ENS 43884: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
| event date = 01/06/2008 11:00 EST
| event date = 01/06/2008 11:00 EST
| last update date = 03/04/2008
| last update date = 03/04/2008
| title = Hpci Declared Inoperable Due To Failed Surveillance Test
| title = Hpci Declared Inoperable Due to Failed Surveillance Test
| event text = During HPCI pump operability surveillance in preparation for a system outage, the system failed to achieve rated flow and pressure in the time required by procedure and Tech Specs. The procedural requirement is <49 seconds and the Tech Spec requirement is < 50 seconds. The system achieved rated flow and pressure in 54 seconds.  The system outage has been delayed until troubleshooting plans can be developed and implemented.
| event text = During HPCI pump operability surveillance in preparation for a system outage, the system failed to achieve rated flow and pressure in the time required by procedure and Tech Specs. The procedural requirement is <49 seconds and the Tech Spec requirement is < 50 seconds. The system achieved rated flow and pressure in 54 seconds.  The system outage has been delayed until troubleshooting plans can be developed and implemented.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 22:14, 1 March 2018

ENS 43884 +/- *RETRACTED*
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+-0.63 h-0.0263 days <br />-0.00375 weeks <br />-8.62974e-4 months <br />)
Opened: Tony Spring
15:22 Jan 6, 2008
NRC Officer: Jeff Rotton
Last Updated: Mar 4, 2008
43884 - NRC Website
Loading map...