ML22356A318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 The CR3MP SAR has been updated to create Revision 3. Each change in the SAR document from Revision 2 to Revision 3 is marked by a revision bar on the right-hand side of the page. A summary of these changes and brief reason for change is included below.
{{#Wiki_filter:Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003
Section no. of Material changed                       Reason for change change Figure 1.1-1           Removed High Density Cellular           Per Customer request to remove Concrete (HDCC)                         HDCC 1.2.1                 Removed High Density Cellular           Per Customer request to remove Concrete (HDCC) and finalized           HDCC, and making vent port a quantity of lift holes with one         required feature of package during doubling as a through-hole for         welding and grout curing for venting purposes.                       RAI 3-5 1.2.1.1               Finalize quantity of lift holes with   See Section 1.2.1 change one doubling up as a through-hole for venting purposes.
 
1.2.1.2               Removed HDCC and admixtures and         Per Customer request to remove included a target LDCC density         HDCC and admixtures, and for finalizing the LDCC mixture 1.2.2.2               Removed HDCC and admixtures and         Per Customer request to remove included a target LDCC density         HDCC and admixtures, and for finalizing the LDCC mixture Appendix 1.3.2         Updated SAR Drawing to Revision 3       Update because of making vent port a required feature and other fabrication accommodations 2.1.1                 Finalize one of the lift holes as a     See Section 1.2.1 change and in through-hole for venting purposes,     response to RAI 2-15 plugged flush.
Table of Changes for CR3MP SAR Revision 3
2.1.2                 Table number cross-reference           Renumbered Table per Section changed to Table 2.1-2                 2.1.3.1 added table 2.1.3                 Clarified that the weights in Table     In response to RAI 3-5 clarifying the 2.1-2 are maximum bounding           LDCC mass weights 2.1.3.1               Added section and new Table 2.1-1       In response to RAI 3-5 clarifying the to make an assessment about actual     LDCC mass LDCC weights.
 
The CR3MP SAR has been updated to create Revision 3. Each change in the SAR document from Revision 2 to Revision 3 is marked by a revision bar on the right-hand side of the page. A summary of these changes and brief reason for change is included below.
 
Section no. of Material changed Reason for change change Figure 1.1-1 Removed High Density Cellular Per Customer request to remove Concrete (HDCC) HDCC 1.2.1 Removed High Density Cellular Per Customer request to remove Concrete (HDCC) and finalized HDCC, and making vent port a quantity of lift holes with one required feature of package during doubling as a through-hole for welding and grout curing for venting purposes. RAI 3-5 1.2.1.1 Finalize quantity of lift holes with See Section 1.2.1 change one doubling up as a through-hole for venting purposes.
1.2.1.2 Removed HDCC and admixtures and Per Customer request to remove included a target LDCC density HDCC and admixtures, and for finalizing the LDCC mixture 1.2.2.2 Removed HDCC and admixtures and Per Customer request to remove included a target LDCC density HDCC and admixtures, and for finalizing the LDCC mixture Appendix 1.3.2 Updated SAR Drawing to Revision 3 Update because of making vent port a required feature and other fabrication accommodations 2.1.1 Finalize one of the lift holes as a See Section 1.2.1 change and in through-hole for venting purposes, response to RAI 2-15 plugged flush.
2.1.2 Table number cross-reference Renumbered Table per Section changed to Table 2.1-2 2.1.3.1 added table 2.1.3 Clarified that the weights in Table In response to RAI 3-5 clarifying the 2.1-2 are maximum bounding LDCC mass weights 2.1.3.1 Added section and new Table 2.1-1 In response to RAI 3-5 clarifying the to make an assessment about actual LDCC mass LDCC weights.
 
Page 1 of 6
Page 1 of 6


Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 Section no. of Material changed                   Reason for change change 2.1.4             Updated Table numbering and           Per Customer request to remove caption and column title regarding   HDCC and in response to RAI 3-5 Table 2.1-3 to reflect the maximum   clarifying the LDCC mass bounding nature of these weight totals. Figure 2.1-1 updated to remove HDCC.
Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003
2.2.1             Removed HDCC                         Per Customer request to remove HDCC 2.3.1             Removed HDCC                         Per Customer request to remove HDCC 2.3.2             Removed HDCC                         Per Customer request to remove HDCC 2.4.5             Finalize one of the lift holes as a   See Section 1.2.1 change through-hole for venting purposes 2.4.8             Finalize one of the lift holes as a   See Section 1.2.1 change through-hole for venting purposes 2.5.2             Revised and clarified load           In response to RAI 2-2 securement narrative 2.6.1             Updated Table cross-reference         As a result of Section 2.1.4 updates 2.6.1.1           Slight increase in temperatures and   Mesh refinement per RAI 3-4 removed HDCC and updated text         response and per Customer request regarding nature of pressure build-up to remove HDCC and response to from moisture                         RAI 3-5 2.6.1.3.1         Slight decrease in pressures         In response to RAI 3-5 2.6.1.3.2         Updated Table cross-reference         As a result of Section 2.1.4 updates 2.6.3             Slight decrease in pressures         In response to RAI 3-5 2.6.7             Revised to include drop orientation   Changes in response to RAI 2-3 assessment and Table 2.6-1 2.6.7.1           Moved this Section from 2.7.1.1 and   Changes in response to RAI 2-4 and expanded to include material testing 2-6 information and new acceptance criteria for NCT Page 2 of 6
 
Table of Changes for CR3MP SAR Revision 3
 
Section no. of Material changed Reason for change change 2.1.4 Updated Table numbering and Per Customer request to remove caption and column title regarding HDCC and in response to RAI 3-5 Table 2.1-3 to reflect the maximum clarifying the LDCC mass bounding nature of these weight totals. Figure 2.1-1 updated to remove HDCC.
2.2.1 Removed HDCC Per Customer request to remove HDCC 2.3.1 Removed HDCC Per Customer request to remove HDCC 2.3.2 Removed HDCC Per Customer request to remove HDCC 2.4.5 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 2.4.8 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 2.5.2 Revised and clarified load In response to RAI 2-2 securement narrative 2.6.1 Updated Table cross-reference As a result of Section 2.1.4 updates 2.6.1.1 Slight increase in temperatures and Mesh refinement per RAI 3-4 removed HDCC and updated text response and per Customer request regarding nature of pressure build-up to remove HDCC and response to from moisture RAI 3-5 2.6.1.3.1 Slight decrease in pressures In response to RAI 3-5 2.6.1.3.2 Updated Table cross-reference As a result of Section 2.1.4 updates 2.6.3 Slight decrease in pressures In response to RAI 3-5 2.6.7 Revised to include drop orientation Changes in response to RAI 2-3 assessment and Table 2.6-1 2.6.7.1 Moved this Section from 2.7.1.1 and Changes in response to RAI 2-4 and expanded to include material testing 2-6 information and new acceptance criteria for NCT
 
Page 2 of 6
 
Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003
 
Table of Changes for CR3MP SAR Revision 3
 
Section no. of Material changed Reason for change change 2.6.7.2, 2.6.7.3, Revised NCT drop test summaries to Changes in response to drop test 2.6.7.4, 2.6.7.5 reflect new simulation runs and RAIs added corner drop follow-through case 2.7.1 Expanded to include new acceptance Changes in response to drop test criteria for HAC and reference to RAIs Section 2.6.7.1 for material 2.7.1.1, 2.7.1.2, Revised HAC drop test summaries to Changes in response to drop test 2.7.1.3 reflect new simulation runs RAIs 2.7.3.1 Updated cross-reference Changes in response to drop test RAIs 2.7.3.2 Change to damage opening area Changes in response to drop test RAIs 2.7.4.1 Temperatures and Pressures reduced Mesh refinement per RAI 3-4 slightly response and response to RAI 3-5 2.7.4.2 Package shell and annular LDCC As a result of mesh refinement per bulk temperatures updated RAI 3-4 response and assessment of the temperatures shown in Figure 3.4-3 2.7.4.3 Temperatures and Pressures reduced As a result of mesh refinement per slightly, yielding slight increase in RAI 3-4 response and response to Stress allowables and margins RAI 3-5 2.7.8 Summary of containment boundary Changes in response to drop test opening adjusted RAIs Appendix 2.12.1 Changes to references to Changes in response to drop test accommodate drop impact analysis RAIs updates Appendix 2.12.2 Changes throughout appendix to Changes in response to drop test accommodate drop impact analysis RAIs updates 3.1.1 Removed HDCC Per Customer request to remove HDCC
 
Page 3 of 6
 
Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003
 
Table of Changes for CR3MP SAR Revision 3
 
Section no. of Material changed Reason for change change 3.1.3 Slight revision in temperatures in As a result of mesh refinement per Tables 3.1-1 and 3.1-2 and summary RAI 3-4 response and per RAI 3-2 cross-reference statement added to response end of section 3.1.4 Table 3.1-3 identifying the CR3MP As a result of RAI 3-5 changes maximum pressures included 3.2.1 Terminology updates and removed Consistency and per Customer HDCC request to remove HDCC 3.2.2 Terminology updates and updated Consistency and because of RAI 3-5 text regarding nature of pressure changes build-up from moisture 3.3 Terminology updates, removed Consistency and because of mesh HDCC and thermal model mesh refinement per RAI 3-4 response updates to text and Figure 3.3-1 3.3.1 Added reference temperature for Because of RAI 3-5 changes NCT Hot case 3.3.2 Slight decrease in pressures and As a result of mesh refinement per updated text regarding nature of RAI 3-4 response and because of pressure build-up from moisture. RAI 3-5 changes Slight package temperature refinement in Table 3.3-2 and Figure 3.3-2 3.4.1, 3.4.2 Terminology updates Consistency and clarity 3.4.2 Fire Test Conditions updated In response to RAI 3-2 including adding Figure 3.4-2 3.4.3 Figure 3.4-5 has been added and In response to RAI 3-3, 3-4 and 3-5 reference to new Appendix 3.5.4.2 has been added. Slight change in pressures and temperatures.
Appendix 3.5.1 References 12 through 16 updated In response to thermal RAIs Appendix 3.5.2 Changes throughout appendix to In response to RAI 3-1 and 3-5 accommodate revised evaluation of pressure in the CR3MP
 
Page 4 of 6
 
Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003
 
Table of Changes for CR3MP SAR Revision 3
 
Section no. of Material changed Reason for change change Appendix 3.5.3 Revised for detail and clarity In response to RAI 3-6 regarding the origin and basis of the convection heat transfer correlations and any associated equations.
Appendix 3.5.4 Added Mesh Sensitivity and Time In response to RAI 3-4 Step Sensitivity evaluations Appendix 3.5.5 Inclusion of a summary of the In response to RAI 3-2 boundary conditions for each of the analyzed thermal cases 4.1.3 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 4.2.1 Slight increase in the number of days In response to RAI 4-2 and removal to 5% hydrogen concentration of HDCC 4.3 Terminology updates and Consistency and clarity and per clarification on LDCC volume and Appendix 2.12.2 updates updates per drop impact evaluation 5.1.1 Removed HDCC Per Customer request to remove HDCC 5.1.2 Updated Dose Rates in Tables 5.1-1 Correction to a minor error in the and 5.1-2 payload modeling process resulted in slightly revised dose rates and resultant energy absorption fraction for Section 5.4.4 5.3.2 Removed HDCC Per Customer request to remove HDCC 5.4.3 Updated Tally Maximum Dose Rates See Section 5.1.2 change in Table 5.4-2 and summary statement 5.4.4 Removed HDCC and all admixtures In response to RAI 4-2 and for from LDCC. Terminology updates consistency and clarity and per and included reference to Appendix customer request to remove 5.5.4. Updates to Figures 5.4-1, 5.4-2 admixtures from LDCC and entirely and Table 5.4-3 remove HDCC Appendix Section Removed HDCC Per Customer request to remove 5.5.2.2 HDCC
 
Page 5 of 6


Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 Section no. of Material changed                    Reason for change change 2.6.7.2, 2.6.7.3,  Revised NCT drop test summaries to    Changes in response to drop test 2.6.7.4, 2.6.7.5  reflect new simulation runs and      RAIs added corner drop follow-through case 2.7.1              Expanded to include new acceptance    Changes in response to drop test criteria for HAC and reference to    RAIs Section 2.6.7.1 for material 2.7.1.1, 2.7.1.2,  Revised HAC drop test summaries to    Changes in response to drop test 2.7.1.3            reflect new simulation runs          RAIs 2.7.3.1            Updated cross-reference              Changes in response to drop test RAIs 2.7.3.2            Change to damage opening area        Changes in response to drop test RAIs 2.7.4.1            Temperatures and Pressures reduced    Mesh refinement per RAI 3-4 slightly                              response and response to RAI 3-5 2.7.4.2            Package shell and annular LDCC        As a result of mesh refinement per bulk temperatures updated            RAI 3-4 response and assessment of the temperatures shown in Figure 3.4-3 2.7.4.3            Temperatures and Pressures reduced    As a result of mesh refinement per slightly, yielding slight increase in RAI 3-4 response and response to Stress allowables and margins        RAI 3-5 2.7.8              Summary of containment boundary      Changes in response to drop test opening adjusted                      RAIs Appendix 2.12.1    Changes to references to              Changes in response to drop test accommodate drop impact analysis      RAIs updates Appendix 2.12.2    Changes throughout appendix to        Changes in response to drop test accommodate drop impact analysis      RAIs updates 3.1.1              Removed HDCC                          Per Customer request to remove HDCC Page 3 of 6
Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003


Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 Section no. of Material changed                    Reason for change change 3.1.3              Slight revision in temperatures in  As a result of mesh refinement per Tables 3.1-1 and 3.1-2 and summary  RAI 3-4 response and per RAI 3-2 cross-reference statement added to  response end of section 3.1.4              Table 3.1-3 identifying the CR3MP    As a result of RAI 3-5 changes maximum pressures included 3.2.1              Terminology updates and removed      Consistency and per Customer HDCC                                request to remove HDCC 3.2.2              Terminology updates and updated      Consistency and because of RAI 3-5 text regarding nature of pressure    changes build-up from moisture 3.3                Terminology updates, removed        Consistency and because of mesh HDCC and thermal model mesh          refinement per RAI 3-4 response updates to text and Figure 3.3-1 3.3.1              Added reference temperature for      Because of RAI 3-5 changes NCT Hot case 3.3.2              Slight decrease in pressures and    As a result of mesh refinement per updated text regarding nature of    RAI 3-4 response and because of pressure build-up from moisture. RAI 3-5 changes Slight package temperature refinement in Table 3.3-2 and Figure 3.3-2 3.4.1, 3.4.2      Terminology updates                  Consistency and clarity 3.4.2              Fire Test Conditions updated        In response to RAI 3-2 including adding Figure 3.4-2 3.4.3              Figure 3.4-5 has been added and      In response to RAI 3-3, 3-4 and 3-5 reference to new Appendix 3.5.4.2 has been added. Slight change in pressures and temperatures.
Table of Changes for CR3MP SAR Revision 3
Appendix 3.5.1    References 12 through 16 updated    In response to thermal RAIs Appendix 3.5.2    Changes throughout appendix to      In response to RAI 3-1 and 3-5 accommodate revised evaluation of pressure in the CR3MP Page 4 of 6


Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 Section no. of Material changed                     Reason for change change Appendix 3.5.3     Revised for detail and clarity        In response to RAI 3-6 regarding the origin and basis of the convection heat transfer correlations and any associated equations.
Section no. of Material changed Reason for change change Appendix 5.5.3 Removed HDCC and all admixtures Per customer updates regarding foam from LDCC and corrected an error in concentrate mass fraction and determination of Foam Concentrate request to remove HDCC and mass fraction admixture Appendix 5.5.4 A detailed step-by-step calculation of In response to RAI 4-1 all values related to the radiolytic gas generation evaluation has been added 7.1.1 Revised and clarified load In response to customer comments securement narrative 7.1.2 Finalize one of the lift holes as a See Section 1.2.1 change and based through-hole for venting purposes on customer comments and clarification to painted surfaces 7.1.3 Revised and clarified load In response to customer comments securement narrative 7.2.1 Revised and clarified load In response to customer comments securement narrative 8.1.1 Removed HDCC Per Customer request to remove HDCC 8.1.3.2 MNOP reduced slightly As a result of RAI 3-5 incorporations 8.1.5.3 Section removed Per Customer request to remove HDCC
Appendix 3.5.4     Added Mesh Sensitivity and Time        In response to RAI 3-4 Step Sensitivity evaluations Appendix 3.5.5    Inclusion of a summary of the          In response to RAI 3-2 boundary conditions for each of the analyzed thermal cases 4.1.3              Finalize one of the lift holes as a   See Section 1.2.1 change through-hole for venting purposes 4.2.1              Slight increase in the number of days  In response to RAI 4-2 and removal to 5% hydrogen concentration          of HDCC 4.3                Terminology updates and                Consistency and clarity and per clarification on LDCC volume and      Appendix 2.12.2 updates updates per drop impact evaluation 5.1.1              Removed HDCC                          Per Customer request to remove HDCC 5.1.2              Updated Dose Rates in Tables 5.1-1    Correction to a minor error in the and 5.1-2                              payload modeling process resulted in slightly revised dose rates and resultant energy absorption fraction for Section 5.4.4 5.3.2              Removed HDCC                           Per Customer request to remove HDCC 5.4.3             Updated Tally Maximum Dose Rates      See Section 5.1.2 change in Table 5.4-2 and summary statement 5.4.4              Removed HDCC and all admixtures        In response to RAI 4-2 and for from LDCC. Terminology updates        consistency and clarity and per and included reference to Appendix    customer request to remove 5.5.4. Updates to Figures 5.4-1, 5.4-2 admixtures from LDCC and entirely and Table 5.4-3                       remove HDCC Appendix Section   Removed HDCC                          Per Customer request to remove 5.5.2.2                                                  HDCC Page 5 of 6


Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 3 Section no. of Material changed                        Reason for change change Appendix 5.5.3    Removed HDCC and all admixtures          Per customer updates regarding foam from LDCC and corrected an error in      concentrate mass fraction and determination of Foam Concentrate        request to remove HDCC and mass fraction                            admixture Appendix 5.5.4    A detailed step-by-step calculation of  In response to RAI 4-1 all values related to the radiolytic gas generation evaluation has been added 7.1.1              Revised and clarified load              In response to customer comments securement narrative 7.1.2              Finalize one of the lift holes as a      See Section 1.2.1 change and based through-hole for venting purposes        on customer comments and clarification to painted surfaces 7.1.3              Revised and clarified load              In response to customer comments securement narrative 7.2.1              Revised and clarified load              In response to customer comments securement narrative 8.1.1              Removed HDCC                            Per Customer request to remove HDCC 8.1.3.2            MNOP reduced slightly                    As a result of RAI 3-5 incorporations 8.1.5.3            Section removed                          Per Customer request to remove HDCC Page 6 of 6}}
Page 6 of 6}}

Latest revision as of 13:20, 15 November 2024

Enclosure 5 - Table of Changes for CR3MP SAR Revision 3
ML22356A318
Person / Time
Site: 07109393
Issue date: 12/19/2022
From:
Orano Federal Services
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML22356A312 List:
References
FS-22-0091, EPID L-2021-NEW-0003
Download: ML22356A318 (1)


Text

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

The CR3MP SAR has been updated to create Revision 3. Each change in the SAR document from Revision 2 to Revision 3 is marked by a revision bar on the right-hand side of the page. A summary of these changes and brief reason for change is included below.

Section no. of Material changed Reason for change change Figure 1.1-1 Removed High Density Cellular Per Customer request to remove Concrete (HDCC) HDCC 1.2.1 Removed High Density Cellular Per Customer request to remove Concrete (HDCC) and finalized HDCC, and making vent port a quantity of lift holes with one required feature of package during doubling as a through-hole for welding and grout curing for venting purposes. RAI 3-5 1.2.1.1 Finalize quantity of lift holes with See Section 1.2.1 change one doubling up as a through-hole for venting purposes.

1.2.1.2 Removed HDCC and admixtures and Per Customer request to remove included a target LDCC density HDCC and admixtures, and for finalizing the LDCC mixture 1.2.2.2 Removed HDCC and admixtures and Per Customer request to remove included a target LDCC density HDCC and admixtures, and for finalizing the LDCC mixture Appendix 1.3.2 Updated SAR Drawing to Revision 3 Update because of making vent port a required feature and other fabrication accommodations 2.1.1 Finalize one of the lift holes as a See Section 1.2.1 change and in through-hole for venting purposes, response to RAI 2-15 plugged flush.

2.1.2 Table number cross-reference Renumbered Table per Section changed to Table 2.1-2 2.1.3.1 added table 2.1.3 Clarified that the weights in Table In response to RAI 3-5 clarifying the 2.1-2 are maximum bounding LDCC mass weights 2.1.3.1 Added section and new Table 2.1-1 In response to RAI 3-5 clarifying the to make an assessment about actual LDCC mass LDCC weights.

Page 1 of 6

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

Section no. of Material changed Reason for change change 2.1.4 Updated Table numbering and Per Customer request to remove caption and column title regarding HDCC and in response to RAI 3-5 Table 2.1-3 to reflect the maximum clarifying the LDCC mass bounding nature of these weight totals. Figure 2.1-1 updated to remove HDCC.

2.2.1 Removed HDCC Per Customer request to remove HDCC 2.3.1 Removed HDCC Per Customer request to remove HDCC 2.3.2 Removed HDCC Per Customer request to remove HDCC 2.4.5 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 2.4.8 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 2.5.2 Revised and clarified load In response to RAI 2-2 securement narrative 2.6.1 Updated Table cross-reference As a result of Section 2.1.4 updates 2.6.1.1 Slight increase in temperatures and Mesh refinement per RAI 3-4 removed HDCC and updated text response and per Customer request regarding nature of pressure build-up to remove HDCC and response to from moisture RAI 3-5 2.6.1.3.1 Slight decrease in pressures In response to RAI 3-5 2.6.1.3.2 Updated Table cross-reference As a result of Section 2.1.4 updates 2.6.3 Slight decrease in pressures In response to RAI 3-5 2.6.7 Revised to include drop orientation Changes in response to RAI 2-3 assessment and Table 2.6-1 2.6.7.1 Moved this Section from 2.7.1.1 and Changes in response to RAI 2-4 and expanded to include material testing 2-6 information and new acceptance criteria for NCT

Page 2 of 6

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

Section no. of Material changed Reason for change change 2.6.7.2, 2.6.7.3, Revised NCT drop test summaries to Changes in response to drop test 2.6.7.4, 2.6.7.5 reflect new simulation runs and RAIs added corner drop follow-through case 2.7.1 Expanded to include new acceptance Changes in response to drop test criteria for HAC and reference to RAIs Section 2.6.7.1 for material 2.7.1.1, 2.7.1.2, Revised HAC drop test summaries to Changes in response to drop test 2.7.1.3 reflect new simulation runs RAIs 2.7.3.1 Updated cross-reference Changes in response to drop test RAIs 2.7.3.2 Change to damage opening area Changes in response to drop test RAIs 2.7.4.1 Temperatures and Pressures reduced Mesh refinement per RAI 3-4 slightly response and response to RAI 3-5 2.7.4.2 Package shell and annular LDCC As a result of mesh refinement per bulk temperatures updated RAI 3-4 response and assessment of the temperatures shown in Figure 3.4-3 2.7.4.3 Temperatures and Pressures reduced As a result of mesh refinement per slightly, yielding slight increase in RAI 3-4 response and response to Stress allowables and margins RAI 3-5 2.7.8 Summary of containment boundary Changes in response to drop test opening adjusted RAIs Appendix 2.12.1 Changes to references to Changes in response to drop test accommodate drop impact analysis RAIs updates Appendix 2.12.2 Changes throughout appendix to Changes in response to drop test accommodate drop impact analysis RAIs updates 3.1.1 Removed HDCC Per Customer request to remove HDCC

Page 3 of 6

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

Section no. of Material changed Reason for change change 3.1.3 Slight revision in temperatures in As a result of mesh refinement per Tables 3.1-1 and 3.1-2 and summary RAI 3-4 response and per RAI 3-2 cross-reference statement added to response end of section 3.1.4 Table 3.1-3 identifying the CR3MP As a result of RAI 3-5 changes maximum pressures included 3.2.1 Terminology updates and removed Consistency and per Customer HDCC request to remove HDCC 3.2.2 Terminology updates and updated Consistency and because of RAI 3-5 text regarding nature of pressure changes build-up from moisture 3.3 Terminology updates, removed Consistency and because of mesh HDCC and thermal model mesh refinement per RAI 3-4 response updates to text and Figure 3.3-1 3.3.1 Added reference temperature for Because of RAI 3-5 changes NCT Hot case 3.3.2 Slight decrease in pressures and As a result of mesh refinement per updated text regarding nature of RAI 3-4 response and because of pressure build-up from moisture. RAI 3-5 changes Slight package temperature refinement in Table 3.3-2 and Figure 3.3-2 3.4.1, 3.4.2 Terminology updates Consistency and clarity 3.4.2 Fire Test Conditions updated In response to RAI 3-2 including adding Figure 3.4-2 3.4.3 Figure 3.4-5 has been added and In response to RAI 3-3, 3-4 and 3-5 reference to new Appendix 3.5.4.2 has been added. Slight change in pressures and temperatures.

Appendix 3.5.1 References 12 through 16 updated In response to thermal RAIs Appendix 3.5.2 Changes throughout appendix to In response to RAI 3-1 and 3-5 accommodate revised evaluation of pressure in the CR3MP

Page 4 of 6

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

Section no. of Material changed Reason for change change Appendix 3.5.3 Revised for detail and clarity In response to RAI 3-6 regarding the origin and basis of the convection heat transfer correlations and any associated equations.

Appendix 3.5.4 Added Mesh Sensitivity and Time In response to RAI 3-4 Step Sensitivity evaluations Appendix 3.5.5 Inclusion of a summary of the In response to RAI 3-2 boundary conditions for each of the analyzed thermal cases 4.1.3 Finalize one of the lift holes as a See Section 1.2.1 change through-hole for venting purposes 4.2.1 Slight increase in the number of days In response to RAI 4-2 and removal to 5% hydrogen concentration of HDCC 4.3 Terminology updates and Consistency and clarity and per clarification on LDCC volume and Appendix 2.12.2 updates updates per drop impact evaluation 5.1.1 Removed HDCC Per Customer request to remove HDCC 5.1.2 Updated Dose Rates in Tables 5.1-1 Correction to a minor error in the and 5.1-2 payload modeling process resulted in slightly revised dose rates and resultant energy absorption fraction for Section 5.4.4 5.3.2 Removed HDCC Per Customer request to remove HDCC 5.4.3 Updated Tally Maximum Dose Rates See Section 5.1.2 change in Table 5.4-2 and summary statement 5.4.4 Removed HDCC and all admixtures In response to RAI 4-2 and for from LDCC. Terminology updates consistency and clarity and per and included reference to Appendix customer request to remove 5.5.4. Updates to Figures 5.4-1, 5.4-2 admixtures from LDCC and entirely and Table 5.4-3 remove HDCC Appendix Section Removed HDCC Per Customer request to remove 5.5.2.2 HDCC

Page 5 of 6

Enclosure 5 to FS-22-0091 CR3MP SAR Revision 3 Docket 71-9393 EPID L-2021-NEW-0003

Table of Changes for CR3MP SAR Revision 3

Section no. of Material changed Reason for change change Appendix 5.5.3 Removed HDCC and all admixtures Per customer updates regarding foam from LDCC and corrected an error in concentrate mass fraction and determination of Foam Concentrate request to remove HDCC and mass fraction admixture Appendix 5.5.4 A detailed step-by-step calculation of In response to RAI 4-1 all values related to the radiolytic gas generation evaluation has been added 7.1.1 Revised and clarified load In response to customer comments securement narrative 7.1.2 Finalize one of the lift holes as a See Section 1.2.1 change and based through-hole for venting purposes on customer comments and clarification to painted surfaces 7.1.3 Revised and clarified load In response to customer comments securement narrative 7.2.1 Revised and clarified load In response to customer comments securement narrative 8.1.1 Removed HDCC Per Customer request to remove HDCC 8.1.3.2 MNOP reduced slightly As a result of RAI 3-5 incorporations 8.1.5.3 Section removed Per Customer request to remove HDCC

Page 6 of 6