Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF6208 | | | project = TAC:MF6208 |
| | stage = Other | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
Line 27: |
Line 27: |
| By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390: GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent] | | By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390: GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent] |
| Rate Core Flow (115 Mlbs/hr [Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015. A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML 15238A745. | | Rate Core Flow (115 Mlbs/hr [Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015. A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML 15238A745. |
| The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; | | The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies; |
| : b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | : b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. |
Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARGO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 2024-09-24
[Table view] Category:Proprietary Information Review
MONTHYEARML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure ML22200A2612022-08-0909 August 2022 Request for Withholding Information from Public Disclosure ML22048C2142022-02-22022 February 2022 Request for Withholding Information from Public Disclosure ML20336A0612021-01-0707 January 2021 Request for Withholding Information from Public Disclosure ML17087A5692017-04-12012 April 2017 Request for Withholding Information from Public Disclosure for Columbia Generating Station ML16207A0332016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1049, Revision 3 ML16207A0162016-09-14014 September 2016 Request for Withholding from Public Disclosure - 5/18/16 Affidavit Executed by E. Hauser, Caldon Ultrasonics Technology Center, Cameron Engineering Report ER-1074, Revision 0 ML16246A2812016-09-14014 September 2016 Request for Withholding Information from Public Disclosure, 6/9/16 Affidavit Executed by J. Harrison, GE-Hitachi and 6/14/16 Affidavit Executed by N. Wilmshurst, EPRI, Related to NEDC-33853P, Revision 0 ML15191A3602015-09-0101 September 2015 Request for Withholding Information from Public Disclosure - 2/20/15 Affiidavit Executed by L. Schichlein, GE-Hitachi Jet Pump 17/18 Riser Evaluation Dated February 2015 ML15086A0562015-04-14014 April 2015 Request for Withholding Information from Public Disclosure, 3/13/15 Affidavit Executed by L. Trosman, General Electric-Hitachi Nuclear Energy Americas, GNF-001N8896-R2-P ML15040A1382015-02-26026 February 2015 Request for Withholding Information from Public Disclosure, 10/21/14 Affidavit Executed by J. Harrison, General Electric-Hitachi Nuclear Energy Americas, GNF-001N8896-R2-P ML14056A1202014-03-0505 March 2014 Request for Withholding Information from Public Disclosure ML13235A0032013-08-23023 August 2013 Request for Withholding Information from Public Disclosure - 7/25/13 Affidavit Executed by L. Dolan, GEH; Enclosures 1 of Geh'S Response to Request for Additional Information Round 4 ML13109A1632013-04-26026 April 2013 Request for Withholding Information from Public Disclosure - 4/2/13 and 4/10/13 Affidavits Executed by L. Dolan, GEH; Enclosures 1 and 3 of Geh'S Request for Additional Information Responses ML13025A3612013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33698P, Revision 2 ML13025A3512013-02-21021 February 2013 Request for Withholding Information from Public Disclosure, Affidavit Dated 12/12/12, Executed by L. Dolan, GE Hitachi Americas LLC, NEDC-33685P, Revision 2 ML12229A4712012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 6/29/12 and 10/22/12 Affidavits Executed by E. Schrull, GEH-Hitachi, NEDC-33751P, Revisions 2 and 3 ML12345A3662012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/12 Executed by E. Schrull, GEH-Hitachi, NEDC-33789P, Revision 0 ML12345A3582012-12-18018 December 2012 Request for Withholding Information from Public Disclosure, 9/26/12 Affidavit Executed by E.Schrull, GEH-Hitachi, GEH 10/5/12 Responses to Nrc/De/Eicb 9/5/12 Request for Additional Information ML12229A4802012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33754P, Revision 0 ML12229A4902012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/12/12 Affidavit Executed by E. Schrull, GEH-Hitachi, Letter GE-MS-CT-106244-JC14 ML12229A4832012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33758P, Revision 0 ML12192A4812012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, Affidavits Dated 11/16/11 and 7/26/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33696P, Revisions 0 and 1 ML12229A4682012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/4/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33750P, Revision 0 ML12229A4762012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/7/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33753P, Revision 0 ML12229A4822012-11-13013 November 2012 Request for Withholding Information from Public Disclosure, 6/27/12 Affidavit Executed by E. Schrull, GEH-Hitachi, NEDC-33756P, Revision 0 ML12192A4542012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33694P, Revision 1 ML12192A4332012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 11/1/11, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33690P, Revision 0 ML12192A3612012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12 Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33685P, Revision 1 ML12192A3252012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 10/31/11 Executed by E. Schrull, GE Hitachi Americas LLC, 0000-0101-7647-R3 Plant-Specific Responses Required by NEDC-32410P-P-A ML12192A5352012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33697P, Revision 1 ML12192A5892012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/5/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33698P, Revision 1 ML12193A1092012-07-30030 July 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 1/27/12, Executed by E. Schrull, GE Hitachi Americas LLC, NEDC-33507P, Revision 1 ML0900602232009-01-0808 January 2009 Request for Withholding Information from Public Disclosure ML0820504672008-09-0303 September 2008 Request for Withholding Information from Public Disclosure ML0422304932004-08-10010 August 2004 Withholding from Public Disclosure, NEDC-33144P, Pressure-Temperature Curves for Energy Northwest Columbia 2024-09-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 September 1, 2015
SUBJECT:
COLUMBIA GENERATING STATION -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF6208)
Dear Mr. Reddemann:
By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15238A773), Energy Northwest submitted an affidavit executed by Ms. Lisa K. Schichlein, Senior Project Manager, GE-Hitachi Nuclear Energy Americas LLC (GEH), dated August 7, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2. Section 2.390: GEH Report No. 001 N6043.5, "Energy Northwest Columbia Generating Station Jet Pump 17/18 Rise Evaluation at 106% [percent]
Rate Core Flow (115 Mlbs/hr [Million Pounds per Hour])," Revision 2, dated August 2015 The information is included in Enclosure 1 to Energy Northwest's letter dated August 13, 2015. A nonproprietary version of Report No. 001 N6043.5, designated as Enclosure 2, to Energy Northwest's letter dated August 13, 2015, has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML 15238A745.
The affidavit stated that the information sought to be withheld is considered to be proprietary for the reasons below: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce his expenditure of resources or improve his competitive position 1n the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov.
Docket No. 50-397 cc: Lisa K. Schichlein Sincerely, Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv M. Reddemann submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016 or via e-mail at Balwant.Singal@nrc.gov.
Sincerely, IRA/ Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road, MIC A-65 Wilmington, NC 28401 Additional distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrPMColumbia Resource RidsNrrLAJBurkhardt Resource RidsRgn4MailCenter Resource RidsNrrDeEvib Resource RidsNrrDorlLpl4-1 Resource ADAMS Accession No. ML 15191 A360 OFFICE NRR/DORL/LPL4-1
/PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC NAME BSingal JBurkhardt JMcHale DATE 7/13/15 7/13/15 8/27/15 OFFICIAL RECORD COPY JPoehler, NRR/DE/EVIB GCheruvenki, NRR/DE/EVIB N RR/DORL/LPL4-1
/BC NRR/DORL/LPL4-1
/PM MMarkley BSingal 9/1/15 9/1/15