ML20207S091: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
REVISED COPY OPERATING DATA REPORT DOCKET NO | ~ | ||
: 1. UNIT NAME: | REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS | ||
: 1. UNIT NAME: | |||
ST. LUCIE UNIT 1 | |||
: 2. REPORTING PERIOD: OCTOBER 1986 | : 2. REPORTING PERIOD: OCTOBER 1986 | ||
: 3. LICENSED THERMAL POWER (MNT): | : 3. LICENSED THERMAL POWER (MNT): | ||
_4. | 2700 | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE): | _4. | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE): | NAMEPLATE RATING (GROSS MWE): | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | 850 | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE): | |||
830 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE): | |||
872 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
839 | |||
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | : 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | ||
SINCE LAST REPORT, GIVE REASONS: | SINCE LAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | ||
: 10. REASONS FOR RESTRICTIONSe IF ANY: | : 10. REASONS FOR RESTRICTIONSe IF ANY: | ||
_____________________________________L___________________________________ | _____________________________________L___________________________________ | ||
MONTHLY | |||
: 11. HOURS IN REPORT PERIOD: | -YTD-CUMULATIVE | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | : 11. HOURS IN REPORT PERIOD: | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS __________ | 745 7296 86448.0 | ||
: 14. HOURS GENERATOR ON-LINE _________________ | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | ||
: 15. UNIT RESERVE SHUTDOWN HOURS _____________ | 745 0 6960.0 l 63108.7 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 13. REACTOR RESERVE SHUTDOWN HOURS __________ | ||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) | 0.0 0.0 205.3 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 14. HOURS GENERATOR ON-LINE _________________ | ||
: 19. UNIT SERVICE FACTOR _____________________ | 745.0 6889.6 62691.7 | ||
: 20. UNIT AVAILABILITY FACTOR ________________ | : 15. UNIT RESERVE SHUTDOWN HOURS _____________ | ||
0 0 | |||
: 22. CAPACITY FACTOR (USING DER NET) | 39.3 | ||
: 23. UNIT FORCED OUTAGE RATE _________________ | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341 | ||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127 | |||
: 19. UNIT SERVICE FACTOR _____________________ | |||
100.0 94.4 72.5 l | |||
: 20. UNIT AVAILABILITY FACTOR ________________ | |||
100.0 94.4 72 6 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 99.9 96.2 l 71.3 | |||
: 22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9 | |||
: 23. UNIT FORCED OUTAGE RATE _________________ | |||
0 1.3 4.1 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS : | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS : | ||
REFUELING 3/21/86, 8 WEEKS _____________________________________________ | REFUELING 3/21/86, 8 WEEKS _____________________________________________ | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
8703180517 870316 | 8703180517 870316 ADOCKOSOOOggO PDR R | ||
o. | |||
REVISED COPY OPERATING DATA REPORT DOCMET NO | REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389. | ||
DATE | DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS | ||
: 1. UNIT NAMEt ST. LUCIE . | : 1. UNIT NAMEt ST. LUCIE. | ||
UNIT 2 | |||
: 2. REPORTING PERID0! OCTOBER 1986 | : 2. REPORTING PERID0! OCTOBER 1986 | ||
: 3. LICENSED THERMAL POWER (MWT)* ______________ 2700 | : 3. LICENSED THERMAL POWER (MWT)* ______________ 2700 | ||
: 4. NAMEPLATE RATING (GROSS MWE)! ______________ 854 | : 4. NAMEPLATE RATING (GROSS MWE)! ______________ | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE)* | 854 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! | : 5. DESIGN ELECTRICAL RATING (NET MWE)* | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! | 830 | ||
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! | ||
882 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! | |||
839 | |||
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________ | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________ | ||
: 10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________ | : 10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________ | ||
MONTHLY | MONTHLY | ||
: 11. HOURS IN REPORT PERID0! _________________ | -YTD-CUMULATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS __________ | : 11. HOURS IN REPORT PERID0! _________________ | ||
745 7296 29345 9 I | |||
: 15. UNIT RESERVE SHUTDOWN HOURS _____________ | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ | ||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) | 745 0 5862.7 23911 6 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 13. REACTOR RESERVE SHUTDOWN HOURS __________ | ||
6.0 0.0 0.0 | |||
: 14. HOURS GENERATOR ON-LINE _________________ | |||
745.0 5791.5 23363 8 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS _____________ | |||
0 0 | |||
0 l | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170 | |||
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 645239 5164670 20071350 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 i | |||
i | i | ||
: 19. UNIT SERVICE FACTOR _____________________ | |||
100 0 79.4 82 4 l | |||
: 20. UNIT AVAILABILITY FACTOR ________________ | |||
100.0 79.4 82 4 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 101.0 80.0 l 82.5l | |||
: 22. CAPACITY FACTOR (USING DER NET) 102.1 80.8 81 9 | |||
: 23. UNIT FORCED OUTAGE RATE _________________ | |||
e 1.3 86 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS | |||
* l i | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i | |||
( | ( | ||
.. -..}} | |||
Latest revision as of 19:38, 6 December 2024
| ML20207S091 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 10/31/1986 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20207S076 | List: |
| References | |
| NUDOCS 8703180517 | |
| Download: ML20207S091 (2) | |
Text
,
~
REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME:
ST. LUCIE UNIT 1
- 2. REPORTING PERIOD: OCTOBER 1986
- 3. LICENSED THERMAL POWER (MNT):
2700
_4.
NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE):
872
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONSe IF ANY:
_____________________________________L___________________________________
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
745 7296 86448.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
745 0 6960.0 l 63108.7
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE _________________
745.0 6889.6 62691.7
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127
- 19. UNIT SERVICE FACTOR _____________________
100.0 94.4 72.5 l
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 94.4 72 6
- 21. CAPACITY FACTOR (USING MDC NET) 99.9 96.2 l 71.3
- 22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.3 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING 3/21/86, 8 WEEKS _____________________________________________
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
8703180517 870316 ADOCKOSOOOggO PDR R
o.
REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389.
DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAMEt ST. LUCIE.
UNIT 2
- 2. REPORTING PERID0! OCTOBER 1986
- 3. LICENSED THERMAL POWER (MWT)* ______________ 2700
- 4. NAMEPLATE RATING (GROSS MWE)! ______________
854
- 5. DESIGN ELECTRICAL RATING (NET MWE)*
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERID0! _________________
745 7296 29345 9 I
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
745 0 5862.7 23911 6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
6.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
745.0 5791.5 23363 8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 645239 5164670 20071350
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 i
i
- 19. UNIT SERVICE FACTOR _____________________
100 0 79.4 82 4 l
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 79.4 82 4
- 21. CAPACITY FACTOR (USING MDC NET) 101.0 80.0 l 82.5l
- 22. CAPACITY FACTOR (USING DER NET) 102.1 80.8 81 9
- 23. UNIT FORCED OUTAGE RATE _________________
e 1.3 86
- 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS
- l i
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i
(
.. -..