IR 05000232/2026001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20206U955
| number = ML20214N375
| issue date = 07/07/1986
| issue date = 11/24/1986
| title = Discusses Safety Insp of License 50-23226-01 on 860618 & 20 & Forwards Notice of Violation.Reply Should Describe Specific Actions to Establish Effective Mgt Control of Radiation Safety Program
| title = Ack Receipt of 860925 Ltr Informing NRC of Steps Taken to Correct Violations Noted During Insp of License 50-23226-01. Response Should Have Been Submitted within 30 Days of Receipt of Notice
| author name = Montgomery J
| author name = Montgomery J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8607110279
| document report number = NUDOCS 8612030618
| package number = ML20206U958
| package number = ML20214N378
| document type = CORRESPONDENCE-LETTERS, DKT 30 MTL BYPRODUCT, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, DKT 30 MTL BYPRODUCT, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 1
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:. _ _ _ _ _ _ - _
* .
    .-
JUL 071986 License No: 50-23226-01 Swanson General Contractor, In ,
  .
11221 Olive Lane    ''h_77 7 Anchorage, Alaska 99515 Attention: Mr. Robert Swanson President Gentlemen:
'
Subject: NRC Inspection This refers to the routine safety inspection conducted by Mr. David D. Skov of this office on June 18 and 20, 1986, of activities authorized by NRC License No. 50-23226-01 and to the discussion of our findings held by Mr. Skov with you and other members of your staff at the conclusion of the inspectio <
' The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the-Commission's rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and
 
representative records, interviews with personnel, and observations by the inspecto Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation enclosed as Appendix A to this letter. These items have been categorized into severity levels as described in the NRC Enforcement Policy, 10 CFR Part 2, Appendix Pursuant to the action taken by the licensee relative to the violation stated in Paragraph B.1.,
Appendix A, no further response to this item is require In addition to the need for corrective action regarding the specific violations included in Appendix A, we are concerned about the effectiveness of your management control system that permitted the violations to occur. Six apparent violations of regulatory requirements were identified which indicate a lack of management control and administration of the radiation safety program in preventing violations of NRC regulations. Therefore, in your reply you should describe in detail the specific actions which you are going to take to establish effective management control of the radiation safety progra Your response to this Notice is to be submitted in accordance with the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violatio REGS LIC30 50-23226-01 PDR
 
-
  ._ - ._ -
  .- . -. - - . - -.
 
. s . . . . . _ _ _   - _ _  _ -. -     _ -_ _
 
  - .
JUL 071986
.
  .
  .
      -2-
,
,
The responses directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51 If you have any questions on this matter or concerning this inspection, we j will be glad to t'iscuss them with yo
Sincerely,


1
g poM License'No. 50-23226-01 NOV 241986  .
:       ames L. Montgomery, Chief
Swanson General Contractors In Olive Lane    -
!      'uclear Materials Safety and Safeguards Branch
Anchorage, Alaska 99515
'
        ..s Attention: Mr. Robert B. Swanson, S President l
Enclosure:
Gentlemen:      '
i Notice of Violation cc w/ enclosure:
Thank you for your letter dated September 25, 1986 informing us of the steps you have taken to correct items which we brought to your attention in~our letter dated July 7, 1986. Your corrective actions will be verified during our next inspectio You are reminded that your response to the NRC Notice of Violation should have been submitted within thirty (30) days of the date of receipt of the Notic The official response to our Notice was not received until October 23, 1986, a period of one hundred and seven (107) day We also bring to your attention that License Condition 1 of your license specifies S and S Electric, Inc. and not the current name of your company, Swanson General Contractor, Inc. The requirement for you to keep your license current, and to submit an application to the Region V office for a license amendment, was explained by Mr. David D. Skov of our office to Mr. Richard Jensen of your staff by telephone on September 8,1986. However, a check of our records indicates that we have not yet received the required applicatio This matter should be resolved promptly in order to avoid further noncompliance with your license. A check made out to the NRC to cover the appropriate amendment fee should accompany your applicatio Your cooperation with us is appreciate
State of Alaska        r i bec w/ enclosure:      .. <
j RSB/ Document Control Desk (RIDS)      -


G. Cook              '
Sincerely, cr%[no E f60Q James L. Montgomery, Chief Nuclear Materials Safety and Safeguards Branch bcc w/ copy of letter dated 9/25/86:
B. Faulkenberry       *   '
State of Alaska Joan Zollicoffer B. Faulkenberry  ^
: J. Martin       " = -, , ,
J. Martin RSB/ Document Contrel' Desk (RIDS) ..
          ,
Region V ' -
            -
g ,J'V DSkov JMon gomery 11/# /86 11/p//86 8612030618 861124 REG 3 LIC30 50-23226-01 PDR   \
. LFMB
      -
        *
C)
l        i , %
l L
i          !
t. l  ,
        ,
              ,
o i
s
            *
          ' vr    *
l        , ,_
            '
1        ,
          '
,
        %
          -
.l
,
!
$
.
i
:
l Region V M  g
] DSkov/dh RThomas  ontgomery  AJo nson 7/8/86 7/JP-/86  7/ $/86   7/J/86
.
I
!
i,
, . ___._-_.---_--.--..-----_---__-.--_-.----_._---.--..._---.__--.w._-._   . - _ - - . - _ - - _ _ _ _ - - - . - - - - - - - - - . - - - - - _ - - -
}}
}}

Revision as of 01:19, 19 January 2021

Ack Receipt of 860925 Ltr Informing NRC of Steps Taken to Correct Violations Noted During Insp of License 50-23226-01. Response Should Have Been Submitted within 30 Days of Receipt of Notice
ML20214N375
Person / Time
Site: 05000232, 03020387
Issue date: 11/24/1986
From: Jonathan Montgomery
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Swanson R
SWANSON GENERAL CONTRACTOR
Shared Package
ML20214N378 List:
References
NUDOCS 8612030618
Download: ML20214N375 (1)


Text

. _ _ _ _ _ _ - _

.-

.

.

g poM License'No. 50-23226-01 NOV 241986 .

Swanson General Contractors In Olive Lane -

Anchorage, Alaska 99515

..s Attention: Mr. Robert B. Swanson, S President l

Gentlemen: '

Thank you for your letter dated September 25, 1986 informing us of the steps you have taken to correct items which we brought to your attention in~our letter dated July 7, 1986. Your corrective actions will be verified during our next inspectio You are reminded that your response to the NRC Notice of Violation should have been submitted within thirty (30) days of the date of receipt of the Notic The official response to our Notice was not received until October 23, 1986, a period of one hundred and seven (107) day We also bring to your attention that License Condition 1 of your license specifies S and S Electric, Inc. and not the current name of your company, Swanson General Contractor, Inc. The requirement for you to keep your license current, and to submit an application to the Region V office for a license amendment, was explained by Mr. David D. Skov of our office to Mr. Richard Jensen of your staff by telephone on September 8,1986. However, a check of our records indicates that we have not yet received the required applicatio This matter should be resolved promptly in order to avoid further noncompliance with your license. A check made out to the NRC to cover the appropriate amendment fee should accompany your applicatio Your cooperation with us is appreciate

Sincerely, cr%[no E f60Q James L. Montgomery, Chief Nuclear Materials Safety and Safeguards Branch bcc w/ copy of letter dated 9/25/86:

State of Alaska Joan Zollicoffer B. Faulkenberry ^

J. Martin RSB/ Document Contrel' Desk (RIDS) ..

Region V ' -

g ,J'V DSkov JMon gomery 11/# /86 11/p//86 8612030618 861124 REG 3 LIC30 50-23226-01 PDR \

-

C)

l L