ENS Event | |
---|---|
13:10 Mar 18, 2013 | |
Title | High Pressure Coolant Injection Inoperable Following Refueling Outage |
Event Description | On 3/18/2013, with the Unit 2 reactor at approximately 165 psig while in Mode 2 (Startup) following a refueling outage, the high pressure coolant injection (HPCI) system was undergoing post-maintenance testing to demonstrate operability of the system following the performance of major system maintenance. The provision allowed by the Technical Specifications was being used to increase reactor pressure above 150 psig for the purpose of performing operability testing and there was reasonable assurance that the HPCI system had been restored to support successful test results. [However, the HPCI system failed to pass operability testing and] as a result of the inability of the HPCI system to function as required during this testing while above 150 psig, HPCI was not capable of performing its safety function. Reactor pressure was decreased below the Technical Specification 3.5.1 LCO Applicability Requirement of 150 psig and work is in progress to make the needed repairs to support returning HPCI to an operable condition.
The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+3.67 h0.153 days <br />0.0218 weeks <br />0.00503 months <br />) | |
Opened: | Kenny Hunter 16:50 Mar 18, 2013 |
NRC Officer: | Donald Norwood |
Last Updated: | Mar 18, 2013 |
48827 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48827\u003C/a\u003E - \u003Ca href=\"/Hatch\" title=\"Hatch\"\u003EHatch\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHigh Pressure Coolant Injection Inoperable Following Refueling Outage\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48827 - Hatch\n","link":"","lat":31.93298888888889,"lon":-82.34381666666667,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
Hatch with 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
WEEKMONTHYEARENS 568962023-12-18T07:23:00018 December 2023 07:23:00
[Table view]10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection System Inoperable ENS 554482021-09-08T05:59:0008 September 2021 05:59:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Unit 1 High Pressure Coolant Injection (HPCI) System Inoperable ENS 546772020-04-22T14:15:00022 April 2020 14:15:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection System (Hpci) Inoperable ENS 542372019-08-23T02:34:00023 August 2019 02:34:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) System Inoperable ENS 539442019-03-19T05:40:00019 March 2019 05:40:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection System Inoperable ENS 525432017-02-08T16:51:0008 February 2017 16:51:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection System Inoperable Due to Degraded Dc to Ac Inverter ENS 500802014-05-02T00:45:0002 May 2014 00:45:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Loss of Hpci Operability Due to Water Accumulation in the Hpci Turbine ENS 488272013-03-18T13:10:00018 March 2013 13:10:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection Inoperable Following Refueling Outage ENS 455412009-12-05T15:59:0005 December 2009 15:59:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Out of Service Due to the Loss of the Suction Auto-Swap Function ENS 448492009-02-12T17:30:00012 February 2009 17:30:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection Suction Source Instrument Malfunction ENS 438842008-01-06T16:00:0006 January 2008 16:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Declared Inoperable Due to Failed Surveillance Test ENS 433742007-05-18T21:45:00018 May 2007 21:45:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Inoperable Hpci Pump ENS 432422007-03-15T19:32:00015 March 2007 19:32:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Declared Inoperable During Startup Testing ENS 432212007-03-08T01:50:0008 March 2007 01:50:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Declared Inoperable Following Surveillance Testing ENS 431532007-02-08T09:32:0008 February 2007 09:32:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) System Inoperable ENS 431522007-02-07T21:40:0007 February 2007 21:40:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolent Injection (Hpci) Declared Inoperable ENS 429142006-10-17T15:21:00017 October 2006 15:21:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Accident Mitigation - Hpci System Inoperable ENS 426572006-06-21T04:15:00021 June 2006 04:15:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) Declared Inoperable Due Excessvie Aux Oil Pump Motor Current ENS 425782006-05-16T13:38:00016 May 2006 13:38:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Inoperable Due to Hpci Discharge Check Valve Body Leak ENS 422622006-01-16T23:31:00016 January 2006 23:31:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci System Isolated Due to Atts Card Failure ENS 408242004-06-17T09:21:00017 June 2004 09:21:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) Declared Inoperable 2023-12-18T07:23:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48827&oldid=85722"