ML20135B986: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 28: | Line 28: | ||
==Dear Mr. Adams:== | ==Dear Mr. Adams:== | ||
We have completed our review of the Baghouse and Conveyor Workplan you submitted to us by letter dated September 27, 1996, for work at 1000 Harvard Avenue, Cleveland, Ohio. This Workplan was written to address only the dismantlement and removal of the filter baghouse and related conveyor assembly t | We have completed our review of the Baghouse and Conveyor Workplan you submitted to us by {{letter dated|date=September 27, 1996|text=letter dated September 27, 1996}}, for work at 1000 Harvard Avenue, Cleveland, Ohio. This Workplan was written to address only the dismantlement and removal of the filter baghouse and related conveyor assembly t | ||
located in the northeast corner of Building G-1, which is a special activity within the overall remediation previously approved for this site. Tha d | located in the northeast corner of Building G-1, which is a special activity within the overall remediation previously approved for this site. Tha d | ||
Engelhard Radiological Control Plan that was also included in your __ | Engelhard Radiological Control Plan that was also included in your __ |
Latest revision as of 07:14, 14 December 2021
ML20135B986 | |
Person / Time | |
---|---|
Issue date: | 10/16/1996 |
From: | Mccormickbarge NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Adams T B. KOH & ASSOCIATES, INC. |
Shared Package | |
ML20135B362 | List: |
References | |
FOIA-96-529 NUDOCS 9703030296 | |
Download: ML20135B986 (1) | |
Text
- .- - _ - - ._ -
( October 16, 1996 Theodore G. Adams B. Koh & Associates, Inc. .
9199 Reisterstown Road i
Suite lil-C Owings Mills, MD 21117-4520
SUBJECT:
REVIEW OF BAGH0VSE AND CONVEYOR WORKPLAN FOR THE ENGELHARD FACILITY
Dear Mr. Adams:
We have completed our review of the Baghouse and Conveyor Workplan you submitted to us by letter dated September 27, 1996, for work at 1000 Harvard Avenue, Cleveland, Ohio. This Workplan was written to address only the dismantlement and removal of the filter baghouse and related conveyor assembly t
located in the northeast corner of Building G-1, which is a special activity within the overall remediation previously approved for this site. Tha d
Engelhard Radiological Control Plan that was also included in your __
September 27, 1996, submittal, was not reviewed in that it was previously reviewed and approved in a letter from me to Mr. A. G. Kopas of Engelhard Corporation, dated June 23, 1995.
1
' Mr. William Snell of my staff discussed the Workplan with you on October 11, 1996, and based on that discussion, we understand that the boiler house, where any material 'that can not be decontaminated will be stored, is located on the site and will be kept locked when radioactive waste is stored there. In addition, we understand that any stored radioactive waste will not be shipped for burial until the overall issue that is being pursued by Chevron and Engelhard with the Department of Energy concerning ownership of the material is resolved. With the above understandings, we found the Workplan acceptable
, and have no additional questions.
Sincerely, Original Signed by J. W. McCormick-Sarger, Chief Decommissioning Branch Division of Nuclear Materials Safety
, cc: Mike Weber, HMSS/DWH/LLDP J Ruth Vandegrift, Ohio Department of Health A. Kopas, Engelhard Corporation W. Potter, Chevron Chemical Company DOCUMENT NAME: A:\BAGHSE.PLN g g. . ,.,.... - .... ... c-c.,, ..s f i e-c.,, s... f i .
0FFICE RIII D RIII b NAME /
SdtflN McBarge M h DATE 10/ff/96 10/17/96 0FFICIAL RECORD COPY f