Category:Map
MONTHYEARML15077A1032015-04-16016 April 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15026A5992015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.4-2, Regional Topographic Map ML15026A5972015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.4-1, ISFSI Yard Area Topography ML15026A5942015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.3-1, Meteorological Instrument Locations ML15026A5932015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.1-3, Site Vicinity Map ML15026A5912015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.1-1, Regional Map ML15026A5882015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.4-4, Probable Maximum Hurricane Path ML12275A2302012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 2.3-1, Meteorological Instrument Locations ML12275A2042012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 1.1-1, Historical Site Plan Showing the Relative Location of the ISFSI with Respect to the Power Plant, Revision 3 ML12275A2272012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 2.1-1, Regional Map ML12275A2292012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 2.1-3, Site Vicinity Map ML12275A2342012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.4-2, Regional Topgraphic Map Showing Surface Hydrology. ML12275A2362012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.4-4, Probable Maximum Hurricane Path. ML12275A2392012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.5-1, Piezometric Surfaces in Calvert County. ML12275A2402012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.5-2, Public Water Supplies in Calvert County. ML12275A2412012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.5-3, Map of Area Showing Known Water Wells. ML12275A2422012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.5-4, Observation Wells Plot Plan. ML12275A2442012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.6-1, Regional Physiographic Map. ML12275A2382012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Figure 2.4-6, Wind Direction for Fetch. ML11269A1552011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.6-8, Epicentral Location Map ML11269A1142011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.1-1, Regional Map ML11269A1182011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.4-2, Regional Topographic Map ML11269A1392011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.6-1, Regional Physiographic Map ML11269A1402011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.6-2, Regional Geologic Map ML11269A1422011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.6-5, Regional Tectonic Map ML11269A1432011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.6-6, Site Geologic Map ML11269A1612011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.1-3, Site Vicinity Map ML11269A2262011-09-0808 September 2011 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Figure 2.5-3, Map of Area Showing Known Water Wells ML1026003872010-09-0909 September 2010 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Figure 2.6-8, Epicentral Location Map. ML1015902172010-06-0303 June 2010 Independent Spent Fuel Storage Installation - Nuclear Regulatory Commission Informal Consultation Preparation 2015-04-16
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML21278A2832021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident ML21278A2602021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event ML21278A2692021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System ML22115A0432021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted ML22115A0462021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted ML21278A3022021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References ML21278A2932021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident ML21278A2962021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update ML21278A3032021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A2852021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted ML21278A2872021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event ML21278A2912021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event ML21278A2552021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology ML21278A2762021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents ML21278A2802021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML21278A2842021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event ML21278A2922021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident ML21278A2712021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event ML21278A2742021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event ML21278A2672021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power ML21278A2622021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted ML21278A2642021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event ML21278A2682021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization ML21278A2752021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event ML21278A2612021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event ML21278A2772021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML21278A2532021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event ML21278A2522021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2892021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident ML21278A2572021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents ML21278A2662021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation ML21278A2992021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A2822021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event ML21278A2862021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A2702021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations ML21278A2542021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event ML21278A2562021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning ML21278A2722021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection ML22115A0442021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted ML21278A2942021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident ML21278A2982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities ML22115A0452021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted ML21278A2882021-09-0707 September 2021 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response ML21278A2782021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event ML21278A2812021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual ML21278A2902021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident 2021-09-07
[Table view] |