ND-18-0154, Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)

From kanterella
(Redirected from ND-18-0154)
Jump to navigation Jump to search
Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
ML18057A796
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/26/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
EA-12-049, ND-18-0154
Download: ML18057A796 (8)


Text

Michael J. Vox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3&4 706 848 6459 tel myox@soutfiernco.com FEB 2 6 2IIW Docket Nos.: 52-025 ND-18-0154 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitioation Strategies for Bevond-Desian-Basis External Events (EA-12-049)

References:

1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012.
2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 29, 2012.
3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, dated August 2012.
4. Vogtle Electric Generating Plant - Units 3 and 4 Overall Integrated Plan in Response to Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), dated August 22, 2013.

Ladies and Gentlemen; On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Southern Nuclear Operating Company. Reference 1 was immediately effective and directed the Vogtle Electric Generating Plant - Units 3 and 4 (VEGP 3&4) to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 3 of Reference 1.

Reference 1 required submission of an Overall Integrated Plan within one year after issuance of the final NRC Interim Staff Guidance (ISG) (Reference 2). Reference 2 endorses industry guidance document NEI 12-06, Revision 0 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the VEGP 3&4 Overall Integrated Plan.

U. S. Nuclear Regulatory Commission ND-18-0154 Page 2 Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports and was followed in developing the enclosed report. The purpose of this letter is to provide the ninth six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The enclosed report provides an update of milestone accomplishments since the submission of the VEGP 3&4 Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief and the basis, if any.

This letter contains no new NRC commitments. If you have any questions, please contact Dave Midlik at 706-848-6737.

I declare upder penalty of perjury that the foregoing is true and correct. Executed on the day of 2018.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Michael J. Vox Regulatory Affairs/Director Vogtle 3&4 Southern Nuclear Operating Company MJY/DWM/amw

Enclosure:

Vogtle Electric Generating Plant - Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)

U. S. Nuclear Regulatory Commission ND-18-0154 Page 3 go:

Southern Nuclear Operating Company/ Georgia Power Company Mr. 8. Kuczynski (w/o enclosure)

Mr. D. A. Bost (w/o enclosure)

Mr. M. D. Rauckhorst (w/o enclosure)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosure)

Mr. D. L. McKlnney Mr. T.W. Yelverton Mr. B. H. Whitley Mr. 0. R. Pierce Ms. A. G. Aughtman Mr. W. A. Sparkman Ms. A. 0. Chamberlain Mr. O. J. Miller Mr. J. D. Williams Mr. M. J. Vox Mr. T. G. Petrak Ms. A. L. Pugh Mr. A. 8. Parton Mr. M. K. Washington Ms. K. A. Roberts Ms. K. M. 8tacy Mr. C. T. Defnall Mr. D. R. Culver Document Cervices RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosure)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Emstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. 8. E. Temple Ms. P. Braxton Mr. F. D. Brown Mr. A. J. Lerch Mr. C. J. Even Ms. V. L. Ordaz Ms. L. A. Kent Mr. P. B. Donnelly Mr. N. D. Karlovich Ms. C. D. Taylor Ms. A. E. Rivera-Varona Mr. B. J. Kemker

U. S. Nuclear Regulatory Commission ND-18-0154 Page 4 Qqlethorpe Power Corporation Mr. R. B. Brinkman Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Mr. R. Easterling (w/o enclosure)

Mr. G. Koucheravy (w/o enclosure)

Ms. K. B. Chesko Mr. J. Hopkins Mr. D. Hawkins Mr. M. L. Clyde Mr. J. Watkins Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch BIngham

Enclosure Vogtle Electric Generating Plant - Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events (EA-12-049)

Enclosure to ND-18-0154 Ninth Six-Month Status Report of FLEX Implementation Vogtle Electric Generating Plant - Units 3 and 4 Ninth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Bevond-Desian-Basis External Events fEA-12-049) 1 Introduction Vogtle Electric Generating Plant - Units 3 and 4 developed an Overall Integrated Plan (Reference 1 in Section 8), documenting the diverse and flexible strategies (FLEX), in response to Reference 2. This enclosure provides an update of milestone accomplishments since submittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

2 Milestone Accomplishments In addition to the submittal of status reports, the following milestone(s) directly related to FLEX implementation have been completed since the development of the Overall Integrated Plan (Reference 1), and are current as of February 28, 2018:

  • None 3 Milestone Schedule Status The following provides an update to Attachment 2 of the Overall Integrated Plan. It providesthe activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed. The revised milestone target completion date does not impact the Order implementation date.

Page 1 of 3

Enclosure to ND-18-0154 Ninth Six-Month Status Report of FLEX implementation Revised Milestone Target Activity Target Completion Status Completion Date Date Subm 60 Day Status Report Oct2012 Complete N/A Subm Oyerall Integrated Plan Aug 2013 Complete N/A Subm 6 Month Status Report Feb 2014 Complete N/A Subm 6 Month Status Report Aug 2014 Complete N/A Subm 6 Month Status Report Feb 2015 Complete N/A Subm 6 Month Status Report Aug 2015 Complete N/A Subm 6 Month Status Report Feb 2016 Complete N/A Subm 6 Month Status Report Aug 2016 Complete N/A Subm 6 Month Status Report Feb 2017 Complete N/A Subm 16 Month Status Report Aug 2017 Complete N/A Subm 16 Month Status Report Feb 2018 Complete N/A Subm 16 Month Status Report Aug 2018 Not Started Subm 16 Month Status Report Feb 2019 Not Started Subm 16 Month Status Report Aug 2019 Not Started Staffing Analysis Completed Oct2019 Not Started Ensure Operational Procedures include Noy2019 Not Started necessarv information Develop Response Plan with NSRC (storage plan and procedural guidance NOV2019 Not Started for strategy /maintenance)

Initiate Phase 3 Eguipment Procurement Dec 2019 Not Started Submit 6 Month Status Report Feb 2020 Not Started Training Complete for Phase 3 FLEX Aug 2020 Not Started strategies NSRC Operational for Vogtle 3&4 Aug 2020 Not Started Submit 6 Month Status Report Aug 2020 Not Started Demonstration for Unit 3 Oct 2020 Not Started Apr 2020^

Completion Report For Unit 3 Dec 2020 Not Started Submit 6 Month Status Report Feb 2021 Not Started Demonstration for Unit 4 Apr 2021 Not Started Submit Completion Report For Unit 4 Jun 2021 Not Started Unit 3 - Full compliance prior to Fuel Load tor Unit 3 Unit 4 - Full compliance prior to Fuel Load for Unit 4

^The revised target completion date does not impact the Order implementation date.

4 Changes to Compliance Method There are no changes tothe compliance method as documented in the Overall Integrated Plan (Reference 1 of this enclosure).

Page 2 of 3

Enclosure to ND-18-0154 Ninth Six-Month Status Report of FLEX Implementation 5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Vogtle Electric Generating Plant - Units 3 and 4 expects to comply with the order implementation date and no relief/relaxation is required at this time.

6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provide a summary of the open items documented in the Overall Integrated Plan or the Draft Safety Evaluation (SE) and the status of each item.

Overall Integrated Plan Open Item Status N/A N/A Draft Safety Evaluation Open Item Status None Received to date N/A 7 Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time.

8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.

1. Vogtle Electric Generating Plant- Units 3 and 4 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049),

dated August 22,2013.

2. NRG Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategiesfor Beyond-Design-Basis External Events, dated March 12,2012.
3. Vogtle Electric Generating Plant- Units 3 and 4 60-Day Response to NRG Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident, dated March 12, 2012 (ND-12-0987).
4. NRG Letter dated March 12, 2012, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50. 54(f) Regarding Recommendations 2.1, 2.3, and 9.3, ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident."

Page 3 of 3