ML17237A046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17237A046
| number = ML17237A046
| issue date = 08/17/2017
| issue date = 08/17/2017
| title = McGuire Nuclear Station Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275
| title = Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275
| author name =  
| author name =  
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC

Revision as of 05:27, 6 April 2019

Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275
ML17237A046
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/17/2017
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17237A046 (7)


Text

Distribution:

Duke Energy Date: 8[17[2017 Document Transmittal

  1. TR-NUC-MC-006874
1. Boyer, Robert P DOCUMENTTRANSMITTALFORM Purpose: Issue 2. Gardner, Troy R 3. Howell, Pamela T Released By: 4. Mc Ginnis, Vickie L Facility:

MCGUIRE NUCLEAR STATION Duke Energx 5. OPS HUMAN PERFORMANCE

-SUBJECT 13225 Hagers Road 6. OPS TRNG MGR. Technical Sgecification Changes -Amendment Nos.296[275 Document Management

7. QATS-MG02DM 8. RESIDENT NRC INSPECT Huntersville, NC 28078 9. SERV BLDG FILE ROOM -10. U S NUC REG WASHINGTON, DC V MNSDCRM@duke-energx.com
11. USNRC -12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 Document ID 1 2 3 4 5 6 7 8 9 10 11 12 LICN MC -MNS-TS-3.6.10

-001 -ISSUED. FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE LICN -MC -MNS-TS-3.7.9

-002 -ISSUED FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&AIE Remarks:

  • *

APPLICABILITY:

MODES 1, 2, 3, and 4. ACTIONS CONDITION REQUIRED ACTION A. One AVS train A.1 Restore AVS train to inoperable.

OPERABLE status. AVS 3.6.10 COMPLETION TIME 7 days B. One or more AVS B.1 Restore AVS train(s) heater ?days train(s) heater to OPERABLE status. inoperable.

OR 8.2 Initiate action in accordance with 7 days Specification 5.6.6. C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5 . 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 3.6.10-1 Amendment Nos. 184/166 AVS 3.6.10 SURVEILLANCE REQUIREMENTS

  • McGuire Units 1 and 2 3.6.10-2 Amendment Nos. 296/275
  • 3. 7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRAVS trains shall be OPERABLE.

CRAVS 3.7.9 ------------------------------------------NOTE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control. APPLICABILITY:

MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION A. One CRAVS train A.1 Restore CRAVS train to inoperable for reasons OPERABLE status . other than Condition B. B. One or more CRAVS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions. boundary in MODE 1,2,3, or4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND B.3 Restore CRE boundary to OPERABLE status. C. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Be in MODE 5. COMPLETION TIME 7 days* Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours (continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

E. Two CRAVS trains inoperable in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

OR One or more CRAVS trans inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

Two CRAVS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE ALTERATIONS.

AND D.2.2. Suspend movement of irradiated fuel assemblies.

E.1 Suspend CORE ALTERATIONS.

AND E.2 Suspend movement of irradiated fuel assemblies.

F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 * * *

  • *
  • G. CONDITION One or more CRAVS train(s) heater inoperable.

REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification

5.6.6. CRAVS

3.7.9 COMPLETION TIME 7 days ?days

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005 . McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for :2:: 15 continuous minutes. SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3. 7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program. CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Pro ram In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 296/275 * * *