Duane Arnold: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
|state=Iowa | |state=Iowa | ||
|town=Palo | |town=Palo | ||
|ISFSI docket=07200032 | |||
|mapping location=42° 6' 3.21" N, 91° 46' 39.34" W | |mapping location=42° 6' 3.21" N, 91° 46' 39.34" W | ||
|company=NextEra Energy | |company=NextEra Energy |
Revision as of 10:33, 11 January 2019
Plant | |
---|---|
Company | NextEra Energy |
Where | Palo, Iowa |
Regulatory | |
Region | NRC Region 3 |
ISFSI docket | 07200032 |
wikipedia link | |
Docket | 05000331 |
---|---|
Licensed Power Level (Thermal) | 1,912 MWt |
Unit type | GE-4 |
Containment | Mark I |
Status | |
NRC Website | |