Final - RO & SRO - Section a Operating
ML011910517
Person / Time
Site: Beaver Valley
Issue date: 06/14/2001
From: Myers L
FirstEnergy Nuclear Operating Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
-RFPFR, 05000412/01-301 05000412/01-301
Download: ML011910517 (54)


Text

{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility: FENOC BVPS Unit 2 Date of Examination: 5/29/01 Examination Level (circle one): RO Operating Test Number: 2LOT3 Administrative Describe method of evaluation: Topic/Subject 1. ONE Administrative JPM, OR Description 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 3.7 Conduct of Perform an ECP Calculation [JPM] Operations K/A 192008 K1.07 3.5 A.2 Equipment Prepare a Clearance Tagout [JPM] Control K/A 2.2.13 3.6 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.5 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 2.6 A.4 Emergency Knowledge of Emergency Plan [Q] Preparedness K/A 2.4.29 2.6 Knowledge of Emergency Plan [Q] K/A 2.4.29 2.6 2LOT3 Rev. 3

ES-301 Administrative Tonics Outline Form ES-301-1 Facility: FENOC BVPS Unit 2 Date of Examination: 5/29/01 Examination Level (circle one): SRO Operating Test Number: 2LOT3 Administrative Describe method of evaluation: Topic/Subject 1. ONE Administrative JPM, OR Description 2. TWO Administrative Questions A.1 Conduct of Calculate RCS Subcooling Margin [JPM] Operations K/A 2.1.7 4.4 Conduct of Review Estimated Critical Position Calculation [JPM] Operations K/A 2.1.7 4.4 A.2 Equipment Review a Clearance Tagout [JPM] Control K/A 2.2.13 3.8 A.3 Radiation Knowledge of Pre-Planning ALARA [Q] Control K/A 2.3.2 2.9 Knowledge of Tech Specs for High Radiation Area [Q] K/A 2.3.1 3.0 A.4 Emergency Determine Protective Action Recommendation (PAR) [JPM] Preparedness K/A 2.4.44 4.0 2LOT3 Rev. 3

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION: 4a K/A

REFERENCE:

2.1.7 3.7/4.4 TASK ID: 0061-009-01-013 JPM APPLICATION: [] REQUALIFICATION IINITIAL EXAM - TRAINING

                          -   FAULTED JPM                    ] ADMINISTRATIVE JPM EVALUATION METHOD:                LOCATION:                    TYPE:               ADMINISTERED BY:

Fý Perform [E Plant Site 1-- Annual Requal Exam [1] BVT

 -- Simulate                  N Simulator          Z Initial Exam                 M NRC F-- Classroom            -] OJT/TPE                  -- Other:
                                                     - Training

_] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time F--' Yes Allotted 15 minutes [Actual minutes Critical: [ No Time: Time: 1E]SAT E A JPM RESULTS: ME SUNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate RCS Subcooling Margin JPM REVISION: 4a I EVALUATOR DIRECTION SHEET TASK STANDARD: Correctly calculate RCS subcooling margin using control board indications and Steam Tables. RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: Calculate RCS subcooling margin using control board indications and Steam Tables. INITIAL CONDITIONS: The reactor was manually tripped from 100% power due to a CCP leak requiring a shutdown of all RCPs. The plant computer, Safety Parameter Display System (SPDS), and Plant Safety Monitoring System (PSMS) are out of service. Core Exit Thermocouple temperatures are NOT available. INITIATING CUE: Your Supervisor directs you to determine the RCS subcooling margin using control board indications and Steam Tables.

REFERENCES:

None TOOLS: Steam Tables Calculator HANDOUT: None

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • n Read:

TASK: Calculate RCS subcooling margin using control board indications and Steam Tables. INITIAL CONDITIONS: The reactor was manually tripped from 100% power due to a ( ICP leak requiring a shutdown of all RCP's. The plant computer, Safety Parameter Display System (SPDS), and Plant Safety Monitorin g System (PSMS) are out of service. Core exit thermocouple temperatu .es are NOT available. INITIATING CUE: Your Supervisor directs you to determine the RCS subcooling margin using control board indications and Steam Tables.

  -fl  At this time, ask the evaluator any questions you have on this JPM.

E When satisfied that you understand the assigned task, announce "I am now beginning the JPM"1. EJ Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations. j- After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303 .F02 Page 4 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 JPM TITLE: Calculate the RCS Subcooling Margin J-PM REVISION: 4a STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U

                                   ,/

lSTART

                                       "*/i
  • iiii 'i *t TIME:

Setup: Initialize IC-177. Place YCT on SPDS, PSMS Plant Computer, 2RCS*YOO 1 (VB-B) 2RCS*YRO01 (VB-B) & 2RCS*Y152E (VB-B).

1. Obtain RCS hot leg wide range 1.1 Candidate locates RCS hot leg wide range temperature indication temperature. [2RCS-TR4131.

Simulator value: SIMULATED CUE: Recorder indicates 575°F. 575 0_________________ F (Range 570 - 5800 F) COMMENTS:

2. Obtain RCS pressure and convert to 2.1 Candidate locates PRZR pressure indication. (Either wide or psia. narrow range).

Simulator values: SIMULATED CUE: Indicator shows 2140 psig NR (2155 psia). psig (NR) S2140 (2155 psia) COMMENTS:

          -2150 psig (WR)

(2165 psia)

RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 5 Revision 4a OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-009 I JPM TITLE: Calculate the RCS Subc°°ling Margin IJPM REVISION: 4aSuclngMri STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' SU

3. Find RCS saturation temperature using 3.1 Candidate locates the saturation temperature in the Steam Tables Steam Tables. for the given PRZR pressure.

Saturation temperature should COMMENTS: be - 646'F (644 - 648'F). 4.C Determine the RCS subcooling 4.1.C Candidate subtracts RCS hot leg temperature from saturation margin. temperature. RCS is approximately 700 + COMMENTS: 10' subcooled. STOP TIME:

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation JPM REVISION: 5 K/A

REFERENCE:

192008 K1.07 3.5 TASKID: 0011-003-01-013 2.1.23 3.9 JPM APPLICATION: M REQUALIFICATION ] INITIAL EXAM -- TRAINING E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: N Perform 1-1 Plant Site - Annual Requal Exam F-1 BVT FI- Simulate [] Simulator Z Initial Exam Z NRC SClassroom - OJT/TPE - Other:

                                            -   Training E---] Other:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 2CR-002 1PM REVISION: 5 JPM TITLE: Perform an Estimated Critical Position Calculation I EVALUATOR DIRECTION SHEET TASK STANDARD: DATA SHEET 1 (FORM ECP-1) Parts A through E completed correctly. RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: You are to simulate (perform) the task of calculating an Estimated Critical Position (ECP). INITIAL CONDITIONS: 0 The plant computer is NOT available for calculation. S Plant startup following a reactor trip. 0 Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet. INITIATING CUE: Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentration with an estimate of criticality occurring with Control Bank 'D' at 100 steps.

REFERENCES:

20M-50.4.F, Rev. 2 BV-2 Curve Book TOOLS: Calculator HANDOUT: "* 20M-50.4.F, Rev. 2 with Critical Data recorded in DATA SHEET 1

                         "* ECP INITIAL CONDITIONS Data Sheet
                         "* BV-2 Curve Book

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Perform an ECP calculation. INITIAL CONDITIONS:

  • The plant computer is NOT available for calculation.
  • Plant startup following a reactor trip.
  • Specific parameters for power history, core age, time since reactor trip, estimated time to criticality, RCS boron concentration and Tavg are provided on the accompanying data sheet.

INITIATING CUE: Your Supervisor directs you to perform an ECP calculation and determine the critical boron concentrationwith an estimate of criticality occurring with Control Bank 'D' at 100 steps. M- At this time, ask the evaluator any questions you have on this JPM.

    . When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
  -     Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations. j- After determining the Task has been met announce "I have completed the JPM". Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 J-PM REVISION: 5I m r JPM TITLE: Perform an Estimated Critical Position Calculation 1 I STEP ( "C" Denotes CRITICAL STEP) STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)n> S/tu START TIME: _______ EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet.

                                                                                                                   -I-EVALUATOR NOTE: This step is optional.

Evaluator may elect to provide procedure.

1. Obtain 20M-50.4.F, Performing An 1. Candidate locates procedure 20M-50.4.F.

Estimated Critical Position Calculation. EVALUATOR NOTE: After Candidate locates the procedure, provide a copy of DATA SHEET 1 (FORM ECP-1) with the following data entered:

                                                       "* Column I, PRIOR TO SHUTDOWN:
  • Boron Concentration SPower
                                                           > Control Rod Position
                                                       "*  Column II, EXPECTED AT CRITICALITY:
                                                            - Control Rod Position COMMENTS:
                                             -I-                                                                 i  ___

EVALUATOR NOTE: This step is optional. Evaluator may elect to provide Curve Book.

2. Obtain BV-2 Plant Curve Book. 2. Candidate obtains the BV-2 Curve Book.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation IJPM REVISION: 5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U

3. Record (review) the given information 3.1 Candidate reviews data in Column I, PRIOR TO SHUTDOWN:

in Part A, Critical Data.

  • Boron Concentration SPower SControl Rod Position 3.2 Candidate reviews data in Column II, EXPECTED AT CRITICALITY:
                                                  > Control Rod Position COMMENTS:
4. Complete Part A, Critical Data, Column 4.1 Candidate refers to Figure CB-12 to estimate Xenon percent.

I, PRIOR TO SHUTDOWN. 4.2 Candidate refers to Figure CB-22 to estimate Samarium percent. COMMENTS:

5. Complete Part A, Critical Data, Column 5.1 Candidate refers to Figure CB-23 to estimate Xenon percent.

II, EXPECTED AT CRITICALITY. 5.2 Candidate refers to Figure CB-22 to estimate Samarium percent. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION: 5 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U

6. Determine Part B. 1, Power Reactivity 6.1 Candidate refers to Figure CB-21 to determine the power Defect. reactivity defect and enters value in Part B, Column I, Line 1.

COMMENTS:

7. Determine Part B.2, Control Rod 7.1 Candidate refers to Figure CB-24B to estimate integral rod worth Reactivity Defect. prior to shutdown.

7.2 Candidate refers to Figure CB-24B to estimate integral rod worth expected at criticality. COMMENTS:

8. Determine Part B.3, Xenon Reactivity 8.1 Candidate refers to Figure CB-23 to estimate Xenon worth prior Defect. to shutdown.

8.2 Candidate refers to Figure CB-23 to estimate Xenon worth expected at criticality. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Perform an Estimated Critical Position Calculation I PM REVISION: 5 1 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S"FOR SAT or "U" FOR UNSAT)=> S/T

9. Determine Part B.4, Samariutn 9.1 Candidate refers to Figure CB-22 to estimate Samarium worth Reactivity Defect. prior to shutdown.

9.2 Candidate refers to Figure CB-22 to estimate Samarium worth expected at criticality. COMMENTS:

10. Calculate Part B.5, Reactivity Change. 10.1 For each Part B defect, Candidate subtracts Column I from Column II and enters the value in Column III.

10.2 Candidate sums all Part B, Column III values and enters the value in Part B, Line 5. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM JPM NUMEIBER: 2CR-002 REVISION: 5 1 JPM TITLE: Perform an Estimated Critical Position Calculation STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/l

11. C Calculate Part C, Critical Boron 11.1 Candidate enters Reactivity Change value from Part B, Line 5 in Concentration. Part C, Column I, Line 1.

11.2 Candidate refers to Figure CB-20 to estimate differential boron worth for the Part A, Column I boron concentration and enters the value in Part C, Column II, Line 1. 11.3 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 1 and enters the value in Part C, Column III, Line 1. 11.4 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 1. 11.5 Candidate adds the boron change from Part C, Column III, Line 1 to Part C, Column IV, Line 1 and enters the value in Part C, Column V, Line 1. 11.6 Candidate refers to Figure CB-20 to estimate differential boron worth for the boron concentration from Part C, Column V, Line 1 and enters the value in Part C, Column II, Line 2. 11.7 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 2 and enters the value in Part C, Column III, Line 2. 11.8 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 2. 11.9.C Candidate adds Part C, Column III, Line 2 to Part C, Column IV, Line 2 and enters the value in Part C, Column V, Line 2. EVALUATOR NOTE: This step is SAT if the method of calculation is correct and the boron concentration for startup is within the the tolerance band listed on the ECP CALCULATION SHEET. COMMENTS:

                                                                                                                   £ ____________

RTL#AS.640U 1/2-ADM-1303.F02 Page 9 of 11 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 2CR-002 PM REVISION: 5I JPM TITLE: Perform an Estimated Critical Position Calculation STEP STANDARD

"(C""Denotes CRITICAL STEP)                          (Indicate "S" FOR SAT or "U" FOR UNSAT)z:      S/U EVALUATOR NOTE: If Candidate continues with procedure, conclude JPM at this point.

STOP TIME:

            *THIS SHEET TO BE GIVEN TO CANDIDATE*

ECP INITIAL CONDITIONS Hours since the reactor tripped: 60 Hours to expected criticality: 20 Power history prior to the reactor trip: 100% for 1 month Core age: MOL (5750 MWD/MTU) Tavg: 547 0 F Initial RCS boron concentration: 1000 ppm

JPM 2CR , Rev. 5 ECP CALCULATION Unit 2 Cycle 9 Data Core AGE EQ XE EQ SAM Prior to Shutdown: Expected at Criticality: MOL 2692 616 B. Reactivity Balance Column: I 11 Il1 (Il-I) Prior S/D Exp at Crit Difference "IMS - 1780 0 -1780 0 818 818

3. Xenon 2692.0 53.8 -2638.2
4. Samarium 616.0 822.4 206.4
5. Reactivity Change -3393.8 C. Critical Boron Concentration Column: I II III IV V Rx Chng B Chge B @ S/D B @ S/U 1 -3393.8 -8.30 408.9 1000 1408.9 2 -7.70 440.8 1000 1440.8

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-503 JPM TITLE: Review Estimated Critical Position Calculation JPM REVISION: 0 K/A

REFERENCE:

192008 K1.07 3.6 TASK ID: 1340-007-03-023 2.1.7 4.4 JPM APPLICATION: -- REQUALIFICATION [ INITIAL EXAM [] TRAINING I FAULTED JPM N ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: M Perform [] Plant Site [] Annual Requal Exam E] BVT F- Simulate f-- Simulator I Initial Exam I NRC I Classroom "-] OJT/TPE [- Other:

                                                       - Training

[] Other: EVALUATION RESULTS Performer Name: PefrerIN Time F--] Yes Allotted Actuatl inte Time: Time: Critical: N No [] SAT SA JPM RESULTS: 1P RS UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/S SN: Name/SSN: Name/SSN: Name/S SN: EVALUATOR Evaluator (Print): Date: , _ Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-503 JPM TITLE: Review Estimated Critical Position Calculation JPM REVISION: 0 1 EVALUATOR DIRECTION SHEET TASK STANDARD: DATA SHEET 1 (FORM ECP-1) reviewed and error(s) identified. RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: You are to simulate (perform) the task of reviewing an Estimated Critical Position (ECP) calculation. INITIAL CONDITIONS: "* The plant computer is NOT available for calculation.

                         "* A plant startup is in progress following a reactor trip.

INITIATING CUE: Reactor Engineering has prepared an ECP calculation for a reactor startup. The NSS requests you to verify that the ECP is accurate for given plant conditions and report the results of your review.

REFERENCES:

20M-50.4.F, Rev. 2 BV-2 Curve Book TOOLS: Calculator HANDOUT: "* DATA SHEET 1 (FORM ECP-1) completed through Part C.

                         "* ECP Initial Conditions Data Sheet
                         "* BV-2 Curve Book

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET THIS SHEET TO BE GIVEN TO CANDIDATE Read: TASK: Review an ECP calculation. INTIAL CONDITIONS: "* The plant computer is NOT available for calculation.

                                    "* A plant startup is in progress following a reactor trip.

INITIATING CUE: Reactor Engineering has prepared an ECP calculation for a reactor startup. The NSS requests you to verify that the ECP is accurate for the given plant conditions and report the results of your review. Li At this time, ask the evaluator any questions you have on this JPM. D When satisfied that you understand the assigned task, announce "I am now beginning the JPM". j

  • Simulate performance or perform as directed the required task.

Point to any indicator or component you verify or check and announce your observations. E After determining the Task has been met announce "I have completed the JPM". Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION: 4b STEP STANDARD

"("C"Denotes CRITICAL STEP)                                          (Indicate "S" FOR SAT or "U" FOR UNSAT)=>          S/U
                          ~   '4i~il*

iii 'i*g~il*i "'ii/i/li!"START TIME: MOO EVALUATOR NOTE: Provide the Candidate with the ECP Initial Conditions Data Sheet and completed DATA SHEET 1 (FORM ECP-1). EVALUATOR NOTE: This step is optional. Evaluator may elect to provide procedure.

1. Obtain 20M-50.4.F, Performing An 1. Candidate locates procedure 20M-50.4.F.

Estimated Critical Position Calculation. COMMENTS: EVALUATOR NOTE: This step is optional. Evaluator may elect to provide the Curve Book.

2. Obtain BV-2 Plant Curve Book. 2. Candidate obtains the BV-2 Curve Book.

COMMENTS:

3. Verify the information in Part A, 3.1 Candidate verifies data in Column I, PRIOR TO SHUTDOWN:

Column I. > Boron Concentration from ECP Initial Conditions Data Sheet.

                                                       >Power from ECP Initial Conditions Data Sheet.

SXenon percent from Figure CB-12 SSamarium percent from Figure CB-22

                                                       > Control Rod Position from ECP Initial Conditions Data Sheet.

COMMENTS:

RTL#A5.640U 1/2-ADM-1303 .F02 Page 5 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I PM REVISION: 4b STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=> S/U

4. Verify the information in Part A, 3.2 Candidate verifies data in Column II, EXPECTED AT Column II. CRITICALITY:

SXenon percent from Figure CB-23 SSamarium percent from Figure CB-22

                                                > Control Rod Position from ECP Initial Conditions Data Sheet.

COMMENTS:

5. Part B. 1, Power Reactivity Defect. 5.1 Candidate verifies data from Figure CB-21 for the power reactivity defect equals the value entered in Part B, Column I, Line 1.

COMMENTS:

6. Part B.2, Control Rod Reactivity 6.1 Candidate verifies data from Figure CB-24B equals the value for Defect. estimated integral rod worth prior to shutdown.

7.2 Candidate verifies data from Figure CB-24B equals the value for estimated integral rod worth expected at criticality. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 6 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation IJPM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)z: S/U

7. Part B.3, Xenon Reactivity Defect. 7.1 Candidate verifies data from Figure CB-23 equals the value entered for Xenon worth prior to shutdown.

7.2 Candidate verifies data for Xenon worth expected at criticality equals the value determined in procedure step IV.B.3. COMMENTS:

8. Part B.4, Samarium Reactivity Defect. 9.1 Candidate verifies data from Figure CB-22 equals the value for Samarium worth prior to shutdown.

9.2 Candidate verifies data for Samarium worth expected at criticality equals the value determined in procedure step IV.B.4. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 7 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation JPM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=* S/U 9.C Part B.5, Reactivity Change. 9.1 For each Part B defect, Candidate verifies the correct value entered in Column III. 9.2.C Candidate determines that the value entered in Part B, Line 5 is NOT correct. EVALUATOR NOTE: The value entered in Part B, Line 5 is incorrect due to a math error. The correct value is 2119.6. EVALUATOR NOTE: When Candidate reports results, inform Candidate to complete Part C, Critical Boron Concentration using the correct Reactivity Change value. COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 8 of 8 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-002 JPM TITLE: Review an Estimated Critical Position Calculation I WM REVISION: 4b STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)=' S/U

11. C Calculate Part C, Critical Boron 11.1 Candidate enters correct Reactivity Change value in Part C, Concentration. Column I, Line 1.

11.2 Candidate refers to Figure CB-20 to estimate differential boron worth for the Part A, Column I boron concentration and enters the value in Part C, Column II, Line 1. 11.3 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 1 and enters the value in Part C, Column III, Line 1. 11.4 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 1. 11.5 Candidate adds the boron change from Part C, Column III, Line 1 to Part C, Column IV, Line 1 and enters the value in Part C, Column V, Line 1. 11.6 Candidate refers to Figure CB-20 to estimate differential boron worth for the boron concentration from Part C, Column V, Line 1 and enters the value in Part C, Column II, Line 2. 11.7 Candidate calculates boron change by dividing Part C, Column I, Line 1 by Part C, Column II, Line 2 and enters the value in Part C, Column III, Line 2. 11.8 Candidate enters the boron concentration from Part A, Column I in Part C, Column IV, Line 2. 11.9.C Candidate adds Part C, Column III, Line 2 to Part C, Column IV, Line 2 and enters the value in Part C, Column V, Line 2. EVALUATOR NOTE: This step is SAT if the method of calculation is correct and the boron concentration is between 1206 and 1334 ppm (+/- 500 pcm tolerance band). COMMENTS: STOP TIME:

                   *THIS SHEET TO BE GIVEN TO CANDIDATE*

ECP INITIAL CONDITIONS Hours since the reactor tripped: 60 Hours to expected criticality: 20 Power history prior to the reactor trip: 100% for 1 mol,ith Core age: MOL (5750 M* MVD/MTU) Tavg: 547 0 F Initial RCS boron concentration: 1000 ppm Control Rod Position Prior to Shutdown: CB 'D' at 200 steps Control Rod Position Expected at Criticality: CB 'D' at 120 steps

Beaver Valley Power Station Unit 2 20M-50.4.F Station Startup Revision 2 Operating Procedures Page F 13 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET 1 FORM ECP-1 A. Critical Data (I) (II) PRIOR TO SHUTDOWN EXPECTED AT CRITICALITY Date ./_./. Time 0 . 0 Date _)/(IJ) Time _.0hrS, Boron Conc. +/-0 0 ppm Power 50 % Xenon Th5  % Xenon  % (Use Fig CB-12 or N/A) (Use Fig CB-23 or N/A) Samarium 100 % Samarium _ %_ (Use Fig CB-22 or N/A) (Use Fig CB-22 or N/A) Control Rod Position Control Rod Position A 2."0 C _2_?0Q A 2 30 C 2j0 B* D 00 B 230 D 120 B. Reactivity Balance - (Record absolute values in Columns I and II) Reactivity Defects Prior to Expected at (11- I) Shutdown Criticality Difference

1. Power (Fig CB-21) (OR Consult RX ENGR) 6!5 pcm 0 (zero) pcm (-) S(!5 pcm
2. Control Rods (Circle Fig. used (Fig. CB-24A, Q 24C OR Consult RX ENGR) 120 pcm 6 15 pcm 6q 5 pcm
3. Xenon (Fig. CB-23) 20-*-/.g pcm 26. 1 pcm (+/-) 207MB pcm
4. Samarium (Fig. CB-22) 61 pcm Tq, 2 pcm (+ I2.'.Z pcm
5. Reactivity Change (Sum of 1-4) =

(-) W pcm (5oq.

Beaver Valley Power Station Station Startup Unit 2 20M-50.4.F Operating Procedures Revision 2 Page F 14 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION DATA SHEET I (continued) FORM ECP-1 C. Critical Boron Concentration D. Estimated Rod Position Correction r'

Beaver Valley Power Station Unit 2 Station Startup 20M-504F Operating Procedures Revision 2 Page F 4 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION

2. For the control rod positions listed on Data Sheet 1(2), Part A (Critical Data) determine and record the control rod reactivity defect for Part B, Columns I and II as follows:
a. BV-2 Curve Book Figure 24A, 24B, or 24C, "Integral Rod Worth vs.

Steps Withdrawn Banks D and C Moving with Overlap". OR

b. Have the Reactor Engineer provide the current value using either the PC version of the Nuclear Design Report (PCNDR) or other NRC approved nuclear design codes.
3. Determine Xenon worth for Data Sheet 1, Part B, Columns I and II as follows:
a. If BV-2 Curve Book Figure CB-12 and/or CB-23, were used in Steps IV.A.1.e and IV.A.2.c, perform the following calculations and record the value obtained in Column C below on Data Sheet 1, Part B, Columns I and I1:

A B C Percent Equil. Xenon Equilibrium Xenon Col. A x Col. B/1 00% Part A Critical Data BOL, MOL, or EOL Xenon Worth CB-12 or CB-23 Prior to Shutdown Column I 2692 pcm 0YT .6 pcm Expected at Criticality Column II U12 -pcm 26. 1 pcm OR

b. Have the Reactor Engineer provide Xenon values in pcm using a computer program that approximates Xenon worth.

Beaver Valley Power Station Unit 2 20M-50.4. F Station Startup Operating Procedures Revision 2 Page F 5 of 28 PERFORMING AN ESTIMATED CRITICAL POSITION CALCULATION

4. Determine Samarium worth for Data Sheet 1(2), Part B, Columns I and I1as follows:
a. If BV-2 Curve Book, Figure CB-22, was used in Step IV.A.2.d, perform the following calculations and record the value obtained in Column C below on Data Sheet 1(2), Part B, Columns I and I1:

A B C

                                                         -- II Percent Equil.           Equilibrium Samarium    Col. Ax Ciol. B/100%

Samarium BOL, MOL, or EOL Samarium Worth Part A Critical Data CB-22 Prior to Shutdown Column I 616 ncmr Expected at Criticality (c00( n I 6I16 pcm Column II 120 161(K pcm 7 . Z pcm OR

b. Have the Reactor Engineer provide Samarium values in pcm using a computer program that approximates Samarium worth.
5. Calculate the reactivity change as follows:
a. On Data Sheet 1(2), Part B, "Reactivity Balance", subtract Column I from Column IIfor each line.
b. Enter the results in Column III, "Difference".
c. Sum all the values in Column III and enter on Line 5.
d. Record this value on Data Sheet 1(2), Part C, Column I, Line 1.

C. Critical Boron Concentration for Startup

1. Data Sheet 1 Calculations
a. Using BV-2 Curve Book, Figure CB-20, "HZP Differential Boron Worth vs. Boron Concentration", AND the Boron Concentration from Part A, Column I, enter the Differential Boron Worth on Data Sheet 1, Part C, Column II, Line 1.
b. -:"Divide the Reactivity Change (Column I, Line 1) by the Differential Boron Worth (Column II, Line 1) and enter the value on Data Sheet 1, Part C, Column Ill, Line 1. Be cautious of signs.
c. Enter the Boron Concentration from Part A, Column I onrData Sheet 1, Part C, Column IV,Line 1.

IIEIFUTIV. RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision I OPERATIONS JOB PERFORMANCE MEASURE _PM REVISION: 0 JPM TITLE: Prepare a Clearance Tagout K/A

REFERENCE:

2.2.13 3.6 TASK ID: 0481-020-03-013 JPM APPLICATION: - REQUALIFICATION Z INITIAL EXAM [] TRAINING

                            -  FAULTED JPM                 15    ADMINISTRATIVE JPM EVALUATION METHOD:                LOCATION:                    TYPE:             ADMINISTERED BY:

Z Perform [[[ Plant Site F- Annual Requal Exam E] BVT [-I Simulate F-- Simulator Z Initial Exam Z NRC Z Classroom E] OJT/TPE F-1 Other: F-1 Training

                                                     - Other:

CNEVALUATION RESULTS Performer Name: [Performer SSN: Time E-1 Yes Allotted Actual Critical: Z* No Time: 20mntsTime: mue 1PM RESULTS: El SAT LT: UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature:

RTL#A5.640U 1/2-ADM- 1303.F02 Page 2 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NIUMBER: 2L0T3 - New JPM TITLE: Prepare a Clearance Tagout 1PM REVISION: 0 I m EVALUATOR DIRECTION SHEET TASK STANDARD: Prepare a clearance tagout. RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: You are to simulate (perform) the task of preparing a clearance tagout. INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate' and drain [2CDS-P22B] Chiller Cond Wtr Booster Pump. INITIATING CUE: As the Reactor Operator, your Supervisor requests you to review the clearance tagout for completeness and report your results.

REFERENCES:

NPDAP-3.4, Rev. 14 TOOLS: None HANDOUT: NPDAP-3.4, Rev. 14 Copy of Op. Manual Figures No. 30-4 & 30-5

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • Read:

TASK: Prepare a clearance tagout. INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to isolate and drain [2CDS-P22B] Chiller Cond Wtr Booster Pump. INITIATING CUE: As the Reactor Operator, your Supervisor requests you to review the clearance tagout for completeness and report your results.

.j     At this time, ask the evaluator any questions you have on this JPM.

J-J[ When satisfied that you understand the assigned task, announce "I am now beginning the JPM". '-j Simulate performance or perform as directed the required task. Point to any indicator or component you verify or check and announce your observations. After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303 .F02 Page 4 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE IJPM NUMBER: 2LOT3 - New PMT JPM REVISION: 0 P TITLE: Prepare a Clearance Tagout STEP STEPI) STANDARD F("C"_Denotes CRITICAALLSTEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) START TIME: SEVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of the JPM, inform the Candidate to report the results of the tagout review in place of signing the tagout form. EVALUATOR NOTE: This step is optional and may not be performed by Candidate. Mark step N/A if not performed. After locating procedure, provide Candidate a copy of NPDAP 3.4.

1. Locates NPDAP-3.4. 1. Candidate locates procedure NPDAP-3.4.

COMMENTS:

"RTL#A5.640U                                                                                         1/2-ADM-1303.F02 Page 5 of 5 Revision 1 OPERATIONS JOB PERFORMANCE MEASURE JPM NUVMIBER: 2L0T3        - NewMJPM TITLE: Prepare a Clearance Tagout                                                   I I

STEP STANDARD "("C"Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)ý S/U EVALUATOR NOTE: Provide JPM handout with tagout forms and Op Manual figures. 2.C. Review clearance points for adequacy Candidate verifies appropriate clearance points are selected. and report results. 2.2.C Candidate identifies the following tagout errors: 2.2.1 480V breaker tag type is listed as "No Tag" (correct type is "Danger Tag"). 2.2.2 Valve 2SWC-45 is incorrectly listed in the "OPEN" position for tag placement. 2.2.3 Valve 2SWC-39 is incorrectly listed in the "SHUT" position for tag restoration. 2.3. Reports that the tagout is NOT correct as wxritten based on the errors noted. COMMENTS: STOP TIME:

2W10-29 -CDS-003 05/17/2001 F4:55 Beaver Valley PowerSta. 2B VP-01-1 Page 1 of I Equipment ID: 2CDS-SP22B

Description:

ISOLATE AND DRAIN PUMP TO INSPECT AND CLEAN CYCLONE SEPERATOR. Reason: ONE CHILLER CND WTR BOOSTER PUMP WILL NORMALLY BE IN CONTINUOUS OPERATION Hazards: PLACE 2CDS-SP22A IN SERVICE BEFORE SECURING 2CDS-SP22B Work Required prior to Completion: Attribute Attribute Description Value Equipment Required For Mode Change No Restored/Removed Prior to Mode NOT APPLICABLE ESF Clearance Required No ragout Type Non-Outage

 .learance Type                                   Danger Number                  Equipment ID                                    Description 00-019047-000                 2CDS-SP22B                   CLEAN AND INSPECT FILTER CYCLONE SEPARATOR TO 2CDS-P22B Status                           Description                    User               Verification Prepared                                                                                                Date Prepared By                     ooley, Tom              05/17/2001 14:55

,Reviewed Reviewed By 00/00/0000 00:00 Pecond Reviewed econd Reviewed By 00/00/0000 00:00 Approved Approved By 00/00/0000 00:00 Issued for Work Issued for Work By 00/00/0000 00:00 estoration Review Restoration Review By 00/00/0000 00:00 Removal Authorized Removal Authorized By 00/00/0000 00:00 Clearance Closed Clearance Closed By 00/00/0000 00:00

Tag List f `/10-29 -CDS-003 05/f '01 14t:55 Beaver Va..-y PowerSta. 2BVP-01-1 Equipment ID Equipment

                                                                                                                                                                    *ge 1 of 1, Equipment         Tag           Tag       Place. Place.      Rest. R es t.

Description Notes 2CDS-P22B-Cs Location Serial Type Config. Seq. Config. Seq. CODENSER WATER BOOSTER PUMP 2-TRBB-730-BASEMENT Caution NORMAL NORMAL 7 S/D-"NORMAL" (AFTER 480VUS-2-1-04/6D 480VUS-2-1 ACB 04/2B6D STOP) 2-SRVB760 Danger OFF 2 ON 6 480VUS-2-1-6D 480V BKR FOR COND WATER BOOSTER 2-SRVB-760- No Tag RACKED OUT PUMP (2CDS-P22B) 3 RACKED IN 5 2swC-45 BOOSTER PUMP (2CDS-P22B) DISCH 2-TRBB-730--EAST OF A CHILLER Danger OPEN ISOL 4 OPEN 4 30-4/C4 2SWC-39 BOOSTER PUMP (2CDS-P22B) SUCTION 2-TRBB-730- Danger SHUT ISOL 5 SHUT 3 30-4/C3 2SWC- 343 CON D WTR BOOSTER PUMP 2-TRBB-730- Danger OPEN (2CDS-P22B) SUCTION DRN 6 SHUT 2 30-4/C3 2SWC-973 (2CDS-P22B) SUCTION TCN ISOL 2-TRBB-730-- Danger OPEN 7 SHUT 30-4/C3

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 - New JPM TITLE: Review a Clearance Tagout JPM[ REVISION: 0 1 K/A

REFERENCE:

2.2.13 3.8 TASK ID: 1310-003-03-023 JPM APPLICATION: [] REQUALIFICATION [* INITIAL EXAM -] TRAINING Z FAULTED JPM [Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Z Perform [] Plant Site -- Annual Requal Exam -- BVT

 -] Simulate                   [j Simulator         Z    Initial Exam            Z NRC Z Classroom           -]  OJT/TPE                 -] Other:

[] Training E--] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time ["- Yes Allotted 20mntsActual minutes Critical: Z* No Time: 20mntsTime: Li SATSA JPM RESULTS: El 1T UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/S SN: JName/S SN: Name/S SN:j Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE 1PM NUMBER: 2L0T3 - New JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 1 EVALUATOR DIRECTION SHEET TASK STANDARD: Review a clearance tagout and correctly identify any error(s). RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: You are to simulate (perform) the task of reviewing a clearance tagout. INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to replace the mechanical seal on [2CHS*P22A] Boric Acid Transfer Pump. INITIATING CUE: The NSS requests you to review the clearance tagout for completeness and report the results of your review.

REFERENCES:

NPDAP 3.4, Rev. 14 TOOLS: None HANDOUT: NPDAP 3.4, Rev. 14 Copy of Op. Manual Figure No. 7-2 & 7-4

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • M Read:

TASK: Review a clearance tagout. INITIAL CONDITIONS: The plant is operating at 100% power with all systems in their normal operating alignment. A clearance tagout has been prepared to replace the mechanical seal on [2CHS*P22A] Boric Acid Transfer Punnp. INITIATING CUE: The NSS requests you to review the clearance tagout for comp leteness and report the results of your review. E At this time, ask the evaluator any questions you have on this JPM. When satisfied that you understand the assigned task, announce "I am now beginning the JPMt1.

""-   ! Simulate performance or perform as directed the required task.
      .,Point to any indicator or component you verify or check and announce your observations.
---]   After determining the Task has been met announce "I have completed the JPM".

Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: JPM REVISION: 2LOT3 0 - New JPM TITLE: Review a Clearance Tagout STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/L

                  "   ii*ii**   :  i@*  i itSTART                     TIME:   ______,__

EVALUATOR NOTE: This task is normally performed using the NOMS clearance computer and signed electronically. For the purpose of the JPM, inform the Candidate to report the results of the tagout review in lieu of signing the tagout form. EVALUATOR NOTE: This step is optional and may not be omitted by the Candidate. Mark step N/A if not performed. Evaluator may elect to provide procedure.

1. Locates procedure NPDAP-3.4.
1. Candidate locates procedure NPDAP-3.4.

COMMENTS:

iTLiA5.640U 1/2-ADM- 1303.F02 Page 5 of 5 Revision 0 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2LOT3 - New JPM TITLE: Review a Clearance Tagout JPM REVISION: 0 STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)* S/U 2.C. Review clearance points for adequacy EVALUATOR NOTE: After Candidate locates and reports results. procedure, provide attached tagout forms and OP Manual figures. 2.1 Candidate verifies appropriate clearance points are selected. 2.2.C Candidate identifies the following tagout errors: 2.2.1 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for tag placement (listed as Open). 2.2.2 No tag is included for the pump benchboard control switch for tag placement. 2.2.3 Valve 2CHS-98 is NOT correctly tagged in the Locked Shut position for restoration (listed as Open). 2.3. Reports that the tagout is NOT correct as written based on the errors noted. EVALUATOR NOTE: Candidate may also identify that the tagout may be enhanced by altering the sequence of tags. This is not required to satisfactorily complete the JPM. COMMENTS: STOP TIME:

2W01-07 -CHS-003 05/01/2001 09:31 Beaver Valley Power Sta. 2BVP-01-1 Page 1 of I Equipment ID: 2CHS-P22A

Description:

Replace the pump mechanical seals for 2CHS-P22A. Reason: None identified Hazards: System contains boric acid solution. Work Required prior to Completion: Run pump OST prior to return to service. Attribute Attribute Description Value Equipment Required For Mode Change Po

estored/Removed Prior to Mode OWER OPERATION ESF Clearance Required No Tagout Type Non-Outage Clearance Type Danger Status Description User Verification Date repared Prepared By Unit 2 NCO 05/01/2001 09:29 eviewed eviewed By Unit 2 NCO 05/01/2001 09:30 econd Reviewed Second Reviewed By 00/00/0000 00:00
ýpproved                                   pproved By                              00/00/0000 00:00 issued for Work                           Issued for Work By                        00/00/0000 00:00 Restoration Review                        Restoration Review By                     00/00/0000 00:00 Removal Authorized                        Removal Authorized By                     00/00/0000 00:00 learance Closed                         Clearance Closed By                       00/00/0000 00:00

Tag List for "01-07-CHS-003 05/ '2001 09:31 Beaver Valley Power Sta. 2BVP-01-1 Parle 1 of 1

                                                                                                                                                                 *m m Equipment ID                  Equipment                         Equipment       Tag          Tag           Place. Place.      Rest. Rest. Notes Description                        Location      Serial        Type          Config. Seq.      Config. Seq.

MCC-2-E13-3F MOTOR STARTER FOR BORIC ACID 2-MSCV-735-- Danger OPEN 1 CLOSED 7 TRANSFER PUMP 2CHS-P22A 2CHS-73 BORIC ACID PP 22A SUCT ISOL 2-AXLB-755-P22A CUB -757 Danger SHUT 2 OPEN 6 2CHS-98 PRI WTR TO BORIC ACID PP 22A 2-AXLB-755-P22A CUB -758 Danger OPEN 3 OPEN 5 2CHS-77 BORIC ACID TK 21A RECIRC ISOL 2-AXLB-755-P22A CUB -759 Danger SHUT 4 OPEN 4 2CHS-79 BORIC ACID PP 22A TO BORIC ACID 2-AXLB-755-P22A CUB -759 Danger SHUT 5 OPEN 3 FILTER 2CHS-868 BORIC ACID TRANSFER PUMP 22A 2-AXLB-755-P22A CUB -756 Danger OPEN 6 SHUT 2 CASING DRAIN 2CHS-625 BORIC ACID PP 22A SUCT STR TEST 2-AXLB-755-P22A CUB -757 Danger OPEN SHUT 1 Component Annotations 2CHS-98 Com KEY REQUIRED [SR-2] Component Print Number

QUESTION: A.3.1.1

a. After signing onto the RWP for the Safeguards Area to manually operate the AFW throttle valves, how can you determine the path of entry that will result in the lowest radiation exposure?
b. Assume that a LOCA has occurred, the Control Room is working through the EOP's having just verified transfer to the Recirculation Mode, and the Emergency Preparedness Plan has been entered with all facilities currently activated. How would you now access this area and what dose considerations, if any, now exist?

Answer:

a. By reviewing the posted area dose maps, OR obtaining a Health Physics Technician briefing.
b. With the EPP facilities activated, access to this area must be made through the Radiological Operations Center (ROC). Dose considerations will now include the increases from the recirculation piping, which passes through the safeguards building, with the potential for large and quickly changing radiation doses.

Technical Reference(s): Health Physics Manual; EPP/IP 1.5, Section 2.0 Learning Objective: 08-01-801, ELO 32; 9250, ELO 12 K/A: 2.3.2 Importance Rating 2.5/2.9 Comments:

QUESTION: A.3.1.2 Several days following a large break LOCA, the plant has been stabilized in Mode 5, and Health Physics has resurveyed the entire plant to update the radiological conditions and postings. You have been sent to the VCT cubicle, to check instrumentation, and found on the RWP that the dose rates inside the cubicle can be as high as 2499 mR/hour.

a. What radiation protection controls would you expect to find at the VCT access point?
b. What Technical Specification requirements must be met for you to enter the cubicle?

Answer:

a. The door [barricade] shall be conspicuously posted [as a high radiation area] and locked,

[with the keys maintained under administrative control of the on duty NSS and/or a facility radiation protection supervisor.]

b. To gain entry requires issuance of an RWP, which must be signed on, and at least one of the following:
   "* A radiation monitoring device which continuously indicates dose rate in the area, or
   "* A radiation monitoring device which continuously integrates the radiation dose in the area and alarms when a preset integrated dose is received, or
   "   An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device, is responsible for positive control over activities in the area.

[]bracketed information not required for full credit. Technical Reference(s): Technical Specifications 6.12.1, 6.12.2 Learning Objective: 08-04-006, ELO 5 K/A: 2.3.1 Importance Rating 2.6/3.0 Comments:

RO ONLY QUESTION: A.4.1.1 NOTE: This is a closed reference question. What is the minimum Emergency Plan classification level that requires activation of the Operations Support Center? Answer: Alert Technical Reference(s): BVPS EPP/I-3, Section E Learning Objective: EPP 9250, ELO 6 & 7 K/A: 2.4.29 Importance Rating 2.6 Comments:

RO ONLY QUESTION: A.4.1.2 NOTE: This is a closed reference question. Following the declaration of a Site Area Emergency at BVPS, which organization is assigned responsibility for accountability of site personnel, and what is the time limit to complete the accountability? Answer: Security, within 30 minutes. Technical Reference(s): BVPS EPP/IP 3.2, Rev. 9 Learning Objective: EPP 9250, ELO 6 K/A: 2.4.29 Importance Rating 2.6 Comments:

RTL#A5.640U 1/2-ADM-1303.F02 Page 1 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) JPM REVISION: 0a K/A

REFERENCE:

2.4.44 4.0 TASK ID: 1350-007-03-023 JPM APPLICATION: [] REQUALIFICATION H INITIAL EXAM E TRAINING [E] FAULTED JPM Z ADMINISTRATIVE JPM EVALUATION METHOD: LOCATION: TYPE: ADMINISTERED BY: Z Perform -- Plant Site E] Annual Requal Exam E] BVT F-1 Simulate E] Simulator Z Initial Exam Z NRC HZ Classroom -] OJT/TPE E] Other: E] Training _---] Other: EVALUATION RESULTS Performer Name: Performer SSN: Time F--' Yes Allotted 15mntsActualmiue Critical: Z* No[ Time: 1miueTime:miue [JSAT E A JPM RESULTS: SI'] UNSAT (Comments required for UNSAT evaluation) Comments: OBSERVERS Name/SSN: Name/SSN: Name/S SN: Name/S SN: EVALUATOR Evaluator (Print): Date: Evaluator Signature:

RTL#A5.640U 1/2-ADM-1303.F02 Page 2 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) JPM REVISION: Oa EVALUATOR DIRECTION SHEET TASK STANDARD: Protective Action Recommendations determined in accordance with EPP/IP 4.1. RECOMMENDED Control Room STARTING LOCATION: DIRECTIONS: Determine Protective Action Recommendations (PAR). INITIAL CONDITIONS: A General Emergency has been declared at BVPS Unit 2 following a LOCA and the continued loss of all 4KV Emergency Power. The following plant conditions exist: 0 35' wind direction is from 270' at 4 MPH. 0 150' wind direction is from 270' at 11 MPH.

  • 500' wind direction is from 285' at 15 MPH.

e No radioactive release has occurred or is anticipated.

  • Health Physics has provided the following dose projections:

At the EAB: 11 REM At 5 miles: 0.9 REM TEDE, 5.5 REM CDE INITIATING CUE: You are the Emergency Director and the TSC/EOF have not yet been activated. You are to evaluate the above conditions and determine which, if any, Offsite Protective Action Recommendations are necessary.

REFERENCES:

EPP/IP 4.1, Rev. 13 TOOLS: None HANDOUT: None. (EPP and EPP/IP's are to be made available to Candidate.)

RTL#A5.640U 1/2-ADM-1303.F02 Page 3 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE CANDIDATE DIRECTION SHEET

  • THIS SHEET TO BE GIVEN TO CANDIDATE
  • El Read:

TASK: Determine Protective Action Recommendations (PAR). INITIAL CONDITIONS: A General Emergency has been declared at BVPS Unit 2, following a LOCA and the continued loss of all 4KV Emergency Power. The following plant conditions exist:

  • 35' wind direction is from 2700 at 4 MPH.

0 150' wind direction is from 270' at 11 IMPH.

  • 500' wind direction is from 285' at 15 MPH.

e No radioactive release has occurred or is anticipated. o Health Physics has provided the following dose projections: At the EAB: 11 REM At 5 miles: 0.9 REM TEDE, 5.5 REM CDE INITIATING CUE: You are the Emergency Director and the TSC/EOF have not yet been activated. You are to evaluate the above conditions and determine which, if any, Offsite Protective Action Recommendations are necessary. El At this time, ask the evaluator any questions you have on this JPM. El When satisfied that you understand the assigned task, announce "I am now beginning the JPM". i--i Simulate performance or perform as directed the required task. El Point to any indicator or component you verify or check and announce your observations. After determining the Task has been met announce " I have completed the JPM". Then hand this sheet to the evaluator.

RTL#A5.640U 1/2-ADM-1303.F02 Page 4 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation ( JPM REVISION: a (A STEP STANDARD ("C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT) I S/U

           ... ..                                            START TIME:__         ______
1. Locate procedure EPP/IP 4.1. 1.1 Candidate locates EPP/IP 4.1.

EVALUATOR CUE: You DO NOT need to fill out an Initial Notification Form (EPP/IP 1.1 Attachment 1)for the purposes of this JPM. COMMENTS:

2. Refer to Offsite Protection Action 2.1 Candidate enters Offsite Protective Action Recommendation Recommendation Flow Chart. Flowchart for General Emergency declaration.

COMMENTS:

3. Navigates PAR flow chart. 3.1 Candidate navigates PAR flow chart as follows:

3.1.1 General Emergency already declared (4). 3.1.2 Met data provided in initial conditions (-). 3.1.3 None of the following are TRUE (4): 35' wind speed < 2 MPH Either 150' or 500' wind direction unavailable 150' & 500' wind direction difference _>165 and _<195 degrees Release started or imminent Release transport spans sunrise or sunset 3.1.4 Dose projection results available - YES (--). 3.1.5 EABTEDE< 10 REM- NO (,). 3.1.6 5 mile dose >1 REM TEDE or >5 REM CDE - YES (--) COMMENTS:

RTL#A5.640U 1/2-ADM-1303.F02 Page 5 of 5 Revision Oa OPERATIONS JOB PERFORMANCE MEASURE JPM[ JPM REVISION: Oa NUMBER: ADM-PAR JPM TITLE: Determine Protective Action Recommendation (PAR) I STEP STANDARD ( "C" Denotes CRITICAL STEP) (Indicate "S" FOR SAT or "U" FOR UNSAT)> S/U

4. Determine Downwind Wedge. 4.1 Candidate determines that the 150' elevation downwind sectors are
                                              'CDEFG'.

4.2 Candidate determines that the 500' elevation downwind sectors are

                                              'DEFGH'.

COMMENTS: 5.C Determine Offsite Protective Action 5.1I.C Candidate determines the following Protective Action Recommendations. Recommendations: Evacuate 360 0for two miles, and Evacuate Sectors 'CDEFGH' for ten miles, and Shelter the remainder of 10 mile EPZ. COMMENTS: STOP TIME: ____,__________}}