ML15033A195: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML15033A195 | | number = ML15033A195 | ||
| issue date = 02/02/2015 | | issue date = 02/02/2015 | ||
| title = | | title = Notification of NRC Initial Operator Licensing Examination 05000483/2015301 | ||
| author name = Gaddy V G | | author name = Gaddy V G | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB |
Revision as of 16:48, 3 April 2019
ML15033A195 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 02/02/2015 |
From: | Vincent Gaddy Operations Branch IV |
To: | Diya F M Union Electric Co |
Gaddy V G | |
References | |
IR 2015001 | |
Download: ML15033A195 (4) | |
See also: IR 05000483/2015301
Text
February 2, 2015
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Union Electric Company
P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301
Dear Mr. Diya:
In a telephone conversation on January 28, 2015, between Messrs. Phillip Swan, Examination
Developer, and Stephen Garchow, Nuclear Regulatory Commission (NRC) Chief Examiner,
arrangements were made for the administration of a licensing retake examination consisting of the Senior Operator portion of the written examination at the Callaway Plant on May 18, 2015.
As agreed during the telephone conversation, the Nuclear Regulatory Commission will provide
written outlines, and your staff will prepare the examinations based on the guidelines in
NUREG-1021, "Operator Licensing Examination Standar
ds for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant
Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examination is administered.
The draft Senior Operator written examination and supporting reference materials identified in
Attachment 3 to ES-201 will be due by April 6, 2015, and final examination materials will be due by April 27, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee, shall approve the examinations before it is submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations, and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary license application, (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
F. Diya - 2 -
number 3150-0090) at least 30 days before the examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the
Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at
817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch Division of Reactor Safety
Docket: 50-483 License: NPF-30
Distribution to Callaway Plant
F. Diya - 2 -
number 3150-0090) at least 30 days before the examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the
Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at
817-200-1159.
Sincerely,
/RA/ Vincent G. Gaddy, Chief
Operations Branch Division of Reactor Safety
Docket: 50-483
License: NPF-30
Distribution to Callaway Plant
DISTRIBUTION
- See next page
R:\_REACTORS\_CW\2015\CW 2015301 RFI-smg.docx ADAMS ACCENSSION NUMBER: ML15033A195 SUNSI Review By: SMG ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE SOE:OB C:OB NAME SGarchow VGaddy SIGNATURE /RA/ /RA/ DATE 02/02/15 02/02/15 OFFICIAL RECORD COPY
Letter to Fadi Diya from Vincent Gaddy, dated February 2, 2015
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301
Distribution
- Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Mike.Langelier@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
CW Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)