__ ______ 1. Locate procedure EPP/IP 4.1. 1.1 Candidate locates EPP/IP 4.1. EVALUATOR CUE: You DO NOT need to fill out an Initial Notification Form (EPP/IP 1.1 Attachment
: 1) for the purposes of this JPM. COMMENTS:  
: 1) for the purposes of this JPM. COMMENTS:
: 2. Refer to Offsite Protection Action 2.1 Candidate enters Offsite Protective Action Recommendation Recommendation Flow Chart. Flowchart for General Emergency declaration.
: 2. Refer to Offsite Protection Action 2.1 Candidate enters Offsite Protective Action Recommendation Recommendation Flow Chart. Flowchart for General Emergency declaration.
COMMENTS:  
COMMENTS:
: 3. Navigates PAR flow chart. 3.1 Candidate navigates PAR flow chart as follows: 3.1.1 General Emergency already declared (4). 3.1.2 Met data provided in initial conditions  
: 3. Navigates PAR flow chart. 3.1 Candidate navigates PAR flow chart as follows: 3.1.1 General Emergency already declared (4). 3.1.2 Met data provided in initial conditions
(-). 3.1.3 None of the following are TRUE (4): 35' wind speed < 2 MPH Either 150' or 500' wind direction unavailable 150' & 500' wind direction difference
(-). 3.1.3 None of the following are TRUE (4): 35' wind speed < 2 MPH Either 150' or 500' wind direction unavailable 150' & 500' wind direction difference
_> 165 and _< 195 degrees Release started or imminent Release transport spans sunrise or sunset 3.1.4 Dose projection results available  
_> 165 and _< 195 degrees Release started or imminent Release transport spans sunrise or sunset 3.1.4 Dose projection results available  
-YES (--). 3.1.5 EABTEDE< 10 REM- NO (,). 3.1.6 5 mile dose >1 REM TEDE or >5 REM CDE -YES (--) COMMENTS:
-YES (--). 3.1.5 EABTEDE< 10 REM- NO (,). 3.1.6 5 mile dose >1 REM TEDE or >5 REM CDE -YES (--) COMMENTS:
RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) I JPM[ REVISION:
RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) I JPM[ REVISION:
Oa STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)> S/U 4. Determine Downwind Wedge. 4.1 Candidate determines that the 150' elevation downwind sectors are 'CDEFG'.
Oa STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)> S/U 4. Determine Downwind Wedge. 4.1 Candidate determines that the 150' elevation downwind sectors are 'CDEFG'.
 
4.2 Candidate determines that the 500' elevation downwind sectors are 'DEFGH'.
===4.2 Candidate===
 
determines that the 500' elevation downwind sectors are 'DEFGH'.
COMMENTS: 5.C Determine Offsite Protective Action Recommendations.
COMMENTS: 5.C Determine Offsite Protective Action Recommendations.
5.1I.C Candidate determines the following Protective Action Recommendations:
5.1I.C Candidate determines the following Protective Action Recommendations:
Evacuate 360 0 for two miles, and Evacuate Sectors 'CDEFGH' for ten miles, and Shelter the remainder of 10 mile EPZ. COMMENTS: STOP TIME: ____,__________}}
Evacuate 360 0 for two miles, and Evacuate Sectors 'CDEFGH' for ten miles, and Shelter the remainder of 10 mile EPZ. COMMENTS: STOP TIME: ____,__________}}

Revision as of 08:05, 14 July 2019

Final - RO & SRO - Section a Operating
ML011910517
Person / Time
Site: Beaver Valley
Issue date: 06/14/2001
From: Myers L
FirstEnergy Nuclear Operating Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
-RFPFR, 05000412/01-301 05000412/01-301
Download: ML011910517 (54)


Text

{{#Wiki_filter:Facility: FENOC BVPS Unit 2 Date of Examination: 5/29/01 Examination Level (circle one): RO Operating Test Number: 2LOT3 Administrative Describe method of evaluation: Topic/Subject

1. ONE Administrative JPM, OR Description
2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 3.7 Conduct of Perform an ECP Calculation

[JPM] Operations K/A 192008 K1.07 3.5 A.2 Equipment Prepare a Clearance Tagout [JPM] Control K/A 2.2.13 3.6 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.5 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 2.6 A.4 Emergency Knowledge of Emergency Plan [Q] Preparedness K/A 2.4.29 2.6 Knowledge of Emergency Plan [Q] K/A 2.4.29 2.6 2LOT3 Rev. 3 Administrative Topics Outline Form ES-301-1 ES-301 Facility: FENOC BVPS Unit 2 Date of Examination: 5/29/01 Examination Level (circle one): SRO Operating Test Number: 2LOT3 Administrative Describe method of evaluation: Topic/Subject

1. ONE Administrative JPM, OR Description
2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 4.4 Conduct of Review Estimated Critical Position Calculation

[JPM] Operations K/A 2.1.7 4.4 A.2 Equipment Review a Clearance Tagout [JPM] Control K/A 2.2.13 3.8 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.9 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 3.0 A.4 Emergency Determine Protective Action Recommendation (PAR) [JPM] Preparedness K/A 2.4.44 4.0 2LOT3 Rev. 3 Form ES-301-1 ES-301 Administrative Tonics Outline RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION: 4a K/A

REFERENCE:

2.1.7 3.7/4.4 TASK ID: 0061-009-01-013 JPM APPLICATION: [] REQUALIFICATION I INITIAL EXAM -TRAINING -FAULTED JPM ] ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Fý Perform [E Plant Site 1-- Annual Requal Exam [1] BVT -- Simulate N Simulator Z Initial Exam M NRC F-- Classroom -] OJT/TPE -- Other: -Training _] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time F--' Yes Allotted 15 minutes [Actual minutes Critical: [ No Time: Time: 1E]SAT JPM RESULTS: E A M E S UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature: RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION: 4a I EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: Correctly calculate RCS subcooling margin using control board indications and Steam Tables. Control Room Calculate RCS subcooling margin using control board indications and Steam Tables. The reactor was manually tripped from 100% power due to a CCP leak requiring a shutdown of all RCPs. The plant computer, Safety Parameter Display System (SPDS), and Plant Safety Monitoring System (PSMS) are out of service. Core Exit Thermocouple temperatures are NOT available. Your Supervisor directs you to determine the RCS subcooling margin using control board indications and Steam Tables. None Steam Tables Calculator HANDOUT: None RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE n Read: TASK: CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Calculate RCS subcooling margin using control board indications and Steam Tables.INITIAL CONDITIONS:

The reactor was manually tripped from 100% power due to a ( requiring a shutdown of all RCP's. The plant computer, Safety Parameter Display System (SPDS), and Plant Safety Monitorin (PSMS) are out of service. Core exit thermocouple temperatu NOT available. INITIATING CUE: Your Supervisor directs you to determine the RCS subcooling using control board indications and Steam Tables. -fl At this time, ask the evaluator any questions you have on this JPM. E When satisfied that you understand the assigned task, announce "I am now beginning the EJ Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations. j- After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator. ICP leak g System .es are margin JPM"1. RTL#A5.640U 1/2-ADM-1303 .F02 Page 4 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate the RCS Subcooling Margin J-PM REVISION: 4a STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U ,/ iiii 'i lSTART TIME: Setup: Initialize IC-177. Place YCT on SPDS, PSMS Plant Computer, 2RCS*YOO 1 (VB-B) 2RCS*YRO01 (VB-B) & 2RCS*Y152E (VB-B). 1. Obtain RCS hot leg wide range 1.1 Candidate locates RCS hot leg wide range temperature indication temperature. [2RCS-TR4131. Simulator value: SIMULATED CUE: Recorder indicates 575°F. 575 0 F (Range 570 -580 0 F) _________________ COMMENTS:

2. Obtain RCS pressure and convert to 2.1 Candidate locates PRZR pressure indication. (Either wide or psia. narrow range). Simulator values: SIMULATED CUE: Indicator shows 2140 psig NR (2155 psia). S2140 psig (NR) (2155 psia) COMMENTS:

-2150 psig (WR) (2165 psia) RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 I JPM TITLE: Calculate the RCS Subc°°ling Margin IJPM REVISION: 4aSuclngMri STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' SU 3. Find RCS saturation temperature using 3.1 Candidate locates the saturation temperature in the Steam Tables Steam Tables. for the given PRZR pressure. Saturation temperature should COMMENTS: be -646'F (644 -648'F).4. C Determine the RCS subcooling margin.RCS is approximately 700 + 10' subcooled. 4.1.C Candidate subtracts RCS hot leg temperature from saturation temperature. COMMENTS: STOP TIME: RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation JPM REVISION: 5 K/A

REFERENCE:

192008 K1.07 3.5 TASKID: 0011-003-01-013 2.1.23 3.9 JPM APPLICATION: M REQUALIFICATION ] INITIAL EXAM -- TRAINING E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: N Perform 1-1 Plant Site -Annual Requal Exam F-1 BVT FI- Simulate [] Simulator Z Initial Exam Z NRC SClassroom -OJT/TPE -Other: -Training E---] Other: RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation 1PM REVISION: 5 I EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: HANDOUT: DATA SHEET 1 (FORM ECP-1) Parts A through E completed correctly. Control Room You are to simulate (perform) the task of calculating an Estimated Critical Position (ECP).0 S 0 The plant computer is NOT available for calculation. Plant startup following a reactor trip. Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet.Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentration with an estimate of criticality occurring with Control Bank 'D' at 100 steps. 20M-50.4.F, Rev. 2 BV-2 Curve Book Calculator "* 20M-50.4.F, Rev. 2 with Critical Data recorded in DATA SHEET 1 "* ECP INITIAL CONDITIONS Data Sheet "* BV-2 Curve Book RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 3 of 11 Revision 1 CANDIDATE DIRECTION SHEET* THIS SHEET TO BE GIVEN TO CANDIDATE

  • Read: Perform an ECP calculation.

INITIAL CONDITIONS: INITIATING CUE: M-* The plant computer is NOT available for calculation.

  • Plant startup following a reactor trip.
  • Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet. Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentrationwith an estimate of criticality occurring with Control Bank 'D' at 100 steps.At this time, ask the evaluator any questions you have on this JPM..When satisfied that you understand the assigned task, announce "I am now beginning the JPM". -Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations.

j- After determining the Task has been met announce "I have completed the JPM". Then hand this sheet to the evaluator. TASK: RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 4 of 11 Revision 1 JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation J-PM REVISION: 5I STEP ( "C" Denotes CRITICAL STEP)STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)n> S/tu START TIME: _______1. Obtain 20M-50.4.F, Performing An Estimated Critical Position Calculation.

2. Obtain BV-2 Plant Curve Book.EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet.1.EVALUATOR NOTE: This step is optional.

Evaluator may elect to provide procedure. Candidate locates procedure 20M-50.4.F. COMMENTS:-I--I- i ___EVALUATOR NOTE: This step is optional. Evaluator may elect to provide Curve Book.2. Candidate obtains the BV-2 Curve Book.COMMENTS: 1 EVALUATOR NOTE: After Candidate locates the procedure, provide a copy of DATA SHEET 1 (FORM ECP-1) with the following data entered: "* Column I, PRIOR TO SHUTDOWN: Boron Concentration SPower > Control Rod Position "* Column II, EXPECTED AT CRITICALITY: -Control Rod Position m r I RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IJPM REVISION: 5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 3. Record (review) the given information 3.1 Candidate reviews data in Column I, PRIOR TO SHUTDOWN: in Part A, Critical Data. Boron Concentration SPower SControl Rod Position 3.2 Candidate reviews data in Column II, EXPECTED AT CRITICALITY: > Control Rod Position COMMENTS:

4. Complete Part A, Critical Data, Column 4.1 Candidate refers to Figure CB-12 to estimate Xenon percent.

I, PRIOR TO SHUTDOWN. 4.2 Candidate refers to Figure CB-22 to estimate Samarium percent. COMMENTS:

5. Complete Part A, Critical Data, Column 5.1 Candidate refers to Figure CB-23 to estimate Xenon percent.

II, EXPECTED AT CRITICALITY. 5.2 Candidate refers to Figure CB-22 to estimate Samarium percent. COMMENTS: RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 6 of 11 Revision 1 JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION: 5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 6. Determine Part B. 1, Power Reactivity 6.1 Candidate refers to Figure CB-21 to determine the power Defect. reactivity defect and enters value in Part B, Column I, Line 1. COMMENTS:

7. Determine Part B.2, Control Rod 7.1 Candidate refers to Figure CB-24B to estimate integral rod worth Reactivity Defect. prior to shutdown.

7.2 Candidate refers to Figure CB-24B to estimate integral rod worth expected at criticality. COMMENTS:

8. Determine Part B.3, Xenon Reactivity 8.1 Candidate refers to Figure CB-23 to estimate Xenon worth prior Defect. to shutdown.

8.2 Candidate refers to Figure CB-23 to estimate Xenon worth expected at criticality. COMMENTS: RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION: 5 1 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/T 9. Determine Part B.4, Samariutn 9.1 Candidate refers to Figure CB-22 to estimate Samarium worth Reactivity Defect. prior to shutdown. 9.2 Candidate refers to Figure CB-22 to estimate Samarium worth expected at criticality. COMMENTS:

10. Calculate Part B.5, Reactivity Change. 10.1 For each Part B defect, Candidate subtracts Column I from Column II and enters the value in Column III. 10.2 Candidate sums all Part B, Column III values and enters the value in Part B, Line 5. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMEIBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IJPM REVISION: 5 1 STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/l 11. C Calculate Part C, Critical Boron 11.1 Candidate enters Reactivity Change value from Part B, Line 5 in Concentration. Part C, Column I, Line 1. 11.2 Candidate refers to Figure CB-20 to estimate differential boron worth for the Part A, Column I boron concentration and enters the value in Part C, Column II, Line 1. 11.3 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 1 and enters the value in Part C, Column III, Line 1. 11.4 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 1. 11.5 Candidate adds the boron change from Part C, Column III, Line 1 to Part C, Column IV, Line 1 and enters the value in Part C, Column V, Line 1. 11.6 Candidate refers to Figure CB-20 to estimate differential boron worth for the boron concentration from Part C, Column V, Line 1 and enters the value in Part C, Column II, Line 2. 11.7 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 2 and enters the value in Part C, Column III, Line 2. 11.8 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 2. 11.9.C Candidate adds Part C, Column III, Line 2 to Part C, Column IV, Line 2 and enters the value in Part C, Column V, Line 2. EVALUATOR NOTE: This step is SAT if the method of calculation is correct and the boron concentration for startup is within the the tolerance band listed on the ECP CALCULATION SHEET.COMMENTS:£ ____________ RTL#AS.640U 1/2-ADM-1303.F02 Page 9 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION: 5I STEP STANDARD "(C"" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)z: S/U EVALUATOR NOTE: If Candidate continues with procedure, conclude JPM at this point.STOP TIME:

  • THIS SHEET TO BE GIVEN TO CANDIDATE*

ECP INITIAL CONDITIONS Hours since the reactor tripped: 60 Hours to expected criticality: 20 Power history prior to the reactor trip: 100% for 1 month Core age: MOL (5750 MWD/MTU) Tavg: 547 0 F Initial RCS boron concentration: 1000 ppm Unit 2 Cycle 9 Data Core AGE EQ XE EQ SAM Prior to Shutdown: Expected at Criticality: B. Reactivity Balance Column: I Prior S/D 1780 11 Il1 (Il-I) Exp at Crit Difference 0 -1780 0 818 2692.0 818 53.8 -2638.2 4. Samarium 616.0 822.4 206.4 5. Reactivity Change C. Critical Boron Concentration Column: I 1 2 Rx Chng -3393.8 II -8.30 -7.70 III B Chge 408.9 440.8 JPM 2CR , Rev. 5 ECP CALCULATION MOL 2692 616 3. Xenon-3393.8 IV B @ S/D 1000 1000 V B @ S/U 1408.9 1440.8"IMS - RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-503 JPM TITLE: Review Estimated Critical Position Calculation JPM REVISION: 0 K/A

REFERENCE:

192008 K1.07 3.6 TASK ID: 1340-007-03-023 2.1.7 4.4 JPM APPLICATION: -- REQUALIFICATION [ INITIAL EXAM [] TRAINING I FAULTED JPM N ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: M Perform [] Plant Site [] Annual Requal Exam E] BVT F- Simulate f-- Simulator I Initial Exam I NRC I Classroom "-] OJT/TPE [- Other: -Training [] Other: EVALUATION RESULTS Performer Name: PefrerIN Time F--] Yes Allotted Actuatl inte Critical: N No Time: Time: [] SAT JPM RESULTS: SA 1P RS UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/S SN: Name/SSN: Name/SSN: Name/S SN: EVALUATOR Evaluator (Print): Date: , _ Evaluator Signature: RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-503 JPM TITLE: Review Estimated Critical Position Calculation JPM REVISION: 0 1 EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: HANDOUT: DATA SHEET 1 (FORM ECP-1) reviewed and error(s) identified. Control Room You are to simulate (perform) the task of reviewing an Estimated Critical Position (ECP) calculation. "* The plant computer is NOT available for calculation. "* A plant startup is in progress following a reactor trip. Reactor Engineering has prepared an ECP calculation for a reactor startup. The NSS requests you to verify that the ECP is accurate for given plant conditions and report the results of your review. 20M-50.4.F, Rev. 2 BV-2 Curve Book Calculator "* DATA SHEET 1 (FORM ECP-1) completed through Part C. "* ECP Initial Conditions Data Sheet "* BV-2 Curve Book RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET THIS SHEET TO BE GIVEN TO CANDIDATE Read: Review an ECP calculation. INTIAL CONDITIONS: INITIATING CUE: "* The plant computer is NOT available for calculation. "* A plant startup is in progress following a reactor trip. Reactor Engineering has prepared an ECP calculation for a reactor startup. The NSS requests you to verify that the ECP is accurate for the given plant conditions and report the results of your review.Li At this time, ask the evaluator any questions you have on this JPM. D When satisfied that you understand the assigned task, announce "I am now beginning the JPM". j Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations. E After determining the Task has been met announce "I have completed the JPM". Then hand this sheet to the evaluator. TASK: RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION: 4b STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U MOO iii ~ "'ii/i/li! "START TIME: EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet and completed DATA SHEET 1 (FORM ECP-1). EVALUATOR NOTE: This step is optional. Evaluator may elect to provide procedure.

1. Obtain 20M-50.4.F, Performing An 1. Candidate locates procedure 20M-50.4.F.

Estimated Critical Position Calculation. COMMENTS: EVALUATOR NOTE: This step is optional. Evaluator may elect to provide the Curve Book. 2. Obtain BV-2 Plant Curve Book. 2. Candidate obtains the BV-2 Curve Book. COMMENTS:

3. Verify the information in Part A, 3.1 Candidate verifies data in Column I, PRIOR TO SHUTDOWN:

Column I. > Boron Concentration from ECP Initial Conditions Data Sheet. >Power from ECP Initial Conditions Data Sheet. SXenon percent from Figure CB-12 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS: RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I PM REVISION: 4b STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U 4. Verify the information in Part A, 3.2 Candidate verifies data in Column II, EXPECTED AT Column II. CRITICALITY: SXenon percent from Figure CB-23 SSamarium percent from Figure CB-22 > Control Rod Position from ECP Initial Conditions Data Sheet. COMMENTS:

5. Part B. 1, Power Reactivity Defect. 5.1 Candidate verifies data from Figure CB-21 for the power reactivity defect equals the value entered in Part B, Column I, Line 1. COMMENTS:
6. Part B.2, Control Rod Reactivity 6.1 Candidate verifies data from Figure CB-24B equals the value for Defect. estimated integral rod worth prior to shutdown.

7.2 Candidate verifies data from Figure CB-24B equals the value for estimated integral rod worth expected at criticality. COMMENTS: RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation IJPM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)z: S/U 7. Part B.3, Xenon Reactivity Defect. 7.1 Candidate verifies data from Figure CB-23 equals the value entered for Xenon worth prior to shutdown. 7.2 Candidate verifies data for Xenon worth expected at criticality equals the value determined in procedure step IV.B.3. COMMENTS:

8. Part B.4, Samarium Reactivity Defect. 9.1 Candidate verifies data from Figure CB-22 equals the value for Samarium worth prior to shutdown.

9.2 Candidate verifies data for Samarium worth expected at criticality equals the value determined in procedure step IV.B.4. COMMENTS: RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 9.C Part B.5, Reactivity Change. 9.1 For each Part B defect, Candidate verifies the correct value entered in Column III. 9.2.C Candidate determines that the value entered in Part B, Line 5 is NOT correct. EVALUATOR NOTE: The value entered in Part B, Line 5 is incorrect due to a math error. The correct value is 2119.6. EVALUATOR NOTE: When Candidate reports results, inform Candidate to complete Part C, Critical Boron Concentration using the correct Reactivity Change value.COMMENTS: RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I WM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' S/U 11. C Calculate Part C, Critical Boron 11.1 Candidate enters correct Reactivity Change value in Part C, Concentration. Column I, Line 1. 11.2 Candidate refers to Figure CB-20 to estimate differential boron worth for the Part A, Column I boron concentration and enters the value in Part C, Column II, Line 1. 11.3 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 1 and enters the value in Part C, Column III, Line 1. 11.4 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 1. 11.5 Candidate adds the boron change from Part C, Column III, Line 1 to Part C, Column IV, Line 1 and enters the value in Part C, Column V, Line 1. 11.6 Candidate refers to Figure CB-20 to estimate differential boron worth for the boron concentration from Part C, Column V, Line 1 and enters the value in Part C, Column II, Line 2. 11.7 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 2 and enters the value in Part C, Column III, Line 2. 11.8 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 2. 11.9.C Candidate adds Part C, Column III, Line 2 to Part C, Column IV, Line 2 and enters the value in Part C, Column V, Line 2. EVALUATOR NOTE: This step is SAT if the method of calculation is correct and the boron concentration is between 1206 and 1334 ppm (+/- 500 pcm tolerance band). COMMENTS: STOP TIME:

  • THIS SHEET TO BE GIVEN TO CANDIDATE*

ECP INITIAL CONDITIONS Hours since the reactor tripped: 60 Hours to expected criticality: 20 Power history prior to the reactor trip: 100% for 1 mol Core age: MOL (5750 Tavg: 547 0 F Initial RCS boron concentration: 1000 ppm Control Rod Position Prior to Shutdown: CB 'D' at 200 s Control Rod Position Expected at Criticality: CB 'D' at 120 s ,ith MVD/MTU) teps teps Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 13 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET 1 FORM ECP-1 A. Critical Data (I) (II) PRIOR TO SHUTDOWN EXPECTED AT CRITICALITY Date ./_./. Time 0 .0 Date _)/(IJ) Time _.0hrS, Boron Conc. +/-0 0 ppm Power 50 % Xenon Th5 % Xenon % (Use Fig CB-12 or N/A) (Use Fig CB-23 or N/A) Samarium 100 % Samarium %_ _ (Use Fig CB-22 or N/A) (Use Fig CB-22 or N/A) Control Rod Position Control Rod Position A 2."0 C _2_?0Q A 2 30 C 2j0 D 00 B 230 D 120 B. Reactivity Balance -(Record absolute values in Columns I and II) Reactivity Defects Prior to Expected at (11 -I) Shutdown Criticality Difference

1. Power (Fig CB-21) (OR Consult RX ENGR) 6!5 pcm 0 (zero) pcm (-) S(!5 pcm 2. Control Rods (Circle Fig. used (Fig. CB-24A, Q 24C OR Consult RX ENGR) 120 pcm 6 15 pcm 6q 5 pcm 3. Xenon (Fig. CB-23) pcm 26. 1 pcm (+/-) 207MB pcm 4. Samarium (Fig. CB-22) 61 pcm Tq, 2 pcm (+ I2.'.Z pcm 5. Reactivity Change (Sum of 1-4) = W (-) (5oq. pcm Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 14 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET I (continued)

FORM ECP-1 C. Critical Boron Concentration D. Estimated Rod Position Correction r' Beaver Valley Power Station Unit 2 20M-504F Station Startup Revision 2 Operating Procedures Page F 4 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION

2. For the control rod positions listed on Data Sheet 1(2), Part A (Critical Data) determine and record the control rod reactivity defect for Part B, Columns I and II as follows: a. BV-2 Curve Book Figure 24A, 24B, or 24C, "Integral Rod Worth vs. Steps Withdrawn Banks D and C Moving with Overlap".

OR b. Have the Reactor Engineer provide the current value using either the PC version of the Nuclear Design Report (PCNDR) or other NRC approved nuclear design codes.3. Determine Xenon worth for Data Sheet 1, Part B, Columns I and II as follows: a. If BV-2 Curve Book Figure CB-12 and/or CB-23, were used in Steps IV.A.1.e and IV.A.2.c, perform the following calculations and record the value obtained in Column C below on Data Sheet 1, Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A B C Percent Equil. Xenon Equilibrium Xenon Col. A x Col. B/1 00% Part A Critical Data BOL, MOL, or EOL Xenon Worth CB-12 or CB-23 2692 pcm U1 2-pcm 0YT .6 pcm 26. 1 pcm OR b. Have the Reactor Engineer provide Xenon values in pcm using a computer program that approximates Xenon worth. Beaver Valley Power Station Station Startup Operating Procedures Unit 2 20M-50.4. F Revision 2 Page F 5 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION

4. Determine Samarium worth for Data Sheet 1(2), Part B, Columns I and I1 as follows: a. If BV-2 Curve Book, Figure CB-22, was used in Step IV.A.2.d, perform the following calculations and record the value obtained in Column C below on Data Sheet 1(2), Part B, Columns I and I1: Prior to Shutdown Column I Expected at Criticality Column II A Percent Equil. Samarium Part A Critical Data B Equilibrium Samarium BOL, MOL, or EOL CB-22 616 ncmr (c00( n I 120 161(K pcm Col. Ax Ciol. B/100% Samarium Worth 6I16 pcm 7 .Z pcm OR b. Have the Reactor Engineer provide Samarium values in pcm using a computer program that approximates Samarium worth. 5. Calculate the reactivity change as follows: a. On Data Sheet 1(2), Part B, "Reactivity Balance", subtract Column I from Column II for each line. b. Enter the results in Column III, "Difference".
c. Sum all the values in Column III and enter on Line 5. d. Record this value on Data Sheet 1(2), Part C, Column I, Line 1. C. Critical Boron Concentration for Startup 1. Data Sheet 1 Calculations
a. Using BV-2 Curve Book, Figure CB-20, "HZP Differential Boron Worth vs. Boron Concentration", AND the Boron Concentration from Part A, Column I, enter the Differential Boron Worth on Data Sheet 1, Part C, Column II, Line 1. b. -:"Divide the Reactivity Change (Column I, Line 1) by the Differential Boron Worth (Column II, Line 1) and enter the value on Data Sheet 1, Part C, Column Ill, Line 1. Be cautious of signs. c. Enter the Boron Concentration from Part A, Column I onrData Sheet 1, Part C, Column IV, Line 1.-- I I C IIEIFUTIV.

RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 1 of 5 Revision I_PM REVISION: 0 JPM TITLE: Prepare a Clearance Tagout K/A

REFERENCE:

2.2.13 3.6 TASK ID: 0481-020-03-013 JPM APPLICATION: -REQUALIFICATION Z INITIAL EXAM [] TRAINING -FAULTED JPM 15 ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Z Perform [[[ Plant Site F- Annual Requal Exam E] BVT [-I Simulate F-- Simulator Z Initial Exam Z NRC Z Classroom E] OJT/TPE F-1 Other: F-1 Training -Other: CNEVALUATION RESULTS Performer Name: [Performer SSN: Time E-1 Yes Allotted Actual Critical: No Time: 20mntsTime: mue 1PM RESULTS: El SAT LT : UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature: RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM- 1303.F02 Page 2 of 5 Revision 1 JPM NIUMBER: 2L0T3 -New JPM TITLE: Prepare a Clearance Tagout 1PM REVISION: 0 EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: HANDOUT: Prepare a clearance tagout. Control Room You are to simulate (perform) the task of preparing a clearance tagout. The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate' and drain [2CDS-P22B] Chiller Cond Wtr Booster Pump. As the Reactor Operator, your Supervisor requests you to review the clearance tagout for completeness and report your results. NPDAP-3.4, Rev. 14 None NPDAP-3.4, Rev. 14 Copy of Op. Manual Figures No. 30-4 & 30-5 I m RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 3 of 5 Revision 1 CANDIDATE DIRECTION SHEET* THIS SHEET TO BE GIVEN TO CANDIDATE

  • Read: Prepare a clearance tagout.INITIAL CONDITIONS:

INITIATING CUE: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate and drain [2CDS-P22B] Chiller Cond Wtr Booster Pump. As the Reactor Operator, your Supervisor requests you to review the clearance tagout for completeness and report your results..j At this time, ask the evaluator any questions you have on this JPM. J-J[ When satisfied that you understand the assigned task, announce "I am now beginning the JPM". '-j Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations. After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator. TASK: ......................-.RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303 .F02 Page 4 of 5 Revision 1 IJPM NUMBER: 2LOT3 -New PMT JPM REVISION: 0 P TITLE: Prepare a Clearance Tagout STEP STANDARD STEPI) F("C"_Denotes CRITICAALLSTEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)START TIME: SEVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of the JPM, inform the Candidate to report the results of the tagout review in place of signing the tagout form.1. Locates NPDAP-3.4. EVALUATOR NOTE: This step is optional and may not be performed by Candidate. Mark step N/A if not performed. After locating procedure, provide Candidate a copy of NPDAP 3.4. 1. Candidate locates procedure NPDAP-3.4. COMMENTS: "RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 5 of 5 Revision 1 JPM NUVMIBER: 2L0T3 -NewMJPM TITLE: Prepare a Clearance Tagout STEP STANDARD "("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)ý S/U 2.C. Review clearance points for adequacy and report results.EVALUATOR NOTE: Provide JPM handout with tagout forms and Op Manual figures. Candidate verifies appropriate clearance points are selected. 2.2.C Candidate identifies the following tagout errors: 2.2.1 480V breaker tag type is listed as "No Tag" (correct type is "Danger Tag"). 2.2.2 Valve 2SWC-45 is incorrectly listed in the "OPEN" position for tag placement. 2.2.3 Valve 2SWC-39 is incorrectly listed in the "SHUT" position for tag restoration. 2.3. Reports that the tagout is NOT correct as wxritten based on the errors noted. COMMENTS: STOP TIME: I I 2W10-29 -CDS-003 05/17/2001 Beaver Valley Power Sta. 2B VP-01-1 Page 1 Equipment ID: 2CDS-SP22B

== Description:==

ISOLATE AND DRAIN PUMP TO INSPECT AND CLEAN CYCLONE SEPERATOR. Reason: ONE CHILLER CND WTR BOOSTER PUMP WILL NORMALLY BE IN CONTINUOUS OPERATION Hazards: PLACE 2CDS-SP22A IN SERVICE BEFORE SECURING 2CDS-SP22B Work Required prior to Completion: Attribute Attribute Description Value Equipment Required For Mode Change No Restored/Removed Prior to Mode NOT APPLICABLE ESF Clearance Required No ragout Type Non-Outage .learance Type Danger Number Equipment ID Description 00-019047-000 2CDS-SP22B CLEAN AND INSPECT FILTER CYCLONE SEPARATOR TO 2CDS-P22B Status Description User Verification Date Prepared Prepared By ooley, Tom 05/17/2001 14:55 ,Reviewed Reviewed By 00/00/0000 00:00 Pecond Reviewed econd Reviewed By 00/00/0000 00:00 Approved Approved By 00/00/0000 00:00 Issued for Work Issued for Work By 00/00/0000 00:00 estoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized Removal Authorized By 00/00/0000 00:00 Clearance Closed Clearance Closed By 00/00/0000 00:00 F4:55 of I Tag List f `/10-29 -CDS-003 Beaver Va..-y Power Sta. 2BVP-01-1 Equipment ID Equipment Description 2CDS-P22B-Cs CODENSER WATER BOOSTER PUMP 480VUS-2-1-04/6D 480VUS-2-1 ACB 04/2B6D 480VUS-2-1-6D 480V BKR FOR COND WATER BOOSTER PUMP (2CDS-P22B) 2swC-45 BOOSTER PUMP (2CDS-P22B) DISCH ISOL 2SWC-39 BOOSTER PUMP (2CDS-P22B) SUCTION ISOL 2SWC- 343 CON D WTR BOOSTER PUMP (2CDS-P22B) SUCTION DRN 2SWC-973 (2CDS-P22B) SUCTION TCN ISOL Equipment Location 2-TRBB-730-BASEMENT 2-SRVB760 2-SRVB-760-2-TRBB-730--EAST OF A CHILLER 2-TRBB-730-2-TRBB-730-2-TRBB-730-- Tag Serial Tag Type Caution Danger No Tag Danger Danger Danger Danger Place. Config. NORMAL OFF RACKED OUT OPEN SHUT OPEN OPEN Place. Seq. 2 3 4 5 6 7 Rest. Config. NORMAL ON RACKED IN OPEN SHUT SHUT SHUT R es t. Seq. 7 6 5 4 3 2 05/f '01 14t:55 1 of 1, Notes S/D-"NORMAL" (AFTER STOP) 30-4/C4 30-4/C3 30-4/C3 30-4/C3 RTL#A5.640U OPERATIONS JOB PERFORMANCE MEASURE 1/2-ADM-1303.F02 Page 1 of 5 Revision 0 JPM NUMBER: 2LOT3 -New JPM TITLE: Review a Clearance Tagout J PM[ REVISION: 0 1 K/A

REFERENCE:

2.2.13 3.8 TASK ID: 1310-003-03-023 JPM APPLICATION: [] REQUALIFICATION INITIAL EXAM -] TRAINING Z FAULTED JPM [Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Z Perform [] Plant Site -- Annual Requal Exam -- BVT -] Simulate [j Simulator Z Initial Exam Z NRC Z Classroom -] OJT/TPE -] Other: [] Training E--] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time ["- Yes Allotted 20mntsActual minutes Critical: No Time: 20mntsTime: Li SAT JPM RESULTS: SA 1T El UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/S SN: J Name/S SN: Name/S SN:j Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature: RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE 1PM NUMBER: 2L0T3 -New JPM TITLE: Review a Clearance Tagout J PM REVISION: 0 1 EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: HANDOUT: Review a clearance tagout and correctly identify any error(s). Control Room You are to simulate (perform) the task of reviewing a clearance tagout. The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to replace the mechanical seal on [2CHS*P22A] Boric Acid Transfer Pump. The NSS requests you to review the clearance tagout for completeness and report the results of your review. NPDAP 3.4, Rev. 14 None NPDAP 3.4, Rev. 14 Copy of Op. Manual Figure No. 7-2 & 7-4 RTL#A5.640U M Read: TASK: 1/2-ADM-1303.F02 Page 3 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Review a clearance tagout.INITIAL CONDITIONS:

The plant is operating at 100% power with all systems in their operating alignment. A clearance tagout has been prepared to the mechanical seal on [2CHS*P22A] Boric Acid Transfer Pun INITIATING CUE: The NSS requests you to review the clearance tagout for comp and report the results of your review. E At this time, ask the evaluator any questions you have on this JPM. When satisfied that you understand the assigned task, announce "I am now beginning the ""- ! Simulate performance or perform as directed the required task. .,Point to any indicator or component you verify or check and announce your observations. ---] After determining the Task has been met announce "I have completed the JPM". Then hand this sheet to the evaluator. normal replace np. leteness JPMt1. RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 -New JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/L " i : i itSTART TIME: ______,__ EVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of the JPM, inform the Candidate to report the results of the tagout review in lieu of signing the tagout form. EVALUATOR NOTE: This step is optional and may not be omitted by the Candidate. Mark step N/A if not performed. Evaluator may elect to provide procedure.

1. Locates procedure NPDAP-3.4.
1. Candidate locates procedure NPDAP-3.4.

COMMENTS: iTLiA5.640U 1/2-ADM- 1303.F02 Page 5 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 -New JPM TITLE: Review a Clearance Tagout J PM REVISION: 0 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR S/U 2.C. Review clearance points for adequacy EVALUATOR NOTE: After Candidate locates and reports results. procedure, provide attached tagout forms and OP Manual figures. 2.1 Candidate verifies appropriate clearance points are selected. 2.2.C Candidate identifies the following tagout errors: 2.2.1 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for tag placement (listed as Open). 2.2.2 No tag is included for the pump benchboard control switch for tag placement. 2.2.3 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for restoration (listed as Open). 2.3. Reports that the tagout is NOT correct as written based on the errors noted. EVALUATOR NOTE: Candidate may also identify that the tagout may be enhanced by altering the sequence of tags. This is not required to satisfactorily complete the JPM. COMMENTS: STOP TIME: 2W01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 Equipment ID: 2CHS-P22A

== Description:==

Replace the pump mechanical seals for 2CHS-P22A. Reason: 05/01/2001 09:31 Page 1 of I None identified Hazards: System contains boric acid solution. Work Required prior to Completion: Run pump OST prior to return to service. Attribute Attribute Description Value Equipment Required For Mode Change Po : estored/Removed Prior to Mode OWER OPERATION ESF Clearance Required No Tagout Type Non-Outage Clearance Type Danger Status Description User Verification Date repared Prepared By Unit 2 NCO 05/01/2001 09:29 eviewed eviewed By Unit 2 NCO 05/01/2001 09:30 econd Reviewed Second Reviewed By 00/00/0000 00:00 ýpproved pproved By 00/00/0000 00:00 issued for Work Issued for Work By 00/00/0000 00:00 Restoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized Removal Authorized By 00/00/0000 00:00 learance Closed Clearance Closed By 00/00/0000 00:00 Tag List for "01-07 -CHS-003 Beaver Valley Power Sta. 2BVP-01-1 05/ '2001 09:31 Parle 1 of 1 Component Annotations 2CHS-98 Com KEY REQUIRED [SR-2] Component Print Numberm Equipment ID Equipment Equipment Tag Tag Place. Place. Rest. Rest. Notes Description Location Serial Type Config. Seq. Config. Seq. MCC-2-E13-3F MOTOR STARTER FOR BORIC ACID 2-MSCV-735-- Danger OPEN 1 CLOSED 7 TRANSFER PUMP 2CHS-P22A 2CHS-73 BORIC ACID PP 22A SUCT ISOL 2-AXLB-755-P22A CUB -757 Danger SHUT 2 OPEN 6 2CHS-98 PRI WTR TO BORIC ACID PP 22A 2-AXLB-755-P22A CUB -758 Danger OPEN 3 OPEN 5 2CHS-77 BORIC ACID TK 21A RECIRC ISOL 2-AXLB-755-P22A CUB -759 Danger SHUT 4 OPEN 4 2CHS-79 BORIC ACID PP 22A TO BORIC ACID 2-AXLB-755-P22A CUB -759 Danger SHUT 5 OPEN 3 FILTER 2CHS-868 BORIC ACID TRANSFER PUMP 22A 2-AXLB-755-P22A CUB -756 Danger OPEN 6 SHUT 2 CASING DRAIN 2CHS-625 BORIC ACID PP 22A SUCT STR TEST 2-AXLB-755-P22A CUB -757 Danger OPEN SHUT 1 QUESTION: A.3.1.1 a. After signing onto the RWP for the Safeguards Area to manually operate the AFW throttle valves, how can you determine the path of entry that will result in the lowest radiation exposure?

b. Assume that a LOCA has occurred, the Control Room is working through the EOP's having just verified transfer to the Recirculation Mode, and the Emergency Preparedness Plan has been entered with all facilities currently activated.

How would you now access this area and what dose considerations, if any, now exist? Answer: a. By reviewing the posted area dose maps, OR obtaining a Health Physics Technician briefing.

b. With the EPP facilities activated, access to this area must be made through the Radiological Operations Center (ROC). Dose considerations will now include the increases from the recirculation piping, which passes through the safeguards building, with the potential for large and quickly changing radiation doses.Technical Reference(s):

Learning Objective: K/A: Importance Rating Health Physics Manual; EPP/IP 1.5, Section 2.0 08-01-801, ELO 32; 9250, ELO 12 2.3.2 2.5/2.9 Comments: QUESTION: A.3.1.2 Several days following a large break LOCA, the plant has been stabilized in Mode 5, and Health Physics has resurveyed the entire plant to update the radiological conditions and postings. You have been sent to the VCT cubicle, to check instrumentation, and found on the RWP that the dose rates inside the cubicle can be as high as 2499 mR/hour.

a. What radiation protection controls would you expect to find at the VCT access point? b. What Technical Specification requirements must be met for you to enter the cubicle? Answer: a. The door [barricade]

shall be conspicuously posted [as a high radiation area] and locked, [with the keys maintained under administrative control of the on duty NSS and/or a facility radiation protection supervisor.]

b. To gain entry requires issuance of an RWP, which must be signed on, and at least one of the following:

"* A radiation monitoring device which continuously indicates dose rate in the area, or "* A radiation monitoring device which continuously integrates the radiation dose in the area and alarms when a preset integrated dose is received, or " An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device, is responsible for positive control over activities in the area. []bracketed information not required for full credit. Technical Reference(s): Technical Specifications 6.12.1, 6.12.2 Learning Objective: 08-04-006, ELO 5 K/A: 2.3.1 Importance Rating 2.6/3.0 Comments: RO ONLY QUESTION: A.4.1.1 NOTE: This is a closed reference question.What is the minimum Emergency Plan classification level that requires activation of the Operations Support Center? Answer: Alert Technical Reference(s): Learning Objective: K/A: Importance Rating BVPS EPP/I-3, Section E EPP 9250, ELO 6 & 7 2.4.29 2.6 Comments: RO ONLY QUESTION: A.4.1.2 NOTE: This is a closed reference question.Following the declaration of a Site Area Emergency at BVPS, which organization is assigned responsibility for accountability of site personnel, and what is the time limit to complete the accountability? Answer: Security, within 30 minutes.Technical Reference(s): Learning Objective: K/A: Importance Rating BVPS EPP/IP 3.2, Rev. 9 EPP 9250, ELO 6 2.4.29 2.6 Comments: RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) JPM REVISION: 0a K/A

REFERENCE:

2.4.44 4.0 TASK ID: 1350-007-03-023 JPM APPLICATION: [] REQUALIFICATION H INITIAL EXAM E TRAINING [E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Z Perform -- Plant Site E] Annual Requal Exam E] BVT F-1 Simulate E] Simulator Z Initial Exam Z NRC HZ Classroom -] OJT/TPE E] Other: E] Training _---] Other: EVALUATION RESULTS Performer Name: Performer S SN: Time F--' Yes Allotted 15mntsActualmiue Critical: No[ Time: 1miueTime:miue [JSAT JPM RESULTS: E A SI'] UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature: RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) JPM REVISION: Oa EVALUATOR DIRECTION SHEET TASK STANDARD: RECOMMENDED STARTING LOCATION: DIRECTIONS: INITIAL CONDITIONS: INITIATING CUE:

REFERENCES:

TOOLS: HANDOUT: Protective Action Recommendations determined in accordance with EPP/IP 4.1. Control Room Determine Protective Action Recommendations (PAR). A General Emergency has been declared at BVPS Unit 2 following a LOCA and the continued loss of all 4KV Emergency Power. The following plant conditions exist: 0 35' wind direction is from 270' at 4 MPH. 0 150' wind direction is from 270' at 11 MPH.

  • 500' wind direction is from 285' at 15 MPH. e No radioactive release has occurred or is anticipated.
  • Health Physics has provided the following dose projections:

At the EAB: 11 REM At 5 miles: 0.9 REM TEDE, 5.5 REM CDE You are the Emergency Director and the TSC/EOF have not yet been activated. You are to evaluate the above conditions and determine which, if any, Offsite Protective Action Recommendations are necessary. EPP/IP 4.1, Rev. 13 None None. (EPP and EPP/IP's are to be made available to Candidate.) RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • El Read: TASK: Determine Protective Action Recommendations (PAR).INITIAL CONDITIONS:

INITIATING CUE: El El A General Emergency has been declared at BVPS Unit 2, following a LOCA and the continued loss of all 4KV Emergency Power. The following plant conditions exist:

  • 35' wind direction is from 2700 at 4 MPH. 0 150' wind direction is from 270' at 11 IMPH.
  • 500' wind direction is from 285' at 15 MPH. e No radioactive release has occurred or is anticipated.

o Health Physics has provided the following dose projections: At the EAB: 11 REM At 5 miles: 0.9 REM TEDE, 5.5 REM CDE You are the Emergency Director and the TSC/EOF have not yet been activated. You are to evaluate the above conditions and determine which, if any, Offsite Protective Action Recommendations are necessary. At this time, ask the evaluator any questions you have on this JPM. When satisfied that you understand the assigned task, announce "I am now beginning the JPM".i--i Simulate performance or perform as directed the required task. El Point to any indicator or component you verify or check and announce your observations. After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator. RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation ( JPM REVISION: a (A STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/U ... .. START TIME:__ ______ 1. Locate procedure EPP/IP 4.1. 1.1 Candidate locates EPP/IP 4.1. EVALUATOR CUE: You DO NOT need to fill out an Initial Notification Form (EPP/IP 1.1 Attachment

1) for the purposes of this JPM. COMMENTS:
2. Refer to Offsite Protection Action 2.1 Candidate enters Offsite Protective Action Recommendation Recommendation Flow Chart. Flowchart for General Emergency declaration.

COMMENTS:

3. Navigates PAR flow chart. 3.1 Candidate navigates PAR flow chart as follows: 3.1.1 General Emergency already declared (4). 3.1.2 Met data provided in initial conditions

(-). 3.1.3 None of the following are TRUE (4): 35' wind speed < 2 MPH Either 150' or 500' wind direction unavailable 150' & 500' wind direction difference _> 165 and _< 195 degrees Release started or imminent Release transport spans sunrise or sunset 3.1.4 Dose projection results available -YES (--). 3.1.5 EABTEDE< 10 REM- NO (,). 3.1.6 5 mile dose >1 REM TEDE or >5 REM CDE -YES (--) COMMENTS: RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) I JPM[ REVISION: Oa STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)> S/U 4. Determine Downwind Wedge. 4.1 Candidate determines that the 150' elevation downwind sectors are 'CDEFG'. 4.2 Candidate determines that the 500' elevation downwind sectors are 'DEFGH'. COMMENTS: 5.C Determine Offsite Protective Action Recommendations. 5.1I.C Candidate determines the following Protective Action Recommendations: Evacuate 360 0 for two miles, and Evacuate Sectors 'CDEFGH' for ten miles, and Shelter the remainder of 10 mile EPZ. COMMENTS: STOP TIME: ____,__________}}