|
|
Line 3: |
Line 3: |
| | issue date = 07/22/2009 | | | issue date = 07/22/2009 |
| | title = Report of Changes and Errors Pursuant to 10 CFR 50.46 | | | title = Report of Changes and Errors Pursuant to 10 CFR 50.46 |
| | author name = Cullen G V | | | author name = Cullen G |
| | author affiliation = Energy Northwest | | | author affiliation = Energy Northwest |
| | addressee name = | | | addressee name = |
Line 30: |
Line 30: |
| In accordance with 10 CFR 50.46(a)(3)(ii), Columbia Generating Station (Columbia) is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS) analysis caused by changes to or errors discovered in acceptable ECCS evaluations for information. | | In accordance with 10 CFR 50.46(a)(3)(ii), Columbia Generating Station (Columbia) is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS) analysis caused by changes to or errors discovered in acceptable ECCS evaluations for information. |
| Since the last 10 CFR 50.46 report provided to the NRC [Reference 1], Columbia loaded a new fuel type (GEl 4) and began using Global Nuclear Fuel's approved analytical methods to perform licensing calculations. | | Since the last 10 CFR 50.46 report provided to the NRC [Reference 1], Columbia loaded a new fuel type (GEl 4) and began using Global Nuclear Fuel's approved analytical methods to perform licensing calculations. |
| Columbia submitted a License Amendment Request (LAR) [Reference 2] to revise Technical Specification (TS) 5.6.3 to add a reference to a new analytical method to beused to determine core operating limits. The LAR was approved by the NRC in Reference | | Columbia submitted a License Amendment Request (LAR) [Reference 2] to revise Technical Specification (TS) 5.6.3 to add a reference to a new analytical method to beused to determine core operating limits. The LAR was approved by the NRC in Reference |
| : 3. There have been no other changes or errors associated with the Columbia ECCS analysis since the last 1OCFR 50.46 report[Reference 1].14 Ot),ý_ | | : 3. There have been no other changes or errors associated with the Columbia ECCS analysis since the last 1OCFR 50.46 report[Reference 1].14 Ot),ý_ |
| REPORT OF CHANGES AND ERRORS PURSUANT TO 10 CFR 50.46 Page 2 of 2 No new regulatory commitments are made in this letter. Should you have any questions or desire additional information regarding this matter, please contact me at (509)377-6105.Respectfully, GV Cul Manager, Regulatory Programs cc: EE Collins -NRC RIV NJ DiFrancesco | | REPORT OF CHANGES AND ERRORS PURSUANT TO 10 CFR 50.46 Page 2 of 2 No new regulatory commitments are made in this letter. Should you have any questions or desire additional information regarding this matter, please contact me at (509)377-6105.Respectfully, GV Cul Manager, Regulatory Programs cc: EE Collins -NRC RIV NJ DiFrancesco |
| -NRC NRR NRC Sr. Resident Inspector | | -NRC NRR NRC Sr. Resident Inspector |
| -988C WA Horin -Winston & Strawn RN Sherman -BPA/1 399}} | | -988C WA Horin -Winston & Strawn RN Sherman -BPA/1 399}} |
|
---|
Category:Letter type:GO
MONTHYEARGO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process 2024-07-30
[Table view] |
Text
ENERGY Gregory V.Cullen , A, .Regulatory Programs EN ERTHT P.O. Box 968, Mail Drop PE20 P Richland, WA 99352-0968 EPh. 509-377-6105 F. 509-377-4317 gvcullen @ energy-northwest.com July 22, 2009 10 CFR 50.46(a)(3)(ii)
G02-09-103 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO 50-397 REPORT OF CHANGES AND ERRORS PURSUANT TO 10 CFR 50.46
References:
- 1) Letter G02-08-033 dated February 29, 2008, DK Atkinson, Energy Northwest to NRC, "2007 Annual Operating Report" 2) Letter GO2-08-108 dated July 16, 2008, SK Gambhir, Energy- Northwest, to NRC, "License Amendment Request for Changes to Technical Specifications Involving Core Operating Limits Report and Scram Time Testing" 3) Letter.May 5, 2009, CF Lyon, NRC, to JV Parrish, Energy Northwest,"Columbia Generating Station -Issuance of Amendment Re: Core Operating Limits Report and Scram Time Testing (TAC No. MD9247)"
Dear Sir or Madam:
In accordance with 10 CFR 50.46(a)(3)(ii), Columbia Generating Station (Columbia) is required to report to the Commission, at least annually, the estimated effect on the limiting Emergency Core Cooling System (ECCS) analysis caused by changes to or errors discovered in acceptable ECCS evaluations for information.
Since the last 10 CFR 50.46 report provided to the NRC [Reference 1], Columbia loaded a new fuel type (GEl 4) and began using Global Nuclear Fuel's approved analytical methods to perform licensing calculations.
Columbia submitted a License Amendment Request (LAR) [Reference 2] to revise Technical Specification (TS) 5.6.3 to add a reference to a new analytical method to beused to determine core operating limits. The LAR was approved by the NRC in Reference
- 3. There have been no other changes or errors associated with the Columbia ECCS analysis since the last 1OCFR 50.46 report[Reference 1].14 Ot),ý_
REPORT OF CHANGES AND ERRORS PURSUANT TO 10 CFR 50.46 Page 2 of 2 No new regulatory commitments are made in this letter. Should you have any questions or desire additional information regarding this matter, please contact me at (509)377-6105.Respectfully, GV Cul Manager, Regulatory Programs cc: EE Collins -NRC RIV NJ DiFrancesco
-NRC NRR NRC Sr. Resident Inspector
-988C WA Horin -Winston & Strawn RN Sherman -BPA/1 399