Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE: | Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE: | ||
REVISION COMPLETED BY: | REVISION COMPLETED BY: | ||
R. L. Kaplan TELEPHONE: | |||
(714) 368-6834 QPJRATING STAIUS 1. | |||
Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2 2. | |||
Reporting Period: | |||
April 1994 3. | |||
Licensed Thermal Power (MWt): | |||
3390 4. | |||
Nameplate Rating (Gross MWe): | |||
Since Last Report, Give Reasons: | 1127 5. | ||
Design Electrical Rat-ing (Net MWe): | |||
1Q70 6. | |||
Maximum Dependable Capacity (Gross MWe): | |||
1127 7. | |||
Maximum Dependable Capacity (Net MWe): | |||
1070 8. | |||
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) | |||
Since Last Report, Give Reasons: | |||
NA 9. | |||
Power Level To Which Restricted, If Any (Net MWe): | |||
NA 10. | |||
Reasons For Restrictions, If Any: | |||
NA This Month Yr.-to-Date Cumulative 11. | |||
Hours In Reporting Period 71R10Q 2,8791QQ 93.816 0Q_ | |||
1 12. | |||
None | Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_ | ||
13. | |||
Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.750 34_ | |||
2 9406210163 940615 | 1 15. | ||
Unit Reserve Shutdown Hours Q100 0100 0.00 16. | |||
Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14 17. | |||
Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_ | |||
18. | |||
Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_ | |||
19. | |||
Unit Service Factor 1DQ100% | |||
100 QD% | |||
74.31% | |||
20. | |||
Unit Availability Factor 10Q10Q% | |||
1QQ100% | |||
74.33% | |||
21. | |||
Unit Capacity Factor (Using MDC Net) 101.01% | |||
1Q0 80% | |||
73.Q3% | |||
1 22. | |||
Unit Capacity Factor (Using DER Net) 1Q1 Q1% | |||
10018Q% | |||
73 0R% | |||
t 1 | |||
23. | |||
Unit Forced Outage Rate Q.00% | |||
0.00% | |||
5.94% | |||
24. | |||
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
None 25. | |||
If Shutdown At End Of Report Period, Estimated Date of Startup: | |||
NA 26. | |||
Units In Test Status (Prior To Commercial Operation): | |||
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1 | |||
2 9406210163 940615 PDR ADOCK 05000361 R | |||
PDR}} | |||
Latest revision as of 10:22, 16 December 2024
| ML20069M145 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/30/1994 |
| From: | Kaplan R SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20069M109 | List: |
| References | |
| NUDOCS 9406210183 | |
| Download: ML20069M145 (1) | |
Text
.
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:
REVISION COMPLETED BY:
R. L. Kaplan TELEPHONE:
(714) 368-6834 QPJRATING STAIUS 1.
Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2 2.
Reporting Period:
April 1994 3.
Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rat-ing (Net MWe):
1Q70 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 71R10Q 2,8791QQ 93.816 0Q_
1 12.
Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_
13.
Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.750 34_
1 15.
Unit Reserve Shutdown Hours Q100 0100 0.00 16.
Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14 17.
Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_
18.
Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_
19.
Unit Service Factor 1DQ100%
100 QD%
74.31%
20.
Unit Availability Factor 10Q10Q%
1QQ100%
74.33%
21.
Unit Capacity Factor (Using MDC Net) 101.01%
1Q0 80%
73.Q3%
1 22.
Unit Capacity Factor (Using DER Net) 1Q1 Q1%
10018Q%
73 0R%
t 1
23.
Unit Forced Outage Rate Q.00%
0.00%
5.94%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1
2 9406210163 940615 PDR ADOCK 05000361 R