{{#Wiki_filter:Form 2.1-1 Examination Preparation Checklist Facility: Nine Mile Point Unit 2                                                    Date of Examination: 4/17/2023 Developed by: Written:        Facility X        NRC            //  Operating:    Facility    X    NRC Chief Target Task Description                                            Examiners Date*
Initials
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations,                  BJF
  -240          arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
  -210      2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).                              BJF
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As          BJF applicable, the facility licensee contact submits to the NRC any prescreened K/As for
  -210 elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
  -210      4. Reference material due for NRC-prepared examinations (F).                                          N/A
  -210      5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).        BJF
: 6. Written examination outline developed by the NRC and sent to the facility licensee contact          BJF
  -195 (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as  BJF
  -150          applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
: 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee          BJF
  -136 (ES-2.3).
: 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility                N/A
  -100 licensee review (ES-2.3).
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms;              BJF
  -75          quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
  -60      11. Preliminary waiver/excusal requests due (ES-2.2 E.1).                                              BJF
: 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors            BJF
  -50 authorization to proceed with the facility review granted (ES-2.3 D).
  -50      13. Examination review results discussed between the NRC and the facility licensee (B.14).              BJF
  -35      14. Examination preparatory week conducted by the NRC and the facility licensee (I).                    BJF
  -30      15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).          BJF
: 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1              BJF
  -14 prepared (ES-2.2 C and E).
    -7      17. Written examinations and operating tests approved by the NRC supervisor (C.9)                      BJF
: 18. Facility licensee management feedback on the examination requested by the NRC                      BJF
    -7 supervisor (C.10).
: 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility      BJF
    -7 (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
    -7      20. Written examination administration guidelines reviewed with the facility licensee (D.14).          BJF
    -7      21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).                BJF
* Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
 
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Brian Fuller 4/10/23 Brian Fuller 4/10/23
 
Y Y
Y Y
Y Y
Y Y
Y Y
 
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Brian Fuller 4/10/23 Brian Fuller  4/10/23
 
Y Y
Y Y
Y Y
Y Y
Y Y
Y Brian Fuller 4/10/23 Brian Fuller 4/10/23}}

Latest revision as of 05:08, 21 February 2024

Final Qa/Related Forms
ML23135A156
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/15/2023
From: Brian Fuller
NRC/RGN-I/DORS/OB
To: Alexander M
Constellation Energy Generation
References
L-2023-OLL-0006
Download: ML23135A156 (1)


Text

Form 2.1-1 Examination Preparation Checklist Facility: Nine Mile Point Unit 2 Date of Examination: 4/17/2023 Developed by: Written: Facility X NRC // Operating: Facility X NRC Chief Target Task Description Examiners Date*

Initials

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, BJF

-240 arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

-210 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3). BJF

3. Facility licensee contact briefed on examination security and other requirements (D.4). As BJF applicable, the facility licensee contact submits to the NRC any prescreened K/As for

-210 elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

-210 4. Reference material due for NRC-prepared examinations (F). N/A

-210 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5). BJF

6. Written examination outline developed by the NRC and sent to the facility licensee contact BJF

-195 (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as BJF

-150 applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee BJF

-136 (ES-2.3).

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility N/A

-100 licensee review (ES-2.3).

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; BJF

-75 quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

-60 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). BJF

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors BJF

-50 authorization to proceed with the facility review granted (ES-2.3 D).

-50 13. Examination review results discussed between the NRC and the facility licensee (B.14). BJF

-35 14. Examination preparatory week conducted by the NRC and the facility licensee (I). BJF

-30 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1). BJF

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 BJF

-14 prepared (ES-2.2 C and E).

-7 17. Written examinations and operating tests approved by the NRC supervisor (C.9) BJF

18. Facility licensee management feedback on the examination requested by the NRC BJF

-7 supervisor (C.10).

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility BJF

-7 (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

-7 20. Written examination administration guidelines reviewed with the facility licensee (D.14). BJF

-7 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12). BJF

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Brian Fuller 4/10/23 Brian Fuller 4/10/23

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Brian Fuller 4/10/23 Brian Fuller 4/10/23

Y Y

Y Y

Y Y

Y Y

Y Y

Y Brian Fuller 4/10/23 Brian Fuller 4/10/23