IR 05000440/2008001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/03/2008
| issue date = 03/03/2008
| title = 03/03/08, Perry, EOC Annual Assessment Letter (Report 05000440-08-001)
| title = 03/03/08, Perry, EOC Annual Assessment Letter (Report 05000440-08-001)
| author name = Caldwell J L
| author name = Caldwell J
| author affiliation = NRC/RGN-III/ORA
| author affiliation = NRC/RGN-III/ORA
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 3, 2008 Mr. Barry Site Vice President
[[Issue date::March 3, 2008]]


Mr. Barry Site Vice President
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097 SUBJECT: ANNUAL ASSESSMENT LETTER - PERRY NUCLEAR PLANT (05000440/2008001)
 
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097
 
SUBJECT: ANNUAL ASSESSMENT LETTER - PERRY NUCLEAR PLANT (05000440/2008001)


==Dear Mr. Allen:==
==Dear Mr. Allen:==
Line 42: Line 37:
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.


Sincerely,/RA/ James L. Caldwell, Regional Administrator Docket No. 50-440 License No. DPR-58  
Sincerely,
/RA/ James L. Caldwell, Regional Administrator Docket No. 50-440 License No. DPR-58  


===Enclosure:===
Enclosure: Perry Inspection/Activity Plan DISTRIBUTION:
Perry Inspection/Activity Plan DISTRIBUTION:
See next page
See next page
}}
}}

Revision as of 14:18, 12 July 2019

03/03/08, Perry, EOC Annual Assessment Letter (Report 05000440-08-001)
ML080600303
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/03/2008
From: Caldwell J
Region 3 Administrator
To: Allen B
FirstEnergy Nuclear Operating Co
References
IR-08-001
Download: ML080600303 (7)


Text

March 3, 2008 Mr. Barry Site Vice President

FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097 SUBJECT: ANNUAL ASSESSMENT LETTER - PERRY NUCLEAR PLANT (05000440/2008001)

Dear Mr. Allen:

On February 12, 2008, the NRC staff completed its performance review of the Perry Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan. Overall, Perry Nuclear Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within

the Regulatory Response column of the NRC's Action Matrix, based on the Mitigating Systems Performance Index (MSPI) results for the Emergency AC Power being White since the first quarter of 2007. On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone column of the NRC's Action Matrix. Therefore, effective the second quarter 2007, the Perry plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the Regulatory Response column, based on the White Emergency AC Power System MSPI.

Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of August 20 to assess the root cause analysis and implementation of corrective actions for the performance index. Based on the results of this inspection, no findings of significance were identified. The staff has identified that the improvements in human performance first noted in our 2006 End-of-Cycle assessment have not been sustained. The performance decline has resulted in the identification of a substantive cross-cutting issue in the area of human performance with a cross-cutting theme in the aspect of work control and planning. There were 12 Green findings with a documented cross-cutting aspect in human performance. Four of the findings shared a common cross-cutting aspect of work control and planning (H.3(a)). In addition, these findings were from more than one cornerstone. This cross-cutting issue will remain open until the number of findings with the same cross-cutting aspect is reduced or when the NRC gains confidence in your actions to address this adverse trend in human performance.

The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ James L. Caldwell, Regional Administrator Docket No. 50-440 License No. DPR-58

Enclosure: Perry Inspection/Activity Plan DISTRIBUTION:

See next page