RBG-47689, Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 1: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/12/2016
| issue date = 07/12/2016
| title = Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 1
| title = Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 1
| author name = Huffstatler K R
| author name = Huffstatler K
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
| addressee name =  
| addressee name =  

Revision as of 01:17, 20 June 2019

Response to Regulatory Issue Summary 2016-09 - River Bend Station, Unit 1
ML16208A055
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/12/2016
From: Huffstatler K
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47689, RIS-16-009
Download: ML16208A055 (2)


Text

-' I

  • RBG-47689 July 12, 2016 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001

Subject:

RBFl-16-0080 Response to Regulatory Issue Summary 2016-09 River Bend Station -Unit 1 Docket No. 50-458 License No. NPF-47

Dear Sir or Madam:

Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4177 On June 16, 2016, NRC issued Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations, to request information related to future licensing examinations for operators.

As pertaining to River Bend Station, Entergy Operations, Inc. herein submits the requested information on the attached NRC Form 536. This document contains no commitments.

If you have any questions, please contact Mr. Sid Durbin at 225-378-3313.

Sincerely, .

R. Huffstatler Manager -Regulatory Assurance (acting) KRH/dhw Attachment cc: U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd. Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station NRC FORM536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

REC-t.r<4>

Estimated burden per response to comply with this voluntary informatiory collection request: 1.hour. *This OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the FOIA, Privacy, and lnforrnation Collections Branch (T-5 .. 0 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ';; EXAMINATION DATA I lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, . . -! NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means * ...........

used to impose an information collection does not display a currently valid OMB number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION River Bend Station -Unit 1 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018. , CY2019 CY2020 ----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 ----NUMBER OF REACTOR 4 6 OPERATORS NUMBER OF SENIOR REACTOR 12 4 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 6/25/18 11/18/2019 ALTERNATE DATE 7/23/18 12/09/2019

c. PROPOSED GENERIC FUNDAMENTALS (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 10 CANDIDATES NRC FORM 536 (05-2016)