Category:Status Report
MONTHYEARNL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding ML22348A0872023-07-25025 July 2023 Enclosure - VEGP Unit 4 - 103g - Final Memorandum Table ML23202A2162023-07-21021 July 2023 Final Vogtle Unit 4 ITAAC Review Status Report ML23184A0372023-07-0303 July 2023 ITAAC Review Status Report 7-3-2023 ML23152A1292023-06-0101 June 2023 Icn Review Status VOG4 6-1-2023 ML23152A1302023-06-0101 June 2023 Vog 4 Dashboard 6-1-2023 ML23093A0862023-04-0303 April 2023 Dashboard Report 4-3-2023 ML23093A0872023-04-0303 April 2023 ITAAC Review Status Report 04/03/2023 NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding ML23060A0642023-03-0101 March 2023 ITAAC Review Status Report 3-1-2023 ML23060A0602023-03-0101 March 2023 Dashboard Report 3-1-2023 ND-23-0021, Nineteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2023-02-22022 February 2023 Nineteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) ML23045A0882023-02-14014 February 2023 3Q 2022 Performance Summary Vogtle Unit 4 ML23045A0072023-02-13013 February 2023 Archives ML23038A0082023-02-0707 February 2023 Construction Reactor Oversight Process Resources Report February 7, 2023 ML23033A0242023-02-0202 February 2023 ITAAC Review Status Report 2-2-2023 ML23003A0202023-01-0303 January 2023 Dashboard Report 1-3-2023 ML23003A0192023-01-0303 January 2023 ITAAC Review Status Report 1-3-2023 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22335A0432022-12-0101 December 2022 Construction Reactor Oversight Process Resources Report December 1, 2022 ML22335A0332022-12-0101 December 2022 ITAAC Review Status Report 12-1-2022 ML22307A0352022-11-0303 November 2022 Dashboard Report 11-3-2022 ML22307A0332022-11-0303 November 2022 ITAAC Review Status Report 11-3-2022 ML22284A0192022-10-11011 October 2022 Construction Reactor Oversight Process Resources Report October 11, 2022 ML22278A0372022-10-0505 October 2022 ITAAC Review Status Report 10-5-2022 ML22244A1472022-09-0101 September 2022 ITAAC Review Status Report 9-1-2022 ML22244A0642022-09-0101 September 2022 Dashboard Report 9-1-2022 ND-22-0628, Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2022-08-24024 August 2022 Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) ML22230C5532022-08-18018 August 2022 ITAAC Review Status Report 8-18-2022 ML22224A1272022-08-12012 August 2022 Dashboard Report 8-12-2022 ML22224A1282022-08-12012 August 2022 ITAAC Review Status Report 8-12-2022 ML22214A0822022-08-0202 August 2022 2Q 2022 Performance Summary Vogtle Unit 4 ML22210A0422022-07-29029 July 2022 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Review Status Report Final ML22208A1002022-07-27027 July 2022 ITAAC Review Status Report 7-27-2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1822022-07-25025 July 2022 ITAAC Review Status Report 7-25-2022 ML22206A1862022-07-25025 July 2022 ITAAC Review Status Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22201A0422022-07-20020 July 2022 Icn Review Status for Vogtle Unit 3 as of July 20, 2022 ML22200A0162022-07-19019 July 2022 Icn Review Status for Vogtle Unit 3 as of July 19, 2022 ML22200A0232022-07-19019 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 19, 2022 ML22200A0262022-07-19019 July 2022 Voices Dashboard Report for Vogtle Unit 4 as of July 19, 2022 ML22200A0222022-07-19019 July 2022 Icn Review Status for Vogtle Unit 4 as of July 19, 2022 ML22192A0282022-07-11011 July 2022 ITAAC Review Status Report 7-11-2022 ML22192A0232022-07-11011 July 2022 Dashboard Report 7-11-2022 ML22192A0202022-07-11011 July 2022 Dashboard Report 7-11-2022 ML22192A0272022-07-11011 July 2022 ITAAC Review Status Report 7-11-2022 ML22187A0212022-07-0606 July 2022 Construction Reactor Oversight Process Resources Report July 6, 2022 ML22186A0342022-07-0505 July 2022 Dashboard Report 7-5-2022 2024-03-28
[Table view] |
Text
No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter 2Q/2022 No findings this quarter No findings this quarter G
No findings this quarter No findings this quarter No findings this quarter 4Q/2021
List of Construction Inspection Reports
List of Construction Assessment Reports/Inspection Plans
Vogtle Unit 4 Findings Archive Additional Inspection and Assessment Information Vogtle Unit 4 2Q/2022 Performance Summary Construction Action Matrix Column:
Licensee Response Operational Programs Security Programs Design/
Engineering Construction/
Installation Procurement/
Fabrication Inspection/
Testing Safeguards Programs Operational Readiness Construction Reactor Safety Most Significant Inspection Findings No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter 3Q/2021 No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter No findings this quarter 1Q/2022
Design Engineering Back to Top Procurement/Fabrication Back to Top Construction/Installation Identified By: NRC Identification Date: 11/29/2021 Significance: Green Item Type: Construction Finding Report: Vogtle Electric Generating Plant, Units 3 And 4 - NRC Initial Test Program and Operational Programs Integrated Inspection Reports 05200025/2021008, 05200026/2021008 Item Number: 05200026/2021008-02 Note: Open in Report (NCV)
Failure to Follow Procedure CNSITPP-502 NRC inspectors identified a construction finding of very low safety significance and an associated NCV of 10 CFR, Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to accomplish activities associated with local leak rate testing of electrical penetration 4-IDSC-EY-P29Y in accordance with procedure 4-CNS-ITPP-502, Containment Penetration Leak Rate (Type B)
Preoperational Test, Version 1.0. Specifically, the licensee failed to wait for flowmeter readings to stabilize prior to recording the leak rate data and inappropriately declaring the test acceptance criteria met. The licensee entered this issue into its CAP as CR 50116481.
The performance deficiency was determined to be of more than minor safety significance and thus a finding because it rendered the quality of a structure, system, or component (SSC) unacceptable or indeterminate and required substantial corrective action. The inspectors determined the finding was associated with the containment and was of very low safety significance (Green) because the issue did not affect a design function. The inspectors determined the finding had a cross-cutting aspect of training, in the area of Human Performance. Specifically, the organization failed to ensure that test personnel were trained to perform tests in a consistent manner.
Back to Top Inspection/Testing Back to Top Security Programs Back to Top Operational Programs Back to Top