| {{#Wiki_filter:SouthernNuclearFEB262IIWDocketNos.:52-02552-026U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington,D.C.20555-0001 MichaelJ.VoxRegulatoryAffairsDirectorVogtle3&4 7825RiverRoadWaynesboro, GA308307068486459telmyox@soutfiernco.com ND-18-0154VogtleElectric GeneratingPlant-Units3 and4NinthSix-Month StatusReportoftheImplementation oftheRequirements oftheCommission OrderwithRegardtoMitioation Strategies forBevond-Desian-Basis ExternalEvents(EA-12-049) | | {{#Wiki_filter:Southern Nuclear FEB26 2IIW Docket Nos.: 52-025 52-026U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington,D.C.20555-0001 Michael J.Vox RegulatoryAffairsDirectorVogtle3&4 7825 River Road Waynesboro, GA 30830 706 848 6459 tel myox@soutfiernco.com ND-18-0154VogtleElectric GeneratingPlant-Units3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitioation Strategies for Bevond-Desian-Basis External Events (EA-12-049) |
|
| |
|
| ==References:== | | ==References:== |
|
| |
|
| 1.NRCOrderNumberEA-12-049, OrderModifying LicenseswithRegardtoRequirements forMitigation Strategies forBeyond-Design-BasisExternalEvents, datedMarch12,2012.2.NRCInterimStaff GuidanceJLD-ISG-2012-01, Compliance withOrderEA-12-049, OrderModifying LicenseswithRegardtoRequirements forMitigation StrategiesforBeyond-Design-Basis ExternalEvents,Revision0, datedAugust29,2012.NEI12-06,DiverseandFlexibleCoping Strategies (FLEX)ImplementationGuide,Revision0, datedAugust2012.VogtleElectricGeneratingPlant-Units3and4 OverallIntegratedPlanin ResponsetoCommissionOrder withRegardtoMitigation Strategies forBeyond-Design-Basis ExternalEvents(EA-12-049), | | 1.NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-BasisExternalEvents, datedMarch12,2012.2.NRCInterimStaff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses withRegardto Requirements for Mitigation StrategiesforBeyond-Design-Basis External Events,Revision0, dated August 29, 2012.NEI 12-06, Diverse andFlexibleCoping Strategies (FLEX)ImplementationGuide,Revision0, dated August 2012.Vogtle ElectricGeneratingPlant-Units3and4 OverallIntegratedPlanin Response toCommissionOrder withRegardto Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), dated August 22, 2013.3.4.Ladies and Gentlemen;OnMarch 12, 2012,theNuclearRegulatoryCommission (NRC)issuedanorder(Reference1) to SouthernNuclearOperatingCompany. |
| datedAugust22,2013.3.4.LadiesandGentlemen;OnMarch12,2012,theNuclearRegulatoryCommission (NRC)issuedanorder(Reference1) toSouthernNuclearOperatingCompany.
| | Reference1wasimmediatelyeffectiveanddirected the Vogtle Electric GeneratingPlant-Units3and4 (VEGP 3&4)to develop, implement, and maintainguidanceandstrategiesto maintainorrestorecore cooling,containment,andspent fuel pool cooling capabilities intheeventofabeyond-design-basisexternalevent.Specific requirements areoutlinedin Attachment3of Reference 1.Reference1requiredsubmissionofan OverallIntegratedPlan withinoneyearafterissuanceof thefinalNRCInterimStaff Guidance (ISG)(Reference 2).Reference 2 endorses industryguidancedocument NEI 12-06, Revision0(Reference3) with clarificationsandexceptionsidentifiedin Reference 2.Reference4provided theVEGP3&4Overall Integrated Plan. |
| Reference1wasimmediatelyeffectiveanddirected theVogtleElectricGeneratingPlant-Units3and4(VEGP3&4)todevelop,implement, andmaintainguidanceandstrategiesto maintainorrestorecore cooling,containment,andspent fuelpoolcoolingcapabilities intheeventofabeyond-design-basisexternalevent.Specific requirements areoutlinedin Attachment3ofReference 1.Reference1requiredsubmissionofan OverallIntegratedPlan withinoneyearafterissuanceof thefinalNRCInterimStaff Guidance(ISG)(Reference 2).Reference 2endorsesindustryguidancedocument NEI12-06,Revision0(Reference3) withclarificationsandexceptionsidentifiedin Reference 2.Reference4provided theVEGP3&4Overall Integrated Plan. | | U.S.Nuclear Regulatory Commission ND-18-0154 Page 2 Reference 1 requires submissionofa status report at six-month intervals following submittal of the overall integrated plan.Reference 3 provides direction regarding the content of the status reports and wasfollowedin developing the enclosed report.The purpose of thisletteristo provide the ninth six-month status report pursuant to Section IV,ConditionC.2,of Reference 1, that delineates progress made in implementing the requirements of Reference 1.The enclosed report provides an update of milestone accomplishments since the submission of theVEGP3&4 Overall IntegratedPlan,including any changes to the compliance method, schedule, or need for relief and the basis, if any.This letter contains no new NRC commitments.Ifyou have any questions, please contact Dave Midlik at 706-848-6737. |
| U.S.NuclearRegulatory Commission ND-18-0154 Page2Reference 1requiressubmissionofastatusreportatsix-month intervals following submittal oftheoverallintegrated plan.Reference 3providesdirection regarding thecontentofthestatusreportsandwasfollowedin developing theenclosedreport.Thepurposeofthisletteristo providetheninthsix-month statusreportpursuanttoSectionIV,ConditionC.2,of Reference 1,thatdelineates progressmadeinimplementing therequirements ofReference 1.Theenclosedreportprovidesanupdateofmilestone accomplishments sincethesubmission oftheVEGP3&4OverallIntegratedPlan,including anychangestothecompliance method,schedule, orneedforreliefandthebasis,ifany.ThislettercontainsnonewNRCcommitments.Ifyouhaveanyquestions, pleasecontactDaveMidlikat706-848-6737. | | I declare upder penaltyofperjury that theforegoingis true and correct.Executed on the day of 2018.Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Michael J.Vox Regulatory Affairs/Director Vogtle 3&4 Southern Nuclear Operating Company MJY/DWM/amw |
| Ideclareupderpenaltyofperjury thattheforegoingis trueandcorrect.Executedonthedayof2018.Respectfully submitted, SOUTHERNNUCLEAROPERATING COMPANYMichaelJ.VoxRegulatory Affairs/Director Vogtle3&4SouthernNuclearOperating CompanyMJY/DWM/amw
| |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| VogtleElectric GeneratingPlant-Units3 and4NinthSix-Month StatusReportoftheImplementation oftheRequirementsoftheCommission OrderwithRegardto MitigationStrategiesfor Beyond-Design-Basis ExternalEvents(EA-12-049) | | VogtleElectric GeneratingPlant-Units3 and 4NinthSix-Month StatusReportof the Implementation of the RequirementsoftheCommission OrderwithRegardto MitigationStrategiesfor Beyond-Design-Basis External Events (EA-12-049) |
| U.S.NuclearRegulatory Commission ND-18-0154 Page3go:SouthernNuclearOperating Company/GeorgiaPowerCompanyMr.8.Kuczynski(w/o enclosure)Mr.D.A.Bost(w/o enclosure)Mr.M.D.Rauckhorst (w/oenclosure) | | U.S.Nuclear Regulatory Commission ND-18-0154 Page 3 go: Southern Nuclear Operating Company/Georgia Power Company Mr.8.Kuczynski(w/o enclosure)Mr.D.A.Bost(w/o enclosure)Mr.M.D.Rauckhorst (w/o enclosure) |
| Mr.M.D.MeierMr.D.H.Jones(w/oenclosure)Mr.D.L.McKlnneyMr.T.W.YelvertonMr.B.H.WhitleyMr.0.R.PierceMs.A.G.AughtmanMr.W.A.SparkmanMs.A.0.Chamberlain Mr.O.J.MillerMr.J.D.WilliamsMr.M.J.VoxMr.T.G.PetrakMs.A.L.PughMr.A.8.PartonMr.M.K.Washington Ms.K.A.RobertsMs.K.M.8tacyMr.C.T.DefnallMr.D.R.CulverDocumentCervicesRTYPE:VND.LI.L06 FileAR.01.02.06 NuclearReoulatorv CommissionMr.W.Jones(w/oenclosure) | | Mr.M.D.Meier Mr.D.H.Jones (w/o enclosure)Mr.D.L.McKlnney Mr.T.W.YelvertonMr.B.H.Whitley Mr.0.R.PierceMs.A.G.AughtmanMr.W.A.Sparkman Ms.A.0.Chamberlain Mr.O.J.Miller Mr.J.D.Williams Mr.M.J.Vox Mr.T.G.PetrakMs.A.L.Pugh Mr.A.8.PartonMr.M.K.Washington Ms.K.A.RobertsMs.K.M.8tacy Mr.C.T.Defnall Mr.D.R.Culver Document Cervices RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv CommissionMr.W.Jones (w/o enclosure) |
| Ms.J.M.Heisserer Mr.C.P.PatelMr.M.E.EmstesMr.G.J.KhouriMr.T.E.ChandlerMs.8.E.TempleMs.P.BraxtonMr.F.D.BrownMr.A.J.LerchMr.C.J.EvenMs.V.L.OrdazMs.L.A.KentMr.P.B.DonnellyMr.N.D.KarlovichMs.C.D.TaylorMs.A.E.Rivera-Varona Mr.B.J.Kemker U.S.NuclearRegulatory Commission ND-18-0154 Page4Qqlethorpe PowerCorporation Mr.R.B.BrinkmanMunicipal ElectricAuthority ofGeorgiaMr.J.E.FullerMr.S.M.JacksonDaltonUtilities Mr.T.BundrosWestinohouse ElectricCompany.LLCMr.R.Easterling (w/oenclosure)Mr.G.Koucheravy (w/oenclosure) | | Ms.J.M.Heisserer Mr.C.P.Patel Mr.M.E.Emstes Mr.G.J.Khouri Mr.T.E.Chandler Ms.8.E.Temple Ms.P.Braxton Mr.F.D.Brown Mr.A.J.Lerch Mr.C.J.Even Ms.V.L.Ordaz Ms.L.A.KentMr.P.B.Donnelly Mr.N.D.KarlovichMs.C.D.Taylor Ms.A.E.Rivera-Varona Mr.B.J.Kemker U.S.Nuclear Regulatory Commission ND-18-0154 Page 4 Qqlethorpe Power Corporation Mr.R.B.Brinkman Municipal Electric Authority of Georgia Mr.J.E.Fuller Mr.S.M.Jackson Dalton Utilities Mr.T.Bundros Westinohouse Electric Company.LLC Mr.R.Easterling (w/o enclosure)Mr.G.Koucheravy (w/o enclosure) |
| Ms.K.B.CheskoMr.J.HopkinsMr.D.HawkinsMr.M.L.Clyde Mr.J.WatkinsOtherMr.J.E.Hesler,BechtelPowerCorporationMs.L.A.Matis,TetraTechNUS,Inc.Dr.W.R.Jacobs,Jr.,Ph.D.,CDSAssociates, Inc.Mr.S.Roetger,GeorgiaPublicServiceCommissionMs.S.W.Kernizan, GeorgiaPublicServiceCommissionMr.K.C.Greene,TroutmanSandersMr.S.Blanton,BalchBIngham Enclosure VogtleElectricGenerating Plant-Units3and4NinthSix-Month StatusReportoftheImplementation oftheRequirements oftheCommission OrderwithRegardtoMitigation Strategies forBevond-Desian-Basis ExternalEvents(EA-12-049) | | Ms.K.B.Chesko Mr.J.Hopkins Mr.D.HawkinsMr.M.L.Clyde Mr.J.Watkins Other Mr.J.E.Hesler, Bechtel Power CorporationMs.L.A.Matis, Tetra Tech NUS, Inc.Dr.W.R.Jacobs, Jr., Ph.D., CDS Associates, Inc.Mr.S.Roetger, Georgia Public Service CommissionMs.S.W.Kernizan, Georgia Public Service CommissionMr.K.C.Greene, Troutman Sanders Mr.S.Blanton, Balch BIngham Enclosure Vogtle Electric Generating Plant-Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events (EA-12-049) |
| Enclosure toND-18-0154NinthSix-Month StatusReportofFLEXImplementation VogtleElectricGenerating Plant-Units3and4NinthSix-Month StatusReportoftheImplementation oftheRequirements oftheCommission OrderwithRegardtoMitigation Strategies forBevond-Desian-Basis ExternalEventsfEA-12-049) 1IntroductionVogtleElectric GeneratingPlant-Units3 and4developedanOverall Integrated Plan(Reference1inSection8),documenting thediverseandflexiblestrategies(FLEX),in responsetoReference 2.Thisenclosure providesanupdateofmilestone accomplishments sincesubmittalof theOverallIntegratedPlan,including anychangestothecompliance method,schedule, orneedforrelief/relaxation andthebasis,ifany.2Milestone AccomplishmentsInadditionto thesubmittalof statusreports,thefollowing milestone(s) directlyrelatedtoFLEXimplementationhave beencompletedsincethedevelopmentoftheOverallIntegratedPlan (Reference 1),andarecurrentasofFebruary28,2018:*None3Milestone ScheduleStatusThefollowing providesanupdateto Attachment2oftheOverallIntegrated Plan.Itprovidesthe activitystatusofeach item,andwhethertheexpected completiondatehaschanged.Thedates areplanningdatessubjecttochange asdesignand implementationdetailsaredeveloped.Therevisedmilestonetargetcompletion datedoesnotimpacttheOrderimplementationdate. | | Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX Implementation Vogtle Electric Generating Plant-Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events fEA-12-049) 1 IntroductionVogtleElectric GeneratingPlant-Units3 and 4 developedanOverall Integrated Plan (Reference1in Section 8), documenting the diverse and flexible strategies(FLEX),in response to Reference 2.This enclosure provides an update of milestone accomplishments sincesubmittalof the Overall IntegratedPlan,including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.2 Milestone AccomplishmentsInadditionto thesubmittalof status reports, the following milestone(s) directly related to FLEXimplementationhave beencompletedsincethedevelopmentoftheOverallIntegratedPlan (Reference 1), and are current as of February 28, 2018:*None 3 Milestone Schedule Status The following providesanupdateto Attachment2ofthe Overall Integrated Plan.Itprovidesthe activitystatusofeach item,andwhethertheexpected completiondatehaschanged.Thedates are planning datessubjecttochange asdesignand implementationdetailsaredeveloped.Therevisedmilestonetargetcompletion date doesnotimpacttheOrderimplementationdate. |
| Page1of3 Enclosure toND-18-0154NinthSix-Month StatusReportofFLEXimplementation Milestone TargetCompletion DateActivityStatusRevisedTargetCompletion DateSubm60DayStatusReportOct2012CompleteN/ASubmOyerallIntegrated PlanAug2013CompleteN/ASubm6MonthStatusReportFeb2014CompleteN/ASubm6MonthStatusReportAug2014CompleteN/ASubm6MonthStatusReportFeb2015CompleteN/ASubm6MonthStatusReportAug2015CompleteN/ASubm6MonthStatusReportFeb2016CompleteN/ASubm6MonthStatusReportAug2016CompleteN/ASubm6MonthStatusReportFeb2017CompleteN/ASubm16MonthStatusReportAug2017CompleteN/ASubm16MonthStatusReportFeb2018CompleteN/ASubm16MonthStatusReportAug2018NotStartedSubm16MonthStatusReportFeb2019NotStartedSubm16MonthStatusReportAug2019NotStartedStaffingAnalysisCompleted Oct2019NotStartedEnsureOperational Procedures includenecessarv information Noy2019NotStartedDevelopResponsePlanwithNSRC(storageplanandprocedural guidanceforstrategy/maintenance) | | Page1of3 Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX implementation Milestone Target Completion Date Activity Status Revised Target Completion Date Subm 60 Day Status Report Oct2012 Complete N/A Subm Oyerall Integrated Plan Aug 2013 Complete N/A Subm 6 Month Status Report Feb 2014 Complete N/A Subm 6 Month Status Report Aug 2014 Complete N/A Subm 6 Month Status Report Feb 2015 Complete N/A Subm 6 Month Status Report Aug 2015 Complete N/A Subm 6 Month Status Report Feb 2016 Complete N/A Subm 6 Month Status Report Aug 2016 Complete N/A Subm 6 Month Status Report Feb 2017 Complete N/A Subm 16 Month Status Report Aug 2017 Complete N/A Subm 16 Month Status Report Feb 2018 Complete N/A Subm 16 Month Status Report Aug 2018 Not Started Subm 16 Month Status Report Feb 2019 Not Started Subm 16 Month Status Report Aug 2019 Not Started Staffing Analysis Completed Oct2019 Not Started Ensure Operational Procedures include necessarv information Noy2019 Not Started Develop Response Plan with NSRC(storageplanandprocedural guidance for strategy/maintenance) |
| NOV2019NotStartedInitiatePhase3Eguipment Procurement Dec2019NotStartedSubmit6MonthStatusReportFeb2020NotStartedTrainingCompletefor Phase3FLEXstrategies Aug2020NotStartedNSRCOperational forVogtle3&4Aug2020NotStartedSubmit6MonthStatusReportAug2020NotStartedDemonstration forUnit3Oct2020NotStartedApr2020^Completion ReportForUnit3Dec2020NotStartedSubmit6MonthStatusReportFeb2021NotStartedDemonstration forUnit4Apr2021NotStartedSubmitCompletion ReportForUnit4Jun2021NotStartedUnit3-Full compliancepriortoFuelLoadtorUnit3 Unit4-FullcompliancepriortoFuelLoadfor Unit4^TherevisedtargetcompletiondatedoesnotimpacttheOrderimplementation date.4ChangestoCompliance MethodTherearenochangestothecompliance methodasdocumented intheOverallIntegrated Plan(Reference1ofthisenclosure).
| | NOV2019 Not Started Initiate Phase 3 Eguipment Procurement Dec 2019 Not Started Submit 6 Month Status Report Feb 2020 Not Started TrainingCompletefor Phase 3 FLEX strategies Aug 2020 Not Started NSRC Operational for Vogtle 3&4 Aug 2020 Not Started Submit 6 Month Status Report Aug 2020 Not Started Demonstration for Unit 3 Oct 2020 Not Started Apr 2020^Completion Report ForUnit3 Dec 2020 Not Started Submit 6 Month Status Report Feb 2021 Not Started Demonstration for Unit 4 Apr 2021 Not Started Submit Completion ReportForUnit4 Jun 2021 Not StartedUnit3-Full compliancepriortoFuelLoadtorUnit3 Unit4-FullcompliancepriortoFuelLoadfor Unit 4^The revised target completiondatedoes not impact the Order implementation date.4 Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference1ofthisenclosure). |
| Page2of3 Enclosure toND-18-0154NinthSix-Month StatusReportofFLEXImplementation 5NeedforRelief/Relaxation andBasisfortheRelief/RelaxationVogtleElectric GeneratingPlant-Units3and4 expectstocomplywiththe orderimplementation dateandnorelief/relaxation isrequiredatthistime.6OpenItemsfromOverallIntegrated PlanandDraftSafetyEvaluation Thefollowing tablesprovideasummaryoftheopenitemsdocumentedinthe OverallIntegratedPlanortheDraft SafetyEvaluation(SE) andthestatusofeachitem.OverallIntegrated PlanOpenItemStatusN/AN/ADraftSafetyEvaluation OpenItemStatusNoneReceivedtodateN/A7Potential DraftSafetyEvaluation ImpactsThereareno potentialimpactstothe DraftSafetyEvaluation identifiedatthistime. | | Page2of3 Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX Implementation 5 Need for Relief/Relaxation and Basis for the Relief/RelaxationVogtleElectric GeneratingPlant-Units3and4 expectstocomplywiththe order implementation date and no relief/relaxation is required at this time.6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provideasummaryoftheopenitemsdocumentedinthe Overall IntegratedPlanortheDraft SafetyEvaluation(SE) and the status of each item.Overall Integrated Plan Open Item Status N/A N/A Draft Safety Evaluation Open Item Status None Received to date N/A 7 Potential Draft Safety Evaluation ImpactsThereareno potentialimpactstothe Draft Safety Evaluation identifiedatthistime. |
| 8References Thefollowing references supporttheupdatestothe OverallIntegrated Plandescribed inthisenclosure.
| | 8 References The following references supporttheupdatestothe Overall Integrated Plan described in this enclosure. |
| 1.VogtleElectricGeneratingPlant-Units3and4OverallIntegrated PlaninResponseto March12,2012Commission OrderModifying LicenseswithRegardtoRequirementsfor Mitigation Strategies forBeyond-Design-Basis ExternalEvents(OrderNumberEA-12-049), | | 1.Vogtle Electric GeneratingPlant-Units3and4 Overall Integrated Plan inResponseto March 12, 2012 Commission Order Modifying Licenses withRegardtoRequirementsfor Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated August 22,2013.2.NRGOrderNumber EA-12-049, Order Modifying Licenses withRegardto Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12,2012.3.Vogtle Electric GeneratingPlant-Units3and4 60-DayResponseto NRG Letter, RequestforInformation PursuanttoTitle 10 of the Code of Federal Regulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,of the Near-Term TaskForceReviewofInsightsfrom the Fukushima Daiichi Accident, datedMarch12, 2012 (ND-12-0987). |
| datedAugust22,2013.2.NRGOrderNumber EA-12-049, OrderModifying LicenseswithRegardtoRequirements forMitigation Strategies forBeyond-Design-Basis ExternalEvents,datedMarch12,2012.3.VogtleElectricGeneratingPlant-Units3and460-DayResponseto NRGLetter,RequestforInformation PursuanttoTitle10oftheCodeofFederalRegulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,of theNear-Term TaskForceReviewofInsightsfrom theFukushima DaiichiAccident, datedMarch12,2012(ND-12-0987).
| | 4.NRG Letter dated March 12, 2012,"Request for Information Pursuant to Title 10oftheCode of Federal Regulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,oftheNear-TermTaskForce ReviewofInsightsfromtheFukushima Dai-ichi Accident." Page3of3}} |
| 4.NRGLetterdatedMarch12,2012,"RequestforInformation PursuanttoTitle10oftheCode ofFederalRegulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,oftheNear-TermTaskForce ReviewofInsightsfromtheFukushima Dai-ichiAccident." | |
| Page3of3}} | |
|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public 2024-09-09
[Table view] Category:Status Report
MONTHYEARNL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding ML22348A0872023-07-25025 July 2023 Enclosure - VEGP Unit 4 - 103g - Final Memorandum Table ML23202A2162023-07-21021 July 2023 Final Vogtle Unit 4 ITAAC Review Status Report ML23184A0372023-07-0303 July 2023 ITAAC Review Status Report 7-3-2023 ML23152A1292023-06-0101 June 2023 Icn Review Status VOG4 6-1-2023 ML23152A1302023-06-0101 June 2023 Vog 4 Dashboard 6-1-2023 ML23093A0862023-04-0303 April 2023 Dashboard Report 4-3-2023 ML23093A0872023-04-0303 April 2023 ITAAC Review Status Report 04/03/2023 NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding ML23060A0642023-03-0101 March 2023 ITAAC Review Status Report 3-1-2023 ML23060A0602023-03-0101 March 2023 Dashboard Report 3-1-2023 ND-23-0021, Nineteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2023-02-22022 February 2023 Nineteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) ML23045A0882023-02-14014 February 2023 3Q 2022 Performance Summary Vogtle Unit 4 ML23045A0072023-02-13013 February 2023 Archives ML23038A0082023-02-0707 February 2023 Construction Reactor Oversight Process Resources Report February 7, 2023 ML23033A0242023-02-0202 February 2023 ITAAC Review Status Report 2-2-2023 ML23003A0202023-01-0303 January 2023 Dashboard Report 1-3-2023 ML23003A0192023-01-0303 January 2023 ITAAC Review Status Report 1-3-2023 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22335A0432022-12-0101 December 2022 Construction Reactor Oversight Process Resources Report December 1, 2022 ML22335A0332022-12-0101 December 2022 ITAAC Review Status Report 12-1-2022 ML22307A0352022-11-0303 November 2022 Dashboard Report 11-3-2022 ML22307A0332022-11-0303 November 2022 ITAAC Review Status Report 11-3-2022 ML22284A0192022-10-11011 October 2022 Construction Reactor Oversight Process Resources Report October 11, 2022 ML22278A0372022-10-0505 October 2022 ITAAC Review Status Report 10-5-2022 ML22244A1472022-09-0101 September 2022 ITAAC Review Status Report 9-1-2022 ML22244A0642022-09-0101 September 2022 Dashboard Report 9-1-2022 ND-22-0628, Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2022-08-24024 August 2022 Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) ML22230C5532022-08-18018 August 2022 ITAAC Review Status Report 8-18-2022 ML22224A1272022-08-12012 August 2022 Dashboard Report 8-12-2022 ML22224A1282022-08-12012 August 2022 ITAAC Review Status Report 8-12-2022 ML22214A0822022-08-0202 August 2022 2Q 2022 Performance Summary Vogtle Unit 4 ML22210A0422022-07-29029 July 2022 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Review Status Report Final ML22208A1002022-07-27027 July 2022 ITAAC Review Status Report 7-27-2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1822022-07-25025 July 2022 ITAAC Review Status Report 7-25-2022 ML22206A1862022-07-25025 July 2022 ITAAC Review Status Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22201A0422022-07-20020 July 2022 Icn Review Status for Vogtle Unit 3 as of July 20, 2022 ML22200A0162022-07-19019 July 2022 Icn Review Status for Vogtle Unit 3 as of July 19, 2022 ML22200A0232022-07-19019 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 19, 2022 ML22200A0262022-07-19019 July 2022 Voices Dashboard Report for Vogtle Unit 4 as of July 19, 2022 ML22200A0222022-07-19019 July 2022 Icn Review Status for Vogtle Unit 4 as of July 19, 2022 ML22192A0282022-07-11011 July 2022 ITAAC Review Status Report 7-11-2022 ML22192A0232022-07-11011 July 2022 Dashboard Report 7-11-2022 ML22192A0202022-07-11011 July 2022 Dashboard Report 7-11-2022 ML22192A0272022-07-11011 July 2022 ITAAC Review Status Report 7-11-2022 ML22187A0212022-07-0606 July 2022 Construction Reactor Oversight Process Resources Report July 6, 2022 ML22186A0342022-07-0505 July 2022 Dashboard Report 7-5-2022 2024-03-28
[Table view] |
Text
Southern Nuclear FEB26 2IIW Docket Nos.: 52-025 52-026U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington,D.C.20555-0001 Michael J.Vox RegulatoryAffairsDirectorVogtle3&4 7825 River Road Waynesboro, GA 30830 706 848 6459 tel myox@soutfiernco.com ND-18-0154VogtleElectric GeneratingPlant-Units3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitioation Strategies for Bevond-Desian-Basis External Events (EA-12-049)
References:
1.NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-BasisExternalEvents, datedMarch12,2012.2.NRCInterimStaff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses withRegardto Requirements for Mitigation StrategiesforBeyond-Design-Basis External Events,Revision0, dated August 29, 2012.NEI 12-06, Diverse andFlexibleCoping Strategies (FLEX)ImplementationGuide,Revision0, dated August 2012.Vogtle ElectricGeneratingPlant-Units3and4 OverallIntegratedPlanin Response toCommissionOrder withRegardto Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), dated August 22, 2013.3.4.Ladies and Gentlemen;OnMarch 12, 2012,theNuclearRegulatoryCommission (NRC)issuedanorder(Reference1) to SouthernNuclearOperatingCompany.
Reference1wasimmediatelyeffectiveanddirected the Vogtle Electric GeneratingPlant-Units3and4 (VEGP 3&4)to develop, implement, and maintainguidanceandstrategiesto maintainorrestorecore cooling,containment,andspent fuel pool cooling capabilities intheeventofabeyond-design-basisexternalevent.Specific requirements areoutlinedin Attachment3of Reference 1.Reference1requiredsubmissionofan OverallIntegratedPlan withinoneyearafterissuanceof thefinalNRCInterimStaff Guidance (ISG)(Reference 2).Reference 2 endorses industryguidancedocument NEI 12-06, Revision0(Reference3) with clarificationsandexceptionsidentifiedin Reference 2.Reference4provided theVEGP3&4Overall Integrated Plan.
U.S.Nuclear Regulatory Commission ND-18-0154 Page 2 Reference 1 requires submissionofa status report at six-month intervals following submittal of the overall integrated plan.Reference 3 provides direction regarding the content of the status reports and wasfollowedin developing the enclosed report.The purpose of thisletteristo provide the ninth six-month status report pursuant to Section IV,ConditionC.2,of Reference 1, that delineates progress made in implementing the requirements of Reference 1.The enclosed report provides an update of milestone accomplishments since the submission of theVEGP3&4 Overall IntegratedPlan,including any changes to the compliance method, schedule, or need for relief and the basis, if any.This letter contains no new NRC commitments.Ifyou have any questions, please contact Dave Midlik at 706-848-6737.
I declare upder penaltyofperjury that theforegoingis true and correct.Executed on the day of 2018.Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Michael J.Vox Regulatory Affairs/Director Vogtle 3&4 Southern Nuclear Operating Company MJY/DWM/amw
Enclosure:
VogtleElectric GeneratingPlant-Units3 and 4NinthSix-Month StatusReportof the Implementation of the RequirementsoftheCommission OrderwithRegardto MitigationStrategiesfor Beyond-Design-Basis External Events (EA-12-049)
U.S.Nuclear Regulatory Commission ND-18-0154 Page 3 go: Southern Nuclear Operating Company/Georgia Power Company Mr.8.Kuczynski(w/o enclosure)Mr.D.A.Bost(w/o enclosure)Mr.M.D.Rauckhorst (w/o enclosure)
Mr.M.D.Meier Mr.D.H.Jones (w/o enclosure)Mr.D.L.McKlnney Mr.T.W.YelvertonMr.B.H.Whitley Mr.0.R.PierceMs.A.G.AughtmanMr.W.A.Sparkman Ms.A.0.Chamberlain Mr.O.J.Miller Mr.J.D.Williams Mr.M.J.Vox Mr.T.G.PetrakMs.A.L.Pugh Mr.A.8.PartonMr.M.K.Washington Ms.K.A.RobertsMs.K.M.8tacy Mr.C.T.Defnall Mr.D.R.Culver Document Cervices RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv CommissionMr.W.Jones (w/o enclosure)
Ms.J.M.Heisserer Mr.C.P.Patel Mr.M.E.Emstes Mr.G.J.Khouri Mr.T.E.Chandler Ms.8.E.Temple Ms.P.Braxton Mr.F.D.Brown Mr.A.J.Lerch Mr.C.J.Even Ms.V.L.Ordaz Ms.L.A.KentMr.P.B.Donnelly Mr.N.D.KarlovichMs.C.D.Taylor Ms.A.E.Rivera-Varona Mr.B.J.Kemker U.S.Nuclear Regulatory Commission ND-18-0154 Page 4 Qqlethorpe Power Corporation Mr.R.B.Brinkman Municipal Electric Authority of Georgia Mr.J.E.Fuller Mr.S.M.Jackson Dalton Utilities Mr.T.Bundros Westinohouse Electric Company.LLC Mr.R.Easterling (w/o enclosure)Mr.G.Koucheravy (w/o enclosure)
Ms.K.B.Chesko Mr.J.Hopkins Mr.D.HawkinsMr.M.L.Clyde Mr.J.Watkins Other Mr.J.E.Hesler, Bechtel Power CorporationMs.L.A.Matis, Tetra Tech NUS, Inc.Dr.W.R.Jacobs, Jr., Ph.D., CDS Associates, Inc.Mr.S.Roetger, Georgia Public Service CommissionMs.S.W.Kernizan, Georgia Public Service CommissionMr.K.C.Greene, Troutman Sanders Mr.S.Blanton, Balch BIngham Enclosure Vogtle Electric Generating Plant-Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events (EA-12-049)
Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX Implementation Vogtle Electric Generating Plant-Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events fEA-12-049) 1 IntroductionVogtleElectric GeneratingPlant-Units3 and 4 developedanOverall Integrated Plan (Reference1in Section 8), documenting the diverse and flexible strategies(FLEX),in response to Reference 2.This enclosure provides an update of milestone accomplishments sincesubmittalof the Overall IntegratedPlan,including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.2 Milestone AccomplishmentsInadditionto thesubmittalof status reports, the following milestone(s) directly related to FLEXimplementationhave beencompletedsincethedevelopmentoftheOverallIntegratedPlan (Reference 1), and are current as of February 28, 2018:*None 3 Milestone Schedule Status The following providesanupdateto Attachment2ofthe Overall Integrated Plan.Itprovidesthe activitystatusofeach item,andwhethertheexpected completiondatehaschanged.Thedates are planning datessubjecttochange asdesignand implementationdetailsaredeveloped.Therevisedmilestonetargetcompletion date doesnotimpacttheOrderimplementationdate.
Page1of3 Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX implementation Milestone Target Completion Date Activity Status Revised Target Completion Date Subm 60 Day Status Report Oct2012 Complete N/A Subm Oyerall Integrated Plan Aug 2013 Complete N/A Subm 6 Month Status Report Feb 2014 Complete N/A Subm 6 Month Status Report Aug 2014 Complete N/A Subm 6 Month Status Report Feb 2015 Complete N/A Subm 6 Month Status Report Aug 2015 Complete N/A Subm 6 Month Status Report Feb 2016 Complete N/A Subm 6 Month Status Report Aug 2016 Complete N/A Subm 6 Month Status Report Feb 2017 Complete N/A Subm 16 Month Status Report Aug 2017 Complete N/A Subm 16 Month Status Report Feb 2018 Complete N/A Subm 16 Month Status Report Aug 2018 Not Started Subm 16 Month Status Report Feb 2019 Not Started Subm 16 Month Status Report Aug 2019 Not Started Staffing Analysis Completed Oct2019 Not Started Ensure Operational Procedures include necessarv information Noy2019 Not Started Develop Response Plan with NSRC(storageplanandprocedural guidance for strategy/maintenance)
NOV2019 Not Started Initiate Phase 3 Eguipment Procurement Dec 2019 Not Started Submit 6 Month Status Report Feb 2020 Not Started TrainingCompletefor Phase 3 FLEX strategies Aug 2020 Not Started NSRC Operational for Vogtle 3&4 Aug 2020 Not Started Submit 6 Month Status Report Aug 2020 Not Started Demonstration for Unit 3 Oct 2020 Not Started Apr 2020^Completion Report ForUnit3 Dec 2020 Not Started Submit 6 Month Status Report Feb 2021 Not Started Demonstration for Unit 4 Apr 2021 Not Started Submit Completion ReportForUnit4 Jun 2021 Not StartedUnit3-Full compliancepriortoFuelLoadtorUnit3 Unit4-FullcompliancepriortoFuelLoadfor Unit 4^The revised target completiondatedoes not impact the Order implementation date.4 Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference1ofthisenclosure).
Page2of3 Enclosure to ND-18-0154NinthSix-Month Status ReportofFLEX Implementation 5 Need for Relief/Relaxation and Basis for the Relief/RelaxationVogtleElectric GeneratingPlant-Units3and4 expectstocomplywiththe order implementation date and no relief/relaxation is required at this time.6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provideasummaryoftheopenitemsdocumentedinthe Overall IntegratedPlanortheDraft SafetyEvaluation(SE) and the status of each item.Overall Integrated Plan Open Item Status N/A N/A Draft Safety Evaluation Open Item Status None Received to date N/A 7 Potential Draft Safety Evaluation ImpactsThereareno potentialimpactstothe Draft Safety Evaluation identifiedatthistime.
8 References The following references supporttheupdatestothe Overall Integrated Plan described in this enclosure.
1.Vogtle Electric GeneratingPlant-Units3and4 Overall Integrated Plan inResponseto March 12, 2012 Commission Order Modifying Licenses withRegardtoRequirementsfor Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated August 22,2013.2.NRGOrderNumber EA-12-049, Order Modifying Licenses withRegardto Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12,2012.3.Vogtle Electric GeneratingPlant-Units3and4 60-DayResponseto NRG Letter, RequestforInformation PursuanttoTitle 10 of the Code of Federal Regulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,of the Near-Term TaskForceReviewofInsightsfrom the Fukushima Daiichi Accident, datedMarch12, 2012 (ND-12-0987).
4.NRG Letter dated March 12, 2012,"Request for Information Pursuant to Title 10oftheCode of Federal Regulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3,oftheNear-TermTaskForce ReviewofInsightsfromtheFukushima Dai-ichi Accident." Page3of3