ML17309A773: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PR.IVOR.l EY'ACCELERATED RIDSPROCESSING)
{{#Wiki_filter:PR.IVOR.l EY'ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTXON SYSTEM(RIDS)DOCKETI05000335NOTES:ACCESSION NBR:9502270257 DOC.DATE:
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)DOCKET I 05000335 NOTES: ACCESSION NBR:9502270257 DOC.DATE: 95/02/21 NOTARIZED:
95/02/21NOTARIZED:
NO FACIL:50-335 St: Lucie Plant, Unit 1, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
NOFACIL:50-335 St:LuciePlant,Unit1,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION SAGER,D.A.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)Zpjg  
FloridaPower6LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)Zpjg


==SUBJECT:==
==SUBJECT:==
ForwardsRev0to"SecondISIIntervalSecondInspPeriodThirdOutage1994SummaryReptSubmittal."
Forwards Rev 0 to"Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal." DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR l ENCL L SIZE: P 50 TXTLE: OR Submittal:
DISTRIBUTION CODE:A047DCOPIESRECEIVED:LTR lENCLLSIZE:P50TXTLE:ORSubmittal:
Xnservice/Testing/Relief from ASMMCode-GL-89-04 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: CR XLE CE XER~Ol NRR7DE/EME B OGC/HDS3 EXTERNAL: LITCO BROWN,B NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME I C NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1.1 1 YOTE TO ALL"RIDS" RECIPIEYTS:
Xnservice/Testing/Relief fromASMMCode-GL-89-04RECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
PLEASE HELP US TO REDUCE~VASTE!COYTACT'I'HE DOCL'MIEN CONTROL DESK, ROON!PI-37 I EXT.504-70S3)TO E LI XII%ATE YOUR XAII E PRO%I DISTRIBU'I'ION LISTS I'OR DOCI.'4!EX'I'S YOL'OY,"I'LI;D!
CRXLECEXER~OlNRR7DE/EME BOGC/HDS3EXTERNAL:
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19 Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 February 21, 1995 L-95-47 10 CFR 50.55a 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Unit 1 Docket No.50-335 1994 Fall Refueling Outage In-Service Ins ection Summar Re ort In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service Inspection (ISI)Summary Report for St.Lucie Unit 1 1994 Fall refueling outage.IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service inspection conducted during the outage.Included with the NIS-1 Report are several attachments that include the 1994 Eddy Current Summary Report, 1994 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owners'eport for Repairs and Replacements performed since the preceding summary report submittal.
LITCOBROWN,BNOACCOPIESLTTRENCL1111661111101111RECIPIENT IDCODE/NAME PD2-2PDAEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCORANSOMEICNRCPDRCOPIESLTTRENCL111111111111.11YOTETOALL"RIDS"RECIPIEYTS:
The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St.Lucie Unit 1 Technical Specifications (TS).The TS requires the submittal of the Steam Generator Tube In-Service Inspection Special Report within 12 months of completing the tube inspection.
PLEASEHELPUSTOREDUCE~VASTE!COYTACT'I'HE DOCL'MIEN CONTROLDESK,ROON!PI-37IEXT.504-70S3)TOELIXII%ATEYOURXAIIEPRO%IDISTRIBU'I'ION LISTSI'ORDOCI.'4!EX'I'S YOL'OY,"I'LI;D!
Should there be any questions, please contact us.Very truly yours, D.A.Vice r St.L er sident e Plant DAS/grm Enclosure cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9502270257 950221 PDR ADOCK 05000335 9 PDR an FPL Group company}}
TOTALNUMBEROFCOPIESREQUIRED:
LTTR20ENCL19 FloridaPower5LightCompany,P.O.Box128,FortPierce,FL34954-0128 February21,1995L-95-4710CFR50.55a10CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnit1DocketNo.50-3351994FallRefueling OutageIn-Service InsectionSummarReortInaccordance withArticleIWA-6000ofASMESectionXI,enclosedistheIn-Service Inspection (ISI)SummaryReportforSt.LucieUnit11994Fallrefueling outage.IWA-6230requiresthereporttobesubmitted totheauthority havingjurisdiction within90daysofcompleting thein-service inspection conducted duringtheoutage.IncludedwiththeNIS-1Reportareseveralattachments thatincludethe1994EddyCurrentSummaryReport,1994OutageSnubberFunctional TestingSummaryReport,andtheNIS-2Owners'eport forRepairsandReplacements performed sincethepreceding summaryreportsubmittal.
TheEddyCurrentSummaryReportprovidestheinformation requiredbySections4.4.5.5.b and6.9.2oftheSt.LucieUnit1Technical Specifications (TS).TheTSrequiresthesubmittal oftheSteamGenerator TubeIn-Service Inspection SpecialReportwithin12monthsofcompleting thetubeinspection.
Shouldtherebeanyquestions, pleasecontactus.Verytrulyyours,D.A.VicerSt.LersidentePlantDAS/grmEnclosure cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant9502270257 950221PDRADOCK050003359PDRanFPLGroupcompany}}

Revision as of 11:00, 6 July 2018

Forwards Rev 0 to Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal.
ML17309A773
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/21/1995
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B027 List:
References
L-95-47, NUDOCS 9502270257
Download: ML17309A773 (2)


Text

PR.IVOR.l EY'ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)DOCKET I 05000335 NOTES: ACCESSION NBR:9502270257 DOC.DATE: 95/02/21 NOTARIZED:

NO FACIL:50-335 St: Lucie Plant, Unit 1, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)Zpjg

SUBJECT:

Forwards Rev 0 to"Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal." DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR l ENCL L SIZE: P 50 TXTLE: OR Submittal:

Xnservice/Testing/Relief from ASMMCode-GL-89-04 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: CR XLE CE XER~Ol NRR7DE/EME B OGC/HDS3 EXTERNAL: LITCO BROWN,B NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME I C NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1.1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE~VASTE!COYTACT'I'HE DOCL'MIEN CONTROL DESK, ROON!PI-37 I EXT.504-70S3)TO E LI XII%ATE YOUR XAII E PRO%I DISTRIBU'I'ION LISTS I'OR DOCI.'4!EX'I'S YOL'OY,"I'LI;D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19 Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 February 21, 1995 L-95-47 10 CFR 50.55a 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Unit 1 Docket No.50-335 1994 Fall Refueling Outage In-Service Ins ection Summar Re ort In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service Inspection (ISI)Summary Report for St.Lucie Unit 1 1994 Fall refueling outage.IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service inspection conducted during the outage.Included with the NIS-1 Report are several attachments that include the 1994 Eddy Current Summary Report, 1994 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owners'eport for Repairs and Replacements performed since the preceding summary report submittal.

The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St.Lucie Unit 1 Technical Specifications (TS).The TS requires the submittal of the Steam Generator Tube In-Service Inspection Special Report within 12 months of completing the tube inspection.

Should there be any questions, please contact us.Very truly yours, D.A.Vice r St.L er sident e Plant DAS/grm Enclosure cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9502270257 950221 PDR ADOCK 05000335 9 PDR an FPL Group company