ML20207S091: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,                                                                                                               . .                      .  ~     .                    - .
{{#Wiki_filter:,
REVISED COPY OPERATING DATA REPORT DOCKET NO                     50 - 335 DATE                         11/13/86 COMPLETED BY N. W. GRANT TELEPHONE       305/694/4432 OPERATING STATUS
~
: 1. UNIT NAME:                                                               ST. LUCIE             UNIT 1
REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
: 1. UNIT NAME:
ST. LUCIE UNIT 1
: 2. REPORTING PERIOD: OCTOBER 1986
: 2. REPORTING PERIOD: OCTOBER 1986
: 3. LICENSED THERMAL POWER (MNT): ______________                                                                                        2700
: 3. LICENSED THERMAL POWER (MNT):
_4.     NAMEPLATE                                                 RATING                 (GROSS MWE): ______________                  850
2700
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                                                               ________          830
_4.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE):                                                                                       ___  872
NAMEPLATE RATING (GROSS MWE):
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                                                                                   _____      839
850
: 5. DESIGN ELECTRICAL RATING (NET MWE):
830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE):
872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS: ________________________________________
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
: 10. REASONS FOR RESTRICTIONSe IF ANY: _______________________________________
: 10. REASONS FOR RESTRICTIONSe IF ANY:
_____________________________________L___________________________________
_____________________________________L___________________________________
.                                                                                                                                              MONTHLY     -YTD-     CUMULATIVE
MONTHLY
: 11. HOURS IN REPORT PERIOD: _________________                                                                                            745       7296                   86448.0
-YTD-CUMULATIVE
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____                                                                                           745 0     6960.0 l               63108.7
: 11. HOURS IN REPORT PERIOD:
: 13. REACTOR RESERVE SHUTDOWN HOURS __________                                                                                             0.0         0.0                     205.3
745 7296 86448.0
: 14. HOURS GENERATOR ON-LINE _________________                                                                                           745.0     6889.6                 62691.7
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
: 15. UNIT RESERVE SHUTDOWN HOURS _____________                                                                                                 0           0                       39.3
745 0 6960.0 l 63108.7
: 16. GROSS THERMAL ENERGY GENERATED (MWH) ____                                                                                          1998087   18400074             159292341
: 13. REACTOR RESERVE SHUTDOWN HOURS __________
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)                                                                                     _      657650     6130430               52186935
0.0 0.0 205.3
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) ___                                                                                          624337     5819335               49253127
: 14. HOURS GENERATOR ON-LINE _________________
: 19. UNIT SERVICE FACTOR _____________________                                                                                           100.0       94.4                       72.5
745.0 6889.6 62691.7
: 20. UNIT AVAILABILITY FACTOR ________________                                                                                           100.0       94.4                       72 6 l
: 15. UNIT RESERVE SHUTDOWN HOURS _____________
!      21. CAPACITY FACTOR (USING MDC NET) _________                                                                                            99.9       96.2 l                     71.3 69.9
0 0
: 22. CAPACITY FACTOR (USING DER NET) _________                                                                                            101.0       96.1
39.3
: 23. UNIT FORCED OUTAGE RATE _________________                                                                                                 0       1.3                         4.1
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127
: 19. UNIT SERVICE FACTOR _____________________
100.0 94.4 72.5 l
: 20. UNIT AVAILABILITY FACTOR ________________
100.0 94.4 72 6
: 21. CAPACITY FACTOR (USING MDC NET) 99.9 96.2 l 71.3
: 22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9
: 23. UNIT FORCED OUTAGE RATE _________________
0 1.3 4.1
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING 3/21/86, 8 WEEKS _____________________________________________
REFUELING 3/21/86, 8 WEEKS _____________________________________________
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                                                                                     ________
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
8703180517 870316
8703180517 870316 ADOCKOSOOOggO PDR R
;              PDR ADOCKOSOOOggO R


          . o.
o.
REVISED COPY OPERATING DATA REPORT DOCMET NO           50 - 389.
REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389.
DATE               11/13/86 COMPLETED BY N. W. GRANT TELEPHONE       305/694/4432 OPERATING STATUS
DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
: 1. UNIT NAMEt ST. LUCIE .                     UNIT 2
: 1. UNIT NAMEt ST. LUCIE.
UNIT 2
: 2. REPORTING PERID0! OCTOBER 1986
: 2. REPORTING PERID0! OCTOBER 1986
: 3. LICENSED THERMAL POWER (MWT)* ______________ 2700
: 3. LICENSED THERMAL POWER (MWT)* ______________ 2700
: 4. NAMEPLATE RATING (GROSS MWE)! ______________ 854
: 4. NAMEPLATE RATING (GROSS MWE)! ______________
: 5. DESIGN ELECTRICAL RATING (NET MWE)*                                                     ________                830
854
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!                                                             ___        882
: 5. DESIGN ELECTRICAL RATING (NET MWE)*
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!                                                         _ _ . , _ _      839
830
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r                             SINCE LAST REPORT, GIVE REASONS! ________________________________________
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!
839
: 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
: 10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________
: 10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________
MONTHLY   -YTD-     CUMULATIVE
MONTHLY
: 11. HOURS IN REPORT PERID0! _________________                                                                         745     7296           29345 9 I                   12. NUMBER OF HOURS REACTOR WAS CRITICAL _____                                                                       745 0   5862.7         23911 6
-YTD-CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS __________                                                                           6.0       0.0                             0.0
: 11. HOURS IN REPORT PERID0! _________________
,                    14. HOURS GENERATOR ON-LINE _________________                                                                         745.0   5791.5         23363 8                   '
745 7296 29345 9 I
: 15. UNIT RESERVE SHUTDOWN HOURS _____________                                                                             0           0                               0 l                   16. GROSS THERMAL ENERGY GENERATED (MWH) ____                                                                      1994252 15450637       60097170
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)                                                             _            645239   5164670       20071350 i
745 0 5862.7 23911 6
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) ___                                                                        631452   4890223       18961266 i                   19. UNIT SERVICE FACTOR _____________________                                                                        100 0      79.4                            82 4 l
: 13. REACTOR RESERVE SHUTDOWN HOURS __________
: 20. UNIT AVAILABILITY FACTOR ________________                                                                        100.0      79.4                            82 4
6.0 0.0 0.0
: 21. CAPACITY FACTOR (USING MDC NET) _________                                                                        101.0      80.0 l                          82.5l
: 14. HOURS GENERATOR ON-LINE _________________
: 22. CAPACITY FACTOR (USING DER NET) _________                                                                        102.1      80.8                            81 9
745.0 5791.5 23363 8
: 23. UNIT FORCED OUTAGE RATE _________________                                                                            e        1.3                              86 l                    24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS *                                                                                                                            ,
: 15. UNIT RESERVE SHUTDOWN HOURS _____________
i
0 0
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt                                                                        ________
0 l
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 645239 5164670 20071350
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 i
i
i
: 19. UNIT SERVICE FACTOR _____________________
100 0 79.4 82 4 l
: 20. UNIT AVAILABILITY FACTOR ________________
100.0 79.4 82 4
: 21. CAPACITY FACTOR (USING MDC NET) 101.0 80.0 l 82.5l
: 22. CAPACITY FACTOR (USING DER NET) 102.1 80.8 81 9
: 23. UNIT FORCED OUTAGE RATE _________________
e 1.3 86
: 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS
* l i
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i
(
(
    -_ _ - _ . . _ . _ _ _ _ _ _ _ _ - . _ . _ . _ _                    _ . _ _ , _ _ _ _ _ _ . _ _ _ . . _ _ _                                                  _ _ . _ _ . . - . . _}}
.. -..}}

Latest revision as of 19:38, 6 December 2024

Corrected Monthly Operating Repts for Oct 1986
ML20207S091
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 10/31/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207S076 List:
References
NUDOCS 8703180517
Download: ML20207S091 (2)


Text

,

~

REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD: OCTOBER 1986
3. LICENSED THERMAL POWER (MNT):

2700

_4.

NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MKE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONSe IF ANY:

_____________________________________L___________________________________

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

745 7296 86448.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

745 0 6960.0 l 63108.7

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

745.0 6889.6 62691.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935
18. NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127
19. UNIT SERVICE FACTOR _____________________

100.0 94.4 72.5 l

20. UNIT AVAILABILITY FACTOR ________________

100.0 94.4 72 6

21. CAPACITY FACTOR (USING MDC NET) 99.9 96.2 l 71.3
22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9
23. UNIT FORCED OUTAGE RATE _________________

0 1.3 4.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/21/86, 8 WEEKS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8703180517 870316 ADOCKOSOOOggO PDR R

o.

REVISED COPY OPERATING DATA REPORT DOCMET NO 50 - 389.

DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAMEt ST. LUCIE.

UNIT 2

2. REPORTING PERID0! OCTOBER 1986
3. LICENSED THERMAL POWER (MWT)* ______________ 2700
4. NAMEPLATE RATING (GROSS MWE)! ______________

854

5. DESIGN ELECTRICAL RATING (NET MWE)*

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEAS NUMBER 3 THROUGH 7) r SINCE LAST REPORT, GIVE REASONS! ________________________________________
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIDHS, IF ANY! _______________________________________

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERID0! _________________

745 7296 29345 9 I

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

745 0 5862.7 23911 6

13. REACTOR RESERVE SHUTDOWN HOURS __________

6.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

745.0 5791.5 23363 8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

0 l

16. GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 645239 5164670 20071350
18. NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 i

i

19. UNIT SERVICE FACTOR _____________________

100 0 79.4 82 4 l

20. UNIT AVAILABILITY FACTOR ________________

100.0 79.4 82 4

21. CAPACITY FACTOR (USING MDC NET) 101.0 80.0 l 82.5l
22. CAPACITY FACTOR (USING DER NET) 102.1 80.8 81 9
23. UNIT FORCED OUTAGE RATE _________________

e 1.3 86

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS
  • l i
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i

(

.. -..