ML20069M145: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:.
{{#Wiki_filter:.
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:
REVISION COMPLETED BY:         R. L. Kaplan TELEPHONE:   (714) 368-6834 QPJRATING STAIUS
REVISION COMPLETED BY:
: 1. Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2
R. L. Kaplan TELEPHONE:
: 2. Reporting Period:                       April 1994
(714) 368-6834 QPJRATING STAIUS 1.
: 3. Licensed Thermal Power (MWt):                   3390
Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2 2.
: 4. Nameplate Rating (Gross MWe):                   1127
Reporting Period:
: 5. Design Electrical Rat-ing (Net MWe):           1Q70
April 1994 3.
: 6. Maximum Dependable Capacity (Gross MWe):       1127
Licensed Thermal Power (MWt):
: 7. Maximum Dependable Capacity (Net MWe):         1070
3390 4.
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Nameplate Rating (Gross MWe):
Since Last Report, Give Reasons:                                   NA
1127 5.
: 9. Power Level To Which Restricted, If Any (Net MWe):                 NA
Design Electrical Rat-ing (Net MWe):
: 10. Reasons For Restrictions, If Any:                                   NA This Month     Yr.-to-Date     Cumulative
1Q70 6.
: 11. Hours In Reporting Period                       71R10Q       2,8791QQ       93.816 10Q_
Maximum Dependable Capacity (Gross MWe):
: 12. Number Of Hours Reactor Was Critical           719100       2.879.00       70.333139_
1127 7.
: 13. Reactor Reserve Shutdown Hours                     0_100           Q10D             0.00 14   Hours Generator On-Line                         719.00       2.879100       69.7501 34_
Maximum Dependable Capacity (Net MWe):
: 15. Unit Reserve Shutdown Hours                       Q100           0100             0.00
1070 8.
: 16. Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
: 17. Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_
Since Last Report, Give Reasons:
: 18. Net Electrical Energy Generated (MWH)       777.113 Q0_ 3.1051051.00 _l32359.749188_
NA 9.
: 19. Unit Service Factor                             1DQ100%         100 QD%           74.31%
Power Level To Which Restricted, If Any (Net MWe):
: 20. Unit Availability Factor                       10Q10Q%         1QQ100%           74.33%
NA 10.
: 21. Unit Capacity Factor (Using MDC Net)           101.01%         1Q0180%           73.Q3%
Reasons For Restrictions, If Any:
: 22. Unit Capacity Factor (Using DER Net)           1Q1tQ1%         10018Q%           7310R%
NA This Month Yr.-to-Date Cumulative 11.
: 23. Unit Forced Outage Rate                           Q.00%           0.00%             5.94%
Hours In Reporting Period 71R10Q 2,8791QQ 93.816 0Q_
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 12.
None
Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_
: 25. If Shutdown At End Of Report Period, Estimated Date of Startup:                     NA
13.
: 26. Units In Test Status (Prior To Commercial Operation):         Forecast       Achieved INITIAL CRITICALITY                             NA             NA INITIAL ELECTRICITY                             NA             NA COMMERCIAL OPERATION                             NA             NA 1
Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.750 34_
2 9406210163 940615                                                                                 I PDR   ADOCK 05000361 R                   PDR                                                                           l}}
1 15.
Unit Reserve Shutdown Hours Q100 0100 0.00 16.
Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14 17.
Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_
18.
Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_
19.
Unit Service Factor 1DQ100%
100 QD%
74.31%
20.
Unit Availability Factor 10Q10Q%
1QQ100%
74.33%
21.
Unit Capacity Factor (Using MDC Net) 101.01%
1Q0 80%
73.Q3%
1 22.
Unit Capacity Factor (Using DER Net) 1Q1 Q1%
10018Q%
73 0R%
t 1
23.
Unit Forced Outage Rate Q.00%
0.00%
5.94%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1
2 9406210163 940615 PDR ADOCK 05000361 R
PDR}}

Latest revision as of 10:22, 16 December 2024

Revised Monthly Operating Repts for April 1994 for San Onofre Nuclear Generating Station,Unit 2
ML20069M145
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/30/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20069M109 List:
References
NUDOCS 9406210183
Download: ML20069M145 (1)


Text

.

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 368-6834 QPJRATING STAIUS 1.

Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2 2.

Reporting Period:

April 1994 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rat-ing (Net MWe):

1Q70 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 71R10Q 2,8791QQ 93.816 0Q_

1 12.

Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_

13.

Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.750 34_

1 15.

Unit Reserve Shutdown Hours Q100 0100 0.00 16.

Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14 17.

Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_

18.

Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_

19.

Unit Service Factor 1DQ100%

100 QD%

74.31%

20.

Unit Availability Factor 10Q10Q%

1QQ100%

74.33%

21.

Unit Capacity Factor (Using MDC Net) 101.01%

1Q0 80%

73.Q3%

1 22.

Unit Capacity Factor (Using DER Net) 1Q1 Q1%

10018Q%

73 0R%

t 1

23.

Unit Forced Outage Rate Q.00%

0.00%

5.94%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1

2 9406210163 940615 PDR ADOCK 05000361 R

PDR