Category:Environmental Report
MONTHYEARML17115A4962017-04-21021 April 2017 Annual Radiological Environmental Operating Report 2016 ML14350A4662014-12-12012 December 2014 Flood Hazard Reevaluation Report ML13128A0052013-04-30030 April 2013 2012 Annual Environmental Operating Report ML0912402872009-04-24024 April 2009 Annual Radiological Environmental Operating Report 2008 ML0809404712008-03-25025 March 2008 Annual Environmental Operating Report ML0712702472007-04-26026 April 2007 Annual Environmental Operating Report 2006 ML0612300862005-12-31031 December 2005 Annual Radioactive Effluent Release Report ML0511002832005-04-0808 April 2005 Annual Radiological Environmental Operating Report 2004 ML0411900952004-04-21021 April 2004 Annual Radioactive Effluent Release Report 2003 ML0312504982003-04-25025 April 2003 2002 Annual Radioactive Effluent Release Report ML0212105322002-04-18018 April 2002 Annual Radiological Environmental Operating Report for 2001 ML18192A3301976-02-18018 February 1976 an Archaeological Survey of a Proposed 345 Kv Power Transmission Line Corridor from Deming, Nm to Greenlee County, Az ML18192A2151976-01-16016 January 1976 Pursuant to the Notice of Availability of the Draft Supplement to Final Environmental Statement Dated Nov. 25, 1975, 40 Copies of Applicant'S Comments to Such Draft Supplement Are Enclosed ML18192A1921975-10-10010 October 1975 Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project ML18192B8301975-02-0303 February 1975 Environmental Report Construction Permit Stage, Volume IV for Palo Verde Nuclear Generating Station, Units 1, 2, & 3. ML18192A2891975-02-0303 February 1975 Environmental Report, Construction Permit Stage, Supplement No. 3 2017-04-21
[Table view] Category:Letter
MONTHYEARML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 IR 05000528/20230042024-02-12012 February 2024 Integrated Inspection Report Report 05000528/2023004 and 05000529/2023004 and 05000530/2023004 ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 1R24 2024-09-23
[Table view] |
Text
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)0:~Rz FII E: FROM..Arizona Pub1icI'Service Cc Phoenix,'Az.h unt 1r 10-10-75 10-11-75 DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO: DL CLASS UNCL'ASS'PROP INFO, ORIG 3 signed.INPUT CC'OTHER NO,CYS REC'D 3 SENTNRC PDR SENT LOCAL PDR Xx'DOCKET NO: STN 50"528/529/530 DESCR IPTION: Ltr notarized 10-10-75....trans the following:
DO NOT REMOV8, ACKNOWLEDGED PLANT NAME: Ariz Palo Verde 1-2-3 ENCLOSURES:
Suppl 8B to the ER: Consisting of revised secti 1.1, 1.2, 2.,3, 3.9, 4.2;'5.6,&10.9............
whi'ch include,.S'outhern'Calif Edison Co as a participant in.'the" pro)ect......(w/neol 8VII)......(200'ys encl rec'd)FOR ACTION/INFCRI'RATION 10-14-75 ehf~BUTLER (L)W/Copies CLARK (L)W/Copies'PARR (L)~W/l Copief'" KNIEL (L)W/Copies SCHWENCER (L')W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies PURPLE (L)W/Copies ZIEMANN"(L)REGAN (E).REID(L)W/Copies W//CopiesŽW/COPIES DICKER (E)LEAR (L)W/Copies W/Copies KNIGHTON (E)SPIES'/Copies" W/Copies YOUNGB LOOD (E)LPM W/Copies*W/opuses INTERNAL DISTR I BUTION~RC PDR OGC, ROOM P-506A~GOSSI CK/STAF F~CASE GIAMBUSSO BOYD MOORE (L)~DEYOUNG (LW" SKOVHOLT (L)GOLLER (L)(Ltr)P.COL'LINS DENISE REG OPR FILE 5 REGION (2)HIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO'TEDESCO~J,COLLINS LAI NAS BENAROYA VOLLMER DENTON MGRIMES~GAMMI LL'KASTNE R~BALLAR D~SPANGLER'NVI RO~MULLER~DICKER KNIG HTON YOUNG BLOOD REGAN PROJECT LDR~&~m~Hh&ESS-LIC ASST R., DI GGS (L)H.GEAR IN,(L)'.GOULBOURNE (L)P.KREUTZER (E)J.'LEE.(L)M.RUBHBROOK(L)
S.REED(E)M.SERVICE (L)S.'SH EPPAR D (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)'.WILSON (L)>~R.INGR'~4 (L')H.DUNCAN A/T I ND~BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD'HAPMAN..
DUBE (Ltr).E.COUPE PETERSON HARTFIELD (2)KLECKER EISENHUT WI GG INTON~,/.6 culS EXTF R N AL DISTR I BUTION 9-LOCAL PDR~~~<<~~~1-, TIC (ABERNATHY)
+~10)-NATIONAL LABS AHL~1-NSIC (BUCHANAN).
1-W.PENNINGTON,'m E-201 GT~1-AS LB 1-CONSULTANTS 1-Newton Anderson NEWMARK/BLUME/AG BABIAN-A.CRS HOLDING/SENT 1.-P D R-SAN/LA/N Y 1-BROOKHAVEN'NAT LAB~1-G..ULR IKSON'RNL f
~~~~~~~~~~~~~1~~.~~~H~\~~~~~~~~~~
a e p UQK3I I'D~BQ CKOKQIRQH'P P.O.BOX 2I666 PHOENIX, ARIZONA 85036 October 10, 1975 ANPP-3126 Director of Nuclear Reactor Regulation Attn: Mr.W.H.Regan, Jr., Chief Environmental Projects Branch 4 Division of Reactor Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
REFERENCE:
Docket Nos.STN 50-528/529/530
Dear Mr.Regan:
We are hereby submitting additional information to the Palo Verde Nuclear Generating Station Environmental Report.Enclosed are three signed originals of Supplement 86.containing revised Sections 1.1, 1.2, 2.3, 3.9, 4.2,'5.6.and 10.9, which have been revised to include Southern California Edison Company as a Participant in this Project.Under separate cover, 197 additional copies of Supplement
/l6 have been provided.An additional three-ring binder labeled Volume VII will be provided within two weeks.Very truly yours, 8 Edwin E.Van Brunt, Jr.Vice President, Nuclear Services ANPP Project Direct EEVBJr/WMP/pk Subscribed and sworn to this 9~day of October, 1975.Ot<<oc gO Notary Public My Gommission Expires~M~MP 1-7'4 Pg) ll ll!F I a P C I 4 P II fh I 4 p C'~a P P~g~
CC Arthur C.Gehr, Esq.Snell&Wilmer 3100 Valley Center Phoenix, Arizona 85073 Carmine F.Cardamone, Jr.1415 North Third Avenue Tucson, Arizona 85705 Barbara E.Fisher, Esq.Arizona Public Law Advocates 201 North Stone Avenue Suite 210 Tucson, Arizona 85701 0 4 PVNGS-1,263 ER INSTRUCTION SHEET PVNGS ER Supplement No.6 presents information to define the effect of the replacement of Tuscon Gas and Electric Company (TGaE)by Southern California Edison Company (SCE)as a member of the Arizona Nuclear Power Project (ANPP).The bulk of the information is on the need for power and on a new transmission line to be added to the project by SCE.This consists of a new Chapter 1 and new Sections S6-2.3.2, S6-3.9.1, S6-4.2, S6-5.6, and S6-10.9.1, and new Appendix 1D dealing only with SCE infor-mation.In addition to these, sections, there are some, pages and figures in the ER which must be changed to reflect the addition of SCE to ANPP.They are page 8.1-1, page 8.1-2, table 8.1-1, table 8.1-2, page 8.2-1, table 8.2-1, Appendix 8A title page, page 8A-l-, table 8A-1, page 8A-9, page 9.1-2, page 9.1-4, page 9.2-2, page 9.2-4, figure 9.2-2, figure 9.2-3, page 9.3-1, page 9.3-4, table 11.3-1, sheets 1 and 8, fig-ure 11.3-1, and responses to questions, 1, 2, 3 and 4 of Chapter 1 in Supplement No.1.This information is presented in three discrete packages.The first is the new Chapter 1, which will be substituted in its entirety with the original Chapter 1 in Volume I (see Chapter I Instructions).
The second package contains the description of the SCE transmission line route.It is to be placed in Volume 7 as indicated by the transmission line instruction sheet.The third package contains the miscellaneous pages changed to reflect the addition of SCE to ANPP.It is to be inserted into Volume VII.It is felt that these changes present the information pertinent to the definition of the need for power and environmental impact subsequent to the addition of SCE to ANPP.A prefix"S6" is used before all sections, pages, and table and figure numbers for ease of identification of pages related to SCE.S6-i Supplement No.6 October 10, 1975 PVN(3S 2&3 ER i In add the co ition ol ingg to the SC',E informa water toirage resee on, a revised description of oi:r is presented as a new f igure reflec , compil All'thh after 2.1-t the e addd ese r the SS 2.Also, a revisedd impact of'he stor itional information evised pages should CE information.
ection 5.1.3 is provided to e reservoir as well as to rovided gaby previous supplements.
e inserted into Volume VIISupplement No.6 October 10, 1975
~~PVNGS-1,263 ER Cha ter 1 Instructions Remove Chapter 1 pages 1-i through 1.4-3 from Volume I and replace it with the Supplement VI revision of Chapter l.Insert Appendix 1D after Appendix 1C in Volume I.Remove and destroy the Supplement 4 revision of Chapter I currently in Volume VI.Supplement No.6 October 10, 1975 Q~i~~"~8