ML14365A133: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 26: Line 26:


Complete NRC Active License Maintenance Log R-109      Page 2 of 53 RO Work History:
Complete NRC Active License Maintenance Log R-109      Page 2 of 53 RO Work History:
Hours  Day Date  Shift Worked Job Position/Assignment Week 1  M 6/30/14 D 12  Unit 1 NSO T 7/1/14  D 12  Extra NSO in control room W  7/2/14  D 12  Unit 2 Admin NSO Th 7/3/14  D 12  Extra NSO in control room F 7/4/14  N/A  Day Off S 7/5/14  N/A  Day Off S 7/6/14  N/A  Day Off  Week 2  M 7/7/14  D 12  Clearance Order Writer T 7/8/14  D 12  Clearance Order Writer W 7/9/14  D 12  Clearance Order Writer Th 7/10/14 D 12  Clearance Order Writer  F 7/11/14 N/A  Day Off  S 7/12/14 N/A  Day Off  S 7/13/14 N/A  Day Off  Week 3  M 7/14/14  N/A  Day Off  T 7/15/14  N/A  Day Off  W 7/16/14    N/A  Day Off  Th 7/17/14  N/A  Day Off  F 7/18/14 D 12  Unit 1 Admin (relieved 2 hrs for NRC physical)
Hours  Day Date  Shift Worked Job Position/Assignment Week 1  M 6/30/14 D 12  Unit 1 NSO T 7/1/14  D 12  Extra NSO in control room W  7/2/14  D 12  Unit 2 Admin NSO Th 7/3/14  D 12  Extra NSO in control room F 7/4/14  N/A  Day Off S 7/5/14  N/A  Day Off S 7/6/14  N/A  Day Off  Week 2  M 7/7/14  D 12  Clearance Order Writer T 7/8/14  D 12  Clearance Order Writer W 7/9/14  D 12  Clearance Order Writer Th 7/10/14 D 12  Clearance Order Writer  F 7/11/14 N/A  Day Off  S 7/12/14 N/A  Day Off  S 7/13/14 N/A  Day Off  Week 3  M 7/14/14  N/A  Day Off  T 7/1 5/14  N/A  Day Off  W 7/16/14    N/A  Day Off  Th 7/17/14  N/A  Day Off  F 7/18/14 D 12  Unit 1 Admin (relieved 2 hrs for NRC physical)
S 7/19/14 D 12  Unit 1 NSO S 7/20/14 D 12  Unit 2 NSO Week 4  M  7/21/14    N/A  Day Off  T 7/22/14  N/A  Day Off  W 7/23/14    N/A  Day Off  Th  7/24/14  N/A  Day Off  F 7/25/14 N 12  Unit 2 Admin (relieved 2 hrs for PHC meeting)  S 7/26/14 N 12  Extra NSO in control room S 7/27/14 N 12  Unit 1 Admin NSO Week 5  M 7/28/14    N/A  Day Off  T 7/29/14 T 8  Requal Training W 7/30/14  T 8  Requal Training Th 7/31/14 T 8  Requal Training F 8/1/14  T 8  Requal Trainin g  S 8/2/14    N/A  Day Off  S 8/3/14    N/A  Day Off  Weeks 6 and 7 8/4/14 thru 8/17/14  N/A  ON VACATION Complete NRC Active License Maintenance Log R-109      Page 3 of 53 RO Work History continued:
S 7/19/14 D 12  Unit 1 NSO S 7/20/14 D 12  Unit 2 NSO Week 4  M  7/21/14    N/A  Day Off  T 7/22/14  N/A  Day Off  W 7/23/14    N/A  Day Off  Th  7/24/14  N/A  Day Off  F 7/25/14 N 12  Unit 2 Admin (relieved 2 hrs for PHC meeting)  S 7/26/14 N 12  Extra NSO in control room S 7/27/14 N 12  Unit 1 Admin NSO Week 5  M 7/28/14    N/A  Day Off  T 7/29/14 T 8  Requal Training W 7/30/14  T 8  Requal Training Th 7/31/14 T 8  Requal Training F 8/1/14  T 8  Requal Trainin g  S 8/2/14    N/A  Day Off  S 8/3/14    N/A  Day Off  Weeks 6 and 7 8/4/14 thru 8/17/14  N/A  ON VACATION Complete NRC Active License Maintenance Log R-109      Page 3 of 53 RO Work History continued:
Hours  Day Date  Shift Worked Job Description Week 8  M 8/18/14    N/A  Day Off  T 8/19/14    N/A  Day Off  W 8/20/14    N/A  Day Off  Th 8/21/14    N/A  Day Off  F 8/22/14 D 12  Clearance Order Writer S 8/23/14 D 12  Unit 2 NSO S 8/24/14 D 12  Unit 2 Admin NSO Week 9  M  8/25/14    N/A  Day Off  T 8/26/14    N/A  Day Off  W 8/27/14    N/A  Day Off  Th  8/28/14    N/A  Day Off  F 8/29/14 N 12  Extra NSO in control room S 8/30/14 N 12  Unit 1 NSO S 8/31/14 N 12  Unit 2 NSO Week 10 M 9/1/14    N/A  Day Off  T 9/2/14  T 8  Requal Training W 9/3/14  T 8  Requal Training Th 9/4/14  T 8  Requal Training F 9/5/14  T 8  Requal Training S 9/6/14    N/A  Day Off  S 9/7/14    N/A  Day Off  Weeks 11 thru 13    9/8/14 thru 9/28/14      ON VACATION Week 14  M 9/29/14 N/A  Day Off  T 9/30/14    N/A  Day Off  W 10/1/14    N/A  Day Off  Th 10/2/14 N/A  Requal Training F 10/3/14 D 12  Unit 1 NSO S 10/4/14    D 12  Unit 1 Admin NSO S 10/5/14    D 12  Unit 2 NSO
Hours  Day Date  Shift Worked Job Description Week 8  M 8/18/14    N/A  Day Off  T 8/19/14    N/A  Day Off  W 8/20/14    N/A  Day Off  Th 8/21/14    N/A  Day Off  F 8/22/14 D 12  Clearance Order Writer S 8/23/14 D 12  Unit 2 NSO S 8/24/14 D 12  Unit 2 Admin NSO Week 9  M  8/25/14    N/A  Day Off  T 8/26/14    N/A  Day Off  W 8/27/14    N/A  Day Off  Th  8/28/14    N/A  Day Off  F 8/29/14 N 12  Extra NSO in control room S 8/30/14 N 12  Unit 1 NSO S 8/31/14 N 12  Unit 2 NSO Week 10 M 9/1/14    N/A  Day Off  T 9/2/14  T 8  Requal Training W 9/3/14  T 8  Requal Training Th 9/4/14  T 8  Requal Training F 9/5/14  T 8  Requal Training S 9/6/14    N/A  Day Off  S 9/7/14    N/A  Day Off  Weeks 11 thru 13    9/8/14 thru 9/28/14      ON VACATION Week 14  M 9/29/14 N/A  Day Off  T 9/30/14    N/A  Day Off  W 10/1/14    N/A  Day Off  Th 10/2/14 N/A  Requal Training F 10/3/14 D 12  Unit 1 NSO S 10/4/14    D 12  Unit 1 Admin NSO S 10/5/14    D 12  Unit 2 NSO


Complete NRC Active License Maintenance Log R-109      Page 4 of 53 TASK TITLE:
Complete NRC Active License Maintenance Log R-109      Page 4 of 53 TASK TITLE:
Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2014 NRC  Task No.:
Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2014 NRC  Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.:
R-AM-075 K/A No.: 2.1.4 Objective No.:
4E.AM-75 K/A IMP: 3.3/3.8  EXAMINEE:   RO EVALUATOR:
4E.AM-75 K/A IMP: 3.3/3.8  EXAMINEE:
RO EVALUATOR:
DATE:
DATE:
The Examinee:
The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 3, 4, 5, 6, 7, 8 APPROX COMPLETION TIME:  10 MINUTES
  (*) 3, 4, 5, 6, 7, 8 APPROX COMPLETION TIME:  10 MINUTES


CRITICAL TIME:
CRITICAL TIME:
N/A EVALUATION METHOD:
N/A EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR     X  CLASSROOM   GENERAL  
X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
rev. 11. 2. 10CFR55.53(
rev. 11. 2. 10CFR55.53(e) MATERIALS:
e) MATERIALS:
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
: 1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.
TASK STANDARDS:
TASK STANDARDS:
Line 69: Line 63:
-AA-105-102, NRC ACTIVE LICENSE MAINTENANCE.
-AA-105-102, NRC ACTIVE LICENSE MAINTENANCE.
CUE: Provide examinee copy of OP-AA-105-102. Refer to OP
CUE: Provide examinee copy of OP-AA-105-102. Refer to OP
-AA-105-102:  Determines Attachment 1 needs to be completed. SAT    UNSAT      N/A Comments:
-AA-105-102:  Determines Attachment 1 needs to be completed. SAT    UNSAT      N/A Comments:   2. Complete upper section of Attachment 1.
: 2. Complete upper section of Attachment 1.
From initiating cue, writes 3 rd quarter of 2014. From initiating cue, writes examinee name and circles ACTIVE license status.
From initiating cue, writes 3 rd quarter of 2014. From initiating cue, writes examinee name and circles ACTIVE license status.
Write employee number.
Write employee number.
SAT    UNSAT      N
SAT    UNSAT      N
/A Comments:
/A Comments: *3. Complete date column of table on  Attachment 1.
*3. Complete date column of table on  Attachment 1.
Note: Any date listed in June or October would not be within the 3 rd quarter of the year, thereby incorrect.
Note: Any date listed in June or October would not be within the 3 rd quarter of the year, thereby incorrect.
Lists at least 5 dates of the shifts listed below, from attached schedule, that count as credited days toward license maintenance.
Lists at least 5 dates of the shifts listed below, from attached schedule, that count as credited days toward license maintenance.
o RO (any 5 of 8) o 7/2/14    D  12  2 o 7/19/14  D  12  1 o 7/20/14  D  12  2 o 7/27/14  N  12  1 o 8/23/14  D  12  2 o 8/24/14  D  12  2 o 8/30/14  N  12  1 o 8/31/14  N  12  2 SAT    UNSAT N/A Comments:
o RO (any 5 of 8) o 7/2/14    D  12  2 o 7/19/14  D  12  1 o 7/20/14  D  12  2 o 7/27/14  N  12  1 o 8/23/14  D  12  2 o 8/24/14  D  12  2 o 8/30/14  N  12  1 o 8/31/14  N  12  2 SAT    UNSAT N/A Comments: *4. Complete shift column of table on Attachment 1.
*4. Complete shift column of table on Attachment 1.
List the shift worked (N or D as applicable)
List the shift worked (N or D as applicable)
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:   *5. Complete length column of table on Attachment 1.
  *5. Complete length column of table on Attachment 1.
List the shift length (12 hours) SAT    UNSAT      N
List the shift length (12 hours) SAT    UNSAT      N
/A Comments:
/A Comments:   *6. Complete unit column of table on  Attachment 1.
  *6. Complete unit column of table on  Attachment 1.
List the applicable unit SAT    UNSAT      N/A Comments:   *7. Complete position and SM log columns on Attachment 1.
List the applicable unit SAT    UNSAT      N/A Comments:
  *7. Complete position and SM log columns on Attachment 1.
Circle the RO position o Circle Y on SM log.
Circle the RO position o Circle Y on SM log.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
Line 93: Line 81:
  *8. Complete signature columns on Attachment 1.
  *8. Complete signature columns on Attachment 1.
Sign under signature.
Sign under signature.
  . SAT    UNSAT      N/A Comments:
  . SAT    UNSAT      N/A Comments:   9. Give completed Attachment 1 to evaluator.
: 9. Give completed Attachment 1 to evaluator.
SAT    UNSAT      N/A Comments:   CUE: THIS COMPLETES THIS JPM.
SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
 
Complete NRC Active License Maintenance Log R-109      Page 7 of 53 ATTACHMENT 1 Active License Tracking Log Page 1 o f 1  Employee Number: ____________
Complete NRC Active License Maintenance Log R-109      Page 7 of 53 ATTACHMENT 1 Active License Tracking Log Page 1 of 1  Employee Number: ____________
SHIFT COVERAGE FOR THE ___3rd__(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF __2014__(YEAR)  ____Examinees Name____      ACTIVE / INACTIVE Name of License Holder License Status At Start (Print)        Quarter (circle one)  RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8
SHIFT COVERAGE FOR THE ___3rd__(1ST, 2ND, 3RD, 4TH) CALENDAR QUARTER OF __2014__(YEAR)  ____Examinees Name____      ACTIVE / INACTIVE Name of License Holder License Status At Start (Print)        Quarter (circle one)  RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8
-hour or 8/12
-hour or 8/12
-hour schedule, enter a "1" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8
-hour schedule, enter a "1" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours length for which turnovers were conducted). Seven shifts at least 8
Line 109: Line 94:
- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours) is satisfied. (NUREG 1021, Revision 9)
DATE SHIFT LENGTH UNIT POSITION (circle one)
DATE SHIFT LENGTH UNIT POSITION (circle one)
SM log SIGNATURE 7/2/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/19/14 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/20/14  D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/27/14  N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/23/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/24/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/30/14 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/31/14 N 12 2 FHS SM US RO Logged Y/N Examinees Signature
SM log SIGNATURE 7/2/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/19/14 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/20/14  D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/27/14  N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/23/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/24/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/30/14 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/31/14 N 12 2 FHS SM US RO Logged Y/N Examinees Signature


At least 5 of the 8 rows above.
At least 5 of the 8 rows above.


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 8 of 53 TASK TITLE:
R-1 1 0     Page 8 of 53 TASK TITLE:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
JPM No.: R-110 REV: 2014 NRC TPO No.: 4C.AP-04 K&A No.: 2.1.31 TASK No.:
JPM No.: R-110 REV: 2014 NRC TPO No.: 4C.AP-04 K&A No.: 2.1.31 TASK No.: R-AP-017, Perform Offsite AC power K&A IMP: 4.6  Availability Surveillance.
R-AP-017, Perform Offsite AC power K&A IMP: 4.6  Availability Surveillance.


EXAMINEE:
EXAMINEE:   RO EVALUATOR:
RO EVALUATOR:
DATE:    The Examinee:
DATE:    The Examinee:
PASSED            this JPM.
PASSED            this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 4, 5, 7, 9 APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME:
  (*) 4, 5, 7, 9 APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME:
45 Minutes
45 Minutes


EVALUATION METHOD:
EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM      IN PLANT        SIMULATE  X  SIMULATOR GENERAL  
X  PERFORM      IN PLANT        SIMULATE  X  SIMULATOR
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 154: Line 132:


Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 9 of 53 RECORD START TIME:
R-1 1 0     Page 9 of 53 RECORD START TIME:
Note:  Only provide cues that are not available in the simulator. Provide a copy of the surveillance.
Note:  Only provide cues that are not available in the simulator. Provide a copy of the surveillance.
PERFORMANCE STEP STANDARD Circle applicable
PERFORMANCE STEP STANDARD Circle applicable
Line 163: Line 141:
-4 Data Sheet, RECORD:  Unit 1 Mode (1).
-4 Data Sheet, RECORD:  Unit 1 Mode (1).
Unit 2 Mode (1).
Unit 2 Mode (1).
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 2. Check 345 KV Transmission Line Status.   
: 2. Check 345 KV Transmission Line Status.   


CUE: All 345 KV Transmission Lines are energized.
CUE: All 345 KV Transmission Lines are energized.
Line 178: Line 155:
Line 2003.
Line 2003.
Line 2004.
Line 2004.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 3. Indicate all closed and open switchyard breakers.
: 3. Indicate all closed and open switchyard breakers.


CUE: All Swyd breakers indicate closed.
CUE: All Swyd breakers indicate closed.
Check status of all 345 KV Swyd breakers.
Check status of all 345 KV Swyd breakers.
On the Data Sheet Drawing of the 345 KV swyd, INDICATE:
On the Data Sheet Drawing of the 345 KV swyd, INDICATE:   Closed breakers with 'X'.
Closed breakers with 'X'.
o Open breakers with 'O'.
o Open breakers with 'O'.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *4. Trace paths for independent power sources to the Unit 1 and 2 SATs.
*4. Trace paths for independent power sources to the Unit 1 and 2 SATs.
CUE: All 345 KV Transmission Lines are energized.
CUE: All 345 KV Transmission Lines are energized.
On the Data Sheet Drawing of the 345 KV Swyd, TRACE:  Single path along the dashed lines from any energized offsite power source to the Unit 1 SAT banks.
On the Data Sheet Drawing of the 345 KV Swyd, TRACE:  Single path along the dashed lines from any energized offsite power source to the Unit 1 SAT banks.
Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Can't retrace any portion of the first path). o Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.
Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Can't retrace any portion of the first path). o Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 10 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-1 1 0     Page 10 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 11 of 53  PERFORMANCE STEP STANDARD Circle applicable
R-1 1 0     Page 11 of 53  PERFORMANCE STEP STANDARD Circle applicable
  *5. Verify Normal (Bus 4) and Alternate (Bus 14) power are energized.
  *5. Verify Normal (Bus 4) and Alternate (Bus 14) power are energized.
CUE: Bus 4 alive light is lit.
CUE: Bus 4 alive light is lit.
Line 206: Line 179:
'ENERGIZED' in step 1.7.
'ENERGIZED' in step 1.7.
Place 'Xs' under 'YES' in steps 1.8 and 1.9.
Place 'Xs' under 'YES' in steps 1.8 and 1.9.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 6. Determine status of Normal and Alternate Power SATs
: 6. Determine status of Normal and Alternate Power SATs


CUE: All X and Y windings for both SATs at each unit are energized At 0PM03J, 1PM01J and 2PM01J, on the Modes 1
CUE: All X and Y windings for both SATs at each unit are energized At 0PM03J, 1PM01J and 2PM01J, on the Modes 1
-4 Data Sheet, OBSERVE and RECORD STATUS:  X or Y winding AC MW and AC amperes indications for each SAT at each unit.
-4 Data Sheet, OBSERVE and RECORD STATUS:  X or Y winding AC MW and AC amperes indications for each SAT at each unit.
SAT MOD indications.
SAT MOD indications.
Place X in 'ENERGIZED' column. SAT    UNSAT      N/A Comments:
Place X in 'ENERGIZED' column. SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 12 of 53 *7. Determine availability status of Normal and Alternate supply breakers to each Unit 1 4160V ESF bus:
R-1 1 0     Page 12 of 53 *7. Determine availability status of Normal and Alternate supply breakers to each Unit 1 4160V ESF bus:
CUE: 1412 CLOSED 1414 NAT (normal after trip)
CUE: 1412 CLOSED 1414 NAT (normal after trip)


Line 240: Line 211:
ACB 2422 (X in Closed Box).
ACB 2422 (X in Closed Box).
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-110     Page 13 of 53  PERFORMANCE STEP STANDARD Circle applicable
R-1 1 0     Page 13 of 53  PERFORMANCE STEP STANDARD Circle applicable
: 8. Determine supply configuration to the 4160V ESF buses.
: 8. Determine supply configuration to the 4160V ESF buses.
CUE: All normal ESF bus feed breakers indicate closed, all crosstie breakers are available.
CUE: All normal ESF bus feed breakers indicate closed, all crosstie breakers are available.
On the Modes 1
On the Modes 1
-4 Data Sheet, OBSERVE and RECORD STATUS:  ESF BUS 141 (X in FROM SAT 142-1 box). ESF Bus 142 (X in FROM SAT 142-2 box). ESF BUS 241 (X in FROM SAT 242-1 box). ESF BUS 242 (X in FROM SAT 242-2 box). SAT    UNSAT      N/A Comments:
-4 Data Sheet, OBSERVE and RECORD STATUS:  ESF BUS 141 (X in FROM SAT 142-1 box). ESF Bus 142 (X in FROM SAT 142-2 box). ESF BUS 241 (X in FROM SAT 242-1 box). ESF BUS 242 (X in FROM SAT 242-2 box). SAT    UNSAT      N/A Comments: *9. Determine capabilities of Unit 1 and Unit 2 SATs to supply Unit 1 ESF buses.
*9. Determine capabilities of Unit 1 and Unit 2 SATs to supply Unit 1 ESF buses.
Step F.3.0 will be completed by another NSO.
Step F.3.0 will be completed by another NSO.
After Reviewing the status of the sources and configuration, on the Modes 1-4 Data sheet, RECORD STATUS:  Unit 1 SAT capable of supplying bus 141 (X in 'YES' box in step 1.13).
After Reviewing the status of the sources and configuration, on the Modes 1-4 Data sheet, RECORD STATUS:  Unit 1 SAT capable of supplying bus 141 (X in 'YES' box in step 1.13).
Line 254: Line 223:
Unit 2 SAT NOT capable of supplying bus 142 (X in 'NO' box in step 1.16).
Unit 2 SAT NOT capable of supplying bus 142 (X in 'NO' box in step 1.16).
o Step F.3.0.
o Step F.3.0.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *10. Notify US/SM of failure to meet acceptance criteria.
*10. Notify US/SM of failure to meet acceptance criteria.
CUE: As SM/US, acknowledge failure.
CUE: As SM/US, acknowledge failure.
Record time that examinee reports failure to meet Acceptance Criteria / need to initiate LCOAR 1BwOL 3.8.1:  __________
Record time that examinee reports failure to meet Acceptance Criteria / need to initiate LCOAR 1BwOL 3.8.1:  __________
Line 263: Line 231:
  (end time)        (start time) 45 minutes. NOTIFY US/SM of failure to meet Acceptance Criteria /
  (end time)        (start time) 45 minutes. NOTIFY US/SM of failure to meet Acceptance Criteria /
need to initiate LCOAR 1BwOL 3.8.1, within 45 minutes of time given in Task Conditions.
need to initiate LCOAR 1BwOL 3.8.1, within 45 minutes of time given in Task Conditions.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: CUE:  THIS COMPLETES THIS JPM.
CUE:  THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:


Line 281: Line 248:
R-200 Page 15 of 53 TASK TITLE:
R-200 Page 15 of 53 TASK TITLE:
Verify Worker Tagout Checklist.
Verify Worker Tagout Checklist.
JPM No.: R-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.:
JPM No.: R-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Obje ctive No.: R-AM-010 K&A IMP: 3.9 EXAMINEE:   RO EVALUATOR:
R-AM-010 K&A IMP: 3.9 EXAMINEE:
RO EVALUATOR:
DATE:
DATE:
The Examinee:
The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 4, 6 APPROX COMPLETION TIME:  30 MINUTES CRITICAL TIME:
  (*) 4, 6 APPROX COMPLETION TIME:  30 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD:
N/A EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR     X  CLASSROOM   GENERAL  
X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 327: Line 289:
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
-10, step F.3. SAT    UNSAT      N/A Comments:
-10, step F.3. SAT    UNSAT      N/A Comments:   2. Refer to Drawing:
: 2. Refer to Drawing:
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
-138, sheet 5B. Refer to M
-138, sheet 5B.
-138, sheet 5B.
Refer to M
SAT    UNSAT      N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.
-138, sheet 5B.
SAT    UNSAT      N/A Comments:
: 3. Verify the clearance BOUNDARY for 2CV03F.
Determines clearance boundary valves selected ar e correct:  2CV129 C/S, Demin Hi Temp Divert Valve.
Determines clearance boundary valves selected ar e correct:  2CV129 C/S, Demin Hi Temp Divert Valve.
2CV8421, RC Filter Bypass Valve.
2CV8421, RC Filter Bypass Valve.
Line 340: Line 299:
2CV8422, RC Filter Outlet Isol Valve.
2CV8422, RC Filter Outlet Isol Valve.
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 18 of 53  EVALUATOR NOTE:  The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
R-200 Page 18 of 53  EVALUATOR NOTE:  The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
Line 358: Line 316:
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 5. Verify the tag type for 2CV 03F. Verifies clearance tag type:
: 5. Verify the tag type for 2CV 03F. Verifies clearance tag type:
2CV129 C/S, Demin Hi Temp Divert Valve  
2CV129 C/S, Demin Hi Temp Divert Valve  
- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve  
- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve  
- RD. 2CV8422 RC Filter Outlet Isol Valve  
- RD. 2CV8422 RC Filter Outlet Isol Valve  
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Ven t Valve - RI. SAT    UNSAT      N/A Comments:
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Ven t Valve - RI. SAT    UNSAT      N/A Comments:
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.
R-200 Page 19 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
R-200 Page 19 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Line 375: Line 331:
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve  
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve  
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:       CUE: THIS COMPLETES THIS JPM. RECORD STOP TIME:   
CUE: THIS COMPLETES THIS JPM. RECORD STOP TIME:   


COMMENTS:
COMMENTS:


Perform Offsite Notification (NARS Form Transmittal) for General Emergency R-403      Page 20 of 53 JOB PERFORMANCE MEASURE TASK TITLE:
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 20 of 53 JOB PERFORMANCE MEASURE TASK TITLE:
Perform Offsite Notification (NARS Form Transmittal) for General Emergency JPM No.: R-403 REV: NRC 2014 TPO No.: 4F.ZP-02 K&A No.: 2.4.43 TASK No.:
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency JPM No.: R-40 3 REV: NRC 201 4 TPO No.: 4F.ZP-02 K&A No.: 2.4.43 TASK No.: R-ZP-004 K&A IMP: 3.2/3.8  EXAMINEE:   RO  EVALUATOR:
R-ZP-004 K&A IMP: 3.2/3.8  EXAMINEE:
RO  EVALUATOR:
DATE:  The Examinee:
DATE:  The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES CRITICAL ELEMENTS:
MINUTES CRITICAL ELEMENTS:
  (*) 3, 4 APPROX COMPLETION TIME:    10 MINUTES
  (*) 3, 4 APPROX COMPLETION TIME:    10 MINUTES


Line 396: Line 347:


EVALUATION METHOD:
EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM      IN PLANT        SIMULATE  _  SIMULATOR     X  CLASSROOM GENERAL  
X  PERFORM      IN PLANT        SIMULATE  _  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 419: Line 369:
: 3. Inform the Shift Manager when the NARS form has been transmitted.
: 3. Inform the Shift Manager when the NARS form has been transmitted.


Perform Offsite Notification (NARS Form Transmittal) for General Emergency R-403      Page 21 of 53 RECORD START TIME:
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 21 of 53 RECORD START TIME:
EVALUATOR NOTE:  Provide examinee the completed NARS form and copy of EP
EVALUATOR NOTE:  Provide examinee the completed NARS form and copy of EP
-MW-114-100-F-01. EVALUATOR NOTE:  JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form. PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
-MW-114-100-F-01. EVALUATOR NOTE:  JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form. PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Line 426: Line 376:
Refer to EP
Refer to EP
-MW-114-100:  Determine step 4.2 needs to be performed.
-MW-114-100:  Determine step 4.2 needs to be performed.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 2 Refer to EP
2 Refer to EP
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. Refer to EP
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. Refer to EP
-MW-114-100-F-01:  Determine NARS Code 38 to be used to transmit NARS form.
-MW-114-100-F-01:  Determine NARS Code 38 to be used to transmit NARS form.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
 
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 22 of 53 *3. Establish communications:
Perform Offsite Notification (NARS Form Transmittal) for General Emergency R-403      Page 22 of 53 *3. Establish communications:
No te: After examinee dials Code 38 , provide the following cue:
Note: After examinee dials Code 38, provide the following cue:
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
NOTE:  If Examinee dials Code 20 (which is  
NOTE:  If Examinee dials Code 20 (which is  
Line 445: Line 393:


the following cue:
the following cue:
CUE Code 38: IEMA online,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once stops after initial roll call is complete critical time STOPS:
CUE Code 38: IEMA online ,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once stops after initial roll call is complete critical time STOPS:
Establish communications as follows:  Pick up NARS phone.
Establish communications as follows:  Pick up NARS phone.
DIAL code 38
DIAL code 38
. Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message."
. Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Call Mark Initial Boxes for  IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC  Grundy Co. E MA  Kankakee Co. EOC Will Co. EOC.
o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Call Mark Initial Boxes for  IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC  Grundy Co. E MA  Kankakee Co. EOC Will Co. EOC.
o Record time and date initial roll call complete.
o Record time and date initial roll call complete.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: EVALUATOR NOTE:  Critical time TIME STOPS after initial roll call is complete on the back of the NARS form. Determine critical time:
EVALUATOR NOTE:  Critical time TIME STOPS after initial roll call is complete on the back of the NARS form. Determine critical time:
_________________________    -    ________________________    =    ________________________
_________________________    -    ________________________    =    ________________________
  (Initial roll call complete)                    (JPM start time)                                         
  (Initial roll call complete)                    (JPM start time)                                         
< 13 minutes
< 13 minutes


Perform Offsite Notification (NARS Form Transmittal) for General Emergency R-403      Page 23 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 23 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
  *4. Verbally transmit the NARS Form. Verbally transmit the NARS Form:  Utility Message No:
  *4. Verbally transmit the NARS Form. Verbally transmit the NARS Form:  Utility Message No:
1_  State Message No: N/A  Status - [B] Drill/Exercise Station - [A] Braidwood Onsite Condition  
1_  State Message No: N/A  Status - [B] Drill/Exercise Station - [A] Braidwood Onsite Condition  
- [D] General Emergency Accident Classified:
- [D] G eneral Emergency Accident Classified:
Time: Two minutes ago.
Time: Two minutes ago.
Date: Today. EAL # : MG1 Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
Date: Today. EAL # : M G1 Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
270  Wind Speed:
270  Wind Speed:
o [A] is N/A  
o [A] is N/A  
Line 468: Line 414:
:  [D] 1, 3, 10 (Block 10) Additional Information:
:  [D] 1, 3, 10 (Block 10) Additional Information:
None Verified With: U. Supervisor Approved By: S. Manager SAT    UNSAT      N/A Comments:
None Verified With: U. Supervisor Approved By: S. Manager SAT    UNSAT      N/A Comments:
 
Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403      Page 24 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Perform Offsite Notification (NARS Form Transmittal) for General Emergency R-403      Page 24 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
: 5. Complete the NARS form.
: 5. Complete the NARS form.
CUE: IF examinee asks for a phone number to use, provide: outside line is 815-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
CUE: IF examinee asks for a phone number to use, provide: outside line is 815-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message Organization (IEMA)
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message Organization (IEMA)
Current time Today's date SAT    UNSAT      N/A Comments:
Current time Today's date SAT    UNSAT      N/A Comments: 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
: 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.
CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online  Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.
PERFORM Final Roll Call and marks boxes for:
PERFORM Final Roll Call and marks boxes for:
IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA, Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA,   Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 7. STATE "NARS communication is complete."
: 7. STATE "NARS communication is complete."
STATE "NARS communication is complete."
STATE "NARS communication is complete."
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:   CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Review Calorimetric Surveillance S-100 Page 25 of 53 TASK TITLE:  Review Calorimetric Surveillance JPM No.:
Review Calorimetric Surveillance S-100 Page 25 of 53 TASK TITLE:  Review Calorimetric Surveillance JPM No.:
S-100  REV:  NRC 2014 TPO No.:  4C.NI
S-100  REV:  NRC 2014 TPO No.:  4C.NI
-05  K&A No.: 2.1.7 TASK No.:  NI
-05  K&A No.: 2.1.7 TASK No.:  NI
-004 Perform calorimetric calculation K&A IMP: 4.7 ADMIN:  CONDUCT OF OPS EXAMINEE:
-004 Perform calorimetric calculation K&A IMP: 4.7 ADMIN:  CONDUCT OF OPS EXAMINEE:     SRO  EVALUATOR:
SRO  EVALUATOR:
DATE:
DATE:
The Examinee:
The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
CRITICAL ELEMENTS:  
CRITICAL ELEMENTS:  
  (*) 2,3  JPM TIME:
  (*) 2,3  JPM TIME: MINUTE S CRITICAL TIME:
MINUTES CRITICAL TIME:
NA  APPROX COMPLETION TIME
NA  APPROX COMPLETION TIME
: 10 MINUTES  EVALUATION METHOD:
: 10 MINUTES  EVALUATION METHOD:
LOCATION:
LOCATION:     X  PERFORM          IN PLANT          SIMULATE      X  SIMULATOR       X  CLASSROOM GENERAL  
X  PERFORM          IN PLANT          SIMULATE      X  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 525: Line 462:
: 1. Refer to completed 1BwOSR 3.3.1.2-1. CUE:  Ensure calorimetric surveillance is handed to examinee with the printout of th e calorimetric data.
: 1. Refer to completed 1BwOSR 3.3.1.2-1. CUE:  Ensure calorimetric surveillance is handed to examinee with the printout of th e calorimetric data.
CUE:  All Prerequisites were met. CUE: (if performed in classroom)
CUE:  All Prerequisites were met. CUE: (if performed in classroom)
CB-C at 226 steps, CB
CB-C at 226 steps, CB-D at 220 steps.
-D at 220 steps.
Review the data sheet for completeness/errors for blocks 1 and 2:
Review the data sheet for completeness/errors for blocks 1 and 2:
Date: Today Time: 10 minutes ago Mwe Gross: Current Control Bank Position NSO's Signature
Date: Today Time: 10 minutes ago Mwe Gross: Current Control Bank Position NSO's Signature


SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: *2. Review blocks 3, 5, 6 and 7.
*2. Review blocks 3, 5, 6 and 7.


Note:  If asked, the plant calorimetric printout from the computer show 99.51% (same as recorded in block 5)
Note:  If asked, the plant calorimetric printout from the computer show 99.51% (same as recorded in block 5)
Line 554: Line 489:
-42)  Block 6 fourth line change to  
-42)  Block 6 fourth line change to  
-1.0 (N-44)  Block 7 check "YES" for NR-44 SAT    UNSAT      N/A Comments:
-1.0 (N-44)  Block 7 check "YES" for NR-44 SAT    UNSAT      N/A Comments:
S-100 Page 27 of 53  PERFORMANCE STEP STANDARD Circle Applicable
S-100 Page 27 of 53  PERFORMANCE STEP STANDARD Circle Applicable
  *3. Verify the power adjustment calculation for channel N
  *3. Verify the power adjustment calculation for channel N
Line 569: Line 503:
o VERIFY the corrected calculated power difference from block 6 in block 9. o VERIFY/SUBTRACT the power difference from the present indicated power and the value as the Power to adjust the NIS channels to in block 10.
o VERIFY the corrected calculated power difference from block 6 in block 9. o VERIFY/SUBTRACT the power difference from the present indicated power and the value as the Power to adjust the NIS channels to in block 10.
SRO Makes the following changes:  N-42:  changes block 9 to + 2.0 and block 10 to 99.5. N-44:  changes block 8 to 98.5, changes block 9 to -1.0 and changes block 10 to 99.5
SRO Makes the following changes:  N-42:  changes block 9 to + 2.0 and block 10 to 99.5. N-44:  changes block 8 to 98.5, changes block 9 to -1.0 and changes block 10 to 99.5
. SAT    UNSAT      N/A Comments:
. SAT    UNSAT      N/A Comments:  
 
   (CUE:) THIS COMPLETES THIS JPM.
   (CUE:) THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME
__________  
__________  


COMMENTS:
COMMENTS:  


Perform Shutdown Margin Calculation S-112        Page 28 of 53 TASK TITLE:
Perform Shutdown Margin Calculation S-112        Page 28 of 53 TASK TITLE:
Perform Shutdown Margin Calculation JPM No.: S-112 REV: NRC 2014 Task No.:
Perform Shutdown Margin Calculation JPM No.: S-112 REV: NRC 2014 Task No.: S-AM-123 K/A No.: 2.1.25 Objective No.: 7E.AM-123-A K/A IMP: 4.2  EXAMINEE:   S RO EVALUATOR:
S-AM-123 K/A No.: 2.1.25 Objective No.:
7E.AM-123-A K/A IMP: 4.2  EXAMINEE:
SRO EVALUATOR:
DATE:  The Examinee:
DATE:  The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES CRITICAL ELEMENTS:
MINUTES CRITICAL ELEMENTS:
  (*) 4, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:
  (*) 4, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:
45 minutes EVALUATION METHOD:
45 minutes EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM  X  IN PLANT        SIMULATE      SIMULATOR     _  CLASSROOM GENERAL  
X  PERFORM  X  IN PLANT        SIMULATE      SIMULATOR
_  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 628: Line 554:
CUE: All Prerequisites, Precautions, Limitations and Actions are met.
CUE: All Prerequisites, Precautions, Limitations and Actions are met.
Refer to 1BwOSR 3.1.1.1
Refer to 1BwOSR 3.1.1.1
-2. SAT    UNSAT      N/A Comments:
-2. SAT    UNSAT      N/A Comments: 2. Review Present Conditions: (step F.1)  Note:  NO errors present on step F.1. Review the following from initiating cue for completeness and/or errors
: 2. Review Present Conditions: (step F.1)  Note:  NO errors present on step F.1. Review the following from initiating cue for completeness and/or errors
:  Date and Time:  Current Date and 10 minutes ago Core Average Burnup:  13,000 EFPH  Core Average Temperature:
:  Date and Time:  Current Date and 10 minutes ago Core Average Burnup:  13,000 EFPH  Core Average Temperature:
587F Power Level:
587 F Power Level:
100%  Present Boron Concentration:
100%  Present Boron Concentration:
300 ppm  SAT    UNSAT      N/A Comments:
300 ppm  SAT    UNSAT      N/A Comments:
Perform Shutdown Margin Calculation S-112        Page 30 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Perform Shutdown Margin Calculation S-112        Page 30 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
: 3. Review total worth due to rods (step F.2)
: 3. Review total worth due to rods (step F.2)
Note:  NO errors present on step F.2  NOTE: Examinee may refer to BwCB-1, Figure 2c for an expanded scale of Figure 2 control bank D rod worth. NOTE: Examinee must refer to correct figure and burn up range. BwCB-1, Figures 2 & 2c are for Hot Full Power and Figures 2a and 2d are for Hot Zero Power. From initiating cue, Unit 1 is at 100% power
Note:  NO errors present on step F.2  NOTE: Examinee may refer to BwCB-1, Figure 2c for an expanded scale of Figure 2 control bank D rod worth. NOTE: Examinee must refer to correct figure and burn up range. BwCB-1 , Figures 2 & 2c are for Hot Full Power and Figures 2a and 2d are for Hot Zero Power. From initiating cue, Unit 1 is at 100% power
. Review total worth due to rods by performing the following:
. Review total worth due to rods by performing the following:
o Review control bank position:  Bank D @ 220 steps (from initiating cue).
o Review control bank position:  Bank D @ 220 steps (from initiating cue).
o Review control bank D inserted worth by performing the following:
o Review control bank D inserted worth by performing the following:
o Refer to BwCB
o Refer to BwCB
-1, Figure 2 for burn up range. o Record control bank D inserted worth:
-1 , Figure 2 for burn up range. o Record control bank D inserted worth:
15 pcm  10 pcm. o Review total available control bank worth by performing the following:
1 5 pcm  10 pcm. o Review total available control bank worth by performing the following:
o Refer to BwCB
o Refer to BwCB
-1, Table 4-1 for control bank worth for burn up.
-1 , Table 4-1 for control bank worth for burn up.
o Determine control bank total worth:  3308.6 pcm. o Subtract control bank D  
o Determine control bank total worth:  3308.6 pcm. o Subtract control bank D  


Line 651: Line 575:
- 15 pcm ( 10 pcm)  = 3293.6 pcm ( 10 pcm). o Review total worth due to rods by performing the following:
- 15 pcm ( 10 pcm)  = 3293.6 pcm ( 10 pcm). o Review total worth due to rods by performing the following:
o Refer to BwCB
o Refer to BwCB
-1, Table 4-1 for shutdown bank worth for burn up range. o Determine shutdown bank total worth:  3648.2 pcm. o Review total rod worth by performing the following:
-1 , Table 4-1 for shutdown bank worth for burn up range. o Determine shutdown bank total worth:  3648.2 pcm. o Review total rod worth by performing the following:
o Add shutdown bank total worth to available control bank worth:  3648.2 pcm + 3293.6 pcm ( 10 pcm) = 6941.8 pcm ( 10 pcm)  SAT    UNSAT      N/A Comments:
o Add shutdown bank total worth to available control bank worth:  3648.2 pcm + 3293.6 pcm ( 10 pcm) = 6941.8 pcm ( 10 pcm)  SAT    UNSAT      N/A Comments:
Perform Shutdown Margin Calculation S-112        Page 31 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Perform Shutdown Margin Calculation S-112        Page 31 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
  *4. Review actual reactivity available due to rods (step F.3)
  *4. Review actual reactivity available due to rods (step F.3)
Line 662: Line 585:
o Review the number of immovable and/or untrippable control rods:
o Review the number of immovable and/or untrippable control rods:
1 (from initiating cue) o Review highest stuck rod worth by performing the following:
1 (from initiating cue) o Review highest stuck rod worth by performing the following:
o Refer to BwC B-1, Table 4-1 for highest stuck rod worth for burn  
o Refer to BwC B-1 , Table 4-1 for highest stuck rod worth for burn  


up. Determine and record highest stuck rod worth is incorrect at 967.2 and the correct value is:  1044.6 pcm
up. Determine and record highest stuck rod worth is incorrect at 967.2 and the correct value is:  1044.6 pcm
. o Review immovable
. o Review immovable /untrippable rod worth by performing the following:
/untrippable rod worth by performing the following:
o Multiply the number of immovable or untrippable control rods by 2000 pcm:  1 X 2000 pcm = 2000 pcm. o Review actual reactivity available due to rods by performing the following::
o Multiply the number of immovable or untrippable control rods by 2000 pcm:  1 X 2000 pcm = 2000 pcm. o Review actual reactivity available due to rods by performing the following::
Subtract immovable
Subtract immovable
  /untrippable rod worth and highest stuck rod worth from total rod worth and determine
  /untrippable rod worth and highest stuck rod worth from total rod worth and determine


that 6941.8 pcm ( 10 pcm) - 2000 pcm  
that 6941.8 pcm ( 10 pcm) - 2000 pcm - 967.2 pcm = 3974.6 pcm ( 10 pcm) is incorrect and it should be:  6941.8 pcm ( 10 pcm) - 2000 pcm - 1044.6 pcm
- 967.2 pcm = 3974.6 pcm ( 10 pcm) is incorrect and it should be:  6941.8 pcm ( 10 pcm) - 2000 pcm  
- 1044.6 pcm
  = 3897.2 pcm ( 10 pcm). SAT    UNSAT      N/A Comments:
  = 3897.2 pcm ( 10 pcm). SAT    UNSAT      N/A Comments:
Perform Shutdown Margin Calculation S-112        Page 32 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 5. Review current Power Defect (step F.4) Note:  NO errors present on step F.4    Review the current power defect for boron concentration and power level by performing the following:
Perform Shutdown Margin Calculation S-112        Page 32 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 5. Review current Power Defect (step F.4) Note:  NO errors present on step F.4    Review the current power defect for boron concentration and power level by performing the following:
Refer to BwCB
Refer to BwCB
-1, Figure 17A for power defect for burn up. Review power defect:
-1, Figure 17A for power defect for burn up. Review power defect:
2667  50 pcm. OR  Refer to BwCB
2667  50 pcm. OR  Refer to BwCB
-1, Table 2
-1, Table 2-1 for power defect for burn up range of 6466.8 EFPH.
-1 for power defect for burn up range of 6466.8 EFPH.
Review power defect:
Review power defect:
2667 pcm. SAT    UNSAT      N/A Comments:
2667 pcm. SAT    UNSAT      N/A Comments:
Perform Shutdown Margin Calculation S-112        Page 33 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Perform Shutdown Margin Calculation S-112        Page 33 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
  *6. Review Shutdown Margin Verification (step F.5)
  *6. Review Shutdown Margin Verification (step F.5)
NOTE: Review value of available shutdown margin and determine that it is incorrect (1307.6 pcm) and the correct value should be
NOTE: Review value of available shutdown margin and determine that it is incorrect (1307.6 pcm) and the correct value should be:  (1230.2 pcm  60 pcm)  NOTE: Review value of minimum required shutdown margin and determine tha t 1.0% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value should be: 1.3% k/k x 1000 pcm/% k/k = 1300 pcm. NOTE: 1230.2 pcm  60 pcm < 1300 pcm is correct. If examinee only catches the shutdown margin limit of 1000 pcm instead of 1300 pcm shutdow n margin will still be adequate  1307.6 pcm  
:  (1230.2 pcm  60 pcm)  NOTE: Review value of minimum required shutdown margin and determine tha t 1.0% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value should be: 1.3% k/k x 1000 pcm/% k/k = 1300 pcm. NOTE: 1230.2 pcm  60 pcm < 1300 pcm is correct. If examinee only catches the shutdown margin limit of 1000 pcm instead of 1300 pcm shutdow n margin will still be adequate  1307.6 pcm  
> 1300 pcm or if the examinee catches only the highest stuck rod worth shutdown margin will still be inadequate 1230.2 > 1000 pcm. NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin. Record time that examinee reports unacceptable shutdown margin or completes surveillance:  __________
> 1300 pcm or if the examinee catches only the highest stuck rod worth shutdown margin will still be inadequate 1230.2 > 1000 pcm.
NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin. Record time that examinee reports unacceptable shutdown margin or completes surveillance:  __________
Critical time =
Critical time =
_________   
_________   
Line 697: Line 612:
. VERIFY Shutdown Margin by performing the following:
. VERIFY Shutdown Margin by performing the following:
Review total corrected rod worth to power defect and determine that 3974.6 pcm ( 10 pcm) +   
Review total corrected rod worth to power defect and determine that 3974.6 pcm ( 10 pcm) +   
-2667 ( 50 pcm). = 1307.6 pcm ( 60 pcm) is incorrect and it should be
-2667 ( 50 pcm). = 1307.6 pcm ( 60 pcm) is incorrect and it should be:  3897.2 pcm ( 10 pcm) +   
:  3897.2 pcm ( 10 pcm) +   
-2667 ( 50 pcm). = 1230.2 pcm ( 60 pcm). o Refer to TRM for Unit 1 COLR. Review the Shutdown Margin Limit for Modes 1 and 2 from the COLR and determine that 1.0
-2667 ( 50 pcm). = 1230.2 pcm ( 60 pcm). o Refer to TRM for Unit 1 COLR. Review the Shutdown Margin Limit for Modes 1 and 2 from the COLR and determine that 1.0
% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value is
% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value is
Line 704: Line 618:
1300 pcm  Determine shutdown margin is unacceptable within 45 minutes of JPM start time
1300 pcm  Determine shutdown margin is unacceptable within 45 minutes of JPM start time
. o Determine 1BwOSR 3.1.1.1-2 is complete.
. o Determine 1BwOSR 3.1.1.1-2 is complete.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE


Perform Shutdown Margin Calculation S-112        Page 34 of 53 *7. Review LCO 3.1.4 or 1BwOL 3.1.4. Note:  Hand examinee copy of 1BwOL 3.1.4 if asked for.
Perform Shutdown Margin Calculation S-112        Page 34 of 53 *7. Review LCO 3.1.4 or 1BwOL 3.1.4. Note:  Hand examinee copy of 1BwOL 3.1.4 if asked for.
Determine that boration is required to be initiated to restore SDM.
Determine that boration is required to be initiated to restore SDM.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Verify Worker Tagout Checklist. S-200 Page 35 of 53 TASK TITLE:
Verify Worker Tagout Checklist. S-200 Page 35 of 53 TASK TITLE:
Verify Worker Tagout Checklist. JPM No.: S-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.:
Verify Worker Tagout Checklist. JPM No.: S-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.:
R-AM-010 K&A IMP: 4.3  EXAMINEE:
R-AM-010 K&A IMP: 4.3  EXAMINEE:   SRO  EVALUATOR:
SRO  EVALUATOR:
DATE:
DATE:
The Examinee:
The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:  MINUTES  CRITICAL ELEMENTS:
JPM TIM E:  MINUTES  CRITICAL ELEMENTS:
  (*) 4, 6, 7 APPROX COMPLETION TIME:  30 MINUTES CRITICAL TIME:
  (*) 4, 6 , 7 APPROX COMPLETION TIME:  30 MINUTES CRITICAL TIME:
N/A EVALUATION METHOD:
N/A EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR     X  CLASSROOM GENERAL  
X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 744: Line 652:
: 9. Determine the sequence of isolation points for 2CV03F is incorrect.
: 9. Determine the sequence of isolation points for 2CV03F is incorrect.
TASK CONDITIONS:
TASK CONDITIONS:
: 1. You are an extra supervisor on shift.
: 1. You are an extra supervisor on shift. 2. Unit 2 is at 100% power.
: 2. Unit 2 is at 100% power.
: 3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
: 3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
: 4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV
: 4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV
Line 759: Line 666:
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV
-10, step F.3. SAT    UNSAT      N/A Comments:
-10, step F.3. SAT    UNSAT      N/A Comments:   2. Refer to Drawing:
: 2. Refer to Drawing:
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M
-138, sheet 5B. Refer to M
-138, sheet 5B.
-138, sheet 5B.
Refer to M
SAT    UNSAT      N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.
-138, sheet 5B.
SAT    UNSAT      N/A Comments:
: 3. Verify the clearance BOUNDARY for 2CV03F.
Determines clearance boundary valves selected are correct:  2CV129 C/S, Demin Hi Temp Divert Valve.
Determines clearance boundary valves selected are correct:  2CV129 C/S, Demin Hi Temp Divert Valve.
2CV8421, RC Filter Bypass Valve.
2CV8421, RC Filter Bypass Valve.
Line 772: Line 676:
2CV8422, RC Filter Outlet Isol Valve.
2CV8422, RC Filter Outlet Isol Valve.
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT    UNSAT      N/A Comments:
Verify Worker Tagout Checklist. S-200 Page 38 of 53  EVALUATOR NOTE:  The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
Verify Worker Tagout Checklist. S-200 Page 38 of 53  EVALUATOR NOTE:  The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4
  & 6. EVALUATOR NOTE:  The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
  & 6. EVALUATOR NOTE:  The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.
Line 789: Line 692:
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 4. 2CV8425 RC Filter Inlet Isol Valve.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
: 5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 5. Verify the tag type for 2CV03F.
: 5. Verify the tag type for 2CV03F.
Verifies clearance tag type:
Verifies clearance tag type:
2CV129 C/S, Demin Hi Temp Divert Valve  
2CV129 C/S, Demin Hi Temp Divert Valve  
Line 796: Line 698:
- RD. 2CV8422 RC Filter Outlet Isol Valve  
- RD. 2CV8422 RC Filter Outlet Isol Valve  
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Vent Valve - RI. SAT    UNSAT      N/A Comments:
- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Vent Valve - RI. SAT    UNSAT      N/A Comments:
Verify Worker Tagout Checklist. S-200 Page 39 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
Verify Worker Tagout Checklist. S-200 Page 39 of 53  PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
  *6. Determine the clearance POSITION for the 2CV03F is incorrect.
  *6. Determine the clearance POSITION for the 2CV03F is incorrect.
Line 807: Line 708:
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve  
- CLOSED. 2CV8422 RC Filter Outlet Isol Valve  
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:   *7. Authorize the clearance order.
  *7. Authorize the clearance order.
Sign the WTO Authorization signature.
Sign the WTO Authorization signature.
o Fill in the date and time.
o Fill in the date and time.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:     CUE: THIS COMPLETES THIS JPM.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
RECORD STOP TIME:
COMMENTS:
COMMENTS:
Verify Worker Tagout Checklist. S-200        Page 40 of 53  ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:
Verify Worker Tagout Checklist. S-200        Page 40 of 53  ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:
Mode Dependent:
Mode Dependent:
Line 835: Line 733:
SPECIAL INSTRUCTIONS:
SPECIAL INSTRUCTIONS:
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8422 RC FILTER OUTLET ISOL VLV 4 RD OPEN    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED:  ___________________
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8422 RC FILTER OUTLET ISOL VLV 4 RD OPEN    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED:  ___________________
__________________________________________  DATE/TIME: ___________________
__________________________________________  DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
Line 862: Line 760:
DATE/TIME __________________  SPECIAL INSTRUCTIONS:
DATE/TIME __________________  SPECIAL INSTRUCTIONS:
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8422 RC FILTER OUTLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8425 RC FILTER INLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED:  ___________________
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8422 RC FILTER OUTLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8425 RC FILTER INLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN V LV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED WTO PLACED:  ___________________
__________________________________________  DATE/TIME: ___________________
__________________________________________  DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
Line 891: Line 789:
SPECIAL INSTRUCTIONS:
SPECIAL INSTRUCTIONS:
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
YES:          NO:      (IF YES SEE ATTACHMENT 14 PART 2)
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8422 RC FILTER OUTLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED    WTO PLACED:  ___________________
EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO    3 AS REQUIRED  2CV8421 RC FILTER BYPASS VLV 2 RI INFO    1 OPEN  2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED    2 CLOSED  2CV8422 RC FILTER OUTLET ISOL VLV 4 RD CLOSED    2 CLOSED  2CV8424 RC FILTER DRAIN VLV 5 RI INFO    2 CLOSED  2CV8423 RC FILTER VENT VLV 5 RI INFO    2 CLOSED    WTO PLACED:  ___________________
__________________________________________  DATE/TIME: ___________________
__________________________________________  DATE/TIME: ___________________ WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________
WTO FINAL CLEAR:
WTO FINAL CLEAR:
WORK CREWMEMBER RELEASE:
WORK CREWMEMBER RELEASE:
Line 906: Line 803:
S-300  REV:  NRC 2014 TPO No.:  8C.HP
S-300  REV:  NRC 2014 TPO No.:  8C.HP
-002  K&A No.:  2.3.11 TASK No.: S
-002  K&A No.:  2.3.11 TASK No.: S
-HP-002:  Authorize Gaseous (Containment K&A IMP:  4.3 or Gas Decay Tank) Rad Waste Release  EXAMINEE:
-HP-002:  Authorize Gaseous (Containment K&A IMP:  4.3 or Gas Decay Tank) Rad Waste Release  EXAMINEE:   RO      SRO    (circle one)
RO      SRO    (circle one)


EVALUATOR:
EVALUATOR:
DATE:    The Examinee:
DATE:    The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 3, 4, 6 APPROX COMPLETION TIME:  30 MINUTE S CRITICAL TIME:
  (*) 3, 4, 6 APPROX COMPLETION TIME:  30 MINUTES CRITICAL TIME:
N/A  EVALUATION METHOD:
N/A  EVALUATION METHOD:
LOCATION:
LOCATION:   X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR     X  CLASSROOM GENERAL  
X  PERFORM  X  IN PLANT        SIMULATE  X  SIMULATOR X  CLASSROOM GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 929: Line 822:
: 1. Copy of partially completed RP
: 1. Copy of partially completed RP
-BR-980  TASK STANDARDS:
-BR-980  TASK STANDARDS:
: 1. Review RP
: 1. Review RP-BR-980. 2. Determine release cannot proceed due to error in RP
-BR-980. 2. Determine release cannot proceed due to error in RP
-BR-980. TASK CONDITIONS: 1. You are the Unit 1 Unit Supervisor.
-BR-980. TASK CONDITIONS: 1. You are the Unit 1 Unit Supervisor.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
: 2. Unit 1 is at 100% power; all systems and controls are normally aligned.
Line 942: Line 834:
PERFORMANCE STEP STANDARD Circle Applicable
PERFORMANCE STEP STANDARD Circle Applicable
: 1. Refer to partially completed RP
: 1. Refer to partially completed RP
-BR-980, Section C Cue: (If asked) Gaseous Release in progress sign has been placed and the 0A VA exhaust fan is in operation.
-BR-980, Section C Cue: (If asked) Gaseous Release in progress sign has been placed and the 0A VA exhaust fan is in operation.
Reads Step D, determines SRO approval required.
Reads Step D, determines SRO approval required.
Reviews entire document SAT    UNSAT      N/A Comments:
Reviews entire document SAT    UNSAT      N/A Comments: 2. Review Section A    Reviews steps A.5.d Determines baseline values for ALERT and ALARM setpoints apply
: 2. Review Section A    Reviews steps A.5.d Determines baseline values for ALERT and ALARM setpoints apply
. SAT    UNSAT      N/
. SAT    UNSAT      N/
A Comments:
A Comments: *3. Determines HIGH Alarm Setpoint was incorrectly established Identifies that the value entered for the HIGH Alarm Setpoint is in error and should be 6.06E
*3. Determines HIGH Alarm Setpoint was incorrectly established Identifies that the value entered for the HIGH Alarm Setpoint is in error and should be 6.06E
-04Ci/cc. SAT    UNSAT      N/A Comments: *4. Determines ALERT Alarm Setpoint was incorrectly established Identifies that the value entered for the ALERT Alarm Setpoint is in error and should be 6.06E
-04Ci/cc. SAT    UNSAT      N/A Comments:
-05Ci/cc. SAT    UNSAT      N/A Comments: 5. Review Section C  Cue:  Shift Manager acknowledges step A.5.d error failure.
*4. Determines ALERT Alarm Setpoint was incorrectly established Identifies that the value entered for the ALERT Alarm Setpoint is in error and should be 6.06E
Identify from review that section C.1.c should have been N/A. SAT    UNSAT      N/A Comments: *6. Determines HIGH and ALERT Alarm Setpoint was incorrectly inputted Identify that the operator incorrectly inputted 7.23E-3Ci/cc into the High and Alert alarm setpoints instead of 7.23E-6Ci/cc in section C.1.c. Also determines that 7.23E
-05Ci/cc. SAT    UNSAT      N/A Comments:
: 5. Review Section C  Cue:  Shift Manager acknowledges step A.5.d error failure.
Identify from review that section C.1.c should have been N/A. SAT    UNSAT      N/A Comments:
*6. Determines HIGH and ALERT Alarm Setpoint was incorrectly inputted Identify that the operator incorrectly inputted 7.23E-3Ci/cc into the High and Alert alarm setpoints instead of 7.23E-6Ci/cc in section C.1.c. Also determines that 7.23E
-6Ci/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E
-6Ci/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E
-04Ci/cc and ALERT Alarm Setpoint is in error and should be 6.06E
-04Ci/cc and ALERT Alarm Setpoint is in error and should be 6.06E
-05Ci/cc SAT    UNSAT      N/A Comments:
-05Ci/cc SAT    UNSAT      N/A Comments: *7. Refuse to approve release until HIGH Alarm and ALERT Alarm setpoints are correctly entered.
*7. Refuse to approve release until HIGH Alarm and ALERT Alarm setpoints are correctly entered.
Determine release is unable to be performed  (cannot be signed) until errors are resolved.
Determine release is unable to be performed  (cannot be signed) until errors are resolved.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: CUE:  THIS COMPLETES THIS JPM  RECORD STOP TIME:
CUE:  THIS COMPLETES THIS JPM  RECORD STOP TIME:


COMMENTS:
COMMENTS:
 
Perform Nuclear Accident Reporting System Notification S-41 3 Page 45 of 53 TASK TITLE:
Perform Nuclear Accident Reporting System Notification S-413 Page 45 of 53 TASK TITLE:
Perform Nuclear Accident Reporting System Notification JPM No.: S-413 REV: NRC 2014 TPO No.: 7.F.ZP-001 K&A No.: 2.4.40 TASK No.: S-ZP-001:  Complete the NARS Form K&A IMP: 4.5 EXAMINEE:   SRO  EVALUATOR:
Perform Nuclear Accident Reporting System Notification JPM No.: S-413 REV: NRC 2014 TPO No.: 7.F.ZP-001 K&A No.: 2.4.40 TASK No.:
S-ZP-001:  Complete the NARS Form K&A IMP: 4.5 EXAMINEE:
SRO  EVALUATOR:
DATE:  The Examinee:
DATE:  The Examinee:
PASSED this JPM.
PASSED this JPM. TIME STARTED:
TIME STARTED:
FAILED TIME FINISHED:
FAILED TIME FINISHED:
JPM TIME:
JPM TIME: MINUTES  CRITICAL ELEMENTS:
MINUTES  CRITICAL ELEMENTS:
  (*) 4, 13, 14 APPROX COMPLETION TIME:
  (*) 4, 13, 14 APPROX COMPLETION TIME:
13 MINUTES  CRITICAL TIME:
13 MINUTES  CRITICAL TIME:
Line 980: Line 860:


EVALUATION METHOD:
EVALUATION METHOD:
LOCATION:
LOCATION:     X  PERFORM      IN PLANT        SIMULATE  X  SIMULATOR     X  CLASSROOM GENERAL  
X  PERFORM      IN PLANT        SIMULATE  X  SIMULATOR X  CLASSROOM
 
GENERAL  


==REFERENCES:==
==REFERENCES:==
Line 989: Line 866:
. 14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications
. 14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications
. 15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations
. 15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations
. 16. EP-MW-114-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. 17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
. 16. EP-MW-1 14-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. 17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.


MATERIALS:
MATERIALS:
Line 1,009: Line 886:
: 5. No impediments to evacuation.
: 5. No impediments to evacuation.


Perform Nuclear Accident Reporting System Notification S-413 Page 46 of 53 6. This is a Time Critical JPM.
Perform Nuclear Accident Reporting System Notification S-41 3 Page 46 of 53 6. This is a Time Critical JPM.
INITIATING CUES:
INITIATING CUES:
The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink
The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink
.
.
Perform Nuclear Accident Reporting System Notification S-413 Page 47 of 53 RECORD START TIME
Perform Nuclear Accident Reporting System Notification S-41 3 Page 47 of 53 RECORD START TIME
:  (Start time is after the student accepts and understands the task)
:  (Start time is after the student accepts and understands the task)
PERFORMANCE STEP STANDARD Circle applicable
PERFORMANCE STEP STANDARD Circle applicable
Line 1,019: Line 896:
. CUE: Provide copy of NARS form to examinee (and  
. CUE: Provide copy of NARS form to examinee (and  


EP-MW-114-100 if asked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if  
EP-MW-114-100 if a sked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if  


asked)  Refer to NARS form
asked)  Refer to NARS form
. SAT    UNSAT      N/A Comments:
. SAT    UNSAT      N/A Comments: 2. Record Utility Message Number. Enters number "1"
: 2. Record Utility Message Number. Enters number "1"
. SAT    UNSAT      N/A Comments: 3. Record State Message Number. Enters "N/A". SAT    UNSAT      N/A Comments: *4. Complete Sections 1
. SAT    UNSAT      N/A Comments:
: 3. Record State Message Number. Enters "N/A". SAT    UNSAT      N/A Comments:
*4. Complete Sections 1
-4. Completes sections 1
-4. Completes sections 1
-4 as follows:
-4 as follows:
o Status - [1B] Drill/Exercise o Station- [2A] Braidwood On-Site Condition  
o Status - [1B] Drill/Exercise o Station- [2A] Braidwood On-Site Condition  
- [3D] General Emergency o Accident Classified  
- [3D] General Emergency o Accident Classified  
-Time: No later than Current Time Date: Today's Date EAL#: MG2 o Accident Terminated  
-Time: No later than Current Time Date: Today's Date EAL#: MG2 o Accident Terminated  
- Time and Date: N/A  SAT    UNSAT      N/A Comments:
- Time and Date: N/A  SAT    UNSAT      N/A Comments: 5. Release Status
: 5. Release Status
. Place "X" by occurring
. Place "X" by occurring
   [5A] None SAT    UNSAT N/A Comments:
   [5A] None SAT    UNSAT N/A Comments: 6. Type of Release
: 6. Type of Release
. Place "X" by Gaseous
. Place "X" by Gaseous
   [6A] Not Applicable
   [6A] Not Applicable


SAT    UNSAT N/A Comments:
SAT    UNSAT N/A Comments: 7. Check Wind Direction and speed. CUE: Wind direction is 270 deg. Wind speed is 10 mph  Record actual data from PPDS:  o Direction (~270 deg) o Speed (mark units)  
: 7. Check Wind Direction and speed. CUE: Wind direction is 270 deg. Wind speed is 10 mph  Record actual data from PPDS:  o Direction (~270 deg) o Speed (mark units)  
(~10 mph) SAT    UNSAT      N/A Comments:
(~10 mph)
Perform Nuclear Accident Reporting System Notification S-41 3 Page 48 of 53  PERFORMANCE STEP STANDARD Circle applicable
SAT    UNSAT      N/A Comments:
 
Perform Nuclear Accident Reporting System Notification S-413 Page 48 of 53  PERFORMANCE STEP STANDARD Circle applicable
: 8. Recommended Actions from EP-AA-111-F-02. In block 9, Check box:
: 8. Recommended Actions from EP-AA-111-F-02. In block 9, Check box:
o [9D] Evacuate Illinois Sub Areas 1,3,10 SAT    UNSAT      N/A Comments:
o [9D] Evacuate Illinois Sub Areas 1,3,10 SAT    UNSAT      N/A Comments: 9. Enter additional info
: 9. Enter additional info
. Record "none" in block 10
. Record "none" in block 10


SAT    UNSAT N/A Comments:
SAT    UNSAT N/A Comments:   10. NARS form approved by Shift Emergency Director
: 10. NARS form approved by Shift Emergency Director
. CUE: No Verifier is available to second check the NARS form Sign the 'Approved by' line SAT    UNSAT N/A Comments: 1 1. Refer to EP
. CUE: No Verifier is available to second check the NARS form Sign the 'Approved by' line SAT    UNSAT N/A Comments:
: 11. Refer to EP
-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
Refer to EP
Refer to EP
-MW-114-100:  Determine step 4.2 needs to be performed.
-MW-114-100:  Determine step 4.2 needs to be performed.
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments: 1 2 Refer to EP
12 Refer to EP
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
Refer to EP
Refer to EP
-MW-114-100-F-01:  Determine NARS Code 38 to be used to transmit NARS form.
-MW-114-100-F-01:  Determine NARS Code 38 to be used to transmit NARS form.
SAT    UNSAT N/A Comments:
SAT    UNSAT N/A Comments:
 
Perform Nuclear Accident Reporting System Notification S-41 3 Page 49 of 53  PERFORMANCE STEP STANDARD Circle applicable
Perform Nuclear Accident Reporting System Notification S-413 Page 49 of 53  PERFORMANCE STEP STANDARD Circle applicable
  *1 3. Establish communications:
  *13. Establish communications:
Note: After examinee dials Code 38, provide the following cue:
Note: After examinee dials Code 38, provide the following cue:
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.
Line 1,075: Line 939:
Pick up NARS phone.
Pick up NARS phone.
DIAL code 38.
DIAL code 38.
Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message."
Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Cal l  Mark Initial Boxes for IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA Kankakee Co. EOC Will Co. EOC.
o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called."  TAKE Initial Roll Cal l  Mark Initial Boxes for IEMA  Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA Kankakee Co. EOC Will Co. EOC.
o Record time and date initial roll call complete. SAT    UNSAT      N/A Comments:
o Record time and date initial roll call complete.
Perform Nuclear Accident Reporting System Notification S-41 3 Page 50 of 53  PERFORMANCE STEP STANDARD Circle applicable EVALUATOR NOTE:  Critical time TIME STOPS when completes initial roll call of the NARS form.
SAT    UNSAT      N/A Comments:
 
Perform Nuclear Accident Reporting System Notification S-413 Page 50 of 53  PERFORMANCE STEP STANDARD Circle applicable EVALUATOR NOTE:  Critical time TIME STOPS when completes initial roll call of the NARS form.
Determine critical time:
Determine critical time:
_________________________    -    ________________________    =    ________________________
_________________________    -    ________________________    =    ________________________
Line 1,086: Line 947:
< 15 minutes
< 15 minutes


Perform Nuclear Accident Reporting System Notification S-413 Page 51 of 53  PERFORMANCE STEP STANDARD Circle applicable
Perform Nuclear Accident Reporting System Notification S-41 3 Page 51 of 53  PERFORMANCE STEP STANDARD Circle applicable
  *14. Verbally transmit the NARS Form.
  *1 4. Verbally transmit the NARS Form.


Verbally transmit the NARS Form:
Verbally transmit the NARS Form:
Utility Message No:
Utility Message No:
1_  State Message No: N/A  Status - [B] Drill/Exerci se  Station - [A] Braidwood Onsite Condition - [D] General Emergency Accident Classified:
1_  State Message No: N/A  Status - [B] Drill/Exerci se  Station - [A] Braidwood Onsite Condition - [D] General Emergency Accident Classified:
Time: When JPM started. Date: Today. EAL # : MG2 Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
Time: When JPM started. Date: Today. EAL # : MG 2 Accident Terminated Date and Time: N/A  Release Status: [A] None  Type of Release: [A] Not Applicable Wind Dir:
270  Wind Speed:
270  Wind Speed:
o [A] is N/A  
o [A] is N/A  
Line 1,098: Line 959:
   [D] Evacuate Illinois Sub Areas 1,3,10 (Block 10) Additional Information
   [D] Evacuate Illinois Sub Areas 1,3,10 (Block 10) Additional Information
: None Verified With: N/A Approved By: S. Manager SAT    UNSAT      N/A Comments:
: None Verified With: N/A Approved By: S. Manager SAT    UNSAT      N/A Comments:
 
Perform Nuclear Accident Reporting System Notification S-41 3 Page 52 of 53  PERFORMANCE STEP STANDARD Circle applicable 1 5. Complete the NARS form.
Perform Nuclear Accident Reporting System Notification S-413 Page 52 of 53  PERFORMANCE STEP STANDARD Circle applicable
: 15. Complete the NARS form.
CUE: IF examinee asks for a phone number to use, provide: outside line is 815
CUE: IF examinee asks for a phone number to use, provide: outside line is 815
-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message  Organization (IEMA)
-10:  Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message  Organization (IEMA)
Current time Today's date SAT    UNSAT N/A Comments:
Current time Today's date SAT    UNSAT N/A Comments: 1 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
: 16. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:
CUE Code 38: IEMA online,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online,  Illinois REAC online CUE: No questions.
CUE Code 38: IEMA online,  Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online,  Illinois REAC online CUE: No questions.
PERFORM Final Roll Call and marks boxes for:
PERFORM Final Roll Call and marks boxes for:
IEMA   Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA, Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
IEM A   Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA,   Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.
SAT    UNSAT      N/A Comments:
 
Perform Nuclear Accident Reporting System Notification S-413 Page 53 of 53  PERFORMANCE STEP STANDARD Circle applicable
: 17. STATE "NARS communication is complete."  STATE "NARS communication is complete."
SAT    UNSAT      N/A Comments:
SAT    UNSAT      N/A Comments:
CUE: THIS COMPLETES THIS JPM.
Perform Nuclear Accident Reporting System Notification S-41 3 Page 53 of 53  PERFORMANCE STEP STANDARD Circle applicable 1 7. STATE "NARS communication is complete."  STATE "NARS communication is complete."
SAT    UNSAT      N/A Comments:      CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME
RECORD STOP TIME
:
:
COMMENTS:}}
COMMENTS:}}

Revision as of 09:19, 9 July 2018

2014 Braidwood Station Initial License Examination Proposed Administrative JPMs
ML14365A133
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A989 List:
References
50-456/OL-14, 50-457/OL-14
Download: ML14365A133 (53)


Text

Complete NRC Active License Maintenance Log R-109 Page 1 of 53 JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an active licensed NSO for the past year.
2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014.
3. All positions were appropriately logged in the SM log for during this time period.

INITIATING CUES:

1. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP

-AA-105-102. 2. Inform the Operations Support Manager when you have completed OP-AA-105-102, Attachment 1.

Complete NRC Active License Maintenance Log R-109 Page 2 of 53 RO Work History:

Hours Day Date Shift Worked Job Position/Assignment Week 1 M 6/30/14 D 12 Unit 1 NSO T 7/1/14 D 12 Extra NSO in control room W 7/2/14 D 12 Unit 2 Admin NSO Th 7/3/14 D 12 Extra NSO in control room F 7/4/14 N/A Day Off S 7/5/14 N/A Day Off S 7/6/14 N/A Day Off Week 2 M 7/7/14 D 12 Clearance Order Writer T 7/8/14 D 12 Clearance Order Writer W 7/9/14 D 12 Clearance Order Writer Th 7/10/14 D 12 Clearance Order Writer F 7/11/14 N/A Day Off S 7/12/14 N/A Day Off S 7/13/14 N/A Day Off Week 3 M 7/14/14 N/A Day Off T 7/1 5/14 N/A Day Off W 7/16/14 N/A Day Off Th 7/17/14 N/A Day Off F 7/18/14 D 12 Unit 1 Admin (relieved 2 hrs for NRC physical)

S 7/19/14 D 12 Unit 1 NSO S 7/20/14 D 12 Unit 2 NSO Week 4 M 7/21/14 N/A Day Off T 7/22/14 N/A Day Off W 7/23/14 N/A Day Off Th 7/24/14 N/A Day Off F 7/25/14 N 12 Unit 2 Admin (relieved 2 hrs for PHC meeting) S 7/26/14 N 12 Extra NSO in control room S 7/27/14 N 12 Unit 1 Admin NSO Week 5 M 7/28/14 N/A Day Off T 7/29/14 T 8 Requal Training W 7/30/14 T 8 Requal Training Th 7/31/14 T 8 Requal Training F 8/1/14 T 8 Requal Trainin g S 8/2/14 N/A Day Off S 8/3/14 N/A Day Off Weeks 6 and 7 8/4/14 thru 8/17/14 N/A ON VACATION Complete NRC Active License Maintenance Log R-109 Page 3 of 53 RO Work History continued:

Hours Day Date Shift Worked Job Description Week 8 M 8/18/14 N/A Day Off T 8/19/14 N/A Day Off W 8/20/14 N/A Day Off Th 8/21/14 N/A Day Off F 8/22/14 D 12 Clearance Order Writer S 8/23/14 D 12 Unit 2 NSO S 8/24/14 D 12 Unit 2 Admin NSO Week 9 M 8/25/14 N/A Day Off T 8/26/14 N/A Day Off W 8/27/14 N/A Day Off Th 8/28/14 N/A Day Off F 8/29/14 N 12 Extra NSO in control room S 8/30/14 N 12 Unit 1 NSO S 8/31/14 N 12 Unit 2 NSO Week 10 M 9/1/14 N/A Day Off T 9/2/14 T 8 Requal Training W 9/3/14 T 8 Requal Training Th 9/4/14 T 8 Requal Training F 9/5/14 T 8 Requal Training S 9/6/14 N/A Day Off S 9/7/14 N/A Day Off Weeks 11 thru 13 9/8/14 thru 9/28/14 ON VACATION Week 14 M 9/29/14 N/A Day Off T 9/30/14 N/A Day Off W 10/1/14 N/A Day Off Th 10/2/14 N/A Requal Training F 10/3/14 D 12 Unit 1 NSO S 10/4/14 D 12 Unit 1 Admin NSO S 10/5/14 D 12 Unit 2 NSO

Complete NRC Active License Maintenance Log R-109 Page 4 of 53 TASK TITLE:

Complete NRC Active License Maintenance Log JPM No.: R-109 REV: 2014 NRC Task No.: R-AM-075 K/A No.: 2.1.4 Objective No.:

4E.AM-75 K/A IMP: 3.3/3.8 EXAMINEE: RO EVALUATOR:

DATE:

The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4, 5, 6, 7, 8 APPROX COMPLETION TIME: 10 MINUTES

CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.

rev. 11. 2. 10CFR55.53(e) MATERIALS:

1. OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE.

TASK STANDARDS:

2. Determine shift activities that are credited toward active license maintenance.
3. Complete OP

-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE, Attachment 1 Active License Maintenance Tracking Log. TASK CONDITIONS:

1. You are an active licensed NSO for the past year.
2. Attached is your work schedule history for the 14 weeks that are partially or entirely within the third quarter of 2014. 3. All positions were appropriately logged in the SM log for during this time period.

INITIATING CUES:

3. The Operations Support Manager asks that you complete your Active License Tracking Log for the THIRD QUARTER of 2014, per OP-AA-105-102. 4. Inform the Operations Support Manager when you have completed OP

-AA-105-102, Attachment 1.

Complete NRC Active License Maintenance Log R-109 Page 5 of 53 RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to OP

-AA-105-102, NRC ACTIVE LICENSE MAINTENANCE.

CUE: Provide examinee copy of OP-AA-105-102. Refer to OP

-AA-105-102: Determines Attachment 1 needs to be completed. SAT UNSAT N/A Comments: 2. Complete upper section of Attachment 1.

From initiating cue, writes 3 rd quarter of 2014. From initiating cue, writes examinee name and circles ACTIVE license status.

Write employee number.

SAT UNSAT N

/A Comments: *3. Complete date column of table on Attachment 1.

Note: Any date listed in June or October would not be within the 3 rd quarter of the year, thereby incorrect.

Lists at least 5 dates of the shifts listed below, from attached schedule, that count as credited days toward license maintenance.

o RO (any 5 of 8) o 7/2/14 D 12 2 o 7/19/14 D 12 1 o 7/20/14 D 12 2 o 7/27/14 N 12 1 o 8/23/14 D 12 2 o 8/24/14 D 12 2 o 8/30/14 N 12 1 o 8/31/14 N 12 2 SAT UNSAT N/A Comments: *4. Complete shift column of table on Attachment 1.

List the shift worked (N or D as applicable)

SAT UNSAT N/A Comments: *5. Complete length column of table on Attachment 1.

List the shift length (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) SAT UNSAT N

/A Comments: *6. Complete unit column of table on Attachment 1.

List the applicable unit SAT UNSAT N/A Comments: *7. Complete position and SM log columns on Attachment 1.

Circle the RO position o Circle Y on SM log.

SAT UNSAT N/A Comments:

Complete NRC Active License Maintenance Log R-109 Page 6 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 8. Complete signature columns on Attachment 1.

Sign under signature.

. SAT UNSAT N/A Comments: 9. Give completed Attachment 1 to evaluator.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

Complete NRC Active License Maintenance Log R-109 Page 7 of 53 ATTACHMENT 1 Active License Tracking Log Page 1 o f 1 Employee Number: ____________

SHIFT COVERAGE FOR THE ___3rd__(1 ST , 2 ND , 3 RD , 4 TH) CALENDAR QUARTER OF __2014__(YEAR) ____Examinees Name____ ACTIVE / INACTIVE Name of License Holder License Status At Start (Print) Quarter (circle one) RECORD OF EIGHT/TWELVE HOUR SHIFTS SERVED DURING QUARTER ENTER the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8

-hour or 8/12

-hour schedule, enter a "1" for the midnight shift, "2" for the day shift, or a "3" for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8

-hours in length are required per quarter. If working a straight 12

-hour schedule, enter a "N" for night shift or a "D" for dayshift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12

-hour shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8

- and 12-hour shifts (in a position required by the plant's Technical Specifications) at sites having a mixed shift schedule, and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION (circle one)

SM log SIGNATURE 7/2/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/19/14 D 12 1 FHS SM US RO Logged Y/N Examinees Signature 7/20/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 7/27/14 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/23/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/24/14 D 12 2 FHS SM US RO Logged Y/N Examinees Signature 8/30/14 N 12 1 FHS SM US RO Logged Y/N Examinees Signature 8/31/14 N 12 2 FHS SM US RO Logged Y/N Examinees Signature

At least 5 of the 8 rows above.

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 8 of 53 TASK TITLE:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

JPM No.: R-110 REV: 2014 NRC TPO No.: 4C.AP-04 K&A No.: 2.1.31 TASK No.: R-AP-017, Perform Offsite AC power K&A IMP: 4.6 Availability Surveillance.

EXAMINEE: RO EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 5, 7, 9 APPROX COMPLETION TIME: 13 MINUTES CRITICAL TIME:

45 Minutes

EVALUATION METHOD:

LOCATION: X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOSR 3.8.1.1, Rev. 4, Unit One Offsite AC Power Availability Surveillance

MATERIALS:

1. 1BwOSR 3.8.1.1 TASK STANDARDS:
1. Partial completion of surveillance 1BwOSR 3.8.1.1.

TASK CONDITIONS:

1. You are an extra NSO.
2. The Unit is at power.
3. Unit 2 is at full power.
4. Unit 2 4KV ESF buses are being supplied from Unit 2 SATs.
5. All Unit 2 Switchyard and 4KV breakers are available.
6. 15 minutes ago the 1A D/G was declared inoperable.

INITIATING CUES:

1. The US has directed you to perform 1BwOSR 3.8.1.1, Unit One Offsite AC Power Availability Surveillance, subsection F.1.0 and notify the US when you have completed it.
2. This is a time critical JPM.

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 9 of 53 RECORD START TIME:

Note: Only provide cues that are not available in the simulator. Provide a copy of the surveillance.

PERFORMANCE STEP STANDARD Circle applicable

1. Record Initial Data.

CUE: All Prerequisites, Precautions, Limitations and Actions have been met. NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.

Record critical time start time: __________

On the Modes 1

-4 Data Sheet, RECORD: Unit 1 Mode (1).

Unit 2 Mode (1).

SAT UNSAT N/A Comments: 2. Check 345 KV Transmission Line Status.

CUE: All 345 KV Transmission Lines are energized.

At 0PM03J, OBSERVE: AC amperes, MW and MVAR for all Lines.

On the Modes 1

-4 Data Sheet, CIRCLE "ENERGIZED" for each:

Line 0104.

Line 2001.

Line 2002.

Line 0103.

Line 2003.

Line 2004.

SAT UNSAT N/A Comments: 3. Indicate all closed and open switchyard breakers.

CUE: All Swyd breakers indicate closed.

Check status of all 345 KV Swyd breakers.

On the Data Sheet Drawing of the 345 KV swyd, INDICATE: Closed breakers with 'X'.

o Open breakers with 'O'.

SAT UNSAT N/A Comments: *4. Trace paths for independent power sources to the Unit 1 and 2 SATs.

CUE: All 345 KV Transmission Lines are energized.

On the Data Sheet Drawing of the 345 KV Swyd, TRACE: Single path along the dashed lines from any energized offsite power source to the Unit 1 SAT banks.

Second path along the dashed lines from a second independent energized offsite power source to the Unit 2 SAT banks. (Can't retrace any portion of the first path). o Verify two independent paths exist from the offsite power sources through the swyd to the UNIT SAT Banks.

SAT UNSAT N/A Comments:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 10 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 11 of 53 PERFORMANCE STEP STANDARD Circle applicable

  • 5. Verify Normal (Bus 4) and Alternate (Bus 14) power are energized.

CUE: Bus 4 alive light is lit.

Bus 14 bus alive light is lit.

Bus voltage indicated on buses 4 and 14.

At 0PM03J, on the Modes 1

-4 Data sheet, OBSERVE and RECORD STATUS

o Bus alive lights lit for buses 4 and 14. o Bus Voltmeter indications for buses 4 and 14.

o Place 'Xs' under

'ENERGIZED' in step 1.7.

Place 'Xs' under 'YES' in steps 1.8 and 1.9.

SAT UNSAT N/A Comments: 6. Determine status of Normal and Alternate Power SATs

CUE: All X and Y windings for both SATs at each unit are energized At 0PM03J, 1PM01J and 2PM01J, on the Modes 1

-4 Data Sheet, OBSERVE and RECORD STATUS: X or Y winding AC MW and AC amperes indications for each SAT at each unit.

SAT MOD indications.

Place X in 'ENERGIZED' column. SAT UNSAT N/A Comments:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 12 of 53 *7. Determine availability status of Normal and Alternate supply breakers to each Unit 1 4160V ESF bus:

CUE: 1412 CLOSED 1414 NAT (normal after trip)

2414 NAT 2412 CLOSED

1422 CLOSED 1424 NAT (but no position indication)

US acknowledges and is unsure of why breaker 1424 has no indication.

If dispatched as EO to investigate 1424, report breaker is locally racked in and open, however the local position indicating lights are DARK. If asked as EO to check control power fuses, report that control power fuses are blown. If blown fuse reported to US, give cue, US directs you to complete surveillance. He will investigate the cause of blown fuses.

If examinee indicates they would change the indicating light bulbs, cue that the bulbs have been changed and are still NOT lit.

2424 NAT 2422 CLOSED On the Modes 1

-4 Data Sheet, OBSERVE and RECORD STATUS: ACB 1412 (X in Closed Box).

ACB 1414 (X in Avail Box).

ACB 2414 (X in Avail Box).

ACB 2412 (X in Closed Box).

ACB 1422 (X in Closed Box).

o Notify US that breaker 1424 does not have position indication lights.

o May try changing position indication light bulb.

o May request EO investigate breaker locally.

o May ask EO to check control power fuse continuity.

o Report blown fuse indication to US ACB 1424 (X in Not Avail Box).

ACB 2424 (X in Avail Box).

ACB 2422 (X in Closed Box).

SAT UNSAT N/A Comments:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-1 1 0 Page 13 of 53 PERFORMANCE STEP STANDARD Circle applicable

8. Determine supply configuration to the 4160V ESF buses.

CUE: All normal ESF bus feed breakers indicate closed, all crosstie breakers are available.

On the Modes 1

-4 Data Sheet, OBSERVE and RECORD STATUS: ESF BUS 141 (X in FROM SAT 142-1 box). ESF Bus 142 (X in FROM SAT 142-2 box). ESF BUS 241 (X in FROM SAT 242-1 box). ESF BUS 242 (X in FROM SAT 242-2 box). SAT UNSAT N/A Comments: *9. Determine capabilities of Unit 1 and Unit 2 SATs to supply Unit 1 ESF buses.

Step F.3.0 will be completed by another NSO.

After Reviewing the status of the sources and configuration, on the Modes 1-4 Data sheet, RECORD STATUS: Unit 1 SAT capable of supplying bus 141 (X in 'YES' box in step 1.13).

Unit 2 SAT capable of supplying bus 141 (X in 'YES box in step 1.14).

Unit 1 SAT capable of supplying bus 142 (X in 'YES' box in step 1.15).

Unit 2 SAT NOT capable of supplying bus 142 (X in 'NO' box in step 1.16).

o Step F.3.0.

SAT UNSAT N/A Comments: *10. Notify US/SM of failure to meet acceptance criteria.

CUE: As SM/US, acknowledge failure.

Record time that examinee reports failure to meet Acceptance Criteria / need to initiate LCOAR 1BwOL 3.8.1: __________

Critical time =

_________

- ___________

(end time) (start time) 45 minutes. NOTIFY US/SM of failure to meet Acceptance Criteria /

need to initiate LCOAR 1BwOL 3.8.1, within 45 minutes of time given in Task Conditions.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 14 of 53 JOB PERFORMANCE MEASURE TASK CONDITIONS:

1. You are an extra operator on shift.
2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV

-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Jim NSO asks you to be the second approval for the clearance order

. 2. Inform Jim when you have completed the peer check.

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 15 of 53 TASK TITLE:

Verify Worker Tagout Checklist.

JPM No.: R-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Obje ctive No.: R-AM-010 K&A IMP: 3.9 EXAMINEE: RO EVALUATOR:

DATE:

The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 6 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

3. OP-AA-109-101, CLEARANCE AND TAGGING, REV 9. 4. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24

. 5. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.

6. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22

. MATERIALS:

1. OP-AA-109-101, CLEARANCE AND TAGGING.
2. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
3. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
4. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.

TASK STANDARDS:

4. Verify isolation points correct for 2CV03F.
5. Determine 2CV8422 position incorrect for 2CV03F.
6. Determine the sequence of isolation points for 2CV03F is incorrect.

TASK CONDITIONS:

1. You are an extra operator on shift.
2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV

-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Jim NSO asks you to be the second approval for clearance order

. CUE: Hand examinee partially completed Worker Tagout.

2. Inform Jim when you have completed the peer chec
k.

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 16 of 53 Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 17 of 53 RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CV

-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.

CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV

-10, step F.3. SAT UNSAT N/A Comments: 2. Refer to Drawing:

M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M

-138, sheet 5B. Refer to M

-138, sheet 5B.

SAT UNSAT N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.

Determines clearance boundary valves selected ar e correct: 2CV129 C/S, Demin Hi Temp Divert Valve.

2CV8421, RC Filter Bypass Valve.

2CV8425, RC Filter Inlet Isol Valve.

2CV8422, RC Filter Outlet Isol Valve.

2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT UNSAT N/A Comments:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 18 of 53 EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4

& 6. EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.

If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.

If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.

When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Determine the clearance SEQUENCE for the 2CV03F is incorrect.

CUE: Acknowledge as Unit Supervisor and inform examinee the checklist sequence will be corrected.

CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.

Determines clearance sequence is incorrect:

1. 2CV129 C/S, Demin Hi Temp Divert Valve.
2. 2CV8421 RC Filter Bypass Valve.
3. 2CV8422 RC Filter Outlet Isol Valve.
4. 2CV8425 RC Filter Inlet Isol Valve.
5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.

SAT UNSAT N/A Comments: 5. Verify the tag type for 2CV 03F. Verifies clearance tag type:

2CV129 C/S, Demin Hi Temp Divert Valve

- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve

- RD. 2CV8422 RC Filter Outlet Isol Valve

- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Ven t Valve - RI. SAT UNSAT N/A Comments:

Perform Offsite AC Power Availability Surveillance with ACB 1424 control power lost.

R-200 Page 19 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Determine the clearance POSITION for the 2CV03F is incorrect.

CUE: Acknowledge as Unit Supervisor and inform examinee the checklist position will be corrected.

CUE: Hand examinee corrected worker tagout in accordance with the evaluator note on JPM page 4. Determines clearance position is incorrect:

2CV129 C/S, Demin Hi Temp Divert Valve

- INFO. 2CV8421 RC Filter Bypass Valve - INFO. 2CV8425 RC Filter Inlet Isol Valve

- CLOSED. 2CV8422 RC Filter Outlet Isol Valve

- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM. RECORD STOP TIME:

COMMENTS:

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403 Page 20 of 53 JOB PERFORMANCE MEASURE TASK TITLE:

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency JPM No.: R-40 3 REV: NRC 201 4 TPO No.: 4F.ZP-02 K&A No.: 2.4.43 TASK No.: R-ZP-004 K&A IMP: 3.2/3.8 EXAMINEE: RO EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4 APPROX COMPLETION TIME: 10 MINUTES

CRITICAL TIME:

13 minutes

EVALUATION METHOD:

LOCATION: X PERFORM IN PLANT SIMULATE _ SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS, Rev. 13

. 2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM, Rev. G.

MATERIALS:

1. EP-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.
2. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.

TASK STANDARDS:

1. Determine correct NARS phone code.
2. Complete transmitting NARS block 10 within 13 minutes of the initiating cue.
3. Transmit NARS data to offsite agencies.

TASK CONDITIONS:

1. You are the Unit 2 Assist NSO.
2. A reactor trip has occurred on Unit 1.
3. A General Emergency was declared two minutes ago, no previous EALs have been declared. 4. EP-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM has been filled out and approved.
5. This is a Time Critical JPM.

INITIATING CUES:

1. The Shift Manager directs you to transmit the NARS form per EP

-MW-114-100, MW Region Offsite Notifications. 2. Another NSO will monitor the remainder of the Main Control Board panels and address alarms as necessary.

3. Inform the Shift Manager when the NARS form has been transmitted.

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403 Page 21 of 53 RECORD START TIME:

EVALUATOR NOTE: Provide examinee the completed NARS form and copy of EP

-MW-114-100-F-01. EVALUATOR NOTE: JPM critical time (13 minutes) starts when the initiating cue has been read to the examinee and stops after initial roll call is complete on the back of the NARS form. PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to EP

-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.

Refer to EP

-MW-114-100: Determine step 4.2 needs to be performed.

SAT UNSAT N/A Comments: 2 Refer to EP

-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. Refer to EP

-MW-114-100-F-01: Determine NARS Code 38 to be used to transmit NARS form.

SAT UNSAT N/A Comments:

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403 Page 22 of 53 *3. Establish communications:

No te: After examinee dials Code 38 , provide the following cue:

CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.

NOTE: If Examinee dials Code 20 (which is

wrong) use Code 20

cue. Otherwise use

Code 38 Cue.

Note: After examinee reads messages, provide

the following cue:

CUE Code 38: IEMA online , Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once stops after initial roll call is complete critical time STOPS:

Establish communications as follows: Pick up NARS phone.

DIAL code 38

. Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called." TAKE Initial Roll Call Mark Initial Boxes for IEMA Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. E MA Kankakee Co. EOC Will Co. EOC.

o Record time and date initial roll call complete.

SAT UNSAT N/A Comments: EVALUATOR NOTE: Critical time TIME STOPS after initial roll call is complete on the back of the NARS form. Determine critical time:

_________________________ - ________________________ = ________________________

(Initial roll call complete) (JPM start time)

< 13 minutes

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403 Page 23 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Verbally transmit the NARS Form. Verbally transmit the NARS Form: Utility Message No:

1_ State Message No: N/A Status - [B] Drill/Exercise Station - [A] Braidwood Onsite Condition

- [D] G eneral Emergency Accident Classified:

Time: Two minutes ago.

Date: Today. EAL # : M G1 Accident Terminated Date and Time: N/A Release Status: [A] None Type of Release: [A] Not Applicable Wind Dir:

270 Wind Speed:

o [A] is N/A

[B] 4.5 Miles/Hr Utility recommendation

[D] 1, 3, 10 (Block 10) Additional Information:

None Verified With: U. Supervisor Approved By: S. Manager SAT UNSAT N/A Comments:

Perform Offsite Notification (NARS Form Transmittal) for G eneral Emergency R-403 Page 24 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

5. Complete the NARS form.

CUE: IF examinee asks for a phone number to use, provide: outside line is 815-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1

-10: Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message Organization (IEMA)

Current time Today's date SAT UNSAT N/A Comments: 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:

CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.

PERFORM Final Roll Call and marks boxes for:

IEMA Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA, Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.

SAT UNSAT N/A Comments: 7. STATE "NARS communication is complete."

STATE "NARS communication is complete."

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

Review Calorimetric Surveillance S-100 Page 25 of 53 TASK TITLE: Review Calorimetric Surveillance JPM No.:

S-100 REV: NRC 2014 TPO No.: 4C.NI

-05 K&A No.: 2.1.7 TASK No.: NI

-004 Perform calorimetric calculation K&A IMP: 4.7 ADMIN: CONDUCT OF OPS EXAMINEE: SRO EVALUATOR:

DATE:

The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS:

(*) 2,3 JPM TIME: MINUTE S CRITICAL TIME:

NA APPROX COMPLETION TIME

10 MINUTES EVALUATION METHOD:

LOCATION: X PERFORM IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

1. 1BwOSR 3.3.1.2

-1, Rev. 17, Unit 1 Power Range High Flux Setpoint Daily Channel Calibration (Computer Calorimetric).

MATERIALS:

1. Copy of completed/ready for review 1BwOSR 3.3.1.2

-1. TASK STANDARDS:

1. Perform review of calorimetric data collected by NSO.
2. Determine calorimetric adjustment calculation incorrectly performed by NSO.

TASK CONDITIONS:

1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at 100% power, all systems are normally aligned.

INITIATING CUES:

1. The Unit NSO has performed the calorimetric surveillance and has asked you to review the proposed NI adjustments per 1BwOSR 0.1

-1,2,3. 2. Review the surveillance and if any changes are necessary, correct the surveillance

. Note: Hand examinee completed calorimetric surveillance, with the Calorimetric printout provided.

RECORD START TIME Note: This JPM is performed by having the examinee review the D

-2 Data sheet from the surveillance. The first data sheet is complete through block 10 but has 3 mistakes in it (two of which propagate forward to blocks 9 and 10). The examinee must locate the mistakes to pass the JPM prior to signing block 11, Review Authorization, and ending the JPM.

S-100 Page 26 of 53 PERFORMANCE STEP STANDARD Circle Applicable

1. Refer to completed 1BwOSR 3.3.1.2-1. CUE: Ensure calorimetric surveillance is handed to examinee with the printout of th e calorimetric data.

CUE: All Prerequisites were met. CUE: (if performed in classroom)

CB-C at 226 steps, CB-D at 220 steps.

Review the data sheet for completeness/errors for blocks 1 and 2:

Date: Today Time: 10 minutes ago Mwe Gross: Current Control Bank Position NSO's Signature

SAT UNSAT N/A Comments: *2. Review blocks 3, 5, 6 and 7.

Note: If asked, the plant calorimetric printout from the computer show 99.51% (same as recorded in block 5)

.

Note: Errors present:

Block 6 second line (N-42) item should be positive 2.0

Block 6 fourth line (N

-44) should be negative 1.0

Block 7:

As a result of correcting the errors, NR

-44 should now be checked YES rather than NO.

Review blocks 3, 5, 6 and 7 for completeness and/or errors:

o Initial NIS Drawer Front Panel Meter Power filled in. o Calculated Calorimetric Power from printout filled in. o Calculated Power difference filled in.

o Block 12 checked (3 NO, 1 YES)

SRO makes the following changes:

Block 6 second line change to +2.0 (N

-42) Block 6 fourth line change to

-1.0 (N-44) Block 7 check "YES" for NR-44 SAT UNSAT N/A Comments:

S-100 Page 27 of 53 PERFORMANCE STEP STANDARD Circle Applicable

  • 3. Verify the power adjustment calculation for channel N

-44. Note: If examinee discovers the mistakes, and wants the NSO to correct, cue the examinee to make the necessary correction on sheet D-2 himself and continue with the review. Note: If examinee identifies early mistakes and stops, inform him to mark-up the needed changes, consider them incorporated and ask if the review is complete.

Note: The examinee needs to verify the determination of the indicated power that N-42 and N-44 must be adjusted to.

Note: If the examinee has NOT identified and corrected the incorrect adjustment determinations (N-44 and N-42) by the time the examinee signs Block 11, "Review Authorization", and ends the JPM then the JPM performance is UNSAT. IF ASKED (when examinee is making corrections):

Cue: N-44 reads 98.5%

Cue: N-42 still reads 101.5%

DETERMINE channel N-44 and N-42 require adjustment as follows:

o Ensure the present percent power values are filled in block 8.

o VERIFY the corrected calculated power difference from block 6 in block 9. o VERIFY/SUBTRACT the power difference from the present indicated power and the value as the Power to adjust the NIS channels to in block 10.

SRO Makes the following changes: N-42: changes block 9 to + 2.0 and block 10 to 99.5. N-44: changes block 8 to 98.5, changes block 9 to -1.0 and changes block 10 to 99.5

. SAT UNSAT N/A Comments:

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME

__________

COMMENTS:

Perform Shutdown Margin Calculation S-112 Page 28 of 53 TASK TITLE:

Perform Shutdown Margin Calculation JPM No.: S-112 REV: NRC 2014 Task No.: S-AM-123 K/A No.: 2.1.25 Objective No.: 7E.AM-123-A K/A IMP: 4.2 EXAMINEE: S RO EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 6 APPROX COMPLETION TIME: 20 MINUTES CRITICAL TIME:

45 minutes EVALUATION METHOD:

LOCATION: X PERFORM X IN PLANT SIMULATE SIMULATOR _ CLASSROOM GENERAL

REFERENCES:

1. 1BwOSR 3.1.1.1

-2, UNIT ONE SHUTDOWN MARGIN SURVEILLANCE DURING OPERATION, Rev. 3

. 2. BwCB-1 (Various), Braidwood Curve Book, Unit 1

. 3. 1BwOL 3.1.4, Rev. 5, LCOAR Rod Group Alignment Limits Tech Spec LCO 3.1.4.

MATERIALS:

1. Copy of 1BwOSR 3.1.1.1

-2. 2. Copy of BwCB

-1. 3. Copy of Braidwood Technical Requirements Manual (TRM)

. 4. Copy of Braidwood Tech Specs and Bases.

TASK STANDARDS:

1. Correctly determine total rod worth due to rods.
2. Correctly determine actual reactivity available due to rods.
3. Correctly determine current power defect.
4. Correctly determine shutdown margin is unacceptable for current plant conditions within 45 minutes. TASK CONDITIONS:
1. You are the Unit 1 Unit Supervisor.
2. Unit 1 is at full power (13,000 EFPH) with all control systems in automatic except rod control, which is in manual. Tave is 587 oF and Most Recent B10 Corrected RCS Boron sample is 300 ppm 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. Control Bank 'D' is at 220 steps. All other rods are fully withdrawn.
3. This is a time critical JPM.

INITIATING CUES:

1. 15 minutes ago it was determined rod M

-4 is inoperable and is immovable due to excessive friction. The QNE has been informed.

2. The unit NSO has completed 1BwOSR 3.1.1.1

-2, Unit One Shutdown Margin Surveillance During Operation, for your review.

3. Review the surveillance and if any changes are necessary, correct the surveillance.
4. Verify appropriate required actions are completed.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Perform Shutdown Margin Calculation S-112 Page 29 of 53 RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE EVALUATOR NOTE: JPM will be performed in the classroom.

1. Refer to completed 1BwOSR 3.1.1.1-2: NOTE: Critical Time begins when examinee understands initiating cue and accepts responsibility for task performance.

Record critical time start time:

__________

CUE: Ensure shutdown margin surveillance is handed to examinee.

CUE: All Prerequisites, Precautions, Limitations and Actions are met.

Refer to 1BwOSR 3.1.1.1

-2. SAT UNSAT N/A Comments: 2. Review Present Conditions: (step F.1) Note: NO errors present on step F.1. Review the following from initiating cue for completeness and/or errors

Date and Time: Current Date and 10 minutes ago Core Average Burnup: 13,000 EFPH Core Average Temperature:

587 F Power Level:

100% Present Boron Concentration:

300 ppm SAT UNSAT N/A Comments:

Perform Shutdown Margin Calculation S-112 Page 30 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

3. Review total worth due to rods (step F.2)

Note: NO errors present on step F.2 NOTE: Examinee may refer to BwCB-1, Figure 2c for an expanded scale of Figure 2 control bank D rod worth. NOTE: Examinee must refer to correct figure and burn up range. BwCB-1 , Figures 2 & 2c are for Hot Full Power and Figures 2a and 2d are for Hot Zero Power. From initiating cue, Unit 1 is at 100% power

. Review total worth due to rods by performing the following:

o Review control bank position: Bank D @ 220 steps (from initiating cue).

o Review control bank D inserted worth by performing the following:

o Refer to BwCB

-1 , Figure 2 for burn up range. o Record control bank D inserted worth:

1 5 pcm 10 pcm. o Review total available control bank worth by performing the following:

o Refer to BwCB

-1 , Table 4-1 for control bank worth for burn up.

o Determine control bank total worth: 3308.6 pcm. o Subtract control bank D

inserted worth from control bank total worth: 3308.6 pcm

- 15 pcm ( 10 pcm) = 3293.6 pcm ( 10 pcm). o Review total worth due to rods by performing the following:

o Refer to BwCB

-1 , Table 4-1 for shutdown bank worth for burn up range. o Determine shutdown bank total worth: 3648.2 pcm. o Review total rod worth by performing the following:

o Add shutdown bank total worth to available control bank worth: 3648.2 pcm + 3293.6 pcm ( 10 pcm) = 6941.8 pcm ( 10 pcm) SAT UNSAT N/A Comments:

Perform Shutdown Margin Calculation S-112 Page 31 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Review actual reactivity available due to rods (step F.3)

NOTE: Review value of highest stuck rod worth and determine that the highest stuck rod worth is incorrect (967.2 pcm) and that the correct value should be 1044.6 pcm. Note: If examinee discovers the mistakes, and wants the NSO to correct, cue the examinee to make th e

necessary correction on surveillance sheet and continue with the review. Note: If examinee identifies early mistakes and stops, inform them to mark-up the needed changes, consider them incorporated and ask if the review is complete.

NOTE: Review value of actual reactivity available due to rods and determine that the actual reactivity available due to rods is incorrect (3974.6 pcm) and that the value should be 3897.2 pcm.

Review actual reactivity due to rods by performing the following:

o Review the number of immovable and/or untrippable control rods:

1 (from initiating cue) o Review highest stuck rod worth by performing the following:

o Refer to BwC B-1 , Table 4-1 for highest stuck rod worth for burn

up. Determine and record highest stuck rod worth is incorrect at 967.2 and the correct value is: 1044.6 pcm

. o Review immovable /untrippable rod worth by performing the following:

o Multiply the number of immovable or untrippable control rods by 2000 pcm: 1 X 2000 pcm = 2000 pcm. o Review actual reactivity available due to rods by performing the following::

Subtract immovable

/untrippable rod worth and highest stuck rod worth from total rod worth and determine

that 6941.8 pcm ( 10 pcm) - 2000 pcm - 967.2 pcm = 3974.6 pcm ( 10 pcm) is incorrect and it should be: 6941.8 pcm ( 10 pcm) - 2000 pcm - 1044.6 pcm

= 3897.2 pcm ( 10 pcm). SAT UNSAT N/A Comments:

Perform Shutdown Margin Calculation S-112 Page 32 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE 5. Review current Power Defect (step F.4) Note: NO errors present on step F.4 Review the current power defect for boron concentration and power level by performing the following:

Refer to BwCB

-1, Figure 17A for power defect for burn up. Review power defect:

2667 50 pcm. OR Refer to BwCB

-1, Table 2-1 for power defect for burn up range of 6466.8 EFPH.

Review power defect:

2667 pcm. SAT UNSAT N/A Comments:

Perform Shutdown Margin Calculation S-112 Page 33 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

NOTE: Review value of available shutdown margin and determine that it is incorrect (1307.6 pcm) and the correct value should be: (1230.2 pcm 60 pcm) NOTE: Review value of minimum required shutdown margin and determine tha t 1.0% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value should be: 1.3% k/k x 1000 pcm/% k/k = 1300 pcm. NOTE: 1230.2 pcm 60 pcm < 1300 pcm is correct. If examinee only catches the shutdown margin limit of 1000 pcm instead of 1300 pcm shutdow n margin will still be adequate 1307.6 pcm

> 1300 pcm or if the examinee catches only the highest stuck rod worth shutdown margin will still be inadequate 1230.2 > 1000 pcm. NOTE: Critical Time ends when examinee completes surveillance or reports unacceptable shutdown margin. Record time that examinee reports unacceptable shutdown margin or completes surveillance: __________

Critical time =

_________

- ___________

(end time) (start time) 45 minutes. CUE: As SM, acknowledge report of inadequate shutdown margin and/or completion of 1BwOSR 3.1.1.1-2 and asks what their recommended actions are

. VERIFY Shutdown Margin by performing the following:

Review total corrected rod worth to power defect and determine that 3974.6 pcm ( 10 pcm) +

-2667 ( 50 pcm). = 1307.6 pcm ( 60 pcm) is incorrect and it should be: 3897.2 pcm ( 10 pcm) +

-2667 ( 50 pcm). = 1230.2 pcm ( 60 pcm). o Refer to TRM for Unit 1 COLR. Review the Shutdown Margin Limit for Modes 1 and 2 from the COLR and determine that 1.0

% k/k x 1000 pcm/% k/k = 1000 pcm is incorrect and the correct value is

1.3% k/k x 1000 pcm/% k/k = 1300 pcm. Determine the available shutdown reactivity is less than the minimum required Shutdown Margin Limit: 1230.2 pcm ( 60 pcm). <

1300 pcm Determine shutdown margin is unacceptable within 45 minutes of JPM start time

. o Determine 1BwOSR 3.1.1.1-2 is complete.

SAT UNSAT N/A Comments: PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

Perform Shutdown Margin Calculation S-112 Page 34 of 53 *7. Review LCO 3.1.4 or 1BwOL 3.1.4. Note: Hand examinee copy of 1BwOL 3.1.4 if asked for.

Determine that boration is required to be initiated to restore SDM.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

Verify Worker Tagout Checklist. S-200 Page 35 of 53 TASK TITLE:

Verify Worker Tagout Checklist. JPM No.: S-200 REV: NRC 2014 Task No.: 4E.AM-06 K&A No.: 2.2.15 Objective No.:

R-AM-010 K&A IMP: 4.3 EXAMINEE: SRO EVALUATOR:

DATE:

The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIM E: MINUTES CRITICAL ELEMENTS:

(*) 4, 6 , 7 APPROX COMPLETION TIME: 30 MINUTES CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

7. OP-AA-109-101, CLEARANC E AND TAGGING, REV 9

. 8. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, REV 24

. 9. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.

10. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS, Rev 22

. MATERIALS:

5. OP-AA-109-101, CLEARANCE AND TAGGING.
6. BwOP CV-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.
7. M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS.
8. BwOP WX-197, CHANGING LIQUID RADWASTE FILTERS.

TASK STANDARDS:

7. Verify isolation points correct for 2CV03F.
8. Determine 2CV8422 position incorrect for 2CV03F.
9. Determine the sequence of isolation points for 2CV03F is incorrect.

TASK CONDITIONS:

1. You are an extra supervisor on shift. 2. Unit 2 is at 100% power.
3. 2CV03F, Unit 2 RC Filter, needs to be replaced.
4. A worker tagout to isolate and drain 2CV03F, in accordance with BwOP CV

-10, CV FILTERS ISOLATION AND RETURN TO SERVICE, step F.3, has been prepared by another operator.

INITIATING CUES:

1. Shift Manager asks you to authorize/verify the clearance order.

CUE: Hand examinee partially completed Worker Tagout.

2. Review the WTO and if any changes are necessary, correct them

.

Verify Worker Tagout Checklist. S-200 Page 36 of 53 Verify Worker Tagout Checklist. S-200 Page 37 of 53 RECORD START TIME:

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

1. Refer to BwOP CV

-10, CV FILTERS ISOLATION AND RETURN TO SERVICE.

CUE: Provide examinee copy of BwOP CV-10. Refer to BwOP CV

-10, step F.3. SAT UNSAT N/A Comments: 2. Refer to Drawing:

M-138, sheet 5B, DIAGRAM OF CVCS AND BTRS CUE: Provide copy of M

-138, sheet 5B. Refer to M

-138, sheet 5B.

SAT UNSAT N/A Comments: 3. Verify the clearance BOUNDARY for 2CV03F.

Determines clearance boundary valves selected are correct: 2CV129 C/S, Demin Hi Temp Divert Valve.

2CV8421, RC Filter Bypass Valve.

2CV8425, RC Filter Inlet Isol Valve.

2CV8422, RC Filter Outlet Isol Valve.

2CV8424, RC Filter Drain Valve. 2CV8423, RC Filter Vent Valve. SAT UNSAT N/A Comments:

Verify Worker Tagout Checklist. S-200 Page 38 of 53 EVALUATOR NOTE: The examinee may determine the clearance position is incorrect (JPM step 6) prior to determining the sequence is incorrect (JPM step 4), or the examinee may discover both errors simultaneously. The examinee must identify both errors to complete critical tasks 4

& 6. EVALUATOR NOTE: The JPM contains corrected Worker Tagout checklist to be given to the examinee AFTER the errors are identified.

If the examinee first determines the incorrect sequence is listed on the Worker Tagout checklist prior to determining the incorrect position is listed, provide examinee JPM page 7.

If the examinee first determines the incorrect position is listed on the Worker Tagout checklist, provide examinee JPM page 8.

When the examinee has determined BOTH the incorrect sequence and position are listed on the Worker Tagout checklist, provide examinee JPM page 9.

PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 4. Determine the clearance SEQUENCE for the 2CV03F is incorrect.

CUE: Acknowledge as Unit Supervisor and inform examinee the checklist sequence will be corrected.

CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.

Determines clearance sequence is incorrect:

1. 2CV129 C/S, Demin Hi Temp Divert Valve. 2. 2CV8421 RC Filter Bypass Valve.
3. 2CV8422 RC Filter Outlet Isol Valve.
4. 2CV8425 RC Filter Inlet Isol Valve.
5. 2CV8424 RC Filter Drain Valve. 5. 2CV8423 RC Filter Vent Valve. o Notifies SM and NSOs of sequencing error.

SAT UNSAT N/A Comments: 5. Verify the tag type for 2CV03F.

Verifies clearance tag type:

2CV129 C/S, Demin Hi Temp Divert Valve

- CI. 2CV8421 RC Filter Bypass Valve - RI. 2CV8425 RC Filter Inlet Isol Valve

- RD. 2CV8422 RC Filter Outlet Isol Valve

- RD. 2CV8424 RC Filter Drain Valve - RI. 2CV8423 RC Filter Vent Valve - RI. SAT UNSAT N/A Comments:

Verify Worker Tagout Checklist. S-200 Page 39 of 53 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE

  • 6. Determine the clearance POSITION for the 2CV03F is incorrect.

CUE: Acknowledge as Unit Supervisor and inform examinee the checklist position will be corrected.

CUE: Hand examinee corrected worker tagout in accordance with the evaluator note above.

Determines clearance position is incorrect:

2CV129 C/S, Demin Hi Temp Divert Valve

- INFO. 2CV8421 RC Filter Bypass Valve - INFO. 2CV8425 RC Filter Inlet Isol Valve

- CLOSED. 2CV8422 RC Filter Outlet Isol Valve

- OPEN. 2CV8424 RC Filter Drain Valve - INFO. 2CV8423 RC Filter Vent Valve - INFO. o Notifies SM and NSOs of position error.

SAT UNSAT N/A Comments: *7. Authorize the clearance order.

Sign the WTO Authorization signature.

o Fill in the date and time.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME:

COMMENTS:

Verify Worker Tagout Checklist. S-200 Page 40 of 53 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:

Mode Dependent:

Condition Dependent:

Production Risk:

Environmental Risk:

Atmospheric Risk:

Reactivity Risk:

WORKER TAGOUT

  1. P14-005 JOB DESCRIPTION
CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________

DATE: Today ___________

SECOND APPROVAL:

__ Joe NSO ___________________

DATE: Today ___________

WTO AUTHORIZATION: _ __________________

DATE/TIME __________________

SPECIAL INSTRUCTIONS:

YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO 3 AS REQUIRED 2CV8421 RC FILTER BYPASS VLV 2 RI INFO 1 OPEN 2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED 2 CLOSED 2CV8422 RC FILTER OUTLET ISOL VLV 4 RD OPEN 2 CLOSED 2CV8424 RC FILTER DRAIN VLV 5 RI INFO 2 CLOSED 2CV8423 RC FILTER VENT VLV 5 RI INFO 2 CLOSED WTO PLACED: ___________________

__________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR:

WORK CREWMEMBER RELEASE: ___________________________

DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

Verify Worker Tagout Checklist. S-200 Page 41 of 53 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:

Mode Dependent:

Condition Dependent:

Production Risk:

Environmental Risk:

Atmospheric Risk:

Reactivity Risk:

WORKER TAGOUT

  1. P14-005 JOB DESCRIPTION
CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________

DATE: Today ___________

SECOND APPROVAL:

__ Joe NSO ___________________

DATE: Today ___________

WTO AUTHORIZATION: _ __________________

DATE/TIME __________________ SPECIAL INSTRUCTIONS:

YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO 3 AS REQUIRED 2CV8421 RC FILTER BYPASS VLV 2 RI INFO 1 OPEN 2CV8422 RC FILTER OUTLET ISOL VLV 3 RD CLOSED 2 CLOSED 2CV8425 RC FILTER INLET ISOL VLV 4 RD CLOSED 2 CLOSED 2CV8424 RC FILTER DRAIN V LV 5 RI INFO 2 CLOSED 2CV8423 RC FILTER VENT VLV 5 RI INFO 2 CLOSED WTO PLACED: ___________________

__________________________________________ DATE/TIME: ___________________

WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR:

WORK CREWMEMBER RELEASE:

___________________________

DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

Verify Worker Tagout Checklist. S-200 Page 42 of 53 ATTACHMENT 14 PART 1 WTO Form Hang/Lift Section Page 1 of 1 Exceptional C/O:

Mode Dependent:

Condition Dependent:

Production Risk:

Environmental Risk:

Atmospheric Risk:

Reactivity Risk:

WORKER TAGOUT

  1. P14-005 JOB DESCRIPTION
CHANGE 2CV03F_________________

WORKING DEPARTMENT: OPS W/O OR W/R: 12345 EQUIP. TAG# 2CV03F COMPONENT DESCRIPTION: UNIT 2 RC FILTER FIRST APPROVAL: __Jim NSO_________________________

DATE: Today ___________

SECOND APPROVAL:

__ Joe NSO ___________________

DATE: Today ___________

WTO AUTHORIZATION: _ __________________

DATE/TIME __________________

SPECIAL INSTRUCTIONS:

YES: NO: (IF YES SEE ATTACHMENT 14 PART 2)

EQUIP. TAG/EQUIPMENT NAME SEQ TAG TYPE POSITION HUNG BY VERIF. BY SFTY. VERIF. RTS SEQ RTS POSITION RTS BY VERIF. BY 2CV129 C/S (DEMIN HI TEMP DIVERT VLV) 1 CI INFO 3 AS REQUIRED 2CV8421 RC FILTER BYPASS VLV 2 RI INFO 1 OPEN 2CV8425 RC FILTER INLET ISOL VLV 3 RD CLOSED 2 CLOSED 2CV8422 RC FILTER OUTLET ISOL VLV 4 RD CLOSED 2 CLOSED 2CV8424 RC FILTER DRAIN VLV 5 RI INFO 2 CLOSED 2CV8423 RC FILTER VENT VLV 5 RI INFO 2 CLOSED WTO PLACED: ___________________

__________________________________________ DATE/TIME: ___________________ WTL COMPLETED WORK START: ______________________________________________ DATE/TIME: ___________________

WTO FINAL CLEAR:

WORK CREWMEMBER RELEASE:

___________________________

DATE/TIME: ___________________

WTO CLEARED: ____________________________________________________________ DATE/TIME: ____________________

(COPIES MAY BE MADE OF THIS FORM FOR ADDITIONAL ISOLATION POINTS)

Review Containment Release for Approval S-300 Page 43 of 53 TASK TITLE: Review Containment Release for Approval

JPM No.:

S-300 REV: NRC 2014 TPO No.: 8C.HP

-002 K&A No.: 2.3.11 TASK No.: S

-HP-002: Authorize Gaseous (Containment K&A IMP: 4.3 or Gas Decay Tank) Rad Waste Release EXAMINEE: RO SRO (circle one)

EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4, 6 APPROX COMPLETION TIME: 30 MINUTE S CRITICAL TIME:

N/A EVALUATION METHOD:

LOCATION: X PERFORM X IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

11. 1BwOS RETS 2.2.B

-1, Rev 2, Unit One Pre

-release Source and Channel Check of Containment Purge Effluent Monitor 1PR01J (1RE

-PR001A/B/C)

12. RP-BR-980, Rev 12, Containment Vent And Mini Purge Gaseous Effluents MATERIALS:
1. Copy of partially completed RP

-BR-980 TASK STANDARDS:

1. Review RP-BR-980. 2. Determine release cannot proceed due to error in RP

-BR-980. TASK CONDITIONS: 1. You are the Unit 1 Unit Supervisor.

2. Unit 1 is at 100% power; all systems and controls are normally aligned.
3. A Unit 1 Containment release package has been initiated to lower containment pressure.
4. 1BwOS RETS 2.2.B-1 has been previously completed, reviewed and approved.

INITIATING CUES:

1. The U1 Assist NSO has completed Containment Release package G 001 through step C.1.f., and states that the package is ready for you. (Cue: Hand release package and surveillance to examinee.)
2. Inform the U1 Admin NSO when the release package review is complete.

Review Containment Release for Approval S-300 Page 44 of 53 RECORD START TIME:

PERFORMANCE STEP STANDARD Circle Applicable

1. Refer to partially completed RP

-BR-980, Section C Cue: (If asked) Gaseous Release in progress sign has been placed and the 0A VA exhaust fan is in operation.

Reads Step D, determines SRO approval required.

Reviews entire document SAT UNSAT N/A Comments: 2. Review Section A Reviews steps A.5.d Determines baseline values for ALERT and ALARM setpoints apply

. SAT UNSAT N/

A Comments: *3. Determines HIGH Alarm Setpoint was incorrectly established Identifies that the value entered for the HIGH Alarm Setpoint is in error and should be 6.06E

-04Ci/cc. SAT UNSAT N/A Comments: *4. Determines ALERT Alarm Setpoint was incorrectly established Identifies that the value entered for the ALERT Alarm Setpoint is in error and should be 6.06E

-05Ci/cc. SAT UNSAT N/A Comments: 5. Review Section C Cue: Shift Manager acknowledges step A.5.d error failure.

Identify from review that section C.1.c should have been N/A. SAT UNSAT N/A Comments: *6. Determines HIGH and ALERT Alarm Setpoint was incorrectly inputted Identify that the operator incorrectly inputted 7.23E-3Ci/cc into the High and Alert alarm setpoints instead of 7.23E-6Ci/cc in section C.1.c. Also determines that 7.23E

-6Ci/cc is incorrect and the HIGH Alarm Setpoint is in error and should be 6.06E

-04Ci/cc and ALERT Alarm Setpoint is in error and should be 6.06E

-05Ci/cc SAT UNSAT N/A Comments: *7. Refuse to approve release until HIGH Alarm and ALERT Alarm setpoints are correctly entered.

Determine release is unable to be performed (cannot be signed) until errors are resolved.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM RECORD STOP TIME:

COMMENTS:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 45 of 53 TASK TITLE:

Perform Nuclear Accident Reporting System Notification JPM No.: S-413 REV: NRC 2014 TPO No.: 7.F.ZP-001 K&A No.: 2.4.40 TASK No.: S-ZP-001: Complete the NARS Form K&A IMP: 4.5 EXAMINEE: SRO EVALUATOR:

DATE: The Examinee:

PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 13, 14 APPROX COMPLETION TIME:

13 MINUTES CRITICAL TIME:

15 minutes

EVALUATION METHOD:

LOCATION: X PERFORM IN PLANT SIMULATE X SIMULATOR X CLASSROOM GENERAL

REFERENCES:

13. EP-AA-112, Rev 16, ERO/ERF Activation and Operation

. 14. EP-MW-114-100, Rev 13, MW Region Offsite Notifications

. 15. EP-AA-111, Rev 18, Emergency Classification and Protective Action Recommendations

. 16. EP-MW-1 14-100-F-01, Rev G, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM. 17. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.

MATERIALS:

2. EP-AA-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.
3. EP-AA-111-F-02, Rev. E, Braidwood Plant Based PAR Flowchart.
4. EP-MW-114-100, Rev 13, MW Region Offsite Notifications.

TASK STANDARDS:

10. Complete NARS form.
11. Determine Protective Action Recommendations.
12. Perform Notifications.

TASK CONDITIONS:

1. You are the Shift Emergency Director and the crew is performing 1BwFR

-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK.

2. No release is occurring.
3. A general emergency has just been declared under MG2, due to the ATWS and Loss of Heat Sink.
4. No hostile action in progress.
5. No impediments to evacuation.

Perform Nuclear Accident Reporting System Notification S-41 3 Page 46 of 53 6. This is a Time Critical JPM.

INITIATING CUES:

The Emergency Plan requires that you COMPLETE AND TRANSMIT the initial NARS form. The Accident was just classified as a General Emergency, MG2, due to the ATWS and Loss of Heat Sink

.

Perform Nuclear Accident Reporting System Notification S-41 3 Page 47 of 53 RECORD START TIME

(Start time is after the student accepts and understands the task)

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to NARS form

. CUE: Provide copy of NARS form to examinee (and

EP-MW-114-100 if a sked and EP-AA-111-F-02, Braidwood Plant Based PAR Flowchart if

asked) Refer to NARS form

. SAT UNSAT N/A Comments: 2. Record Utility Message Number. Enters number "1"

. SAT UNSAT N/A Comments: 3. Record State Message Number. Enters "N/A". SAT UNSAT N/A Comments: *4. Complete Sections 1

-4. Completes sections 1

-4 as follows:

o Status - [1B] Drill/Exercise o Station- [2A] Braidwood On-Site Condition

- [3D] General Emergency o Accident Classified

-Time: No later than Current Time Date: Today's Date EAL#: MG2 o Accident Terminated

- Time and Date: N/A SAT UNSAT N/A Comments: 5. Release Status

. Place "X" by occurring

[5A] None SAT UNSAT N/A Comments: 6. Type of Release

. Place "X" by Gaseous

[6A] Not Applicable

SAT UNSAT N/A Comments: 7. Check Wind Direction and speed. CUE: Wind direction is 270 deg. Wind speed is 10 mph Record actual data from PPDS: o Direction (~270 deg) o Speed (mark units)

(~10 mph) SAT UNSAT N/A Comments:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 48 of 53 PERFORMANCE STEP STANDARD Circle applicable

8. Recommended Actions from EP-AA-111-F-02. In block 9, Check box:

o [9D] Evacuate Illinois Sub Areas 1,3,10 SAT UNSAT N/A Comments: 9. Enter additional info

. Record "none" in block 10

SAT UNSAT N/A Comments: 10. NARS form approved by Shift Emergency Director

. CUE: No Verifier is available to second check the NARS form Sign the 'Approved by' line SAT UNSAT N/A Comments: 1 1. Refer to EP

-MW-114-100, MW REGION OFFSITE NOTIFICATIONS.

Refer to EP

-MW-114-100: Determine step 4.2 needs to be performed.

SAT UNSAT N/A Comments: 1 2 Refer to EP

-MW-114-100-F-01, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM.

Refer to EP

-MW-114-100-F-01: Determine NARS Code 38 to be used to transmit NARS form.

SAT UNSAT N/A Comments:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 49 of 53 PERFORMANCE STEP STANDARD Circle applicable

  • 1 3. Establish communications:

Note: After examinee dials Code 38, provide the following cue:

CUE: After a short pause, a beep is heard, followed by a seven more beeps, for a total of 8 beeps.

NOTE: If Examinee dials Code 20 (which is wrong) use Code 20 cue.

Otherwise use Code 38 Cue.

Note: After examinee reads messages, provide the following cue:

CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online Note: Once initial roll call is complete critical time STOPS: Establish communications as follows:

Pick up NARS phone.

DIAL code 38.

Read the following message:"This is Exelon Nuclear Braidwood Station Control Room. Please standby for a NARS message." o Read the following message:"This is the Exelon Nuclear Braidwood Station Control room. Please standby to receive a NARS message and respond as the roll is called." TAKE Initial Roll Cal l Mark Initial Boxes for IEMA Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA Kankakee Co. EOC Will Co. EOC.

o Record time and date initial roll call complete. SAT UNSAT N/A Comments:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 50 of 53 PERFORMANCE STEP STANDARD Circle applicable EVALUATOR NOTE: Critical time TIME STOPS when completes initial roll call of the NARS form.

Determine critical time:

_________________________ - ________________________ = ________________________

(Initial roll call complete) (JPM start time)

< 15 minutes

Perform Nuclear Accident Reporting System Notification S-41 3 Page 51 of 53 PERFORMANCE STEP STANDARD Circle applicable

  • 1 4. Verbally transmit the NARS Form.

Verbally transmit the NARS Form:

Utility Message No:

1_ State Message No: N/A Status - [B] Drill/Exerci se Station - [A] Braidwood Onsite Condition - [D] General Emergency Accident Classified:

Time: When JPM started. Date: Today. EAL # : MG 2 Accident Terminated Date and Time: N/A Release Status: [A] None Type of Release: [A] Not Applicable Wind Dir:

270 Wind Speed:

o [A] is N/A

[B] 10 Miles/Hr Utility recommendation:

[D] Evacuate Illinois Sub Areas 1,3,10 (Block 10) Additional Information

None Verified With: N/A Approved By: S. Manager SAT UNSAT N/A Comments:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 52 of 53 PERFORMANCE STEP STANDARD Circle applicable 1 5. Complete the NARS form.

CUE: IF examinee asks for a phone number to use, provide: outside line is 815

-458-7882. CUE: John Smith, IEMA. Fill in the following information on the NARS Form after transmitting info in blocks 1

-10: Mark 11A, EXELON Examinee Name Outside line number Current Time Current Date Name of person from IEMA receiving message Organization (IEMA)

Current time Today's date SAT UNSAT N/A Comments: 1 6. Perform Final Roll Call Note: As examinee performs final roll call provide the following cues:

CUE Code 38: IEMA online, Grundy Co. Sheriff online Kankakee Co. Sheriff online Will Co. Sheriff online Illinois REAC online Grundy Co. EMA online Kankakee Co. EOC online Will Co. EOC online CUE Code 20: IEMA online, Illinois REAC online CUE: No questions.

PERFORM Final Roll Call and marks boxes for:

IEM A Grundy Co. Sheriff Kankakee Co. Sheriff Will Co. Sheriff Illinois REAC Grundy Co. EMA, Kankakee Co. EOC Will Co. EOC Ask if there are any questions about the information provided.

SAT UNSAT N/A Comments:

Perform Nuclear Accident Reporting System Notification S-41 3 Page 53 of 53 PERFORMANCE STEP STANDARD Circle applicable 1 7. STATE "NARS communication is complete." STATE "NARS communication is complete."

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME

COMMENTS: