IR 05000295/2013403: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 22: Line 22:
and General Manager  
and General Manager  


ZionSolutions , LLC 101 Shiloh Boulevard Zion, IL 60099
ZionSolutions , LLC 101 Shiloh Boulevard Zion, IL 60099 SUBJECT: NRC SECURITY INSPECTION REPORT 05000295/2013403(DNMS); 05000304/2013403(DNMS) - ZION NUCLEAR POWER STATION
 
SUBJECT: NRC SECURITY INSPECTION REPORT 05000295/2013403(DNMS); 05000304/2013403(DNMS) - ZION NUCLEAR POWER STATION


==Dear Mr. Daly:==
==Dear Mr. Daly:==

Revision as of 15:33, 18 May 2019

IR 05000295-13-403 and 05000304-13-403 for Zion Nuclear Power Station
ML13198A064
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/12/2013
From: Orlikowski R J
NRC/RGN-III/DNMS/MCID
To: Daly P
ZionSolutions
Slawinski W J
References
IR-13-403
Download: ML13198A064 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 Warrenville Road, Ste 210 Lisle, IL 60532-4362 July 12, 2013 Mr. Patrick Daly, Senior Vice-President

and General Manager

ZionSolutions , LLC 101 Shiloh Boulevard Zion, IL 60099 SUBJECT: NRC SECURITY INSPECTION REPORT 05000295/2013403(DNMS); 05000304/2013403(DNMS) - ZION NUCLEAR POWER STATION

Dear Mr. Daly:

On June 20, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed a security inspection at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The purpose of the inspection was to determine compliance with NRC Order EA-03-099, for additional security measures associated with access authorization, fitness for duty, and behavioral observation. The enclosed report documents the inspection results, which were discussed with you and members of your staff on May 10, 2013, at the conclusion of the on-site inspection and on June 20, 2013 following in-office review.

The inspection was conducted in response to an incident involving site security officers, which

your staff reported to the NRC on April 29, 2013. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission

's rules and regulations and with the conditions of your license. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-identified or self-revealing findings were identified during this inspection. However, a licensee-identified violation which was determined to be of very low safety significance is documented in this report. The violation is categorized at Severity Level IV. Since the violation is of very low safety significance, was self-identified and documented in your corrective action program, the NRC is treating this issue as a non-cited violation (NCV) in accordance with Section 2.3.2 of the Enforcement Policy.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. No response is required for the non-cited violation. However, if you contest the subject or severity level of the NCV you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; and the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/

reading-rm/adams.html. Since the enclosed report contains security related information and must be protected from unauthorized disclosure, the enclosure will not be available for public inspection.

We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/ Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 05000295, 05000304 License Nos. DPR-39, DPR-48

Enclosure:

Inspection Report Nos.: 05000295/2013403(DNMS); 05000304/2013403(DNMS) (Non Public)

cc w/encl: Patrick Thurman, Zion Solutions, LLC E. Moore, ZionSolutions, LLC Gary Bouchard, ZionSolutions, LLC Alan Parker, EnergySolutions John Christian, Energy Solutions Russ Workman, Energy Solutions cc w/o encl: Zion Nuclear Power Station Service List