Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 The CR3MP SAR has been updated to create Revision 2. Each change in the SAR document from Revision 1 to Revision 2 is marked by a revision bar on the right-hand side of the page.

Section no. of Material changed Reason for change change 1.2.1 Added statement about pressure Update as a result of Section 2.3.1 vent port and plug change to allow for venting of package during welding for potential use of weld pre-heat or post-heat, which could occur prior to full 28-day grout curing 1.2.1.1 Added statement about pressure Update as a result of including vent vent port and plug and the plug port weld 1.2.1.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Appendix 1.3.2 Updated SAR Drawing to Revision Update as a result of including vent 2 port 2.1.1 Added statement about pressure Update as a result of including vent vent port and plug and the plug port weld 2.2 Added statement about pressure Update as a result of including vent vent port plug port 2.3.1 Removed carbon equivalency Allow greater flexibility for requirement for material procurement 2.3.1 Changed as-cast to wet-cast Per customer request, clarify terms and added a definition of terms 2.3.2 Added statement about pressure Update as a result of including vent vent port plug weld examination port requirements 2.3.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification 2.4.5 Added statement about pressure Update as a result of including vent vent port plug port 2.4.8 Added statement about pressure Update as a result of including vent vent port plug port Page 1 of 3

Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Section no. of Material changed Reason for change change Appendix 2.12.1 Added Reference 28 Update as a result of including vent port Appendix 2.12.2.1.1 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Appendix 2.12.2.1.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Table 3.2-3 Changed to As-Cast, from Cast Per customer request, clarify terms 4.1.1 Added statement about pressure Update as a result of including vent vent port plug port 4.1.3 Added statement about pressure Update as a result of including vent vent port plug weld port 5.3.2 Changed as-cast to wet-cast Per customer request, clarify terms 5.4.4 Revised to include statements Clarified per NRC feedback received regarding hydrogen diffusion and clarified the location of grout within the two distinct models for spatial energy deposition and time to reach 5% Hydrogen 5.4.4 Clarified with a statement regarding Customer-initiated request slurry density and wet-cast density such that LDCC air fraction as minimum 40% is attained 7.1.2 Added step regarding installation, Update as a result of including vent welding and examination of the port pressure vent port plug 8.1.2 Added statement about pressure Update as a result of including vent vent port plug weld examination port requirements 8.1.4 Added statement about pressure Update as a result of including vent vent port plug and its weld port 8.1.5.2 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification Page 2 of 3

Enclosure 4 to FS-22-0015 CR3MP SAR Revision 2 Docket 71-9393 EPID L-2021-NEW-0003 Table of Changes for CR3MP SAR Revision 2 Section no. of Material changed Reason for change change 8.1.5.2 Changed wet cast density standard Customer-initiated update to correct from ASTM C567 to ASTM the applicable ASTM standard C796/C796M 8.1.5.2 Changed slurry density requirement Customer-initiated request to an LDCC air fraction requirement 8.1.5.3 Changed compressive strength Customer-initiated correction to occurring at 28-day cure, not 7-day specification 8.1.5.3 Changed wet cast density standard Customer-initiated update to correct from ASTM C567 to ASTM the applicable ASTM standard C796/C796M Appendix 8.3.1 Updated Reference 4 and added Changed as a result of Section 8.1.2 Reference 5 and Section 8.1.5.2 updates Page 3 of 3