ML021900574: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Prairie Island Nuclear Generating Plant Attachment 3 to Supplement dated February 15, 2002 to License Amendment Request dated December 11, 2000 Conversion to Improved Technical Specifications (ITS)
{{#Wiki_filter:Prairie Island Nuclear Generating Plant to Supplement dated February 15, 2002 to License Amendment Request dated December 11, 2000 Conversion to Improved Technical Specifications (ITS)
Revision 9 Change Pages
Revision 9 Change Pages


improved Technical Specifications Supplement dated 2/1 5/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                             Insert 3.4        3.4.1-2       12/11/00 3.4.5-1 3.4                       9/4/01 3.4.5-4       12111/00 3.4 3.4.6-1       12/11/00 3.4 3.4.6-2        12/11/00 3.4 3.4.6-3       12/11/00 3.4 3.4.7-1        12/11/00 3.4 3.4.7-2        12/11/00 3.4 3.4.7-3         12/11/00 3.4 3.4 3.4         3.4.8-1        12/11/00 12/11/00 3.4         3.4.8-2 12/11/00 3.4         3.4.8-3 12/11/00 3.4         3.4.10-2 12/11/00 3.4         3.4.12-1 3.4                         12fl11/00 3.4.12-2 3.4                         12/11/00 3.4.12-3 3.4         3.4.12-4       12/11/00 3.,4                        12/11/00 3.4.13-1 3.4        3.4.13-2       12/11/00 3.4                        12/11/00 3.4.13-3 3.4        3.4.13-4       12/11/00 3.4                        12/11/ 00 3.4.13-5 3.4                        12111/00 3.4.14-3 3.4                        12/11/00 3.4.17-1 3.4                        12/11/00 3.4.17-2 3.4                        12/11/00 3.4.17-3 3.4                        12/11/00 B 3.4.1-5 3.4                        12/11/00 B 3.4.3-5 3.4                       9/4/01 B 3.4.5-3 1 of 13
Remove 3.4.1-2 3.4.5-1 3.4.5-4 3.4.6-1 3.4.6-2 3.4.6-3 3.4.7-1 3.4.7-2 3.4.7-3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.,4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 improved Technical Specifications Supplement dated 2/1 5/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 3.4.8-1 3.4.8-2 3.4.8-3 3.4.10-2 3.4.12-1 3.4.12-2 3.4.12-3 3.4.12-4 3.4.13-1 3.4.13-2 3.4.13-3 3.4.13-4 3.4.13-5 3.4.14-3 3.4.17-1 3.4.17-2 3.4.17-3 B 3.4.1-5 B 3.4.3-5 B 3.4.5-3 Insert 12/11/00 9/4/01 12111/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12fl11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/ 00 12111/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 9/4/01 1 of 13


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                       Insert 3.4       B        B 3.4.5-4           12/11/00 12/11/00 3.4       B        B 3.4.5-7 12/11/00 3.4       B        B 3.4.5-8 12/11/00 3.4       B        B 3.4.6-2 3.4                                       12/11/00 B        B 3.4.6-3 3.4                                       12/1100 B        B 3.4.6-4 3.4                                       12/11/00 B        B 3.4.6-5 3.4                                       12/11/00 B        B 3.4.6-6 3.4 B
Remove 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 Insert 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/1100 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 B
3.4                                       12/11/00 B        B 3.4.7-2 3.4                                       12/11/00 B        B 3.4.7-4 3.4                                        12/11/00 B        B 3.4.7-5 3.4                                        12/11/00 B         B 3.4.7-6 3.4 B
B B
3.4                  B 3.4.8-2             12/11/00 B
B B
3.4                                        12/11/00         .
B B
B        B 3.4.8-3 12/11/00 3.4                  B 3.4.8-4 B
B B
3.4                  B 3.4.12-1        S12/11/00 B                                12/11/00 3.4                  B 3.4.12-2            12/11/00 B
B B
B 3.4        B
B B
          .......... B 3.4.12-3            12/11/00 B
B B
3.4                  B 3.4.12-4            12/11/00 B
B B
3.4                  B 3.4.12-5            12/11/00 B                                            1 0........0...
B B
3.4                  B 3.4.12-6            12/11/00 B
B B
3.4                 B 3.4.12-7             12/11/00 B
B B
3.4                 B 3.4.12-8              1211/ I00 B                               12/111100 3.4                 B 3.4.12-9            12/11/00          . .........
B B
                                    . ..z .......................
B B
B                               12/11/00 12/11/00 3.4                 B 3.4.12-10 B                             i12/11/00 3.4                 B 3.4.12-11 B
B B
B                                                             ..
B B
3.4                 B 3.4.13-1          i12/11/00 B
B Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 12/11/00 12/11/00 12/11/00 S12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 1 0........0...
3.4                 B 3.4.13-2 2 of 13
12/11/00 12/11/00 1211/ I00 12/11/00 12/11/00 12/111100
...z.......................
12/11/00 i12/11/00 i12/11/00 B 3.4.5-4 B 3.4.5-7 B 3.4.5-8 B 3.4.6-2 B 3.4.6-3 B 3.4.6-4 B 3.4.6-5 B 3.4.6-6 B 3.4.7-2 B 3.4.7-4 B 3.4.7-5 B 3.4.7-6 B 3.4.8-2 B 3.4.8-3 B 3.4.8-4 B 3.4.12-1 B 3.4.12-2 B 3.4.12-3 B 3.4.12-4 B 3.4.12-5 B 3.4.12-6 B 3.4.12-7 B 3.4.12-8 B 3.4.12-9 B 3.4.12-10 B 3.4.12-11 B 3.4.13-1 B 3.4.13-2 2 of 13


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                           Insert 3.4    B  B 3.4.13-3                 12/11/00 3.4 B  B 3.4.13-4                 12/11/00 3.4        S 3 . .......
Remove B 3.4.13-3 B 3.4.13-4 S 3........
1....3.-.......12/11/00 B  B 3.4.13-5 3.4                  1 3-7
1....3.-.......
          ......................... 12/11/00 B  B 3.4.13-6 3.4        B 3.4.13-7                 12/11/00 B
B 3.4.13-5 1 3 -7 B 3.4.13-6 B 3.4.13-7 B 3.4.13-1 B 3.4.13-1 B 3...........4............13  
3.4        B 3.4.13-1                 12/11/00 B
-12 B 3.4.13-13 B 3.4.13-17 B 3.4.13-11 B 3.4.13-12 B 3.4.14-7 B 3.4.17-3 B 3.4.17-4 B 3.4.17-5 Cover Page 1 of 28 S2of 28 3 of 28 4 of 28 5 of 28 6 of 28 7 of 28 Insert 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 2
3.4        B 3.4.13-1                 12/11/00 B
2 8 of 28 9 of 28 10 of 28 11 of 28 12 of 28 13 of 28 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 B
3.4        B B 3...........4............13 3.4.13-13   -12 12/11/00 B
B B
3.4     B  B 3.4.13-17                12/11/00 3.4    B  B 3.4.13-11                12/11/00 B 3.4.13-12                12/11/00 3.4     B 3.4     B  B 3.4.14-7                 12/11/00 3.4    B                              12/11/00 B 3.4.17-3 3.4     B                              12/11/00 B 3.4.17-4 3.4     B                              12/11/00 B 3.4.17-5 3.4     C  Cover Page 3.4     C  1 of 28                    2 S2of 28 3.4     C                              2 3 of 28 3.4     C 4 of 28 3.4     C 5 of 28 3.4     C 6 of 28 3.4     C 7 of 28 3.4     C 3.4 C  8 of 28 3.4         9 of 28 C
B B
3.4         10 of 28 C
B B
3.4         11 of 28 C
B B
3.4 C  12 of 28 3.4 C   13 of 28 3 of 13
B B
B B
B B
3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 C
C C
C C
C C
C C
C C
C C
C 3 of 13


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                                                                                                           Insert Chapter/                                                                                                                     Revision/                                     Chapterl Section                               Part                                   Page                                           Date                                         Section 3.4                                   C                                         14 of 28                                                                                 3A.
Remove Insert Chapter/
C ..... ... ..... ..                                    28 15 of~~~~~~~~~~~~~~~~.                                                                   3.4 3.4                .... ... ..                          . . . .  . . . . .                      .....
Revision/
C                                          16of28                                                                                   3.4 3.4
Chapterl Section Part Page Date Section 3.4 C
          .. . .. . .. . . ..... ..*...                        ~~~~~~~~~~~~~~~~~--
14 of 28 3A.
3A4 C                                         17 of 28 3.4
3.4 C
                  % -~~~~~~~~~~~~~~~~                           ..........
15 of 28 3.4
                                            . . . . .............N               18 of 28
~~~~~~~~~~~~~~~~.
                                                                                            }* ...  ...................
3.4 C
                                                                                                    .-  ~~~~~~~~            .......
16of28 3.4 3.4 C
                                                                                                                          ....      .......................              34 3.4                                     C 3.4                                      C                                        19 of 28                                   2                                           3.4 3.4                                     C                                         20 of 28                                   2                                           3.4
17 of 28 3A4
                                                                                                                . . . . .4 ............ . . . . . ... . .. . . . . ..... -* .i 3.4                                     C                                         21 of 28                                                                                 3 3.4                                 . C                                         2 of 28                                                                                   34
~~~~~~~~~~~~~~~~~--
%4.........            ...........
3.4 C
              ..............      i% .............................        ...4o     ........ *.......
18 of 28 34
                                                                                                            .......          .2 . ........                      . i!
-~~~~~~~~~~~~~~~~ ~~~~~~~~
3.4                                       C                                       24 of 28                                   2                                             3.4 3.4    . . . . . ......
....................N } *...................
    . .14 S.....3               ...      ......
3.4 C
                          .......... c................
19 of 28 2
C                        ....................
3.4 3.4 C
235of    oi28
20 of 28 2
                                                                                          ..  *. .....  ...........    . 2.....                          . . . ....
3.4  
                                                                                                                                        .................                i:34 3.4 -3           4 .....
.....4..............
            ...........    . . . ..i Cc .......                 .....246of 28                   2. 2 ..                                      .....3.4 3.4     .....  . ...... . . . ......
.................. -*.i 3.4 C
                .......                  C .........
21 of 28 3
C                            .........
3.4  
257of       28 ......
. C 2 of 28 34  
                                                                                              ............................  .23-4                     ......
% 4.........
3.4                                     C                                         2-of28                                     23 3.4                                     C                                         27o 823.4 3.4                                       C
i%
                                          ..C
4o *.......  
                                            .                                  i                                                        .... .....................
.2........
3.4                                       D                                         5                                           12/11/00                                   34 3 .4........                        ..          ...........                                ................
i!
3.4                                       D                                       11                                           12/11/003 3.4                                       D                                       12                                     '*12/11/00                                       3 3.4                                       D                                       13                                             12/11/00                         .... 34.
3.4 C
3.4                                       D                                       14                                             12/11/00                                 34 3.4                                       D                                       15                                             12/11/00                                 34 4            .3               ........ D ..                          .."..3.        ./00.3                                   t2. . . . .                                 4.*
24 of 28 2
3.4                                       D                                       17                                             12/11/00                                 34 3.4                                       D                                       18                                             12/11/00                                   34 3.4                                       D                                       19                                             12/11/00                                 3.4 4 of 13
3.4 S.....3 14 c................
o i *......  
. 2.....  
..........i :
3.4 C
235of 28 34
-3 4....  
......... i c.......
: 2.
3.4 C
246of 28 2
3.4 C
3.4 C
257of 28  
.23-4 3.4 C
2-of28 23 3.4 C
i C
3.4 C
27o 823.4 3.4 D
5 12/11/00 34 3.4........
3.4 D
11 12/11/003 3.4 D
12  
'*12/11/00 3
3.4 D
13 12/11/00
: 34.
3.4 D
14 12/11/00 34 3.4 D
15 12/11/00 34  
.3 4
D 2
./00.3 4.*
t
.."..3.
3.4 D
17 12/11/00 34 3.4 D
18 12/11/00 34 3.4 D
19 12/11/00 3.4 4 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS


              £CL JO 9 "t7"C Cl (3
00!/ [IL 00!1 V IZ!
S...........      ci. . ..
                                                                                                                .......Ci tic*
c3 ci ci Cl ci
                                                                                                                              . S..
(3 ci
                                                                      ...........i . . . . ..
ci          V ti'c"£ ci 9c                                                  ci 00!/ [IL 00!1 VIZ!                               ge Zc                                                  ci            tic*
001 !-I1!
001 !-I1!
0014 IZý                                                                                   ci            ti'c 0014 Iz                                   cc                                                ci ti7" 00/1* I/Z L                                                                                 ci Cl G
0014 IZý 0014 Iz 00/1* I/Z L 001 1 VIZ!
Cl 6Z LC                                                                "ti'c
00/ 1 /Z I 001 * -IzL 00/ V Z!
                                    /ZI 00111 VIZ!
00!L /IOZ 0011,11Z!
00/                                                                                         {3 001 *-IzL                               BZ ci ti c 00/ VZ!     . ........................... ...... . ..... . .....
001/,1.1* 1 00/* ý 1/
ci 00!L /IOZ                             9Z                                                    Gi 6ZZ                                                  ci 0011,11Z!
00/* LIZ 00/* 1 /zL lpesul Cl (3
Cl          Vic Ci
S...........
                          ....                                                                                                        ti'c 001/,1.1* 1                             0*                                                  ci 00/*ý 1/                                                                                     ci 00/* LIZ                                                                                     ci 00/*1 /zL lpesul                                                                                         eAO WON SNOIIoflU.LSNI!SNIIVCdfl Ii-a e5ej e5ueqO 6 UO!S!AG~1 Zog/ palep iueweiddns SUf2o!JeipoadS IBOIULIOGI_ paAodwj
Ci ci c3 ci ci Cl S..
ci (3
ci ci ci ci ci ci ci ci Cl Cl
{3 G
ci ci ci Cl ci ci ci Gi Ci eAO WON
£CL JO 9 "t7" C tic*
V "£ tic*
ti'c ti'c ti7" "ti'c ti c Vic ti'c
..........i......
Zc 9c ge cc 6Z BZ LC 9Z 6ZZ 0*
SNOIIoflU.LSNI!SNIIVCdfl Ii-a e5ej e5ueqO 6 UO!S!AG~1 Zog / palep iueweiddns SUf2o!JeipoadS IBOIULIOGI_ paAodwj


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                                Insert 3.4     D                              S...
Remove D
3.4     D 3.4 D                                ..............          . ............
D D
3.4         ....... ........ . . .
D D
D 3.4 D
D D
3.4     D D            ._._...
D D
3.4 D
D D
3.4         - ..... .. ........ . .
D D
D                              S.          ......
E E
                                        . . . . .....     .. . 4. ............ . .
E E
3.4 D
E E
3.4                 . . . . .... ....
E E
D 3.4             ....... ........
E E
3.4     D D
E E
3.4 3.4     E          3.4.1-3                                               2 E          3.4.5-1                                               4 3.4 E                                                                  1 3.4                3.4.5-4 E
E E
3.4                  3.4.6-1 E            3 ........ 6..........
E E
3.4      E            3.4.6-2 i3.4.6-3 3.4      E 3.4      E            3.4.6-4 3.4      E            3.4.7-1 3.4      E            3.4.7-2 3.4      E            3.4.7-3 3.4      E            3.4.7-4 3.4      E            3.4.8-1
Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Insert 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 2
              =...............................
4 1
3.4                    3.4.8-2 E
3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4.1-3 3.4.5-1 3.4.5-4 3.4.6-1 3........
3.4                    3.4.8-3 E
6 3.4.6-2 i3.4.6-3 3.4.6-4 3.4.7-1 3.4.7-2 3.4.7-3 3.4.7-4 3.4.8-1  
3.4                    3.4.10-2 E
=...............................
3.4                    3.4.12-1 6 of 13
3.4.8-2 3.4.8-3 3.4.10-2 3.4.12-1 6 of 13 S...
S.
: 4.


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                                                                           Insert Chapter/                                                                                               Revision/                             Chapter!
Remove Insert Chapter/
Section                             Part                         Page                                 Date                             ,Section
Revision/
    -3. . . . ..........
Chapter!
    . :4 3.4 ~~~
Section Part Page Date  
3.4
,Section 3.4 E
          ~ ~~                 ......
3.4.12-2 3.4
iEE E 3.4.12-2 3.4.12-4
-3
                                                                                            .......    ..............        ..... ...3.4    34         A 3.4                                 E                                   3.4.12-5                                                             3.4 3.4                                 E                                   3.4.12-7                       2                                           ,4
:4  
: 3.              .............
~~~  
F3.4.13-1.            .      .......... ... ................ .. .......
~ ~~
3.4                                 E                                   3.4.13-363.4 3.4                                 E                                   3.4.13-4                                                                 !'          A 3.4                                 E                                   3.4.13-5                                                             34;:
i E......
3.4                                 E                                   3.4.13-6                                                         i             A*,
3.4 E
3.4                                 E                                   3.4.14-3                       2                                     3.4 3.4                                 E                                   3.4.17-1 3.4E                                                                   3.4.17-2                                                             3.4 3.4                                 E                                   3.4.17-3 3.4                                 E                                   B3.4.1-7                                                             3.4 3.4                                 E                                   B 3.4.3-6                                                           3.4 3.4                                 E                                   B 3.4.5-3                                                           34, 3.4                                 E                                   B3.4.67-2 B 3.4.5-5                                                           3.4 3.4.. . 3.4   ~ ....3~1 .......... F...
3.4.12-4 34 A
                                                  ......                B 3..65....
3.4 E
3.4.5-8 4 .........
3.4.12-5 3.4 3.4 E
                                                                                ;    ;i*    ... ..
3.4.12-7 2  
                                                                                                                  ....... .......            ! "*i:*        A 3.4                                 E                                   B 3.4.5-9                                                           3ý4 3.4     . 14        .....          E...........
,4
                                                                          -B4----
: 3.
B 3.4.-7   ----    .........
F3.4.13-1.
                                                                                                                  -..... S...... ........ 3.4   .
3.4 E
3.4 3.4                                E                                   B 3.4.36-B                                                                                4 3.4                                 E                                      3.4.6-4                                                             34 3.4                                 E                                   B 3.4.7-2                                                             3.4 3.4                                 E                                   B 334.7-3                                                         ,          A 7 of 13
3.4.13-3 63.4 3.4 E
3.4.13-4 A
3.4 E
3.4.13-5 34;:
3.4 E
3.4.13-6 i
A*,
3.4 E
3.4.14-3 2
3.4 3.4 E
3.4.17-1 3.4E 3.4.17-2 3.4 3.4 E
3.4.17-3 3.4 E
B3.4.1-7 3.4 3.4 E
B 3.4.3-6 3.4 3.4 E
B 3.4.5-3 34,
3.4 E
B 3.4.5-5 3.4 3.4 F
B 3.4.5-8 3.4 E
B 3.4.5-9 3ý4 3.4 E
B3.4.67-2 3.4 3.4 E
B 3.4.6-4 3 4 3.4 ~
~
B 3..65....
A 3.4 E
B 3.4.-7 3.4
................... 3 1 4  
;i*
"*i 3.4 E
B 3.4.36-3.4 4
S......
14
-B ----
4 ----
3.4 E
B 3.4.7-2 3.4 3.4 E
B 334.7-3 A
7 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                         Insert Chapter/
Remove Chapter/
Section                 Part B 3.4.7-4 3.4                     E 3.4                     E           B 3.4.7-5 3.4                     E           B 3.4.7-6 3.4                    E           B 3.4.7-7 3.4                     E 3.4                     E B 3.4.8-2 3.4                    E B 3.4.8-3 3.4                     E           B 3.4.8-4 3.4                   E           B 3.4.8-5 3.4                   E           B 3.4.12-1 3.4                    E 3.4                   E           B 3.4.12-2 3.4                    E           B 3.4.12-3 3.4                     E           B 3.4.12-4 3.4                    E          B 3.4.12-5 3.4                    E          B 3.4.12-6 3.4                    E          B 3.4.12-7 3.4                    E          B 3.4.12-8 3.4                     E           B 3.4.12-9 3.4................
Section Part 3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
E S........ B 3.4.12-10 3.4                   E           B 3.4.12-11 3.4                   E           B 3.4.12-12 B 3.4.12-13 3............4     .E              B B 3.4.12-14 3.4.12-16 3.4                     E            3.4.12-15 3.4                     E E          B 3.4.12-17 3.4 B 3.4.12-15 3.4 3.4 E
3.4 E
E          B .......1........
3.4 E
S 3.4.12-18 B 3.4.12-16 3.4                     E E          B 3.4.12-19 3.4                                 B 3.4.12-17 3.4                     E B 3.4.12-18 3.4                   iE B 3.4.12-19 B 3.4.12-20 B 3.4.12-21           2 8 of 13
3.4 E
3.4 E S........
3.4 E
3.4 E
3.4 E
3.4 E
3............4  
.E 3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 E
3.4 iE Insert B 3.4.7-4 B 3.4.7-5 B 3.4.7-6 B 3.4.7-7 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS B 3.4.8-2 B 3.4.8-3 B 3.4.8-4 B 3.4.8-5 B 3.4.12-1 B 3.4.12-2 B 3.4.12-3 B 3.4.12-4 B 3.4.12-5 B 3.4.12-6 B 3.4.12-7 B 3.4.12-8 B 3.4.12-9 B 3.4.12-10 B 3.4.12-11 B 3.4.12-12 B 3.4.12-13 B 3.4.12-14 B 3.4.12-15 B 3.4.12-16 B 3.4.12-17 B 3.4.12-18 B 3.4.12-19 B 3.4.12-15 S.......1........
B 3.4.12-16 B 3.4.12-17 B 3.4.12-18 B 3.4.12-19 B 3.4.12-20 B 3.4.12-21 2
8 of 13


improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                           Insert Chapter/                                                 Revisioi Section     Part                       Page             Date 3.4         E                           B 3.4.12-22 3.4         E                           B 3.4.13-1 3.4         E                           B 3.4.13-2 3.4         E                           B 3.4.13-3 3.4         E                         ::B 3.4.13-4 3...........                   ...
Remove Chapter/
E....................        B  3.4 B 3.4.13-25 3.4 3.4 iBB E3 3.4 3.4         EE                          B 3.4.13-7 3.4.13-9 3.4   ..      E                           B 3.4.13-1 3.4         E                           B 3.4.13-11 3.4                                       B 3.4.13-1         .E 3.4           E                           B 3.4.13-13 3.4           E                           B 3.4.13-14 3.4           E                           B 3.4.14-93 3.4           E                           B 3.4.13-5 3.4           E                           B 3.4.17-6 3.4           E                           B 3.4.17-7 3.4         E                           B 3.4.17-8 3.4           F                           2             12/11/00 3.4           F                           3             5/1/01 3.4           F                           4             12/1 1100 3.4           F                           5             941401 3.4           F                           6             12/1 1/00 3.4           F                           7             12/111/00 3.4           F                           8             12/11/00 3.4         EF                           9             12/11/00 3.4           F                           10             12/11/00 9 of 13
Revisioi Section Part Page Date 3.4 E
B 3.4.12-22 3.4 E
B 3.4.13-1 3.4 E
B 3.4.13-2 3.4 E
B 3.4.13-3 3.4 E
::B 3.4.13-4 3...........
B 3. 4 5
3.4 E
B 3.4.13-2 3.4 E
iB 3.4.13-7 3.4 E
B 3 3.4 E
B 3.4.13-9 3.4 E
B 3.4.13-1 3.4 E
B 3.4.13-11 3.4  
.E B 3.4.13-1 3.4 E
B 3.4.13-13 3.4 E
B 3.4.13-14 3.4 E
B 3.4.14-93 3.4 E
B 3.4.13-5 3.4 E
B 3.4.17-6 3.4 E
B 3.4.17-7 3.4 E
B 3.4.17-8 3.4 F
2 12/11/00 3.4 F
3 5/1/01 3.4 F
4 12/1 1100 3.4 F
5 941401 3.4 F
6 12/1 1/00 3.4 F
7 12/111/00 3.4 F
8 12/11/00 3.4 EF 9
12/11/00 3.4 F
10 12/11/00 improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Insert 9 of 13


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                                                 Insert Chapter/                                                                               Revision!                 Chapter!
Remove Insert Chapter/
Section                       Part                     Page                           Date                     Section 3.4                           F                           11                         12/11/00                 3.4 13212/11/00                                           34 3.4 3.4                            FF                                                      12/11/00 3.4                         iF               ............ 14                       . 12/11100
Revision!
                                                                            ..........               ..........34*
Chapter!
4.
Section Part Page Date Section 3.4 F
3.4                             F                           16                         12/11/00                 3.4 3.4                             F                           18                         12/11/00                 3.4 3.4 *:................    .. F........      ...........
11 12/11/00 3.4 3.4 F
012/11/00                             ... . . . 3.4 i o.i; 3.4                             F                           22                         12/11/00                 34
212/11/00 34 3.4 F
              .. ... . . . ..-F
13 12/11/00 3.4 iF 14 12/11100 34*
...4........                     ............        ......
.......... 4.
                                      ..............       .. -.... ............        *i .-
3.4 F
D.............
16 12/11/00 3.4 3.4 F
3.4                             F                           21                        12/11/00                  34 3.4                            F                              412/11/00                                         34 3.4                           F                           27                          12/11/00                 3.4 3.4 3.4    ..................
18 12/11/00 3.4 3.4 F
S...3.4F                                    . ...........
012/11/00 3.4 3.4 F
                            ...FF...... . . . .............
22 12/11/00 34  
                ......                                      2802110 i325      ....
......................i; i o.........
                                                                      .7 ......
3.4 F
                                                                            ....  ... i .i;
21 12/11/00 34
                                                                                ......    ~
...4........  
12/11/00     . ... . .
..............-F
0......
* i D.............
3.4                                                           912/11/0034
3.4 F
                                  .......                 .... ...........                       0......
412/11/00 34 3.4 F
                                                                                                    .. .          3...........
25 12/11/00 i3 0......
3.4                             F21                                                    12/11/00           ~ 3.4 3.4                             F                           33                        12/11/00                 3.4 12/11/00                 3.4 3.4 3.4                             F F                          2338                        12/11/00                  34 3.4                            F23                                                     12/11/00                 3.4 3.4                           F                             40                         12/11/00                 34 10 of 13
3...........
3.4 F
27 12/11/00 3.4 3.4F 2802110 3.4 3.4 F
912/11/0034 3.4 F21 12/11/00
~
3.4 S.....................  
..........7
.i;
~ i 0......
3.4 F
33 12/11/00 3.4 3.4 F
23 12/11/00 34 3.4 F
38 12/11/00 3.4 3.4 F23 12/11/00 3.4 3.4 F
40 12/11/00 34 10 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS


improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                               Insert Chapter/
Remove Chapter/
Section   Part 3.4       F 41            2/20/01 3.4       F                 12.11/ 00 42 3.4       F                 12/11/00 43 3.4       F   44            12/11/00 3.4       F                 12/11/00 45 3.4       F 46            9/4/01 3.4       F 3.4       F 3.4       F 3.4       F 3.4       G    1            5/1/01 12/11/00 3.4       G    3 12/11/00 3.4       G    7 12/11/00 3.4       G    13 12/11/00 3.4       G    14 12/11/00 3.4       G    34 12/11/00 3.4       G    37 3.4       G 3.4       G 3.4       G 3.4       G 3.4       G 3.4      G 3.6       B     3.6.3-2       5/1/01 3.6       B    3.6.8-1       5/1/01 5/1/0 1 3.6      B    3.6.8-2 5/1/01 3.6      B    3.6.8-3 5/1/01 3.6      B    3.6.8-4 11 of 13
Section Part 3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
3.4 F
G G
G G
G G
G G
G G
G G
G 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.6 3.6 3.6 3.6 3.6 B
B B
B B
Insert 41 42 43 44 45 46 1
3 7
13 14 34 37 3.6.3-2 3.6.8-1 3.6.8-2 3.6.8-3 3.6.8-4 2/20/01 12.11/ 00 12/11/00 12/11/00 12/11/00 9/4/01 5/1/01 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 5/1/01 5/1/01 5/1/0 1 5/1/01 5/1/01 11 of 13 improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS


CLb J0 Z 9             6-V'919                                                     9 9C D             9T           .....
CLb J0 Z 9C 9
i.....                   9 ..i......
6-V'919 9
6-CV9T S                        . .....             .... .... Bl                    . . .........             ....
D 9T 9
6-CV9T S Bl 9T i.....  
.. i......
$9TK 9
9-V9'9T8 B9'C i....................-.....
z-
-8*9T 3
9T 9  
.B 3
9C z9-8'9 3
9T 9"C 9
-9'9'"
9'C
~~.
/.£ z
C z
C'9C3 K
Lo0/L./
99 oi 9.9 i7.............
i i -...............%
i * *
;7.........
7 !.......
7 o G................  
'*K.
K0 fKIS 9 '
a 9 "C 4< *
[ *[/4/9 6
s 9"&#xa3; C
Sti!
[0IL/S
-'9"9 0
i Tc St[/L/S Cc G09 0 ~
9*
WWVZS CS
~~~~~~~
......Ol...9.''..9
~~~~~~~~~~.....  
!i:
9'C.1 999 9'C M4/9 99[/S V-9'9TS a
9TS 39 9c
[4/V9 9-9*9T9 S
NO9 9_ C NLOWS V-'9C 9L9 9,C
: i.  
.9 001
/Z 99 D
9 9*
*[p/S O[-9'p 9u 9dn u o 9
L*/ /zIu
-9'9 9p d
9.9 K9 9
9T
9T
      $9TK              '            i ....................-......
[O/[&#xfd;/z L-9*9'95 a
9              9-V9'9T8                                                        B9'C .                          .......              ....
K,
                                                                              -8*9T                                                      3                                              9T
[0/U [/5 9*9*93 5
                          .                              z-
e 9*C
                                      .B......
!R9 59*
                              .......                                                      9 z9-8'9                                                                        3                                              9T 3              9C
[O/[Z-6-'9 95 8
                                                                              -9'9'"                                                                                                    9'C 9
99C ci 00/~
9"C C'9C3                                      z                                                                                                                                '
uo/Oe eie9 Sono9T sua eozd 9e*
                                                    /.&#xa3;                        ~~.
uoe p/LsAO-9dWI 9
                                                                                ......... z..                                            C                                                  "
oia                                            9.9 999 Lo0/L./fKIS                                                                                                                              9 "C K                                                                  '
                              '*K.      K0 s                                                                                            9"&#xa3; 4<*                [
                                                *[/4/9                    6 i7        .....
                                    ................... i i....- ........ .. .%                          ...........
iCc*.......                ..............        ;7 . ... .....                          .. . -...
St[/L/S Tc                                                                                                                G09 i
7! ....... 7o G . ...............
WWVZS                                                                                    CS 0  ~        9*
999                                                                                                              9'C 9'C.1 99[/S M4/9                    V-9'9TS          a                                                                                              9TS
                                                                              -'9"9                                                        0                                                    "
C          Sti!                      [0IL/S S                                                '
39                  9c                        [4/V9                  9-9*9T9
                                                          ~~~~~~~        .. .. ..Ol...9.''..9                                                                                                  "
001 /Z                                    '                                          ....  .9  ..... .....                                    99
: i.                                                                                                                                                                            9,C NO9        9_C        !      : NLOWS  ~~~~~~~~~~.....
                                                    !i:
V-'9C 9L9  ....
O[-9'p 9u                                                                                                          9dn D        9                9*
                      *[p/S 9              9T                    [O/[&#xfd;/z /zIud            L-9*9'95
                                                                            -9'9 9p          a                                                                                             9.9 K9            uo            9                    L*/
9*9*93                                                              e5                                            9*C K,                               [0/U[/5 59*                   [O/[Z-                   6-'9 95                                                             8                                             99C
  !R9 uo/Oe                     00/~eie9                                         Sono9T ci 9
sua eozd9e*               uoe p/LsAO-9dWI


Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Remove                                                                                                                                                                   Insert Rhpemov                                                                                                                           Revision!                                 Chapter!
Remove Insert Rhpemov Revision!
Section ....              .......;
Chapter!
                                  ..Part               .......                                  Page !ii*!!**                                   Dat                                '    Section 3.6. .......                        ...........      E...............
Section Part Page Dat Section
                                                  ......              ...........                    B 3.6.8-1 3.6                                                 E                                               B 3.6.8-4                                   2                                     -* 6 E                                               B 3.6.8-5                                   2,36                                   i 3.6 3.6                                                  E                                               B 3.6.8-6                               12 B 3.6.8-7                                   2 3.6                                                 E S... . . . . . . . . . . . ...........
!ii*!!**
F                                              5                                             12/1/01                                 36 3.6 F                                               20                                           5/1/01                                 3 6 3.6 F                                               21                                           5/1/01                                  3.6 3.6 F                                              23                                            5/1/01                                 3.6 3.6.......
3.6 E
.            ......    .. ...    ...................[ ...... - ....   . ...  ........... ........ ... . .
B 3.6.8-1 3.6 E
F                                                29                                           5/1/01                                 3.6 3.6 G                                               1                                           5/1/01                                 3,6 3.6 G                                               3                                             5/11/01                                 3.6 3.6 G                                               34                                           5/1/01                                 36 3.6 G                                             .35                       . ....... .... . .. 5/1/01
B 3.6.8-4 2
                                                                                                                                                        .... ......... ... ... ... .. . . ... 3.6 3.6                                                                                    .....
6 3.6 E
13 of 13
B 3.6.8-5 2,36 i
3.6 E
B 3.6.8-6 1 2 3.6 E
B 3.6.8-7 2
S.
3.6 F
5 12/1/01 36 3.6 F
20 5/1/01 3 6 3.6 F
21 5/1/01 3.6  
...................[.................................
3.6 F
23 5/1/01 3.6 3.6 F
29 5/1/01 3.6 3.6 G
1 5/1/01 3,6 3.6 G
3 5/11/01 3.6 3.6 G
34 5/1/01 36 3.6 G
35 5/1/01 3.6 13 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS


RCS Pressure, Temperature, and Flow - DNB Limits 3.4.1 CONDITION                     REQUIRED ACTION                 COMPLETION TIME B. Required Action and           B.1   Be in MODE 2.                 6 hours associated Completion Time not met.
RCS Pressure, Temperature, and Flow - DNB Limits 3.4.1 CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Be in MODE 2.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.4.1.1     Verify pressurizer pressure is greater than or equal 12 hours to the limit specified in the COLR.
6 hours associated Completion Time not met.
SR 3.4.1.2     Verify RCS average temperature is less than or       12 hours equal to the limit specified in the COLR.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure is greater than or equal 12 hours to the limit specified in the COLR.
SR 3.4.1.3     Verify RCS total flow rate is within the limit       24 months specified in the COLR.
SR 3.4.1.2 Verify RCS average temperature is less than or 12 hours equal to the limit specified in the COLR.
Prairie Island Units 1 and 2                             3.4.1-2                               1/2/02
SR 3.4.1.3 Verify RCS total flow rate is within the limit 24 months specified in the COLR.
Prairie Island Units 1 and 2 3.4.1-2 1/2/02


RCS Loops - MODE 3 3.4.5 3.4   REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Loops-MODE 3 LCO     3.4.5   Two RCS loops shall be OPERABLE, and either:
RCS Loops - MODE 3 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Loops-MODE 3 LCO 3.4.5 Two RCS loops shall be OPERABLE, and either:
: a. Two RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or
: a. Two RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or
: b. One RCS loop shall be in operation when the Rod Control System is not capable of rod withdrawal.
: b. One RCS loop shall be in operation when the Rod Control System is not capable of rod withdrawal.
                  ----------------------------------------  N O TE --------------------------------------
N O TE --------------------------------------
Both reactor coolant pumps may be de-energized for _<12 hours to perform preplanned work activities provided:
Both reactor coolant pumps may be de-energized for _< 12 hours to perform preplanned work activities provided:
: a. No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
: a.
: b. Core outlet temperature is maintained at least 10&deg;F below saturation temperature.
No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
APPLICABILITY:       MODE 3.
: b.
ACTIONS CONDITION                             REQUIRED ACTION                     COMPLETION TIME A. One RCS loop                     A.1     Restore inoperable RCS             72 hours inoperable,                               loop to OPERABLE status.
Core outlet temperature is maintained at least 10&deg;F below saturation temperature.
Prairie Island Units 1 and 2                                       3.4.5-1                                         1/2/02
APPLICABILITY:
MODE 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One RCS loop A.1 Restore inoperable RCS 72 hours inoperable, loop to OPERABLE status.
Prairie Island Units 1 and 2 3.4.5-1 1/2/02


RCS Loops - MODE 3 3.4.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.4.5.1     Verify required RCS loops are in operation.                 12 hours SR 3.4.5.2     Verify required steam generator capable of                 12 hours removing decay heat.
RCS Loops - MODE 3 3.4.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify required RCS loops are in operation.
SR 3.4.5.3     -------------------------- NOTE ------------------------
12 hours SR 3.4.5.2 Verify required steam generator capable of 12 hours removing decay heat.
SR 3.4.5.3 NOTE ------------------------
Not required to be performed until 24 hours after a required pump is not in operation.
Not required to be performed until 24 hours after a required pump is not in operation.
Verify correct breaker alignment and indicated             7 days power are available to each required pump.
Verify correct breaker alignment and indicated 7 days power are available to each required pump.
Prairie Island Units 1 and 2                               3.4.5-4                                   1/2/02
Prairie Island Units 1 and 2 3.4.5-4 1/2/02


RCS Loops-MODE 4 3.4.6 3.4     REACTOR COOLANT SYSTEM (RCS) 3.4.6     RCS Loops - MODE 4 LCO       3.4.6 Two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and one loop shall be in operation.
RCS Loops-MODE 4 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Loops - MODE 4 LCO 3.4.6 Two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and one loop shall be in operation.
                ---------------------------------------    NOTES -------------------------------------
NOTES -------------------------------------
: 1.     All reactor coolant pumps (RCPs) and RHR pumps may be de energized for _<1 hour per 8 hour period provided:
: 1.
: a. No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
All reactor coolant pumps (RCPs) and RHR pumps may be de energized for _< 1 hour per 8 hour period provided:
: b. Core outlet temperature is maintained at least 10'F below saturation temperature.
: a.
: 2.     No RCP shall be started with any RCS cold leg temperature < the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:
No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
: a. The secondary side water temperature of each steam generator (SG) is _<50'F above each of the RCS cold leg temperatures; or
: b.
: b. There is a steam or gas bubble in the pressurizer.
Core outlet temperature is maintained at least 10'F below saturation temperature.
APPLICABILITY:       MODE 4.
: 2.
Prairie Island Units 1 and 2                                     3.4.6-1                                             1/2/02
No RCP shall be started with any RCS cold leg temperature < the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:
: a.
The secondary side water temperature of each steam generator (SG) is _< 50'F above each of the RCS cold leg temperatures; or
: b.
There is a steam or gas bubble in the pressurizer.
APPLICABILITY:
MODE 4.
Prairie Island Units 1 and 2 3.4.6-1 1/2/02


RCS Loops - MODE 4 3.4.6 ACTIONS REQUIRED ACTION                    COMPLETION CONDITION                                                           TIME A. One required loop         A. 1 Initiate action to restore a       Immediately inoperable.                      second loop to OPERABLE status.
RCS Loops - MODE 4 3.4.6 ACTIONS CONDITION A.
AND A.2 ---------- NOTE------
One required loop inoperable.
B.
Both loops inoperable.
OR Required loop not in operation.
REQUIRED ACTION COMPLETION TIME A. 1 Initiate action to restore a second loop to OPERABLE status.
AND A.2 ----------
NOTE------
Only required if RHR loop is OPERABLE.
Only required if RHR loop is OPERABLE.
24 hours Be in MODE 5.
Be in MODE 5.
                              -I-                                       F B. Both loops inoperable. B. 1 Suspend operations that           Immediately would cause introduction OR                              into the RCS, coolant with boron concentration less Required loop not in            than required to meet SDM operation.                      of LCO 3.1.1.
-I-F B. 1 Suspend operations that would cause introduction into the RCS, coolant with boron concentration less than required to meet SDM of LCO 3.1.1.
AND B.2   Initiate action to restore one   Immediately loop to OPERABLE status and operation.
AND B.2 Initiate action to restore one loop to OPERABLE status and operation.
Prairie Island Units 1 and 2                             3.4.6-2                                     1/2/02
Immediately 24 hours Immediately Immediately Prairie Island Units 1 and 2 3.4.6-2 1/2/02


RCS Loops - MODE 4 3.4.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.4.6.1     Verify required RHR or RCS loop is in                         12 hours operation.
RCS Loops - MODE 4 3.4.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify required RHR or RCS loop is in 12 hours operation.
SR 3.4.6.2     Verify required SG capable of removing decay                 12 hours heat.
SR 3.4.6.2 Verify required SG capable of removing decay 12 hours heat.
SR 3.4.6.3     -------------------------- NOTE -------------------------
SR 3.4.6.3 NOTE -------------------------
Not required to be performed until 24 hours after a required pump is not in operation.
Not required to be performed until 24 hours after a required pump is not in operation.
Verify correct breaker alignment and indicated               7 days power are available to each required pump.
Verify correct breaker alignment and indicated 7 days power are available to each required pump.
Prairie Island Units 1 and 2                                       3.4.6-3                             1/2/02
Prairie Island Units 1 and 2 3.4.6-3 1/2/02


RCS Loops - MODE 5, Loops Filled 3.4.7 3.4   REACTOR COOLANT SYSTEM (RCS) 3.4.7   RCS Loops- MODE 5, Loops Filled LCO       3.4.7     One residual heat removal (RUR) loop shall be OPERABLE and in operation, and either:
RCS Loops - MODE 5, Loops Filled 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Loops-MODE 5, Loops Filled LCO 3.4.7 One residual heat removal (RUR) loop shall be OPERABLE and in operation, and either:
: a. One additional RHR loop shall be OPERABLE; or
: a. One additional RHR loop shall be OPERABLE; or
: b. One steam generator (SG) shall be capable of removing decay heat.
: b. One steam generator (SG) shall be capable of removing decay heat.
                  -------------------------------------        N OTES ------------------------------------
N OTES ------------------------------------
: 1.     The RHR pump of the loop in operation may be de-energized for *< 1 hour per 8 hour period provided:
: 1.
: a.     No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
The RHR pump of the loop in operation may be de-energized for *< 1 hour per 8 hour period provided:
: b.     Core outlet temperature is maintained at least 10&deg;F below saturation temperature.
: a.
: 2.     One required RHR loop may be inoperable for _<2 hours for surveillance testing provided that the other RI-R loop is OPERABLE and in operation.
No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and
: 3.     No reactor coolant pump shall be started with one or more RCS cold leg temperatures _<the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:
: b.
: a. The secondary side water temperature of each SG is _<50'F above each of the RCS cold leg temperatures; or
Core outlet temperature is maintained at least 10&deg;F below saturation temperature.
: 2.
One required RHR loop may be inoperable for _< 2 hours for surveillance testing provided that the other RI-R loop is OPERABLE and in operation.
: 3.
No reactor coolant pump shall be started with one or more RCS cold leg temperatures _< the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:
: a. The secondary side water temperature of each SG is _< 50'F above each of the RCS cold leg temperatures; or
: b. There is a steam or gas bubble in the pressurizer.
: b. There is a steam or gas bubble in the pressurizer.
: 4.       Both RHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.
: 4.
Prairie Island Units 1 and 2                                             3.4.7-1                                     1/2/02
Both RHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.
Prairie Island Units 1 and 2 3.4.7-1 1/2/02


RCS Loops - MODE 5, Loops Filled
RCS Loops - MODE 5, Loops Filled  


====3.4.7 APPLICABILITY====
====3.4.7 APPLICABILITY====
MODE 5 with RCS loops filled.
MODE 5 with RCS loops filled.
A CTIONS, TI N A__________________________________________________
A CTIONS, A__________________________________________________
REQUIRED ACTION                       COMPLETION CONDITION                                                                                TIME A. 1 Initiate action to restore a               Immediately A.      One required RHR loop inoperable.                                        second RHR loop to OPERABLE status.
TI N CONDITION A.
AND OR One RHR loop A.2         Initiate action to restore         Immediately OPERABLE.
One required RHR loop inoperable.
required SG capable to remove decay heat.
AND One RHR loop OPERABLE.
r B. One or more SGs not                      B. 1       Initiate action to restore a       Immediately capable of decay heat                            second RHR loop to removal.                                        OPERABLE status.
B. One or more SGs not capable of decay heat removal.
AND                                                OR B.2         Initiate action to restore a       Immediately One RHR loop OPERABLE.                                        required SG capable to remove decay heat.
AND One RHR loop OPERABLE.
____________________________                      L_______________________________              a Prairie Island Units 1 and 2                                                             3.4.7-2                               1/2/02
REQUIRED ACTION A. 1 Initiate action to restore a second RHR loop to OPERABLE status.
OR A.2 Initiate action to restore required SG capable to remove decay heat.
r B. 1 Initiate action to restore a second RHR loop to OPERABLE status.
OR B.2 Initiate action to restore a required SG capable to remove decay heat.
L _______________________________
a COMPLETION TIME Immediately Immediately Immediately Immediately Prairie Island Units 1 and 2 3.4.7-2 1/2/02


RCS Loops - MODE 5, Loops Filled 3.4.7 ACTIONS (continued)
RCS Loops - MODE 5, Loops Filled 3.4.7 ACTIONS (continued)
CONDITION             REQUIRED ACTION               COMPLETION TIME C. No required RHR loops C.1 Suspend operations that     Immediately OPERABLE.                 would cause introduction into the RCS, coolant with AND                       boron concentration less than required to meet SDM Required RHR loop not     of LCO 3.1.1.
CONDITION REQUIRED ACTION COMPLETION TIME C. No required RHR loops C.1 Suspend operations that Immediately OPERABLE.
would cause introduction into the RCS, coolant with AND boron concentration less than required to meet SDM Required RHR loop not of LCO 3.1.1.
in operation.
in operation.
AND C.2 Initiate action to restore   Immediately one RHR loop to OPERABLE status and operation.
AND C.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.
Prairie Island Units 1 and 2                         3 4.7-3                           1/2/02
Prairie Island Units 1 and 2 3 4.7-3 1/2/02


RCS Loops - MODE 5, Loops Filled 3.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.4.7.1     Verify required RHR loop is in operation.             12 hours SR 3.4.7.2     Verify required SG capable of removing decay         12 hours heat.
RCS Loops - MODE 5, Loops Filled 3.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 Verify required RHR loop is in operation.
SR 3.4.7.3     -------------------------- NOTE     ---------------
12 hours SR 3.4.7.2 Verify required SG capable of removing decay 12 hours heat.
Not required to be performed until 24 hours after a required pump is not in operation.
SR 3.4.7.3 NOTE Not required to be performed until 24 hours after a required pump is not in operation.
Verify correct breaker alignment and indicated       7 days power are available to each required RHR pump.
Verify correct breaker alignment and indicated 7 days power are available to each required RHR pump.
Prairie Island Units I and 2                                 3.4.7-4                           1/2/02
Prairie Island Units I and 2 3.4.7-4 1/2/02


RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4     REACTOR COOLANT SYSTEM (RCS) 3.4.8     RCS Loops - MODE 5, Loops Not Filled LCO       3.4.8   Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.
RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops - MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.
                  ---------------------------------------    NOTES --------------------------------------
NOTES --------------------------------------
: 1. All RHR pumps may be de-energized for s< 1 hour per 8 hour period provided:
: 1.
: a. No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1;
All RHR pumps may be de-energized for s< 1 hour per 8 hour period provided:
: b. The core outlet temperature is maintained > 10&deg;F below saturation temperature; and
: a.
: c. No draining operations to further reduce the RCS water volume are permitted.
No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1;
: 2. One RHR loop may be inoperable for _<2 hours for surveillance testing provided that the other RHR loop is OPERABLE and in operation.
: b.
APPLICABILITY:           MODE 5 with RCS loops not filled.
The core outlet temperature is maintained > 10&deg;F below saturation temperature; and
ACTIONS CONDITION                               REQUIRED ACTION                     COMPLETION TIME A. One required RHR loop                 A. I Initiate action to restore           Immediately inoperable.                                 RHR loop to OPERABLE status.
: c.
Prairie Island Units 1 and 2                                             3.4.8-1                                         1/2/02
No draining operations to further reduce the RCS water volume are permitted.
: 2.
One RHR loop may be inoperable for _< 2 hours for surveillance testing provided that the other RHR loop is OPERABLE and in operation.
APPLICABILITY:
MODE 5 with RCS loops not filled.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required RHR loop A. I Initiate action to restore Immediately inoperable.
RHR loop to OPERABLE status.
Prairie Island Units 1 and 2 3.4.8-1 1/2/02


RCS Loops - MODE 5, Loops Not Filled 3.4.8 ACTIONS (continued)
RCS Loops - MODE 5, Loops Not Filled 3.4.8 ACTIONS (continued)
CONDITION                         REQUIRED ACTION               COMPLETION TIME B. No required RHR loop       B.1           Suspend operations that     Immediately OPERABLE.                             would cause introduction into the RCS, coolant with OR                                     boron concentration less than required to meet SDM Required RHR loop not in               of LCO 3.1.1.
CONDITION REQUIRED ACTION COMPLETION TIME B. No required RHR loop B.1 Suspend operations that Immediately OPERABLE.
would cause introduction into the RCS, coolant with OR boron concentration less than required to meet SDM Required RHR loop not in of LCO 3.1.1.
operation.
operation.
AND
AND NOTE A Safety Injection pump may be run as required to maintain adequate core cooling and RCS inventory.
                              ----------------------  NOTE --------
B.2 Initiate action to restore one Immediately RHR loop to OPERABLE status and operation.
A Safety Injection pump may be run as required to maintain adequate core cooling and RCS inventory.
Prairie Island Units 1 and 2 3.4.8-2 1/2/02
B.2 Initiate action to restore one         Immediately RHR loop to OPERABLE status and operation.
Prairie Island Units 1 and 2                                       3.4.8-2                           1/2/02


RCS Loops - MODE 5, Loops Not Filled 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY SR 3.4.8.1   Verify required RHR loop is in operation.             12 hours SR 3.4.8.2   -------------------- NOTE ---------------------------
RCS Loops - MODE 5, Loops Not Filled 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify required RHR loop is in operation.
12 hours SR 3.4.8.2 NOTE ---------------------------
Not required to be performed until 24 hours after a required pump is not in operation.
Not required to be performed until 24 hours after a required pump is not in operation.
Verify correct breaker alignment and indicated       7 days power are available to each required RHR pump.
Verify correct breaker alignment and indicated 7 days power are available to each required RHR pump.
Prairie Island Units 1 and 2                             3.4.8-3                           1/2/02
Prairie Island Units 1 and 2 3.4.8-3 1/2/02


Pressurizer Safety Valves 3.4.10 ACTIONS (continued)
Pressurizer Safety Valves 3.4.10 ACTIONS (continued)
CONDITION                     REQUIRED ACTION                 COMPLETION TIME B. Required Action and       B.l   Be in MODE 3.                 6 hours associated Completion Time not met.             AND OR                         B.2   Be in MODE 4 with any         24 hours RCS cold leg temperature Both pressurizer safety           _*the OPPS enable valves inoperable,               temperature specified in the PTLR.
CONDITION REQUIRED ACTION COMPLETION TIME B.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.4.10.1     Verify each pressurizer safety valve is             In accordance OPERABLE in accordance with the Inservice           with the Testing Program. Following testing, lift settings   Inservice Testing shall be within 1% (2460 to 2510 psig).             Program Prairie Island Units 1 and 2                           3.4.10-2                                   1/2/02
Required Action and B.l Be in MODE 3.
6 hours associated Completion Time not met.
AND OR B.2 Be in MODE 4 with any 24 hours RCS cold leg temperature Both pressurizer safety
_* the OPPS enable valves inoperable, temperature specified in the PTLR.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify each pressurizer safety valve is In accordance OPERABLE in accordance with the Inservice with the Testing Program. Following testing, lift settings Inservice Testing shall be within 1% (2460 to 2510 psig).
Program Prairie Island Units 1 and 2 3.4.10-2 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature                       I 3.4.12 3.4     REACTOR COOLANT SYSTEM (RCS) 3.4.12   Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature LCO       3.4.12 LTOP shall be provided with:
LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature LCO 3.4.12 LTOP shall be provided with:
: a. a maximum of one SI pump capable of injecting into the RCS;
: a.
: b. the emergency core cooling system (ECCS) accumulators isolated;
a maximum of one SI pump capable of injecting into the RCS;
: c. an OPERABLE Over Pressure Protection System (OPPS); and
: b.
: d. two OPERABLE pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR.
the emergency core cooling system (ECCS) accumulators isolated;
                  --------------------------------------    NOTES --------------------------------------
: c.
: 1. Both SI pumps may be run for < 1 hour while conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.
an OPERABLE Over Pressure Protection System (OPPS); and
: 2. ECCS accumulator may be unisolated when accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.
: d.
APPLICABILITY:       MODE 4 when any RCS cold leg temperature is _*the OPPS enable temperature specified in the PTLR and > the SI pump disable temperature specified in the PTLR.
two OPERABLE pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR.
Prairie Island Units I and 2                                     3.4.12-1                                             1/2/02
NOTES --------------------------------------
: 1.
Both SI pumps may be run for < 1 hour while conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.
: 2.
ECCS accumulator may be unisolated when accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.
APPLICABILITY:
MODE 4 when any RCS cold leg temperature is _* the OPPS enable temperature specified in the PTLR and > the SI pump disable temperature specified in the PTLR.
Prairie Island Units I and 2 3.4.12-1 I
1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS CONDITION                   REQUIRED ACTION               COMPLETION TIME A. Two SI pumps capable of       A.1   Initiate action to assure a Immediately injecting into the RCS.           maximum of one SI pump is capable of injecting into the RCS.
LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Two SI pumps capable of A.1 Initiate action to assure a Immediately injecting into the RCS.
B. An ECCS accumulator           B.1   Isolate affected ECCS       1 hour not isolated when the             accumulator.
maximum of one SI pump is capable of injecting into the RCS.
B. An ECCS accumulator B.1 Isolate affected ECCS 1 hour not isolated when the accumulator.
ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
C. Required Action and         C.1   Increase RCS cold leg       12 hours associated Completion           temperature to > the OPPS Time of Condition B not           enable temperature met.                             specified in the PTLR.
C. Required Action and C.1 Increase RCS cold leg 12 hours associated Completion temperature to > the OPPS Time of Condition B not enable temperature met.
OR C.2   Depressurize affected       12 hours ECCS accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
specified in the PTLR.
D. One required PORV             D.1   Restore required PORV to     7 days inoperable.                       OPERABLE status.
OR C.2 Depressurize affected 12 hours ECCS accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
Prairie Island Units 1 and 2                             3.4.12-2                               1/2/02
D. One required PORV D.1 Restore required PORV to 7 days inoperable.
OPERABLE status.
Prairie Island Units 1 and 2 3.4.12-2 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS (continued)
LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS (continued)
CONDITION               REQUIRED ACTION           COMPLETION TIME E. Two PORVs inoperable. E.1   Be in MODE 5.           8 hours OR                     AND Required Action and     E.2 Depressurize RCS and     12 hours associated Completion       establish RCS vent of> 3 Time of Condition A, C,     square inches.
CONDITION REQUIRED ACTION COMPLETION TIME E. Two PORVs inoperable.
E.1 Be in MODE 5.
8 hours OR AND Required Action and E.2 Depressurize RCS and 12 hours associated Completion establish RCS vent of> 3 Time of Condition A, C, square inches.
or D not met.
or D not met.
OR OPPS inoperable.
OR OPPS inoperable.
Prairie Island Units I and 2                       3.4.12-3                           1/2/02
Prairie Island Units I and 2 3.4.12-3 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.4.12.1   Verify a maximum of one SI pump is capable of         12 hours injecting into the RCS.
LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify a maximum of one SI pump is capable of 12 hours injecting into the RCS.
SR 3.4.12.2     -------------------- NOTE       ---------------
SR 3.4.12.2 NOTE Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
Verify each ECCS accumulator is isolated.
Verify each ECCS accumulator is isolated.           Once within 12 hours and every 12 hours thereafter SR 3.4.12.3   Verify PORV block valve is open for each             72 hours required PORV.
Once within 12 hours and every 12 hours thereafter SR 3.4.12.3 Verify PORV block valve is open for each 72 hours required PORV.
SR 3.4.12.4     -------------------- NOTE--.         ----------
SR 3.4.12.4 NOTE--.
Not required to be performed until 12 hours after decreasing RCS cold leg temperature to < the OPPS enable temperature specified in the PTLR.
Not required to be performed until 12 hours after decreasing RCS cold leg temperature to < the OPPS enable temperature specified in the PTLR.
Perform a COT on OPPS.                             31 days SR 3.4.12.5     Perform CHANNEL CALIBRATION for each               24 months OPPS actuation channel.
Perform a COT on OPPS.
Prairie Island Units 1 and 2                           3.4.12-4                                 1/2/02
31 days SR 3.4.12.5 Perform CHANNEL CALIBRATION for each 24 months OPPS actuation channel.
Prairie Island Units 1 and 2 3.4.12-4 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature 3.4.13 3.4     REACTOR COOLANT SYSTEM (RCS) 3.4.13   Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) _*Safety Injection (SI) Pump Disable Temperature LCO       3.4.13 LTOP shall be provided with: 1) no SI Pumps capable of injecting into the RCS; 2) the emergency core cooling system (ECCS) accumulators isolated; and 3) one of the following pressure relief capabilities:
LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) _* Safety Injection (SI) Pump Disable Temperature LCO 3.4.13 LTOP shall be provided with: 1) no SI Pumps capable of injecting into the RCS; 2) the emergency core cooling system (ECCS) accumulators isolated; and 3) one of the following pressure relief capabilities:
: a.     An Over Pressure Protection System (OPPS) shall be OPERABLE with two pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR; or
: a.
: b.     The RCS depressurized and an RCS vent of > 3 square inches.
An Over Pressure Protection System (OPPS) shall be OPERABLE with two pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR; or
                  ---------------------------------------    NOTES -------------------------------------
: b.
: 1. Both safety injection (SI) pumps may be run for < 1 hour while conducting SI system testing provided there is a steam or gas bubble in the pressurizer, the reactor vessel head is on, and at least one isolation valve between the SI pump and the RCS is shut.
The RCS depressurized and an RCS vent of > 3 square inches.
: 2. During reduced inventory conditions an SI pump may be run as required to maintain adequate core cooling and RCS inventory.
NOTES -------------------------------------
: 3. ECCS accumulator may be unisolated when ECCS accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.
: 1.
APPLICABIIJTY:         MODE 4 when any RCS cold leg temperature is < the SI Pump disable temperature specified in the PTLR, MODE 5 when the steam generator (SG) primary system manway and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the SG primary system manway and pressurizer manways are closed and secured in position.
Both safety injection (SI) pumps may be run for < 1 hour while conducting SI system testing provided there is a steam or gas bubble in the pressurizer, the reactor vessel head is on, and at least one isolation valve between the SI pump and the RCS is shut.
Prairie Island Units 1 and 2                                       3.4.13-1                                             1/2/02
: 2.
During reduced inventory conditions an SI pump may be run as required to maintain adequate core cooling and RCS inventory.
: 3.
ECCS accumulator may be unisolated when ECCS accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.
APPLICABIIJTY:
MODE 4 when any RCS cold leg temperature is < the SI Pump disable temperature specified in the PTLR, MODE 5 when the steam generator (SG) primary system manway and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the SG primary system manway and pressurizer manways are closed and secured in position.
Prairie Island Units 1 and 2 3.4.13-1 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature 3.4.13 ACTIONS CONDITION                 REQUIRED ACTION                 COMPLETION TIME A. One or both SI pump(s)     A.1 Initiate action to verify no SI Immediately capable of injecting into     pump is capable of injecting the RCS.                     into the RCS.
LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both SI pump(s)
B. An ECCS accumulator         B.1 Isolate affected ECCS           1 hour not isolated when the         accumulator.
A.1 Initiate action to verify no SI Immediately capable of injecting into pump is capable of injecting the RCS.
into the RCS.
B. An ECCS accumulator B.1 Isolate affected ECCS 1 hour not isolated when the accumulator.
ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
C. Required Action and       C.l Increase RCS cold leg           12 hours associated Completion       temperature to > the OPPS Time of Condition B not     enable temperature specified met.                         in the PTLR.
C. Required Action and C.l Increase RCS cold leg 12 hours associated Completion temperature to > the OPPS Time of Condition B not enable temperature specified met.
OR C.2 Depressurize affected ECCS       12 hours accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
in the PTLR.
Prairie Island Units 1 and 2                         3.4.13-2                                 1/2/02
OR C.2 Depressurize affected ECCS 12 hours accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.
Prairie Island Units 1 and 2 3.4.13-2 1/2/02


LTOP - RCSCLT
LTOP - RCSCLT
* SI Pump Disable Temperature 3.4.13 ACTIONS (continued)
* SI Pump Disable Temperature 3.4.13 ACTIONS (continued)
CONDITION               REQUIRED ACTION               COMPLETION TIME D. ------- NOTE ---------   D.1 Restore required PORV to     24 hours Only applicable in LCO       OPERABLE status.
CONDITION REQUIRED ACTION COMPLETION TIME D. ------- NOTE ---------
D.1 Restore required PORV to 24 hours Only applicable in LCO OPERABLE status.
3.4.13.a.
3.4.13.a.
One required PORV inoperable.
One required PORV inoperable.
E. Two required PORVs       E. I Depressurize RCS and         8 hours inoperable for LCO           establish RCS vent of> 3 3.4.13.a.                   square inches.
E. Two required PORVs E. I Depressurize RCS and 8 hours inoperable for LCO establish RCS vent of> 3 3.4.13.a.
square inches.
OR Required Action and associated Completion Time of Condition A, C, or D not met.
OR Required Action and associated Completion Time of Condition A, C, or D not met.
OR OPPS inoperable.
OR OPPS inoperable.
Prairie Island Units 1 and 2                       3.4-13-3                               1/2/02
Prairie Island Units 1 and 2 3.4-13-3 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.4.13.1   Verify no SI pumps are capable of injecting into                 12 hours the RCS.
LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 Verify no SI pumps are capable of injecting into 12 hours the RCS.
SR 3.4.13.2     --------------------------- NOTE -------------------------
SR 3.4.13.2 NOTE -------------------------
Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
Verify each ECCS accumulator is isolated.                       Once within 12 hours and every 12 hours thereafter SR 3.4.13.3   ------------------------- NOTE ----------------------------     12 hours for Only required to be performed when complying                   unlocked open with LCO 3.4.13.b.Verify required RCS vent->_ 3                 vent valve(s) square inches open.
Verify each ECCS accumulator is isolated.
                  -------------------------------------------------------------. A ND Verify required RCS vent > 3 square inches open.               31 days for other vent path(s)
Once within 12 hours and every 12 hours thereafter SR 3.4.13.3 NOTE ----------------------------
SR 3.4.13.4   Verify PORV block valve is open for each                       72 hours required PORV.
12 hours for Only required to be performed when complying unlocked open with LCO 3.4.13.b.Verify required RCS vent- >_ 3 vent valve(s) square inches open.  
Prairie Island Units I and 2                                 3.4.13-4                                       1/2/02
-------------------------------------------------------------. A N D Verify required RCS vent > 3 square inches open.
31 days for other vent path(s)
SR 3.4.13.4 Verify PORV block valve is open for each 72 hours required PORV.
Prairie Island Units I and 2 3.4.13-4 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS (continued)
LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                 FREQUENCY i
SURVEILLANCE SR 3.4.13.5 NOTE
SR 3.4.13.5       ----------------- NOTE       ---------------
: 1. Not required to be performed until 12 hours after decreasing RCS cold leg temperature to  
: 1. Not required to be performed until 12 hours after decreasing RCS cold leg temperature to
< the OPPS enable temperature specified in the PTLR.
                  < the OPPS enable temperature specified in the PTLR.
: 2. Only required to be performed when complying with LCO 3.4.13.a.
: 2. Only required to be performed when complying with LCO 3.4.13.a.
Perform a COT on OPPS.                               31 days SR 3.4.13.6   Perform CHANNEL CALIBRATION for OPPS                 24 months actuation channel.
Perform a COT on OPPS.
Prairie Island Units 1 and 2                         3.4.13-5                               1/2/02
FREQUENCY 31 days SR 3.4.13.6 Perform CHANNEL CALIBRATION for OPPS 24 months actuation channel.
Prairie Island Units 1 and 2 3.4.13-5 i
1/2/02


RCS Operational LEAKAGE 3,4.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                           FREQUENCY SR 3.4.14.1   ----------------------------      NOTE         ---------------
RCS Operational LEAKAGE 3,4.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.14.1 NOTE Not required to be performed until 12 hours after establishment of steady state operation.
Not required to be performed until 12 hours after establishment of steady state operation.
Verify RCS operational leakage within limits by 24 hours performance of RCS water inventory balance.
Verify RCS operational leakage within limits by                       24 hours performance of RCS water inventory balance.
SR 3.4.14.2 Verify steam generator tube integrity is in In accordance accordance with the Steam Generator Program.
SR 3.4.14.2   Verify steam generator tube integrity is in                           In accordance accordance with the Steam Generator Program.                         with the Steam Generator Program Prairie Island Units 1 and 2                                       3.4.14-3                                       1/2/02
with the Steam Generator Program Prairie Island Units 1 and 2 3.4.14-3 1/2/02


RCS Specific Activity 3.4.17 3.4     REACTOR COOLANT SYSTEM (RCS) 3.4.17   RCS Specific Activity LCO       3.4.17   The specific activity of the reactor coolant shall be within limits:
RCS Specific Activity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 RCS Specific Activity LCO 3.4.17 The specific activity of the reactor coolant shall be within limits:
APPLICABILITY:         MODES I and 2, MODE 3 with RCS average temperature (Tavg) 2! 500'F.
APPLICABILITY:
ACTIONS                                                                     -T REQUIRED ACTION                          COMPLETION CONDITION                                                                       TIME A. DOSE EQUIVALENT                             N ote ---------------- ------------------.
MODES I and 2, MODE 3 with RCS average temperature (Tavg) 2! 500'F.
1-131 > 1.0 bLCi/gm.      LCO 3.0.4 is not applicable.
ACTIONS  
A.1   Verify DOSE                             Once per 4 hours EQUIVALENT 1-131 within the acceptable region of Figure 3.4.17-1.
-T CONDITION A.
AND 48 hours A.2   Restore DOSE EQUIVALENT 1-131 to within limit.
DOSE EQUIVALENT 1-131 > 1.0 bLCi/gm.
Prairie Island Units 1 and 2                               3.4.17-1                                           1/2/02
REQUIRED ACTION N ote ----------------
LCO 3.0.4 is not applicable.
A.1 Verify DOSE EQUIVALENT 1-131 within the acceptable region of Figure 3.4.17-1.
AND A.2 Restore DOSE EQUIVALENT 1-131 to within limit.
COMPLETION TIME Once per 4 hours 48 hours Prairie Island Units 1 and 2 3.4.17-1 1/2/02


RCS Specific Activity 3.4.17 ACTIONS (continued)
RCS Specific Activity 3.4.17 ACTIONS (continued)
CONDITION                     REQUIRED ACTION           COMPLETION TIME B. Gross specific activity     B.1   Be in MODE 3 with         6 hours of the reactor coolant           Tavg < 500 0 F.
CONDITION REQUIRED ACTION COMPLETION TIME B.
Gross specific activity B.1 Be in MODE 3 with 6 hours of the reactor coolant Tavg < 5000 F.
not within limit.
not within limit.
C. Required Action and         C.l   Be in MODE 3 with         6 hours associated Completion             Tavg < 500'F.
C.
Required Action and C.l Be in MODE 3 with 6 hours associated Completion Tavg < 500'F.
Time of Condition A not met.
Time of Condition A not met.
OR DOSE EQUIVALENT 1-131 in the unacceptable region of Figure 3.4.17-1.
OR DOSE EQUIVALENT 1-131 in the unacceptable region of Figure 3.4.17-1.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.4.17.1     Verify reactor coolant gross specific activity   7 days
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify reactor coolant gross specific activity 7 days
* 100/2 ,MCi/gm.
* 100/2,MCi/gm.
Prairie Island Units 1 and 2                             3.4.17-2                             1/2/02
Prairie Island Units 1 and 2 3.4.17-2 1/2/02


RCS Specific Activity 3.4.17 SURVEILLANCE REQUIREMENTS (continued)
RCS Specific Activity 3.4.17 SURVEILLANCE REQUIREMENTS (continued)
FREQUENCY SURVEILLANCE SR 3.4.17.2                               N OTE   -------------------------
SURVEILLANCE SR 3.4.17.2 SR 3.4.17.3 N OTE -------------------------
Only required to be performed in MODE 1.
Only required to be performed in MODE 1.
Verify reactor coolant DOSE EQUIVALENT                               14 days 1-131 specific activity _*1.0 ktCi/gm.                               AND Between 2 and 6 hours after a THERMAL POWER change of >_15% RTP within a 1 hour period SR 3.4.17.3                                N O TE             - - - - - - ------
Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity _* 1.0 ktCi/gm.
Not required to be performed           until 31   days after a minimum of 2 effective full power days and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for >_ 48 hours.
N O TE -------------
Determine L from a sample taken in MODE 1 after                       184 days a minimum of 2 effective full power days and 20 days of MODE I operation have elapsed since the reactor was last subcritical for >_ 48 hours.
Not required to be performed until 31 days after a minimum of 2 effective full power days and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for >_ 48 hours.
Prairie Island Units 1 and 2                                 3.4.17-3                                             1/2/02
Determine L from a sample taken in MODE 1 after a minimum of 2 effective full power days and 20 days of MODE I operation have elapsed since the reactor was last subcritical for >_ 48 hours.
Prairie Island Units 1 and 2 FREQUENCY 14 days AND Between 2 and 6 hours after a THERMAL POWER change of >_ 15% RTP within a 1 hour period 184 days 3.4.17-3 1/2/02


RCS Pressure, Temperature, and Flow - DNB Limits B 3.4.1 BASES SURVEILLANCE   SR 3.4.1.2 REQUIREMENTS (continued)    Since Required Action A. 1 allows a Completion Time of 2 hours to restore parameters that are not within limits, the 12 hour Surveillance Frequency for RCS average temperature is sufficient to ensure the temperature can be restored to a normal operation, steady state condition following load changes and other expected transient operations. The 12 hour interval has been shown by operating practice to be sufficient to regularly assess for potential degradation and to verify operation is within safety analysis assumptions.
RCS Pressure, Temperature, and Flow - DNB Limits B 3.4.1 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.4.1.2 Since Required Action A. 1 allows a Completion Time of 2 hours to restore parameters that are not within limits, the 12 hour Surveillance Frequency for RCS average temperature is sufficient to ensure the temperature can be restored to a normal operation, steady state condition following load changes and other expected transient operations. The 12 hour interval has been shown by operating practice to be sufficient to regularly assess for potential degradation and to verify operation is within safety analysis assumptions.
SR 3.4.1.3 Measurement of RCS total flow rate once every 24 months allows the installed RCS flow instrumentation to be calibrated and verifies the actual RCS flow rate is greater than or equal to the minimum required RCS flow rate. This verification may be performed via a precision calorimetric heat balance or other means.
SR 3.4.1.3 Measurement of RCS total flow rate once every 24 months allows the installed RCS flow instrumentation to be calibrated and verifies the actual RCS flow rate is greater than or equal to the minimum required RCS flow rate. This verification may be performed via a precision calorimetric heat balance or other means.
The Frequency of 24 months reflects the importance of verifying flow after a refueling outage when the core has been altered, which may have caused an alteration of flow resistance.
The Frequency of 24 months reflects the importance of verifying flow after a refueling outage when the core has been altered, which may have caused an alteration of flow resistance.
REFERENCES       1. USAR, Section 14.
REFERENCES
Prairie Island Units 1 and 2                       B 3.4.1-5                                     1/2/02
: 1.
USAR, Section 14.
Prairie Island Units 1 and 2 B 3.4.1-5 1/2/02


RCS P/T Limits B 3.4.3 BASES (continued)
RCS P/T Limits B 3.4.3 BASES (continued)
ACTIONS           A.l and A.2 Operation outside the P/T limits during MODE 1, 2, 3, or 4 must be corrected so that the RCPB is returned to a condition that has been verified by stress analyses.
ACTIONS A.l and A.2 Operation outside the P/T limits during MODE 1, 2, 3, or 4 must be corrected so that the RCPB is returned to a condition that has been verified by stress analyses.
The 30 minute Completion Time reflects the urgency of restoring the parameters to within the analyzed range. Most violations will not be severe, and the activity can be accomplished in this time in a controlled manner.
The 30 minute Completion Time reflects the urgency of restoring the parameters to within the analyzed range. Most violations will not be severe, and the activity can be accomplished in this time in a controlled manner.
Besides restoring operation within limits, an evaluation is required to determine if RCS operation can continue. The evaluation must verify the RCPB integrity remains acceptable and must be completed before continuing operation. Several methods may be used, including an engineering evaluation to determine effects of the out of-limit condition on the structural integrity of the RCS, a comparison with pre-analyzed transients in the stress analyses, new analyses, or inspection of the components.
Besides restoring operation within limits, an evaluation is required to determine if RCS operation can continue. The evaluation must verify the RCPB integrity remains acceptable and must be completed before continuing operation. Several methods may be used, including an engineering evaluation to determine effects of the out of-limit condition on the structural integrity of the RCS, a comparison with pre-analyzed transients in the stress analyses, new analyses, or inspection of the components.
Line 470: Line 779:
The 72 hour Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. A favorable evaluation must be completed before continuing to operate.
The 72 hour Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. A favorable evaluation must be completed before continuing to operate.
Condition A is modified by a Note requiring that Required Action A.2 to be completed whenever the Condition is entered. The Note emphasizes the need to perform the evaluation of the effects of the excursion outside the allowable limits. Restoration alone per Required Action A. 1 is insufficient because higher than analyzed stresses may have occurred and may have affected the RCPB integrity.
Condition A is modified by a Note requiring that Required Action A.2 to be completed whenever the Condition is entered. The Note emphasizes the need to perform the evaluation of the effects of the excursion outside the allowable limits. Restoration alone per Required Action A. 1 is insufficient because higher than analyzed stresses may have occurred and may have affected the RCPB integrity.
Prairie Island Units 1 and 2                         B 3.4.3-5                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.3-5 1/2/02


RCS Loops - MODE 3 B 3.4.5 BASES LCO           The Note permits both RCPs to be de-energized for (continued)     _<12 hours to perform preplanned work activities.
RCS Loops - MODE 3 B 3.4.5 BASES LCO The Note permits both RCPs to be de-energized for (continued)
_< 12 hours to perform preplanned work activities.
One purpose of the Note is to allow performance of tests that are designed to validate various accident analyses values. One of these tests is validation of the pump coastdown curve used as input to a number of accident analyses including a loss of flow accident. This test was performed during the initial startup testing program, and would normally only be performed once. If, however, changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values of the coastdown curve must be revalidated by conducting the test again. Another test performed during the startup testing program was the validation of rod drop times, both with and without flow. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values.
One purpose of the Note is to allow performance of tests that are designed to validate various accident analyses values. One of these tests is validation of the pump coastdown curve used as input to a number of accident analyses including a loss of flow accident. This test was performed during the initial startup testing program, and would normally only be performed once. If, however, changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values of the coastdown curve must be revalidated by conducting the test again. Another test performed during the startup testing program was the validation of rod drop times, both with and without flow. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values.
Another purpose of the Note is to allow stopping of both RCP's for a sufficient time to perform station electrical lineup changes without transition to MODE 4. During these evolutions both RCP's may be inoperable. Transition to MODE 4 would put the plant through unnecessary cooldown and heatup transients. The 12 hour time period specified is adequate to perform the necessary load shedding, switching and load restoration activities and restart an RCP without requiring transition to MODE 4.
Another purpose of the Note is to allow stopping of both RCP's for a sufficient time to perform station electrical lineup changes without transition to MODE 4. During these evolutions both RCP's may be inoperable. Transition to MODE 4 would put the plant through unnecessary cooldown and heatup transients. The 12 hour time period specified is adequate to perform the necessary load shedding, switching and load restoration activities and restart an RCP without requiring transition to MODE 4.
Utilization of the Note is permitted provided the following conditions are met:
Utilization of the Note is permitted provided the following conditions are met:
Prairie Island Units 1 and 2                       B 3.4.5-3                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.5-3 1/2/02


RCS Loops - MODE 3 B 3.4.5 BASES LCO           a. No operations are permitted that would dilute the RCS boron (continued)      concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, thereby maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM is maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and
RCS Loops - MODE 3 B 3.4.5 BASES LCO (continued)
: b. Core outlet temperature is maintained at least 10&deg;F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.
: a.
No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, thereby maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM is maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and
: b.
Core outlet temperature is maintained at least 10&deg;F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.
An OPERABLE RCS loop consists of one OPERABLE RCP and one OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.5.2. An RCP is OPERABLE if it is capable of being powered and is able to provide forced flow if required.
An OPERABLE RCS loop consists of one OPERABLE RCP and one OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.5.2. An RCP is OPERABLE if it is capable of being powered and is able to provide forced flow if required.
APPLICABILITY In MODE 3, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. The most stringent condition of the LCO, that is, two RCS loops OPERABLE and two RCS loops in operation, applies to MODE 3 with the Rod Control System capable of rod withdrawal.
APPLICABILITY In MODE 3, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. The most stringent condition of the LCO, that is, two RCS loops OPERABLE and two RCS loops in operation, applies to MODE 3 with the Rod Control System capable of rod withdrawal.
The least stringent condition, that is, two RCS loops OPERABLE and one RCS loop in operation, applies to Mode 3 with the Rod Control System not capable of rod withdrawal.
The least stringent condition, that is, two RCS loops OPERABLE and one RCS loop in operation, applies to Mode 3 with the Rod Control System not capable of rod withdrawal.
Operation in other MODES is covered by:
Operation in other MODES is covered by:
LCO   3.4.4, "RCS Loops-MODES 1 and 2";
LCO 3.4.4, "RCS Loops-MODES 1 and 2";
LCO   3.4.6, "RCS Loops-MODE 4";
LCO 3.4.6, "RCS Loops-MODE 4";
LCO   3.4.7, "RCS Loops-MODE 5, Loops Filled";
LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";
LCO   3.4.8, "RCS Loops-MODE 5, Loops Not Filled";
LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled";
Prairie Island Units 1 and 2                       B 3.4.5-4                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.5-4 1/2/02


RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS       D.1, D.2, and D.3 (continued) coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.
RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS D.1, D.2, and D.3 (continued) coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.
SURVEILLANCE   SR 3.4.5.1 REQUIREMEN'S This SR requires verification every 12 hours that the required loops are in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS loop performance.
SURVEILLANCE SR 3.4.5.1 REQUIREMEN'S This SR requires verification every 12 hours that the required loops are in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS loop performance.
SR 3.4.5.2 SR 3.4.5.2 requires verification that the SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered.
SR 3.4.5.2 SR 3.4.5.2 requires verification that the SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered.
The 12 hour Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of the SG to remove decay heat.
The 12 hour Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of the SG to remove decay heat.
Prairie Island Units I and 2                       B 3.4.5-7                                   1/2/02
Prairie Island Units I and 2 B 3.4.5-7 1/2/02


RCS Loops - MODE 3 B 3.4.5 BASES SURPVEILLANCE   SR 3.4.5.3 REQUIREMENTS (continued)    Verification that each required RCP is OPERABLE ensures that an additional RCP can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power availability to each required RCP. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability.
RCS Loops - MODE 3 B 3.4.5 BASES SURPVEILLANCE REQUIREMENTS (continued)
SR 3.4.5.3 Verification that each required RCP is OPERABLE ensures that an additional RCP can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power availability to each required RCP. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
REFERENCES           1. License Amendment Request Dated November 19, 1999.
REFERENCES
: 1. License Amendment Request Dated November 19, 1999.
(Approved by License Amendment 152/143, July 14, 2000.)
(Approved by License Amendment 152/143, July 14, 2000.)
: 2. NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation."
: 2.
Prairie Island Units I and 2                       B 3.4.5-8                                   1/2/02
NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation."
Prairie Island Units I and 2 B 3.4.5-8 1/2/02


RCS Loops - MODE 4 B 3.4.6 BASES (continued)
RCS Loops - MODE 4 B 3.4.6 BASES (continued)
LCO               The purpose of this LCO is to require that at least two loops be OPERABLE in MODE 4 and that one of these loops be in operation.
LCO The purpose of this LCO is to require that at least two loops be OPERABLE in MODE 4 and that one of these loops be in operation.
The LCO allows the two loops that are required to be OPERABLE to consist of any combination of RCS loops and RHR loops. Any one loop in operation provides enough flow to remove the decay heat from the core with forced circulation. An additional loop is required to be OPERABLE to provide redundancy for heat removal.
The LCO allows the two loops that are required to be OPERABLE to consist of any combination of RCS loops and RHR loops. Any one loop in operation provides enough flow to remove the decay heat from the core with forced circulation. An additional loop is required to be OPERABLE to provide redundancy for heat removal.
Note 1 permits all RCPs or RHR pumps to be de-energized for
Note 1 permits all RCPs or RHR pumps to be de-energized for  
                  *< 1 hour per 8 hour period. The purpose of the Note is to permit tests that are designed to validate various accident analyses values.
*< 1 hour per 8 hour period. The purpose of the Note is to permit tests that are designed to validate various accident analyses values.
One of the LCO tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.
One of the LCO tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.
Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by startup test procedures:
Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by startup test procedures:
: a. No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, therefore maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM in maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and Prairie Island Units 1 and 2                           B 3.4.6-2                                   1/2/02
: a.
No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, therefore maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM in maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and Prairie Island Units 1 and 2 B 3.4.6-2 1/2/02


RCS Loops - MODE 4 B 3.4.6 BASES LCO           b. Core outlet temperature is maintained at least 10&deg;F below (continued)       saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.
RCS Loops - MODE 4 B 3.4.6 BASES LCO
Note 2 requires a steam or gas bubble in the pressurizer or that the secondary side water temperature of each SG be _*50TF above each of the RCS cold leg temperatures before the start of an RCP with any RCS cold leg temperature < the OPPS enable temperature specified in the PTLR. A steam or gas bubble ensures that the pressurizer will accommodate the swell resulting from an RCP start. Either of these restraints prevents a low temperature overpressure event due to a thermal transient when an RCP is started.
: b.
Core outlet temperature is maintained at least 10&deg;F below (continued) saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.
Note 2 requires a steam or gas bubble in the pressurizer or that the secondary side water temperature of each SG be _* 50TF above each of the RCS cold leg temperatures before the start of an RCP with any RCS cold leg temperature < the OPPS enable temperature specified in the PTLR. A steam or gas bubble ensures that the pressurizer will accommodate the swell resulting from an RCP start. Either of these restraints prevents a low temperature overpressure event due to a thermal transient when an RCP is started.
An OPERABLE RCS loop consists of an OPERABLE RCP and an OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.6.2.
An OPERABLE RCS loop consists of an OPERABLE RCP and an OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.6.2.
Similarly for the RHR System, an OPERABLE RHR loop consists of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RCPs and RHR pumps are OPERABLE if they are capable of being powered and are able to provide forced flow if required.
Similarly for the RHR System, an OPERABLE RHR loop consists of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RCPs and RHR pumps are OPERABLE if they are capable of being powered and are able to provide forced flow if required.  
,AYPLICABILITY In MODE 4, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing.
,AYPLICABILITY In MODE 4, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing.
Operation in other MODES is covered by:
Operation in other MODES is covered by:
LCO   3.4.4, "RCS Loops-MODES 1 and 2";
LCO 3.4.4, "RCS Loops-MODES 1 and 2";
LCO   3.4.5, "RCS Loops-MODE 3";
LCO 3.4.5, "RCS Loops-MODE 3";
LCO   3.4.7, "RCS Loops - MODE 5, Loops Filled";
LCO 3.4.7, "RCS Loops - MODE 5, Loops Filled";
LCO   3.4.8, "RCS Loops - MODE 5, Loops Not Filled";
LCO 3.4.8, "RCS Loops - MODE 5, Loops Not Filled";
LCO   3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation - High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level" (MODE 6).
LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation - High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level" (MODE 6).
Prairie Island Units I and 2                       B 3.4.6-3                                   1/2/02
Prairie Island Units I and 2 B 3.4.6-3 1/2/02


RCS Loops - MODE 4 B 3.4.6 BASES (continued)
RCS Loops - MODE 4 B 3.4.6 BASES (continued)
ACTIONS           A. I If one required loop is inoperable, redundancy for heat removal is lost. Action must be initiated to restore a second RCS or RHR loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal. Entry to a reduced MODE (MODE 5 or 6) requires RHR availability for long term decay heat removal. Remaining in MODE 4, with RCS loop operation, is conservative.
ACTIONS A. I If one required loop is inoperable, redundancy for heat removal is lost. Action must be initiated to restore a second RCS or RHR loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal. Entry to a reduced MODE (MODE 5 or 6) requires RHR availability for long term decay heat removal. Remaining in MODE 4, with RCS loop operation, is conservative.
If restoration is not accomplished and an RHR Loop is OPERABLE, the unit must be brought to MODE 5 within 24 hours. Bringing the unit to MODE 5 is a conservative action with regard to decay heat removal. With only one RHR loop OPERABLE, redundancy for decay heat removal is lost and, in the event of a loss of the remaining RUR loop, it would be safer to initiate that loss from MODE 5 rather than MODE 4. The Completion Time of 24 hours is a reasonable time, based on operating experience, to reach MODE 5 from MODE 4 in an orderly manner and without challenging plant systems.
If restoration is not accomplished and an RHR Loop is OPERABLE, the unit must be brought to MODE 5 within 24 hours. Bringing the unit to MODE 5 is a conservative action with regard to decay heat removal. With only one RHR loop OPERABLE, redundancy for decay heat removal is lost and, in the event of a loss of the remaining RUR loop, it would be safer to initiate that loss from MODE 5 rather than MODE 4. The Completion Time of 24 hours is a reasonable time, based on operating experience, to reach MODE 5 from MODE 4 in an orderly manner and without challenging plant systems.
The Required Action is modified by a Note which indicates that the unit must be placed in MODE 5 only if a RHR loop is OPERABLE.
The Required Action is modified by a Note which indicates that the unit must be placed in MODE 5 only if a RHR loop is OPERABLE.
With no RHR loop OPERABLE, the unit is in a condition with only limited cooldown capabilities. Therefore, the actions are to be concentrated on the restoration of a RHR loop, rather than a cooldown of extended duration.
With no RHR loop OPERABLE, the unit is in a condition with only limited cooldown capabilities. Therefore, the actions are to be concentrated on the restoration of a RHR loop, rather than a cooldown of extended duration.
Prairie Island Units I and 2                           B 3.4.6-4                                   1/2/02
Prairie Island Units I and 2 B 3.4.6-4 1/2/02


RCS Loops- MODE 4 B 3.4.6 BASES ACTIONS         B. I and B.2 (continued)
RCS Loops-MODE 4 B 3.4.6 BASES ACTIONS B. I and B.2 (continued)
If both loops are inoperable or a required loop not in operation, except during conditions permitted by Note 1 in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RCS or RIHR loop to OPERABLE status and operation must be initiated. The margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for decay heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.
If both loops are inoperable or a required loop not in operation, except during conditions permitted by Note 1 in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RCS or RIHR loop to OPERABLE status and operation must be initiated. The margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for decay heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.
SURVEILLANCE     SR 3.4.6.1 REQUIREMENTS This SR requires verification every 12 hours that the required RCS or RHR loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS and RHR loop performance.
SURVEILLANCE SR 3.4.6.1 REQUIREMENTS This SR requires verification every 12 hours that the required RCS or RHR loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS and RHR loop performance.
Prairie Island Units 1 and 2                         B 3.4.6-5                                 1/2/02
Prairie Island Units 1 and 2 B 3.4.6-5 1/2/02


RCS Loops - MODE 4 B 3.4.6 BASES SURVEILLANCE   SR 3.4.6.2 REQUIREMENTS (continued)    SR 3.4.6.2 requires verification that the required SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered. The 12 hour Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.
RCS Loops - MODE 4 B 3.4.6 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.4.6.2 SR 3.4.6.2 requires verification that the required SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered. The 12 hour Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.
SR 3.4.6.3 Verification that each required pump is OPERABLE ensures that an additional RCS or RHR pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.
SR 3.4.6.3 Verification that each required pump is OPERABLE ensures that an additional RCS or RHR pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.
Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
Prairie Island Units 1 and 2                       B 3.4.6-6                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.6-6 1/2/02


RCS Loops - MODE 4 B 3.4.6 BASES (continued)
RCS Loops - MODE 4 B 3.4.6 BASES (continued)
REFERENCES       1. License Amendment Request Dated November 19, 1999.
REFERENCES
: 1. License Amendment Request Dated November 19, 1999.
(Approved by License Amendment 152/143, July 14, 2000.)
(Approved by License Amendment 152/143, July 14, 2000.)
: 2. NRC Information Notice 95-35, "Degraded Ability of Steam Generator to Remove Decay Heat by Natural Circulation."
: 2.
Prairie Island Units 1 and 2                       B 3-.46-7                               1/2/02
NRC Information Notice 95-35, "Degraded Ability of Steam Generator to Remove Decay Heat by Natural Circulation."
Prairie Island Units 1 and 2 B 3-.46-7 1/2/02


RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES BACKGROUND     OPERABLE RHR loop or maintaining a SG capable of removing (continued)   decay heat to provide an alternate method for decay heat removal via natural circulation.
RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES BACKGROUND OPERABLE RHR loop or maintaining a SG capable of removing (continued) decay heat to provide an alternate method for decay heat removal via natural circulation.
APPLICABLE     In MODE 5, RCS circulation increases the time available for SAFETY         mitigation of an accidental boron dilution event. The RHR ANALYSES       loops provide this circulation.
APPLICABLE In MODE 5, RCS circulation increases the time available for SAFETY mitigation of an accidental boron dilution event. The RHR ANALYSES loops provide this circulation.
RCS Loops - MODE 5 (Loops Filled) satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii).
RCS Loops - MODE 5 (Loops Filled) satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii).
LCO           The purpose of this LCO is to require that at least one RHR loop be OPERABLE and in operation with an additional RHR loop OPERABLE or a SG capable of removing decay heat via natural circulation. One RHR loop provides sufficient forced circulation to perform the safety functions of the reactor coolant under these conditions. An additional RHR loop is required to be OPERABLE to provide redundancy. However, if the standby RHR loop is not OPERABLE, an acceptable alternate method is a SG. Should the operating RHR loop fail, the SG could be used to remove decay heat via natural circulation.
LCO The purpose of this LCO is to require that at least one RHR loop be OPERABLE and in operation with an additional RHR loop OPERABLE or a SG capable of removing decay heat via natural circulation. One RHR loop provides sufficient forced circulation to perform the safety functions of the reactor coolant under these conditions. An additional RHR loop is required to be OPERABLE to provide redundancy. However, if the standby RHR loop is not OPERABLE, an acceptable alternate method is a SG. Should the operating RHR loop fail, the SG could be used to remove decay heat via natural circulation.
Note 1 permits all RHR pumps to be de-energized _*1 hour per 8 hour period. The purpose of the Note is to permit tests designed to validate various accident analyses values. One of the tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour time period is adequate to perform the test, and operating Prairie Island Units 1 and 2                       B 3.4.7-2                                 1/2/02
Note 1 permits all RHR pumps to be de-energized _* 1 hour per 8 hour period. The purpose of the Note is to permit tests designed to validate various accident analyses values. One of the tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour time period is adequate to perform the test, and operating Prairie Island Units 1 and 2 B 3.4.7-2 1/2/02


RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO           Note 4 provides for an orderly transition from MODE 5 to MODE 4 (continued)  during a planned heatup by permitting removal of RHR loops from operation when at least one RCS loop is in operation. This Note provides for the transition to MODE 4 where an RCS loop is permitted to be in operation and replaces the RCS circulation function provided by the RHR loops.
RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO (continued)
APPLICABILITY Note 4 provides for an orderly transition from MODE 5 to MODE 4 during a planned heatup by permitting removal of RHR loops from operation when at least one RCS loop is in operation. This Note provides for the transition to MODE 4 where an RCS loop is permitted to be in operation and replaces the RCS circulation function provided by the RHR loops.
RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. A SG is capable of removing decay heat via natural circulation when: 1) there is the ability to pressurize and control pressure in the RCS; 2) there is sufficient secondary side water level in the SG relied on for decay heat removal; and 3) there is an available supply of feedwater (Ref.
RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. A SG is capable of removing decay heat via natural circulation when: 1) there is the ability to pressurize and control pressure in the RCS; 2) there is sufficient secondary side water level in the SG relied on for decay heat removal; and 3) there is an available supply of feedwater (Ref.
1). An OPERABLE SG can perform as a heat sink via natural circulation when it has the capability to remove decay heat as specified in SR 3.4.7.2.
1). An OPERABLE SG can perform as a heat sink via natural circulation when it has the capability to remove decay heat as specified in SR 3.4.7.2.
APPLICABILITY  In MODE 5 with RCS loops filled, this LCO requires forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. One loop of RHR provides sufficient circulation for these purposes. However, one additional RHR loop is required to be OPERABLE, or a SG is capable of removing decay heat.
In MODE 5 with RCS loops filled, this LCO requires forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. One loop of RHR provides sufficient circulation for these purposes. However, one additional RHR loop is required to be OPERABLE, or a SG is capable of removing decay heat.
Operation in other MODES is covered by:
Operation in other MODES is covered by:
LCO   3.4.4, "RCS Loops-MODES 1 and 2";
LCO 3.4.4, "RCS Loops-MODES 1 and 2";
LCO   3.4.5, "RCS Loops-MODE 3";
LCO 3.4.5, "RCS Loops-MODE 3";
LCO   3.4.6, "RCS Loops-MODE 4";
LCO 3.4.6, "RCS Loops-MODE 4";
LCO   3.4.8, "RCS Loops-MODE 5, Loops Not Filled";
LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled";
LCO   3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).
LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).
Prairie Island Units 1 and 2                       B 3.4.7-4                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.7-4 1/2/02


RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)
RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)
ACTIONS           A. 1, A.2, B. 1 and B.2 If one RHR loop is OPERABLE and the SGs are not capable of removing decay heat, redundancy, for heat removal is lost. Action must be initiated immediately to restore a second RIHR loop to OPERABLE status or to restore the required SG capability to remove decay heat. Either Required Action will restore redundant heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.
ACTIONS A. 1, A.2, B. 1 and B.2 If one RHR loop is OPERABLE and the SGs are not capable of removing decay heat, redundancy, for heat removal is lost. Action must be initiated immediately to restore a second RIHR loop to OPERABLE status or to restore the required SG capability to remove decay heat. Either Required Action will restore redundant heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.
C.1 and C.2 If a required RHR loop is not in operation, except during conditions permitted by Note 1, or if no loop is OPERABLE, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RHR loop to OPERABLE status and operation must be initiated. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for heat removal.
C.1 and C.2 If a required RHR loop is not in operation, except during conditions permitted by Note 1, or if no loop is OPERABLE, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RHR loop to OPERABLE status and operation must be initiated. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for heat removal.
Prairie Island Units 1 and 2                         B 3.4.7-5                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.7-5 1/2/02


RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)
RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)
SURVEILLANCE     SR 3.4.7.1 REQUIREMENTS This SR requires verification every 12 hours that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RUR loop performance.
SURVEILLANCE SR 3.4.7.1 REQUIREMENTS This SR requires verification every 12 hours that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RUR loop performance.
SR 3.4.7.2 SR 3.4.7.2 requires verification that the required SG has the capability to remove decay heat via natural circulation. This provides an alternate decay heat removal method in the event that the second RHR loop is not OPERABLE. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater(Ref. 1).
SR 3.4.7.2 SR 3.4.7.2 requires verification that the required SG has the capability to remove decay heat via natural circulation. This provides an alternate decay heat removal method in the event that the second RHR loop is not OPERABLE. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater(Ref. 1).
The 12 hour Frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.
The 12 hour Frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.
SR 3.4.7.3 Verification that each required RHR pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.
SR 3.4.7.3 Verification that each required RHR pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.
Verification is performed by verifying proper breaker alignment and power available to each required RHR pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. If at least one SG is capable of decay heat removal, this Surveillance is not needed. The Frequency Prairie Island Units I and 2                           B 3.4.7-6                                   1/2/02
Verification is performed by verifying proper breaker alignment and power available to each required RHR pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. If at least one SG is capable of decay heat removal, this Surveillance is not needed. The Frequency Prairie Island Units I and 2 B 3.4.7-6 1/2/02


RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES SUIRVEILLANCE SR 3.4.7.3 (continued)
RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES SUIRVEILLANCE REQUIREMENTS SR 3.4.7.3 (continued) of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
REQUIREMENTS of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
REFERENCES     1. NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation".
REFERENCES
: 2. License Amendment Request Dated November 19, 1999.
: 1. NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation".
: 2.
License Amendment Request Dated November 19, 1999.
(Approved by License Amendment 152/143, July 14, 2000.)
(Approved by License Amendment 152/143, July 14, 2000.)
Prairie Island Units 1 and 2                     B 3.4.7-7                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.7-7 1/2/02


RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES LCO             Note 1 permits all RHR pumps to be de-energized _<1 hour per 8 (continued)    hour period. The circumstances for stopping both RHR pumps are to be limited to situations when the outage time is short and core outlet temperature is maintained > 10 F below saturation temperature. The Note prohibits boron dilution with coolant at boron concentrations less than required to assure SDM is maintained or draining operations when RHR forced flow is stopped.
RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES LCO (continued)
Note 2 allows one RHR loop to be inoperable for a period of
Note 1 permits all RHR pumps to be de-energized _< 1 hour per 8 hour period. The circumstances for stopping both RHR pumps are to be limited to situations when the outage time is short and core outlet temperature is maintained > 10 F below saturation temperature. The Note prohibits boron dilution with coolant at boron concentrations less than required to assure SDM is maintained or draining operations when RHR forced flow is stopped.
                < 2 hours, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible.
Note 2 allows one RHR loop to be inoperable for a period of  
< 2 hours, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible.
An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required.
An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required.
APPLICABILITY   In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System.
APPLICABILITY In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System.
Operation in other MODES is covered by:
Operation in other MODES is covered by:
LCO 3.4.4, "RCS Loops-MODES 1 and 2";
LCO 3.4.4, "RCS Loops-MODES 1 and 2";
LCO   3.4.5, "RCS Loops-MODE 3";
LCO 3.4.5, "RCS Loops-MODE 3";
LCO   3.4.6, "RCS Loops-MODE 4";
LCO 3.4.6, "RCS Loops-MODE 4";
LCO   3.4.7, "RCS Loops-MODE 5, Loops Filled";
LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";
LCO   3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RIHR) and Coolant Circulation-Low Water Level" (MODE 6).
LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RIHR) and Coolant Circulation-Low Water Level" (MODE 6).
Prairie Island Units 1 and 2                         B 3.4.8-2                                 1/2/02
Prairie Island Units 1 and 2 B 3.4.8-2 1/2/02


RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)
RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)
ACTIONS           A. I If one required RHR loop is inoperable, redundancy for RHR is lost.
ACTIONS A. I If one required RHR loop is inoperable, redundancy for RHR is lost.
Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.
Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.
B. I and B.2 If no required loop is OPERABLE or the required loop is not in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action must be initiated immediately to restore an RHR loop to OPERABLE status and operation. The margin to criticality must not be reduced in this type of operation.
B. I and B.2 If no required loop is OPERABLE or the required loop is not in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action must be initiated immediately to restore an RHR loop to OPERABLE status and operation. The margin to criticality must not be reduced in this type of operation.
Line 607: Line 932:
The action to restore must continue until one loop is restored to OPERABLE status and operation.
The action to restore must continue until one loop is restored to OPERABLE status and operation.
The Note in Required Action B.2 allows the use of one safety injection pump to provide heat removal in the event of a loss of RHR system cooling during reduced RCS inventory conditions.
The Note in Required Action B.2 allows the use of one safety injection pump to provide heat removal in the event of a loss of RHR system cooling during reduced RCS inventory conditions.
Prairie Island Units 1 and 2                         B 3.4.8-3                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.8-3 1/2/02


RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)
RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)
SURVEILLANCE     SR 3.4.8.1 REQUIREMENTS This SR requires verification every 12 hours that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.
SURVEILLANCE REQUIREMENTS REFERENCES SR 3.4.8.1 This SR requires verification every 12 hours that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.
SR 3.4.8.2 Verification that each required pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
SR 3.4.8.2 Verification that each required pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
This SR is modified by a Note that states the SR is not required to be performed until 24 hours after a pump is not in operation.
REFERENCES        None.
None.
Prairie Island Units 1 and 2                         B 3.4.8-4                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.8-4 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 B 3.4   REACTOR COOLANT SYSTEM (RCS)
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.12 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND         The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) and the pressurizer power operated relief valves (PORVs) provide the LTOP function (Ref. 2).
B 3.4.12 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) and the pressurizer power operated relief valves (PORVs) provide the LTOP function (Ref. 2).
The PTLR provides the maximum allowable OPPS actuation setpoints for the PORVs and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.
The PTLR provides the maximum allowable OPPS actuation setpoints for the PORVs and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.
The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.
The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.
LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.
LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.
This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, above the safety injection (SI) pump disable temperature, limiting coolant input capability requires one (SI) pump incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. In MODE 4, above the SI Prairie Island Units 1 and 2                             B 3.4.12-1                                 1/2/02
This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, above the safety injection (SI) pump disable temperature, limiting coolant input capability requires one (SI) pump incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. In MODE 4, above the SI Prairie Island Units 1 and 2 B 3.4.12-1 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES BACKGROUND     pump disable temperature, one PORV is the overpressure protection (continued)    device that acts to terminate an increasing pressure event.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES BACKGROUND (continued)
APPLICABLE SAFE-Y ANALYSES pump disable temperature, one PORV is the overpressure protection device that acts to terminate an increasing pressure event.
Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of more than one SI pump for makeup in the event of loss of inventory, then pumps can be made available through manual actions.
Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of more than one SI pump for makeup in the event of loss of inventory, then pumps can be made available through manual actions.
In MODE 4, above the SI pump disable temperature, pressure relief consists of two PORVs with reduced lift settings. Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.
In MODE 4, above the SI pump disable temperature, pressure relief consists of two PORVs with reduced lift settings. Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.
As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS.
As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS.
The PTLR presents the OPPS setpoints for LTOP.
The PTLR presents the OPPS setpoints for LTOP.
APPLICABLE      Safety analyses (Ref. 2) demonstrate that the reactor vessel is SAFE-Y          adequately protected against exceeding the Reference 1 P/T limits.
Safety analyses (Ref. 2) demonstrate that the reactor vessel is adequately protected against exceeding the Reference 1 P/T limits.
ANALYSES        In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference I limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized Prairie Island Units 1 and 2                       B 3.4.12-2                                 1/2/02
In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference I limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized Prairie Island Units 1 and 2 B 3.4.12-2 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE     RCS and a sufficiently sized RCS vent. Each of these means has a SAFETY         limited overpressure relief capability. LCO 3.4.13, "LTOP
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE RCS and a sufficiently sized RCS vent. Each of these means has a SAFETY limited overpressure relief capability. LCO 3.4.13, "LTOP
* SI ANALYSES       Pump Disable Temperature," provides the requirements for (continued) overpressure prevention at the lower temperatures.
* SI ANALYSES Pump Disable Temperature," provides the requirements for (continued) overpressure prevention at the lower temperatures.
The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method.
The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method.
The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.
The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.
Line 638: Line 964:
The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.
The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.
The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:
The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:
: a. Rendering one SI pump incapable of injection;
: a.
: b. Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and
Rendering one SI pump incapable of injection;
: c. Disallowing start of an RCP if secondary temperature is more than 50TF above primary temperature in any one loop.
: b.
Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and
: c.
Disallowing start of an RCP if secondary temperature is more than 50TF above primary temperature in any one loop.
LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.
LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.
Prairie Island IJnits I and 2                     B,3_4 12-3                                   1/2/02
Prairie Island IJnits I and 2 B, 3_4 12-3 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE     The Reference 2 analyses demonstrate that one PORV can maintain SAFETY         RCS pressure below limits when only one SI pump and all charging ANALYSES       pumps are actuated. Thus, the LCO allows only one SI pump (continued)   OPERABLE during the Applicability of this specification.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE The Reference 2 analyses demonstrate that one PORV can maintain SAFETY RCS pressure below limits when only one SI pump and all charging ANALYSES pumps are actuated. Thus, the LCO allows only one SI pump (continued)
OPERABLE during the Applicability of this specification.
Since one PORV cannot handle the pressure transient resulting from ECCS accumulator injection, when RCS temperature is low, the LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
Since one PORV cannot handle the pressure transient resulting from ECCS accumulator injection, when RCS temperature is low, the LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.
The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.
The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.
Line 650: Line 980:
The consequences of a small break loss of coolant accident (LOCA) in LTOP MODE 4 above the SI Pump disable temperature conform to 10 CFR 50.46 and 10 CFR 50, Appendix K, requirements by having a maximum of one SI pump OPERABLE and SI actuation enabled.
The consequences of a small break loss of coolant accident (LOCA) in LTOP MODE 4 above the SI Pump disable temperature conform to 10 CFR 50.46 and 10 CFR 50, Appendix K, requirements by having a maximum of one SI pump OPERABLE and SI actuation enabled.
The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of one SI pump and all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times. The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.
The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of one SI pump and all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times. The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.
The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are Prairie Island Units 1 and 2                       B 3.4.12-4                                 1/2/02
The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are Prairie Island Units 1 and 2 B 3.4.12-4 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE     periodically modified as the reactor vessel material toughness SAFETY         decreases due to neutron embrittlement caused by neutron ANALYSES       irradiation. Revised limits are determined using neutron fluence (continued)   projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE periodically modified as the reactor vessel material toughness SAFETY decreases due to neutron embrittlement caused by neutron ANALYSES irradiation. Revised limits are determined using neutron fluence (continued) projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.
The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).
The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).
LCO           This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference I limits as a result of an operational transient.
LCO This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference I limits as a result of an operational transient.
To limit the coolant input capability, the LCO requires that a maximum of one SI pump be capable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).
To limit the coolant input capability, the LCO requires that a maximum of one SI pump be capable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).
The LCO is modified by two Notes. Note 1 allows operation of both SI pumps for _<1 hour for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut. The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODE 4. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS. This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.
The LCO is modified by two Notes. Note 1 allows operation of both SI pumps for _< 1 hour for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut. The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODE 4. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS. This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.
Prairie Island Units 1 and 2                       B 3.4.12-5                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.12-5 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES LCO             Note 2 states that ECCS accumulator isolation is only required (continued)    when the ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES LCO (continued)
Note 2 states that ECCS accumulator isolation is only required when the ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.
To provide low temperature overpressure mitigation through pressure relief, the LCO requires an OPERABLE OPPS with two pressurizer PORVs. A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.
To provide low temperature overpressure mitigation through pressure relief, the LCO requires an OPERABLE OPPS with two pressurizer PORVs. A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.
APPLICABILITY This LCO is applicable in MODE 4 when any RCS cold leg temperature is _<the OPPS enable temperature specified in the PTLR and > the SI Pump disable temperature specified in the PTLR. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR.
APPLICABILITY This LCO is applicable in MODE 4 when any RCS cold leg temperature is _< the OPPS enable temperature specified in the PTLR and > the SI Pump disable temperature specified in the PTLR. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR.
LCO 3.4.3 provides the operational P/T limits for all MODES.
LCO 3.4.3 provides the operational P/T limits for all MODES.
LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.13 provides the LTOP requirements in MODE 4 _<SI pump disable temperature and in MODES 5 and 6.
LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.13 provides the LTOP requirements in MODE 4 _< SI pump disable temperature and in MODES 5 and 6.
Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.
Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.
Prairie Island Units 1 and 2                       B 3.4.12-6                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.12-6 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES (continued)
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES (continued)
ACTIONS           A.I With two SI pumps capable of injecting into the RCS, RCS overpressurization is possible.
ACTIONS A.I With two SI pumps capable of injecting into the RCS, RCS overpressurization is possible.
To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.
To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.
B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour.
B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour.
Line 674: Line 1,005:
If isolation is needed and cannot be accomplished in 1 hour, Required Action C.1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours. By increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.
If isolation is needed and cannot be accomplished in 1 hour, Required Action C.1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours. By increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.
The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.
The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.
D.1 In MODE 4 when any RCS cold leg temperature is -<the OPPS enable temperature specified in the PTLR, with one required PORV Prairie Island Units 1 and 2                           B 3.4.12-7                                   1/2/02
D.1 In MODE 4 when any RCS cold leg temperature is -< the OPPS enable temperature specified in the PTLR, with one required PORV Prairie Island Units 1 and 2 B 3.4.12-7 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS         D.1 (continued) inoperable, the PORV must be restored to OPERABLE status within a Completion Time of 7 days. Two PORVs are required to provide low temperature overpressure mitigation while withstanding a single failure of an active component.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS D.1 (continued) inoperable, the PORV must be restored to OPERABLE status within a Completion Time of 7 days. Two PORVs are required to provide low temperature overpressure mitigation while withstanding a single failure of an active component.
The Completion Time considers the facts that only one of the PORVs is required to mitigate an overpressure transient and that the likelihood of an active failure of the remaining valve path during this time period is very low.
The Completion Time considers the facts that only one of the PORVs is required to mitigate an overpressure transient and that the likelihood of an active failure of the remaining valve path during this time period is very low.
E.I MODE 5 must be entered, the RCS must be depressurized and a vent must be established within 12 hours when:
E.I MODE 5 must be entered, the RCS must be depressurized and a vent must be established within 12 hours when:
: a. Both PORVs are inoperable; or
: a.
: b. A Required Action and associated Completion Time of Condition A, C, or D is not met; or
Both PORVs are inoperable; or
: c. The OPPS is inoperable.
: b.
The vent must be sized _>3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.
A Required Action and associated Completion Time of Condition A, C, or D is not met; or
Prairie Island Ilnits I and 2                       B 3.4.12-8                                   1/2/02
: c.
The OPPS is inoperable.
The vent must be sized _> 3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.
Prairie Island Ilnits I and 2 B 3.4.12-8 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS         E.I (continued)
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS E.I (continued)
The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.
The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.
SURVEILLANCE   SR 3.4.12.1 and SR 3.4.12.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, one SI pump is verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.
SURVEILLANCE SR 3.4.12.1 and SR 3.4.12.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, one SI pump is verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.
The SI pump is rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.
The SI pump is rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.
The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.
The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.
SR 3.4.12.2 is modified by a Note specifying that this verification is only required when the ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. If ECCS accumulator pressure is less than this limit, no verification is required since the ECCS accumulator cannot pressurize the RCS to or above the OPPS setpoint.
SR 3.4.12.2 is modified by a Note specifying that this verification is only required when the ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. If ECCS accumulator pressure is less than this limit, no verification is required since the ECCS accumulator cannot pressurize the RCS to or above the OPPS setpoint.
The Frequency of 12 hours is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.
The Frequency of 12 hours is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.
Prairie Island Units 1 and2                       B 3.4.12-9                                     1/2/02
Prairie Island Units 1 and2 B 3.4.12-9 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE   SR 3.4.12.3 REQUIREMENTS (continued)   The PORV block valve must be verified open every 72 hours to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room.
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE SR 3.4.12.3 REQUIREMENTS (continued)
The PORV block valve must be verified open every 72 hours to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room.
The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.
The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.
Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.
Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.
Line 701: Line 1,036:
This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.
This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.
PORV actuation during this testing could depressurize the RCS and is not required.
PORV actuation during this testing could depressurize the RCS and is not required.
Prairie Island Units 1 and 2                     B 3.4.12-10                                     1/2/02
Prairie Island Units 1 and 2 B 3.4.12-10 1/2/02


LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE   SR 3.4.12.4 (continued)
LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE REQUIREMENTS SR 3.4.12.4 (continued)
REQUIREMENTS A Note has been added indicating that this SR is required to be performed 12 hours after decreasing RCS cold leg temperature to
A Note has been added indicating that this SR is required to be performed 12 hours after decreasing RCS cold leg temperature to
_<the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.
_< the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.
The 12 hour initial time considers the unlikehood of a low temperature overpressure event during this time.
The 12 hour initial time considers the unlikehood of a low temperature overpressure event during this time.
SR 3.4.12.5 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.
SR 3.4.12.5 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.
REFERENCES     1. 10 CFR 50, Appendix G.
REFERENCES
: 2. USAR, Section 4.4.
: 1.
: 3. ASME, Boiler and Pressure Vessel Code, Section XI, Appendix G, with ASME Code Case N-514.
10 CFR 50, Appendix G.
Prairie Island Units I and 2                     B 3.4.12-11                                 1/2/02
: 2.
USAR, Section 4.4.
: 3.
ASME, Boiler and Pressure Vessel Code, Section XI, Appendix G, with ASME Code Case N-514.
Prairie Island Units I and 2 B 3.4.12-11 1/2/02


LTOP - RCSCLT < SI Pump Disable Temperature B 3.4.13 B 3.4   REACTOR COOLANT SYSTEM (RCS)
LTOP - RCSCLT < SI Pump Disable Temperature B 3.4.13 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.13   Low Temperature Overpressure Protection (LTOP) Reactor Coolant System Cold Leg Temperature (RCSCLT) _<Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND         The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) provides the actuation setpoints for the pressurizer power operated relief valves (PORVs) for the LTOP function (Ref. 2). The PTLR provides the maximum allowable OPPS actuation setpoints and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.
B 3.4.13 Low Temperature Overpressure Protection (LTOP) Reactor Coolant System Cold Leg Temperature (RCSCLT) _< Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) provides the actuation setpoints for the pressurizer power operated relief valves (PORVs) for the LTOP function (Ref. 2). The PTLR provides the maximum allowable OPPS actuation setpoints and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.
The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.
The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.
LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.
LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.
This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, at or below the safety injection (SI) pump disable temperature, limiting coolant input capability requires both SI pumps incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. The pressure Prairie Island Units 1 and 2                           B 3.4-13-112                                 1/2/02
This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, at or below the safety injection (SI) pump disable temperature, limiting coolant input capability requires both SI pumps incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. The pressure Prairie Island Units 1 and 2 B 3.4-13-112 1/2/02


LTOP - RCSCLT _*SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND     relief capacity requires either two redundant RCS relief valves or a (continued)   depressurized RCS and an RCS vent of sufficient size. One PORV or the open RCS vent is the overpressure protection device that acts to terminate an increasing pressure event.
LTOP - RCSCLT _* SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND relief capacity requires either two redundant RCS relief valves or a (continued) depressurized RCS and an RCS vent of sufficient size. One PORV or the open RCS vent is the overpressure protection device that acts to terminate an increasing pressure event.
Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the safety injection SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of an SI pump for makeup in the event of loss of inventory, the pump can be made available through manual actions.
Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the safety injection SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of an SI pump for makeup in the event of loss of inventory, the pump can be made available through manual actions.
The LTOP pressure relief consists of two PORVs with reduced lift settings or a depressurized RCS and an RCS vent of sufficient size.
The LTOP pressure relief consists of two PORVs with reduced lift settings or a depressurized RCS and an RCS vent of sufficient size.
Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.
Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.
OPPS and PORV Requirements As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS. The PTLR presents the OPPS setpoints for LTOP.
OPPS and PORV Requirements As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS. The PTLR presents the OPPS setpoints for LTOP.
RCS Vent Requirements Once the RCS is depressurized, a vent exposed to the containment atmosphere will maintain the RCS at containment ambient pressure Prairie Island Units 1 and 2                       B 3.4.13-2                                   1/2/02
RCS Vent Requirements Once the RCS is depressurized, a vent exposed to the containment atmosphere will maintain the RCS at containment ambient pressure Prairie Island Units 1 and 2 B 3.4.13-2 1/2/02


LTOP - RCSCLT       *< SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND     RCS Vent Requirements (continued) in an RCS overpressure transient, if the relieving requirements of the transient do not exceed the capabilities of the vent. Thus, the vent path must be capable of relieving the flow resulting from the limiting LTOP mass or heat input transient, and maintaining pressure below the P/T limits. The required vent capacity may be provided by one or more vent paths.
LTOP - RCSCLT *< SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND RCS Vent Requirements (continued) in an RCS overpressure transient, if the relieving requirements of the transient do not exceed the capabilities of the vent. Thus, the vent path must be capable of relieving the flow resulting from the limiting LTOP mass or heat input transient, and maintaining pressure below the P/T limits. The required vent capacity may be provided by one or more vent paths.
APPLICABLE     Safety analyses (Ref. 2) demonstrate that the reactor vessel is SAFETY          adequately protected against exceeding the Reference I P/T limits.
APPLICABLE SAFETY ANALYSES Safety analyses (Ref. 2) demonstrate that the reactor vessel is adequately protected against exceeding the Reference I P/T limits.
ANALYSES        In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference 1 limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized RCS and a sufficiently sized RCS vent. Each of these means has a limited overpressure relief capability. LCO 3.4.12, "LTOP > SI Pump Disable Temperature," provides the requirements for overpressure prevention at temperatures above the SIP disable temperature.
In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference 1 limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized RCS and a sufficiently sized RCS vent. Each of these means has a limited overpressure relief capability. LCO 3.4.12, "LTOP > SI Pump Disable Temperature," provides the requirements for overpressure prevention at temperatures above the SIP disable temperature.
The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method or the depressurized and vented RCS condition.
The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method or the depressurized and vented RCS condition.
The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.
The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.
Prairie Island Units I and 2 B 3.4.13-3                                   1/2/02
Prairie Island Units I and 2 B 3.4.13-3 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE     Transients that are capable of overpressurizing the RCS are SAFETY         categorized as either mass or heat input transients. The bounding ANALYSES       mass input transient is inadvertent safety injection with injection (continued)   from one SI pump and three charging pumps, and letdown isolated.
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE Transients that are capable of overpressurizing the RCS are SAFETY categorized as either mass or heat input transients. The bounding ANALYSES mass input transient is inadvertent safety injection with injection (continued) from one SI pump and three charging pumps, and letdown isolated.
The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.
The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.
The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:
The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:
: a. Rendering both SI pumps incapable of injection;
: a.
: b. Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and
Rendering both SI pumps incapable of injection;
: c. Disallowing start of an RCP if secondary temperature is more than 50'F above primary temperature in any one loop.
: b.
Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and
: c.
Disallowing start of an RCP if secondary temperature is more than 50'F above primary temperature in any one loop.
LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.
LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.
The Reference 2 analyses demonstrate that either one PORV or the depressurized RCS and RCS vent can maintain RCS pressure below limits when all charging pumps are actuated. Neither one PORV nor the RCS vent can handle the pressure transient resulting from inadvertent SI pump or ECCS accumulator injection when the RCS is below the SI Pump disable temperature. Thus, the LCO requires both SI pumps to be disabled below the temperature specified in the PTLR.
The Reference 2 analyses demonstrate that either one PORV or the depressurized RCS and RCS vent can maintain RCS pressure below limits when all charging pumps are actuated. Neither one PORV nor the RCS vent can handle the pressure transient resulting from inadvertent SI pump or ECCS accumulator injection when the RCS is below the SI Pump disable temperature. Thus, the LCO requires both SI pumps to be disabled below the temperature specified in the PTLR.
The LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.
The LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.
Prairie Island Units 1 and 2                       B 3.4.13-4                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.13-4 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE     Fracture mechanics analyses established the temperature of LTOP SAFETY        Applicability at the OPPS enable temperature specified in the PTLR.
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE SAFETY ANALYSES (continued)
ANALYSES      The fracture mechanics analyses show that the vessel is protected (continued)  when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times.
Fracture mechanics analyses established the temperature of LTOP Applicability at the OPPS enable temperature specified in the PTLR.
The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times.
The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.
The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.
The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are periodically modified as the reactor vessel material toughness decreases due to neutron embrittlement caused by neutron irradiation. Revised limits are determined using neutron fluence projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.
The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are periodically modified as the reactor vessel material toughness decreases due to neutron embrittlement caused by neutron irradiation. Revised limits are determined using neutron fluence projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.
Line 751: Line 1,094:
The RCS vent is passive and is not subject to active failure.
The RCS vent is passive and is not subject to active failure.
The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).
The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).
Prairie Island Units 1 and 2                       B 3.4.13-5                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.13-5 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES (continued)
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES (continued)
LCO               This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference 1 limits as a result of an operational transient.
LCO This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference 1 limits as a result of an operational transient.
To limit the coolant input capability, the LCO requires both SI pumps be incapable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).
To limit the coolant input capability, the LCO requires both SI pumps be incapable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).
The LCO is modified by three Notes. Note 1 allows operation of both SI pumps for _*1 hour for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.
The LCO is modified by three Notes. Note 1 allows operation of both SI pumps for _* 1 hour for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.
The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODES 4, 5 or 6. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS.
The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODES 4, 5 or 6. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS.
This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.
This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.
Note 2 allows operation of an SI pump during reduced inventory conditions as required to maintain adequate core cooling and RCS inventory. The purpose of this note is to allow use of an SI pump in the event of a loss of other injection capability (e.g., loss of Residual Heat Removal System cooling while in reduced inventory conditions). The operation of an SI pump under such conditions would be controlled by an approved emergency operating procedure.
Note 2 allows operation of an SI pump during reduced inventory conditions as required to maintain adequate core cooling and RCS inventory. The purpose of this note is to allow use of an SI pump in the event of a loss of other injection capability (e.g., loss of Residual Heat Removal System cooling while in reduced inventory conditions). The operation of an SI pump under such conditions would be controlled by an approved emergency operating procedure.
Prairie Island Units I and 2                         B 3.4.13-6                                     1/2/02
Prairie Island Units I and 2 B 3.4.13-6 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES LCO             Note 3 states that ECCS accumulator isolation is only required when (continued)    ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES LCO (continued)
APPLICABILITY Note 3 states that ECCS accumulator isolation is only required when ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.
The elements of the LCO that provide low temperature overpressure mitigation through pressure relief are:
The elements of the LCO that provide low temperature overpressure mitigation through pressure relief are:
: a. An OPERABLE OPPS with two PORVs; or A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.
: a.
: b. A depressurized RCS and an RCS vent.
An OPERABLE OPPS with two PORVs; or A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.
: b.
A depressurized RCS and an RCS vent.
An RCS vent is OPERABLE when open with an area of
An RCS vent is OPERABLE when open with an area of
_>3.0 square inches. Because the RCS vent opening specification is based on the flow capacity of a PORV, a PORV maintained in the open position may be utilized to meet the RCS vent requirement.
_> 3.0 square inches. Because the RCS vent opening specification is based on the flow capacity of a PORV, a PORV maintained in the open position may be utilized to meet the RCS vent requirement.
Each of these methods of overpressure prevention is capable of mitigating the limiting LTOP transient.
Each of these methods of overpressure prevention is capable of mitigating the limiting LTOP transient.
APPLICABILITY    This LCO is applicable in MODE 4 when any RCS cold leg temperature is _*the SI Pump disable temperature specified in the PTLR, in MODE 5, and in MODE 6 when the reactor vessel head is on and the SG primary system manways and pressurizer manway are closed and secured. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR. When the reactor vessel head is off, overpressurization cannot occur.
This LCO is applicable in MODE 4 when any RCS cold leg temperature is _* the SI Pump disable temperature specified in the PTLR, in MODE 5, and in MODE 6 when the reactor vessel head is on and the SG primary system manways and pressurizer manway are closed and secured. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR. When the reactor vessel head is off, overpressurization cannot occur.
Prairie Island Units 1 and 2                       B 3.4.13-7                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.13-7 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES APPLICABILITY   LCO 3.4.3 provides the operational P/T limits for all MODES.
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABILITY (continued)
(continued)    LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) _<Safety Injection Pump (SI) Pump Disable Temperature," provides the requirements for MODE 4 below the OPPS enable temperature and above the SI Pump disable temperature.
LCO 3.4.3 provides the operational P/T limits for all MODES.
LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) _< Safety Injection Pump (SI) Pump Disable Temperature," provides the requirements for MODE 4 below the OPPS enable temperature and above the SI Pump disable temperature.
Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.
Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.
ACTIONS         A.1 With one or more SI pumps capable of injecting into the RCS, RCS overpressurization is possible.
ACTIONS A.1 With one or more SI pumps capable of injecting into the RCS, RCS overpressurization is possible.
To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.
To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.
B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour.
B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour.
This is only required when the ECCS accumulator pressure is at or more than the maximum RCS pressure for the existing temperature allowed by the P/T limit curves.
This is only required when the ECCS accumulator pressure is at or more than the maximum RCS pressure for the existing temperature allowed by the P/T limit curves.
If isolation is needed and cannot be accomplished in 1 hour, Required Action C. 1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours. By Prairie Island Units 1 and 2                       B 3.4.13-8                                   1/2/02
If isolation is needed and cannot be accomplished in 1 hour, Required Action C. 1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours. By Prairie Island Units 1 and 2 B 3.4.13-8 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES ACTIONS       B.1, C.1, and C.2 (continued) increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an ECCS accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES ACTIONS B.1, C.1, and C.2 (continued) increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an ECCS accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.
The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.
The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.
D.1 The consequences of operational events that will overpressunize the RCS are more severe at lower temperature. Thus, with one PORV inoperable in MODE 4 when any RCS cold leg temperature is _<the SI Pump disable temperature specified in the PTLR, MODE 5 or in MODE 6 with the head on, the Completion Time to restore two valves to OPERABLE status is 24 hours. A Note clarifies that Condition D is only applicable when the OPPS and PORVs are being used to satisfy the pressure relief requirements of LCO 3.4.13.a.
D.1 The consequences of operational events that will overpressunize the RCS are more severe at lower temperature. Thus, with one PORV inoperable in MODE 4 when any RCS cold leg temperature is _< the SI Pump disable temperature specified in the PTLR, MODE 5 or in MODE 6 with the head on, the Completion Time to restore two valves to OPERABLE status is 24 hours. A Note clarifies that Condition D is only applicable when the OPPS and PORVs are being used to satisfy the pressure relief requirements of LCO 3.4.13.a.
The Completion Time represents a reasonable time to investigate and repair several types of relief valve failures without exposure to a lengthy period with only one OPERABLE PORV to protect against overpressure events.
The Completion Time represents a reasonable time to investigate and repair several types of relief valve failures without exposure to a lengthy period with only one OPERABLE PORV to protect against overpressure events.
E.1 The RCS must be depressurized and a vent must be established within 8 hours when:
E.1 The RCS must be depressurized and a vent must be established within 8 hours when:
Prairie Island Units 1 and 2                       B 3.4.13-9                                 1/2/02
Prairie Island Units 1 and 2 B 3.4.13-9 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES ACTIONS       E. 1 (continued)
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES ACTIONS E. 1 (continued)
: a. Both required PORVs are inoperable; or
: a.
: b. A Required Action and associated Completion Time of Condition A, C, or D is not met; or
Both required PORVs are inoperable; or
: c. The OPPS is inoperable.
: b.
The vent must be sized &#x17d;_3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.
A Required Action and associated Completion Time of Condition A, C, or D is not met; or
: c.
The OPPS is inoperable.
The vent must be sized &#x17d;_ 3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.
The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.
The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.
SUPVPILLANCE   SR 3.4.13.1 and SR 3.4.13.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, both SI pumps are verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.
SUPVPILLANCE SR 3.4.13.1 and SR 3.4.13.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, both SI pumps are verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.
The SI pumps are rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the Prairie Island Units 1 and 2                     B 3.4.13-10                                     1/2/02
The SI pumps are rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the Prairie Island Units 1 and 2 B 3.4.13-10 1/2/02


LTOP - RCSCLT _<SI Pump Disable Temperature B 3.4.13 BASES SURVEILLANCE   SR 3.4.13.1 and SR 3.4.13.2 (continued)
LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES SURVEILLANCE SR 3.4.13.1 and SR 3.4.13.2 (continued)
REQUIREMENTS pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.
REQUIREMENTS pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.
The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.
The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.
Line 803: Line 1,153:
The Frequency of 12 hours is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.
The Frequency of 12 hours is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.
SR 3.4.13.3 The RCS vent of >_ 3 square inches is proven OPERABLE by verifying its open condition either:
SR 3.4.13.3 The RCS vent of >_ 3 square inches is proven OPERABLE by verifying its open condition either:
: a. Once every 12 hours for a valve that is not locked, sealed, or secured in the open position.
: a.
: b. Once every 31 days for other vent path(s) (e.g., a vent valve that is locked, sealed, or secured in position). A removed pressurizer safety valve or open manway also fits this category.
Once every 12 hours for a valve that is not locked, sealed, or secured in the open position.
: b.
Once every 31 days for other vent path(s) (e.g., a vent valve that is locked, sealed, or secured in position). A removed pressurizer safety valve or open manway also fits this category.
The passive vent path arrangement must only be open when required to be OPERABLE. This Surveillance is required if the vent is being used to satisfy the pressure relief requirements of LCO 3.4.13b.
The passive vent path arrangement must only be open when required to be OPERABLE. This Surveillance is required if the vent is being used to satisfy the pressure relief requirements of LCO 3.4.13b.
Prairie Island Units 1 and 2                       B 3.4.13-11                                 1/2/02
Prairie Island Units 1 and 2 B 3.4.13-11 1/2/02


LTOP - RCSCLT _*SI Pump Disable Temperature B 3.4.13 BASES SLUPVEILLANCE SR 3.4.13.4 REQUIREMENTS (continued)   The PORV block valve must be verified open every 72 hours to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room. This Surveillance is performed if the PORV satisfies the LCO.
LTOP - RCSCLT _* SI Pump Disable Temperature B 3.4.13 BASES SLUPVEILLANCE SR 3.4.13.4 REQUIREMENTS (continued)
The PORV block valve must be verified open every 72 hours to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room. This Surveillance is performed if the PORV satisfies the LCO.
The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.
The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.
Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.
Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.
Line 815: Line 1,168:
This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.
This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.
PORV actuation during this testing could depressurize the RCS and is not required.
PORV actuation during this testing could depressurize the RCS and is not required.
Prairie Island Units 1 and 2                     B 3.4.13-12                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.13-12 1/2/02


LTOP - RCSCLT     *< SI Pump Disable Temperature B 3.4.13 BASES SUJRVEILLANCE  SR 3.4.13.5 (continued)
LTOP - RCSCLT *< SI Pump Disable Temperature B 3.4.13 BASES SU JRVEILLANCE REQUIREMES SR 3.4.13.5 (continued)
REQUIREMES Note I has been added indicating that this SR is not required to be performed until 12 hours after decreasing RCS cold leg temperature to _<the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.
Note I has been added indicating that this SR is not required to be performed until 12 hours after decreasing RCS cold leg temperature to _< the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.
The 12 hour initial time considers the unlikehood of a low temperature overpressure event during this time.
The 12 hour initial time considers the unlikehood of a low temperature overpressure event during this time.
Note 2 has been added to specify that this SR is only required to be performed when OPPS and PORVs are providing the LTOP function per LCO 3.4.13.a.
Note 2 has been added to specify that this SR is only required to be performed when OPPS and PORVs are providing the LTOP function per LCO 3.4.13.a.
SR 3.4.13.6 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.
SR 3.4.13.6 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.
REFERENCES     1. 10 CFR 50, Appendix G.
REFERENCES
: 2. USAR, Section 4.4.
: 1.
: 3. ASME, Boiler and Pressure Vessel Code, Section XI, Appendix G, with ASME Code Case N-514.
10 CFR 50, Appendix G.
Prairie Island Units 1 and 2                     B 3.4.13-13                                 1/2/02
: 2.
USAR, Section 4.4.
: 3.
ASME, Boiler and Pressure Vessel Code, Section XI, Appendix G, with ASME Code Case N-514.
Prairie Island Units 1 and 2 B 3.4.13-13 1/2/02


RCS Operational LEAKAGE B 3.4.14 BASES SURVEILLANCE   SR 3.4.14.1 (continued)
RCS Operational LEAKAGE B 3.4.14 BASES SURVEILLANCE SR 3.4.14.1 (continued)
REQUIREMENTS The RCS water inventory balance must be met with the reactor at steady state operating condition (stable temperature, power level, equilibrium xenon, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). Therefore, a Note is added allowing that this SR is not required to be performed until 12 hours after establishing steady state operation. The 12 hour allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established.
REQUIREMENTS The RCS water inventory balance must be met with the reactor at steady state operating condition (stable temperature, power level, equilibrium xenon, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). Therefore, a Note is added allowing that this SR is not required to be performed until 12 hours after establishing steady state operation. The 12 hour allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established.
Steady state operation is required to perform a proper inventory balance since calculations during maneuvering are not useful. For RCS operational LEAKAGE determination by water inventory balance, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows.
Steady state operation is required to perform a proper inventory balance since calculations during maneuvering are not useful. For RCS operational LEAKAGE determination by water inventory balance, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows.
An early warning of pressure boundary LEAKAGE or unidentified LEAKAGE is provided by monitoring containment atmosphere radioactivity. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE. These leakage detection systems are specified in LCO 3.4.16, "RCS Leakage Detection Instrumentation."
An early warning of pressure boundary LEAKAGE or unidentified LEAKAGE is provided by monitoring containment atmosphere radioactivity. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE. These leakage detection systems are specified in LCO 3.4.16, "RCS Leakage Detection Instrumentation."
The 24 hour Frequency is a reasonable interval to trend LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents.
The 24 hour Frequency is a reasonable interval to trend LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents.
SR 3.4.14.2 This SR provides the means necessary to determine SG OPERABILITY in an operational MODE. The requirement to demonstrate SG tube integrity in accordance with the Steam Prairie Island Units 1 and 2                     B 3.4.14-7                                   1/2/02
SR 3.4.14.2 This SR provides the means necessary to determine SG OPERABILITY in an operational MODE. The requirement to demonstrate SG tube integrity in accordance with the Steam Prairie Island Units 1 and 2 B 3.4.14-7 1/2/02


RCS Specific Activity B 3.4.17 BASES APPIICABILITY For operation in MODE 3 with RCS average temperature < 500'F, (continued)   and in MODES 4 and 5, the release of radioactivity in the event of a SGTR is unlikely since the saturation pressure of the reactor coolant is below the lift pressure settings of the main steam safety valves.
RCS Specific Activity B 3.4.17 BASES APPIICABILITY For operation in MODE 3 with RCS average temperature < 500'F, (continued) and in MODES 4 and 5, the release of radioactivity in the event of a SGTR is unlikely since the saturation pressure of the reactor coolant is below the lift pressure settings of the main steam safety valves.
ACTIONS       A.1 and A.2 With the DOSE EQUIVALENT 1-131 greater than the LCO limit, samples at intervals of 4 hours must be taken to demonstrate that the limits of Figure 3.4.17-1 are not exceeded. The Completion Time of 4 hours is required to obtain and analyze a sample. Sampling is done to continue to provide a trend.
ACTIONS A.1 and A.2 With the DOSE EQUIVALENT 1-131 greater than the LCO limit, samples at intervals of 4 hours must be taken to demonstrate that the limits of Figure 3.4.17-1 are not exceeded. The Completion Time of 4 hours is required to obtain and analyze a sample. Sampling is done to continue to provide a trend.
The DOSE EQUIVALENT 1-131 must be restored to within limits within 48 hours. The Completion Time of 48 hours is required, if the limit violation resulted from normal iodine spiking.
The DOSE EQUIVALENT 1-131 must be restored to within limits within 48 hours. The Completion Time of 48 hours is required, if the limit violation resulted from normal iodine spiking.
Permitting POWER OPERATION to continue for limited time periods with the primary coolant's specific activity greater than 1.0 jiCi/gm DOSE EQUIVALENT 1-131, but within the allowable limit shown on Figure 3.4.17-1, accommodates the possible iodine spiking phenomenon which may occur following changes in THERMAL POWER. Operation with specific activity levels exceeding 1.0 &#xfd;tCi/gm DOSE EQUIVALENT 1-131 but within the limits shown on Figure 3.4.17-1 should be minimized since the activity levels allowed by the figure increase the dose at the site boundary following a postulated steam generator tube rupture.
Permitting POWER OPERATION to continue for limited time periods with the primary coolant's specific activity greater than 1.0 jiCi/gm DOSE EQUIVALENT 1-131, but within the allowable limit shown on Figure 3.4.17-1, accommodates the possible iodine spiking phenomenon which may occur following changes in THERMAL POWER. Operation with specific activity levels exceeding 1.0 &#xfd;tCi/gm DOSE EQUIVALENT 1-131 but within the limits shown on Figure 3.4.17-1 should be minimized since the activity levels allowed by the figure increase the dose at the site boundary following a postulated steam generator tube rupture.
A Note to the ACTIONS excludes the MODE change restriction of LCO 3.0.4. This exception allows entry into the applicable MODE(S) while relying on the ACTIONS even though the ACTIONS may eventually require plant shutdown. This exception is acceptable due to the significant conservatism incorporated into the specific activity limit, the low probability of an event which is Prairie Island Units 1 and 2                       B 3.4.17-3                                   1/2/02
A Note to the ACTIONS excludes the MODE change restriction of LCO 3.0.4. This exception allows entry into the applicable MODE(S) while relying on the ACTIONS even though the ACTIONS may eventually require plant shutdown. This exception is acceptable due to the significant conservatism incorporated into the specific activity limit, the low probability of an event which is Prairie Island Units 1 and 2 B 3.4.17-3 1/2/02


RCS Specific Activity B 3.4.17 BASES ACTIONS       A.1 and A.2 (continued) limiting due to exceeding this limit, and the ability to restore transient specific activity excursions while the plant remains at, or proceeds to power operation.
RCS Specific Activity B 3.4.17 BASES ACTIONS A.1 and A.2 (continued) limiting due to exceeding this limit, and the ability to restore transient specific activity excursions while the plant remains at, or proceeds to power operation.
B.1 With the gross specific activity in excess of the allowed limit, the reactor must be placed in a MODE in which the requirement does not apply. The change within 6 hours to MODE 3 and RCS average temperature < 500'F lowers the saturation pressure of the reactor coolant below the setpoints of the main steam safety valves and prevents venting the SG to the environment in a SGTR event. The allowed Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.
B.1 With the gross specific activity in excess of the allowed limit, the reactor must be placed in a MODE in which the requirement does not apply. The change within 6 hours to MODE 3 and RCS average temperature < 500'F lowers the saturation pressure of the reactor coolant below the setpoints of the main steam safety valves and prevents venting the SG to the environment in a SGTR event. The allowed Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.
C.1 If a Required Action and the associated Completion Time of Condition A is not met or if the DOSE EQUIVALENT 1-131 is in the unacceptable region of Figure 3.4.17-1, the reactor must be brought to MODE 3 with RCS average temperature < 500'F within 6 hours. The Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.
C.1 If a Required Action and the associated Completion Time of Condition A is not met or if the DOSE EQUIVALENT 1-131 is in the unacceptable region of Figure 3.4.17-1, the reactor must be brought to MODE 3 with RCS average temperature < 500'F within 6 hours. The Completion Time of 6 hours is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.
Prairie Island Units 1 and 2                     B 3.4.17-4                                   1/2/02
Prairie Island Units 1 and 2 B 3.4.17-4 1/2/02


RCS Specific Activity B 3.4.17 BASES (continued)
RCS Specific Activity B 3.4.17 BASES (continued)
SURVEILLANCE     SR 3.4.17.1 REQUREMENTS SR 3.4.17.1 requires performing a gamma isotopic analysis as a measure of the gross specific activity of the reactor coolant at least once every 7 days. While basically a quantitative measure of radionuclides with half lives longer than 15 minutes, excluding iodines, this measurement is the sum of the degassed gamma activities and the gaseous gamma activities in the sample taken.
SURVEILLANCE SR 3.4.17.1 REQUREMENTS SR 3.4.17.1 requires performing a gamma isotopic analysis as a measure of the gross specific activity of the reactor coolant at least once every 7 days. While basically a quantitative measure of radionuclides with half lives longer than 15 minutes, excluding iodines, this measurement is the sum of the degassed gamma activities and the gaseous gamma activities in the sample taken.
This Surveillance provides an indication of any increase in gross specific activity.
This Surveillance provides an indication of any increase in gross specific activity.
Trending the results of this Surveillance allows proper remedial action to be taken before reaching the LCO limit under normal operating conditions. The Surveillance is applicable in MODES 1 and 2, and in MODE 3 with T,,, at least 500'F. The 7 day Frequency considers the unlikelihood of a gross fuel failure during the time.
Trending the results of this Surveillance allows proper remedial action to be taken before reaching the LCO limit under normal operating conditions. The Surveillance is applicable in MODES 1 and 2, and in MODE 3 with T,,, at least 500'F. The 7 day Frequency considers the unlikelihood of a gross fuel failure during the time.
SR 3.4.17.2 This Surveillance is performed in MODE 1 only to ensure iodine remains within limit during normal operation and following fast power changes when fuel failure is more apt to occur. The 14 day Frequency is adequate to trend changes in the iodine activity level, considering gross activity is monitored every 7 days. The Frequency, between 2 and 6 hours after a power change > 15% RTP within a 1 hour period, is established because the iodine levels peak during this time following fuel failure; samples at other times would provide inaccurate results.
SR 3.4.17.2 This Surveillance is performed in MODE 1 only to ensure iodine remains within limit during normal operation and following fast power changes when fuel failure is more apt to occur. The 14 day Frequency is adequate to trend changes in the iodine activity level, considering gross activity is monitored every 7 days. The Frequency, between 2 and 6 hours after a power change > 15% RTP within a 1 hour period, is established because the iodine levels peak during this time following fuel failure; samples at other times would provide inaccurate results.
Prairie Island Units I and 2                         B 3.4.17-5                                   1/2/02
Prairie Island Units I and 2 B 3.4.17-5 1/2/02


PACKAGE 3.4 REACTOR COOLANT SYSTEM (RCS)
PACKAGE 3.4 REACTOR COOLANT SYSTEM (RCS)
PART C MARKUP OF PRAIRIE ISLAND CURRENT TECHNICAL SPECIFICATIONS List of Pages Part  Current Technical                     Part  Current Technical C Page Specifications Page                   C Page Specifications Page 1      TS.3-10-8                             18    TS.3.1-9 2      TS.3.1 -1                             19    TS.3.1 -10 3     TS.3.1-1 Overflow                   20      Figure TS.3.1-3 4      TS.3.1-2                            21      TS.3.3-3 5      TS.3.1-2 Overflow                   22      Table TS.4.1-1C(Page  3 of 4) 6      TS.3.1-2 Overflow (Cont.)            23    Table TS.4.1-1C(Page  4 of 4) 7     TS.3.1-3                             24     Table TS.4.1-2A(Page  1 of 2) 8      TS.3.1-3 Overflow                    25    Table TS.4.1-2A(Page 2 of 2) 9      TS.3.1-4                             26    Table TS.4.1-2B(Page 1 of 2) 10      TS.3.1-4 Overflow                    27      Table TS.4.1-2B(Page 2 of 2) 11      TS.3.1-4 Overflow (( ont.)           28      TS.4.3-1 12      TS.3.1-5                            29      TS.4.6-3 13      TS.3.1-5 Overflow                    30      TS.4.18-1 14    TS.3.1-6 15    TS.3.1-7 16      TS.3.1-8 17      TS.3.1-8 Overflow PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 Improved Technical Specifications Conversion Submittal
PART C MARKUP OF PRAIRIE ISLAND CURRENT TECHNICAL SPECIFICATIONS List of Pages Current Technical Specifications Page TS.3-10-8 TS.3.1 -1 TS.3.1-1 Overflow TS.3.1-2 TS.3.1-2 Overflow TS.3.1-2 Overflow (C TS.3.1-3 TS.3.1-3 Overflow TS.3.1-4 TS.3.1-4 Overflow TS.3.1-4 Overflow ((
TS.3.1-5 TS.3.1-5 Overflow TS.3.1-6 TS.3.1-7 TS.3.1-8 TS.3.1-8 Overflow Part C Page ont.)
18 19 20 21 22 23 24 25 26 27 28 29 30 ont.)
Current Technical Specifications Page TS.3.1-9 TS.3.1 -10 Figure TS.3.1-3 TS.3.3-3 Table TS.4.1-1C(Page 3 of 4)
Table TS.4.1-1C(Page 4 of 4)
Table TS.4.1-2A(Page 1 of 2)
Table TS.4.1-2A(Page 2 of 2)
Table TS.4.1-2B(Page 1 of 2)
Table TS.4.1-2B(Page 2 of 2)
TS.4.3-1 TS.4.6-3 TS.4.18-1 PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 Improved Technical Specifications Conversion Submittal Part C Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17


AF 4-00             *TS.30 8 REV 92   3/13/90 R 2                   Addressed
AF 4-00  
                                                                            ....              [ s w..........
*TS.30 8 REV 92 3/13/90 R 2 Addressed w..........
where 4.
[ s where J-C rssrTmprtr adFo DNB Liis Parametera LCO
LCO  .                        1                                          1 J-C       rssrTmprtr           adFo         DNB Liis Parametera The following DNB related parameters     limits shall be maintained                 R-9 during POWER OPERATION:                                                           -----
: 4.
a   Reactor Coolant System Tavg *!limit specified in the COLRP-Aii
1 1
: b. Pressurizer Pressure           > limit specified in the COLP 222
The following DNB related parameters limits shall be maintained R-9 during POWER OPERATION:
: c. Reactor Coolant Flow            >the value specified in the CORE OPERATING LIMITS REPORT 4.1 With any of the above parameters exceeding its     limit,     restore the parameter to within its   limit within 2 hours 4.l            or reduce THERMAL POWER to MOIDE 2 less than 5% of RATED ThERMAL the net     hours.                                         L3.4-05 within the next 4hus Compliance with a. and b. is demonstrated by verifying that each of SR3 .4 .7.1      the parameters is within its     limits at least once each 12 hours.
a Reactor Coolant System Tavg *!limit specified in the COLRP-Aii
L SR3 .4 SR3. 4 .1.I
: b.
      .1.3 Compliance with c. is d,,*nntr ated by verify4-ng RCS that the parameter is total flow rate within 4&#xfd;t limit specified in the COLR after each refueling   cycle.
Pressurizer Pressure
R-9 134.1---
: c.
LC
Reactor Coolant Flow
      *Limit not applicable during either a THERMAL POWER ramp ner-ease in excess oT (5%) RATED THERMAL POWER per minute or a THERMAL POWER step inerease in excess of (10%) RATED THERMAL POWER PI Current TS                       1 of 30                 Markup for PI ITS Part C
> limit specified in the COLP 222
>the value specified in the CORE OPERATING LIMITS REPORT
4.1  
4.l With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours or reduce THERMAL POWER to MOIDE 2 less than 5% of RATED ThERMAL the net hours.
L3.4-05 within the next 4hus Compliance with a.
and b.
is demonstrated by verifying that each of the parameters is within its limits at least once each 12 hours.
.1.I Compliance with c.
is d,,*nntr ated by verify4-ng RCS total flow rate
.1.3 that the parameter is within 4&#xfd;t limit specified in the COLR after each refueling cycle.
L R-9 134.1---
*Limit not applicable during either a THERMAL POWER ramp ner-ease in excess oT (5%)
RATED THERMAL POWER per minute or a THERMAL POWER step inerease in excess of (10%)
RATED THERMAL POWER Markup for PI ITS Part C
.7.1 SR3.4 SR3.4 SR3. 4 LC PI Current TS 1 of 30


TS . 3.l1-4 4RT 17 ;7 7/.144/0A0 3.-41 REACTOR COOLANT SYSTEM                                                                         A3 .4-00   I i...........
TS. 3.l1-4 4R T 17 ;7 7/.14 4/0A0 3.-41 REACTOR COOLANT SYSTEM A3.4-00 I
Applies to the operating status of the reactor coolant                             system when ir -adiatod fu!l is in the containment.
i...........
Objecti-e e s*c.ifyn theso himiting         bo me t4o       -
Applies to the operating status of the reactor coolant system when ir -adiatod fu!l is in the containment.
ens--fer                 n tr sae operation.
Objecti-e e s*c.ifyn theso himiting bo me t4o ens--fer sae n tr operation.
eoolant system which must be m~et to assure safe reactor operation.
eoolant system which must be m~et to assure safe reactor operation.
Specification A. Operational Components
Specification A.
Operational Components
: 1. Reactor Coolant Loops and Coolant Circulation
: 1. Reactor Coolant Loops and Coolant Circulation
: a. Reactor Critical LC03.4.4         (1)   A reactor shall not be in MODE 2;nade or maintained eritieal         unless both reactor coolant loops (with their associated steam generator and reactor coolant pump) are                                 in operation, eexeept 4*-
: a.
with thermal power <P-7               (if power >P-7,             open Reactor Trip Breaker) during low power PHYSICS TESTS SR3.4.18.2                New SP., Verify power <zP-7 and perform COT on P-7, power (low setpoint) and intermzediate range neutron I   --
Reactor Critical LC03.4.4 SR3.4.18.2 LC034.4 1 (1)
R-9L flux channels.
A reactor shall not be in MODE 2;nade or maintained eritieal unless both reactor coolant loops (with their associated steam generator and reactor coolant pump) are in operation, eexeept 4*-
or 2)     as specified     in 3.l.A.l.a.         (2)     below.
with thermal power <P-7 (if power >P-7, open Reactor Trip Breaker) during low power PHYSICS TESTS New SP., Verify power <zP-7 and perform COT on P-7, power (low setpoint) and intermzediate range neutron flux channels.
(2)    With less than the above required reactor coolant loops LC034.4 1                in   operation,     be in at   least     ,ODE         3HGT SIRUTDOW       within   6 hours.
(2)
I --
L R-9 or 2) as specified in 3.l.A.l.a.
(2) below.
With less than the above required reactor coolant loops in operation, be in at least  
,ODE 3HGT SIRUTDOW within 6
hours.
NewA SR, Verify each RCS loop in operation
NewA SR, Verify each RCS loop in operation
: b. Reactor   Coolant System MODE         -5/4VeFaG      1erv RM:R:1c           Abeo e 3 E0o-F77
: b.
                                                                    ....-_ -- &#xfd;: :A7 Reactor coolant system averago temperature shall not 1LC03.4.5 1      (1)    be in MODE 3eXeeed Ounless both reactor coolant loops (with their           associated steam generator and reactor coolant pump) are OPERABLE and both RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or PI Current TS                                2 of 30                                Markup for PI ITS Part C
Reactor Coolant System MODE
-5 /4Ve FaG 1erv RM:R:1c Abeo e 3 E0o-F 77 1LC03.4.5 1 (1)
Reactor coolant system averago temperature shall not be in MODE 3eXeeed Ounless both reactor coolant loops (with their associated steam generator and reactor coolant pump) are OPERABLE and both RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or Markup for PI ITS Part C
-_ -- &#xfd;: :A7 2 of 30 PI Current TS


with--at least one reactor coolant loop in                                         [M3 operation when the Rod Control System isE not capable of rod withdrawal.
with--at least one reactor coolant loop in
(except as specified in           3.l.A.l.b(2)             and 3.l.A.I.b.         (3) below).
[M3 operation when the Rod Control System isE not capable of rod withdrawal.
(2)       A reactor coolant loop may be inoperable for 72 hours provided STARTUP OPERATI*N                 sT dis..nt.i.nud*       until LC03.4.5                  GDEPRmAILITY is restored. If OPERABILITY is not restored cond A                    within the time specified, be in MODE 4rcduc                             riactorh4 colant cstm    s,   average temperature bc....                 35Q0     within the next 12 4 hours.                                                                   b.
(except as specified in 3.l.A.l.b(2) and 3.l.A.I.b.
(3)       With both reactor coolant pumps inoperable or not in operat ion immediately:                                                         IL3"4-I18 I operat Cond D                    (a)        DC energizc all     Place the control rod drive system in a condition incapable of rod withdrawal me-h-anisms, (b)        Suspend all     operations involving a reduction of RCS&#xfd;------                 ,R-9 boron concentration,                                                         ,-
(3) below).
JLC  3o*..4.5 LCO Note (c)        Establish and maintain the core outlet temperature                             at least 10 OF below saturation temperature, and LCO3.4.5                  (c)        Initiate action to restore one reactor coolant pump to Cond D                                OPERABLE status and operation.*
LC03.4.5 cond A (2)
OP   E---ILITY                   -----    -  *1--,7-*-------&deg; I*                                      I 3igOr next 12 hours.           While applicablc,             this   specification cupercodes 3.1.A.I.b(2).
A reactor coolant loop may be inoperable for 72 hours provided STARTUP OPERATI*N sT dis..nt.i.nud*
* If the RCP shutdown or inoperability was due to preplanned work LC03          . activities           such as testing, switching, or maintenance, immediate NOTE            restoration action is not required, but if at least                                 one reactor coolant pump is not restored to operability and operation within 12 hours, reauc       reacuor cooiano systom averagc tcmpcrature t-e                                           R-9 I  3 If one RCS loop is not in operation with Rod Control Cod C            System capable of rod withdrawal, within one hour CoLC03. 4. 5      restore the loop to operation, or render the Rod Control System inoperable.
until GDEPRmAILITY is restored. If OPERABILITY is not restored within the time specified, be in MODE 4rcduc riactorh4 colant s, cstm average temperature bc....
SR3. 4.5  .2 New SRs, Verify RCS loops operating, verify SG cap~able of~2 SR3o4o5.3              removing decay heat, verify breaker alignment for non SR3 4.. 5. 1 R-9
35Q0 within the next 12 4 hours.
                                                                                                                                  -j__
b.
PI Current TS                                     3 of 30                                 Markup for P1 ITS Part C
(3)
With both reactor coolant pumps inoperable or not in operat Cond D (a)
(b)
JLC 3o*..4.5 (c)
LCO Note LCO3.4.5 (c)
Cond D ion immediately:
IL3"4-I18 I DC energizc all Place the control rod drive system in a condition incapable of rod withdrawal me-h-anisms, Suspend all operations involving a reduction of RCS&#xfd; ------
,R-9 boron concentration, Establish and maintain the core outlet temperature at least 10 OF below saturation temperature, and Initiate action to restore one reactor coolant pump to OPERABLE status and operation.*
OP E---ILITY 1--,
* 7-*-------&deg; 3igOr next 12 hours.
While applicablc, this specification cupercodes 3.1.A.I.b(2).
If the RCP shutdown or inoperability was due to preplanned work  
. activities such as testing, switching, or maintenance, immediate restoration action is not required, but if at least one reactor coolant pump is not restored to operability and operation within 12 hours, CoLC03. 4. 5 Cod C SR3
.4. 5. 1 SR3. 4.5. 2 SR3o4o5.3 reauc reacuor cooiano systom averagc tcmpcrature t-e If one RCS loop is not in operation with Rod Control System capable of rod withdrawal, within one hour restore the loop to operation, or render the Rod Control System inoperable.
R-9 I
3 New SRs, Verify RCS loops operating, verify SG cap~able of~2 removing decay heat, verify breaker alignment for non R-9  
-j__
Markup for P1 ITS Part C operat I*
I PI Current TS 3 of 30 LC03 NOTE


T6. 3. 12 REV 135S          F5/                A3.'08
-.1.A.I.c.
  -. 1.A.I.c.     Reactor     Coolant   System Mode 4,       loops fillet   I.Arvee- e Temperature Belo&#xfd;
Reactor Coolant System Mode 4, loops fillet 3so F kanau T6. 3. 12 REV 135S F5/
_*a#*.9*....I*       *        *[73 102 3so F kanau                                                  Reacter        Vesl-lnq I
A3.'08 I.Arvee-e Temperature Belo&#xfd; Reacter Vesl-lnq
(1)Whonever       the reactor coolant system average               temperature is below 0   .4. 6     350 0F, eme.pt during R.FU.EINC. at.eaiscoMTode                 4, two loops consisting of any combination of methods for romoving d..ay he                                 shall be OPERABLE with one in operation* (except as specified in 3.I.A. ,7 67,)07 below) .
_*a#*.9*....I*  
(2) Accoptable mothods for r.m.ving dccay heot arc at least one reEW3I1.-24 coolant system loop pump and its (3) -a s sia         steam gon.rat.r; er and residual heat removal loop ineluding a pump and its        assee-ated      heaat eHelianger JA3.4-I03       1 3.-1. A. I .e.- Reactor Coolant System Mode 5, loops filledAverage                               Tempe-r&#xfd;             c e4-ew 3SOFR-(and Reactor Coolant LolAe-thke-RatrVslFano ILC03.4.7 3S02F, except during REUELINC               t last two methods for                   ......          n deeay heatMode 5 with loops filled, one RHR loop shall be OPERABLE with -neand   in operation* (.x..pt. as specif id                     in 3 .. A.-.c. (2) hbow);   . Accoptable methods for romoving d..ay hoot ar.and at least one r.a.       coolant pump and its asso.iat.* steam generator capable of decay heat removal; or a residual heat removal loop including a pump and its         assoeiatcd heat oxchang3c                                         3.
*[73 102 (1)Whonever the reactor coolant system average temperature is below 0  
                                                                                                          ]M3.4-26 JLR3.4-241 I     26.42                                       5     IO (2) Wit4h only one required loop inoperable OPERABLE method of rI                                               zoving LCO3.4.61 Cond AI        deeay heat,       immediately initiate         p-empt- action to restore a second loop to two OPERABLE methods of r.m.ving.                         de.ay                   -        lRl.4-2l (2) Wi.th'..e.-l. one required     R.R loop inoperable and one RH? loop ICond A           OPERABLE method of romoving d...                 hot, immediately initiate                             p.emp-.
.4.
action     to restore a second             loop to twe   -wR OPERABLE         or initiate           action to restore       required SG capable to e-f-removeing                         decay heat.             ILR3.4-24J
6 350 0F, eme.pt during R.FU.EINC. at  
                                                                                                                                .I-A201 ILC03.4.7 Cond B       I (2) With enly one or more SGs not caipable OPERABLE methed of removing decay heat and one ERR loop OPERABLE, immediately initiate action to restore a second ERR loop to twe OPERABLE or initiate action peeemp or restore required SGs capable to remove methods of removing                                           deca heat.                                                                                                     .4-24 Onlyv required If the remaining RH loop             0  is operable method is                     an Cond A Note
.eaiscoMTode 4, two loops consisting of any combination of methods for romoving d..ay he shall be OPERABLE with one in operation* (except as specified in 3.I.A.  
                                -eep, be in MODE SCOLD &#xa3;I. TDOWN within 24 hours.                                                       I R-.9 PI Current TS                                 4 of 30                             Markup for PI ITS Part C
,7 67,)07 below).
(2)
Accoptable mothods for r.m.ving dccay heot arc at least one reEW3I1.-24 coolant system loop pump and its (3) -a s sia steam gon.rat.r; er and residual heat removal loop JA3.4-I03 1 I
3.-1. A. I.e.-
ILC03.4.7 LCO3.4.61 Cond AI Reactor Coolant System Mode 5, loops filledAverage Tempe-r&#xfd; c
e4-ew 3SOF R-(and Reactor Coolant LolAe-thke-RatrVslFano 3S02F, except during REUELINC t last two methods for n
deeay heatMode 5 with loops filled, one RHR loop shall be OPERABLE with -neand in operation* (.x..pt. as specif id in 3..
A.-.c. (2) hbow);  
. Accoptable methods for romoving d..ay hoot ar.and at least one r.a.
coolant pump and its asso.iat.* steam generator capable of decay heat removal; or a residual heat removal loop including a pump and its assoeiatcd heat oxchang3c
: 3.  
]M3.4-26 JLR3.4-241 I
26.42 IO 5
(2) Wit4h only one required loop inoperable OPERABLE method of rI zoving deeay heat, immediately initiate p-empt-action to restore a second loop to two OPERABLE methods of r.m.ving.
de.ay lRl.4-2l (2) Wi.th'..e.-l. one required R.R loop inoperable and one RH? loop ICond A OPERABLE method of romoving d...
hot, immediately initiate p.emp-.
action to restore a second  
-wR loop to twe OPERABLE or initiate action to restore required SG capable to e-f-removeing decay heat. ILR3.4-24J  
.I-A201 ILC03.4.7 Cond B I Cond A Note (2) With enly one or more SGs not caipable OPERABLE methed of removing decay heat and one ERR loop OPERABLE, immediately initiate peeemp action to restore a second ERR loop to twe OPERABLE or initiate action or restore required SGs capable to remove methods of removing deca heat.  
.4-24 Onlyv required If the remaining RH 0
loop is operable method is an  
-eep, be in MODE SCOLD &#xa3;I. TDOWN within 24 hours.
I R-.9 Markup for PI ITS Part C a pump and its assee-ated heaat eHelianger ineluding PI Current TS 4 of 30


REV 13i SI/9s ILC03.4 Cond B       I (3)Wih no QPPEz&#xfd;LE moetheds of reimoving docay-hoot Both loops                     IiF inoperable or required loop not in operation, suspend a144 operations     that would cause introduction into RCS coolant with involving a roeducti*n in boron concentration less than required to meet SDM of LCO 3,1.       I4 of the r...t. r e..lant system and i*mmediately initiate       preompt action to restore one loop OPERABLE and in operation Cond C            method of rcmoving decay heat.
REV 13i SI/9s ILC03.4 Cond B I
I (3)       With no .P.P..LE motheod ef removing decay heot required RHR loops OPERABLE or required RHR loop not in operation, suspend a-l operations     that would cause introduction into RCS coolant... with involving a roduction in       boron concentration less than required to meet SDM of LCO 3.1.1 of the re..t.r eoolant sy.to. and immediately initiate       prempt action   to restore     one loop OPERABLE and in operation mIthod of romoving doay heat.                           I     22 i
(3) Wih no QPPEz&#xfd;LE moetheds of reimoving docay  
i
-hoot Both loops IiF inoperable or required loop not in operation, suspend a144 operations that would cause introduction into RCS coolant with involving a roeducti*n in boron concentration less than required to meet SDM of LCO 3,1.
                                                                                                                    ,R-9 i R-9 (4)       A reactor coolant pump may be started at RCS temperature less LC03.4. 6              than the Over Pressure Protection System Enable Temperature specified in the PTLR,         only if either of the following NOTE 2 LC03 .4 .7 conditions is met:
I4 of the r...t.
NOTE 3 There is   a steam or gas bubble in     the pressurizer,       or The (steam generator minus RCS) temperature difference 0
r e..lant system and i*mmediately Cond C I
for the steam generator in that loop is less than 50 F.
LC03.4. 6 NOTE 2 LC03.4.7 NOTE 3 initiate preompt action to restore one loop OPERABLE and in operation method of rcmoving decay heat.
Both RHR loops may be removed from operation for planned heatup to 1NODE 4 when at least one RCS loop is in NOTLCO3
(3)
            .4. 7        operation.
With no.P.P..LE motheod ef removing decay heot required RHR loops OPERABLE or required RHR loop not in operation, suspend a-l operations that would cause introduction into RCS coolant... with involving a roduction in boron concentration less than required to meet SDM of LCO 3.1.1 of the re..t.r eoolant sy.to. and immediately initiate prempt action to restore one loop OPERABLE and in operation mIthod of romoving doay heat.
NOTET 4TT SR3.4. 6. 1 New SRs, Verify one RHR or RCS loop in operation, verify SR3.4.6.22 SG capable of removing decay heat, -verify pump breaker SR3.4.76.3 alignment 27      New SRs, Verify one RHR loop in operation, verify SG SR3. 4. 7.SR.        capable of removing decay heat, verify pump breaker SR3. 4. 7. 3        alignment                                                                              R-9 PI Current TS                                   5 of 30                     Markup for PI ITS Part C
I 22 (4)
A reactor coolant pump may be started at RCS temperature less than the Over Pressure Protection System Enable Temperature specified in the PTLR, only if either of the following conditions is met:
There is a steam or gas bubble in the pressurizer, or The (steam generator minus RCS) temperature difference for the steam generator in that loop is less than 50 0 F.
NOTLCO3
.4. 7 NOTET 4TT SR3.4. 6. 1 SR3.4.6.22 SR3.4.76.3 SR3. 4. 7.SR.
27 SR3. 4. 7. 3 Both RHR loops may be removed from operation for planned heatup to 1NODE 4 when at least one RCS loop is in operation.
New SRs, Verify one RHR or RCS loop in operation, verify SG capable of removing decay heat, -verify pump breaker alignment New SRs, Verify one RHR loop in capable of removing decay heat, alignment operation, verify SG verify pump breaker R-9 Markup for PI ITS Part C PI Current TS i
1 i
I
,R-9 i
I R-9 5 of 30


TS-3-42L d--Reactor Coolant System, Mode 5, loops noct filled&#xfd;.e-vel Bele;w
TS 42L d--Reactor Coolant System, Mode 5, loops noct filled&#xfd;.e-vel Bele;w (1)
                          --    i=-  +-L*  P **rt'".**- "*
Both residual heat removal loops, each consisting of a assceiated heat exchanger, shall be OPERABLE with one operation* (except as specified in 3.l.A.l.d.
* F'1...q.-sP, ILR3.4-24 pump aneat (1)       Both residual heat removal loops, each consisting of a assceiated heat exchanger, shall be OPERABLE with one in operation* (except as specified in 3.l.A.l.d.           (2)
(2)
ELC03.4.8 below).
ILCO3. 4. 8 Cond A Cond3.4.B8 LCO3.4.13 Notes below).
With one required e- beth residual heat removal loop(s) inoperable, ILCO3 . 4 . 8 prempUimmediately action shall be taken to restore the inoperable Cond A                  residual heat removal loop=-(s         to an OPERABLE status.
With one required e-beth residual heat removal loop(s) prempUimmediately action shall be taken to restore the residual heat removal loop=-(s to an OPERABLE status.
                    .4.B8 and, if no ERR loops operable, or required R-HR Loop               ib 433 Cond3                    not in operation, immediately suspend all operations involving reduction in RCS boron concentration and initiate action to restore one RHR Loop to OPERAT&#xfd;BLE status and in operation.
and, if no ERR loops operable, or required R-HR Loop not in operation, immediately suspend all operations involving reduction in RCS boron concentration and initiate action to restore one RHR Loop to OPERAT&#xfd;BLE status and in operation.
During reduced inventory conditions, a safety injection                           R-9 LCO3.4 .13              pump may be run as required to maintain adequate core Notes                  cooling and RCS inventory in the event of a loss of Residual Heat Removal System cooling.
During reduced inventory conditions, a safety injection pump may be run as required to maintain adequate core cooling and RCS inventory in the event of a loss of Residual Heat Removal System cooling.
per 8 hour period      38 All pumps may be shutdown for up to one hour LC03.4. 6        provided the reactor is subcritical, no operations are permitted LCO3. 4.7        that would cause dilution of the reactor coolant boron NOTE 1          concentration and core outlet temperature is main tained at least lOoF below saturation temperature.
ILR3.4-24 pump ane at in inoperable, inoperable ib 433 R-9 LC03.4. 6 LCO3. 4.7 NOTE 1 All pumps may be shutdown for up to one hour per 8 hour period provided the reactor is subcritical, no operations are permitted that would cause dilution of the reactor coolant boron concentration and core outlet temperature is main tained at least lOoF below saturation temperature.
03.4.8 R-9 I    6 4 7 LCO.        nerequired RI-IFloop may be inoperable for < 2 hours for LC03.4. surveillance provided that the other ERR loop is OPERABLE and in LCO3T NO T E 2 4. 8  uo pe r at i on .                                                 ]         ] t
LCO.
.4.8.1           New S~s, Verify required ERR loop in operation, verify breaker
4 7 nerequired RI-IF loop may be inoperable for < 2 hours for LC03.4.
.4.8.2 1 alignment for RHR pump not operating                                                               3-9 PI Current TS                                       6 of 30                     Markup for P1 ITS Part C
surveillance provided that the other ERR loop is OPERABLE and in LCO3T
: 4. 8 N O T E 2 u o p e r a t i o n.
]  
] t
.4.8.1  
.4.8.2 1
New S~s, Verify required ERR loop in operation, verify breaker alignment for RHR pump not operating R-9 I
6 3-9 Markup for P1 ITS Part C ELC03.4.8
38 i=-
+-L*
P **rt'".**-
F'1...q.-sP, PI Current TS 03.4.8 6 of 30


PG9.3 .i REV 91     10/27/89 3.1.A.2 Roactor           Coolant....         Proesr*_-   Control
PG9.3.i REV 91 10/27/89 3.1.A.2 Roactor Coolant....
: a. Pressurizer                                                                         I       o8 (1) When A reactor is in MODE 1, " and 3, the pressurizer shall be L C 3 ..9                                                                      .
Proesr*_- Control
I          OPERABLE withsahll not be mado 'or mont...n.d                   criti.al n.r shall reactor coolant system average temperature                   exceed 350 0 F dnlo-es pressurizer level
: a.
* 90             there is   a steam bubble in         tho pr.ssur.z. r and two heater groups A-and-B are operable                           I and capable of being powered. from an emergency power                           Low.
L C 3.. 9 I Pressurizer I
o8 (1) When A reactor is in MODE 1, " and 3, the pressurizer shall be OPERABLE withsahll not be mado 'or mont...n.d criti.al n.r shall reactor coolant system average temperature exceed 350 0F dnlo-es pressurizer level
* 90 there is a steam bubble in tho pr.ssur.z. r and two heater groups A-and-B are operable I
and capable of being powered. from an emergency power Low.
supply'/.
supply'/.
(except as specified in           3.l.A.2.a.2 and 3.l.A.2.a.3 below).
(except as specified in 3.l.A.2.a.2 and 3.l.A.2.a.3 below).
IA3.4-08I (2)During Modes 1,           2, and 3STARTUP OPERATION
IA3.4-08I (2)During Modes 1, 2,
  ".ICondB,C           Croup for        A or B one pressurizer heater group may be inoperable 72  hours provided                                                 -, ---- - -I, - ---  I- I is restored.
and 3STARTUP OPERATION  
If     OPERABILITY is       not restored within the time specified, be in at least MODE 3HOT SHUJTDCW             within the next 6                         A3.4TT8J hours and MODE 4r...du......     ro.act.r coolant system average temperature b.lw 3502-F within l2the following 6 hours.
".ICondB,C Croup A or B one pressurizer heater group for 72 hours may be inoperable provided is restored.
(3)   With the pressurizer otherwise inoperable, within one
If OPERABILITY is not restored within the time specified, be in at least MODE 3HOT SHUJTDCW within the next 6 A3.4TT8J hours and MODE 4r...du......
_hea     initiate   the action necessary to place the unit in LCO3 . 4. 9 Cond A             HOT SIIUTDOWN,       and be in     a*.*east- MODE 3490T 9UUTDO.
ro.act.r coolant system average temperature b.lw 3502-F within l2the following 6 hours.
Within the necxt G he-urs, AND fully insert all rods AND render Control Rod                                 F       -.-3 system incapable of rod withdrawal in 6 hours,                                                 R---
(3)
and be in MODE 4rodueo           roacter coolant averaegoF34-0 tornooraturo     below 3SOF within ltho           fellew4-ieg-6 hours.
With the pressurizer otherwise inoperable, within one
ISR3..9.1         New SR, Verify water level is           <   90W- in pressurizer.
_hea initiate the action necessary to place the unit in LCO3. 4. 9 Cond A HOT SIIUTDOWN, and be in a*.*east-MODE 3490T 9UUTDO.
R-9 PI Current TS                                     7 of 30                       Markup for P1 ITS Part C
Within the necxt G he-urs, AND fully insert all rods AND render Control Rod F  
-.-3 system incapable of rod withdrawal in 6 hours, R---
and be in MODE 4rodueo roacter coolant averaegoF34-0 tornooraturo below 3SOF within ltho fellew4-ieg-6 hours.
ISR3..9.1 New SR, Verify water level is  
< 90W-in pressurizer.
R-9 Markup for P1 ITS Part C
---- - -I,
I - I PI Current TS 7 of 30


TS.3.i 3 GAvorflo-w
TS.3.i 3 GAvorflo-w
: b. Pressurizer Safety Valves
: b. Pressurizer Safety Valves
                  .l1)eReactor Coolant System modes 1,     2, 3- and 4 with           08 LCl.cll                     dleg ave..aretemperaLures greater than OPPS enable temperature specified in the- PTLRzrequeal
.l1)eReactor Coolant System modes 1, 2, 3-and 4 with LCl.cll dleg ave..aretemperaLures greater than OPPS enable temperature specified in the-PTLRzrequeal  
      . . .to        350 0 When A reactor is in MODE 1c             3t rt and 4 with all         IA3.4-08 sal         ea be made or maintained criticealno net sehealreactor coolant system cold leg ave-*eraqe JLC03.4.10  I  temperatures&#xfd; >exeeed OPPS enable tempera Iture, specified in the PTLR, 3             u4-e-uns--two pressurizer safety valves shall beare OPERABLE, with lift     settings of 2485 psig +"J -I%
.to 3500 JLC03.4.10 I
IA3.-4-*4!
LC03.4.10 Cond A Cond B LCo3.4.10 NOTE When A reactor is in MODE 1c rt 3t and 4 with all sal ea net be made or maintained criticealno sehealreactor coolant system cold leg ave-*eraqe temperatures&#xfd; >exeeed OPPS enable tempera Iture, specified in the PTLR, 3 u4-e-uns--two pressurizer safety valves shall beare OPERABLE, with lift settings of 2485 psig +"J -I%
LC03.4.10 If these conditions cannot be satisfied,               discontinue Cond A        STA:RTUP OPERATION and within 15 minutes restore valve to OPERABLE statusinitiate the action neccessary to place the unit in HOT S-UTD*O           , and IA3.4-08 be in     at least MO0DE 3I!OT SHJTDOWN within the next Cond B 6 hours     and re*-eer-be   in MODE 41 with any reactor coolant system cold leg F- erage-temperature below the OPPS enable temperature specified in the PTLR
If these conditions cannot be satisfied, discontinue STA:RTUP OPERATION and within 15 minutes restore valve to OPERABLE statusinitiate the action neccessary to place the unit in HOT S-UTD*
                    -848-F--within 24the follewing 6 hours.                                 IL3-4-I09 R-9
O  
:    l Jl3.4     l LCo3.4.10 NOTE        I
, and be in at least MO0DE 3I!OT SHJTDOWN within the next 6 hours and re*-eer-be in MODE 41 with any reactor coolant system cold leg F-erage-temperature below the OPPS enable temperature specified in the PTLR
: 2)         IRoacter Coolant System Average- T-empe rat~r-e-below 350 0 -F At least one proesurizer safety valve shall be OPEPLALE, with a lift sctting   of 2485 psig +/-1%,       whenever the head is en the reactEr vessel, except during hydroctatie testo.
-848-F--within 24the follewing 6 hours.
I IA3.4-08 IA3.-4-* 4!
IA3.4-08 IL3-4-I09 R-9 l
Jl3.4 l
: 2)
IRoacter Coolant System Average-T-empe rat~r-e-belo w 350 0 -F At least one proesurizer safety valve shall be OPEPLALE, with a lift sctting of 2485 psig +/-1%, whenever the head is en the reactEr vessel, except during hydroctatie testo.
With no pressurizer saf ety valve OPERABLE, promptly place an OPEP--ALE residual heat removal loop into operation.
With no pressurizer saf ety valve OPERABLE, promptly place an OPEP--ALE residual heat removal loop into operation.
P1 Current TS                              8 of 30                        Markup for P1 ITS Part C
Markup for P1 ITS Part C
08 8 of 30 P1 Current TS


REV 135     5,/4/98 3.*.A.2.O     Pressurizer Power Operated Relief Valves L0.     .      1) 1i modes 1m   , 2t and   g             ,Reactor Coolant System average 0
REV 135 5,/4/98 3.*.A.2.O Pressurizer Power Operated Relief Valves L0.
E temperature greater than or equal to 35.0 F (a) In MODES 1, 2, and 3Reactor coolant system average                                             3       8 tcmpralture shall not oxcccd--342 F-*u*leees two power operated relief                 valves (PORVs)
1i
JLCQ&#xfd; 4.l 11            and their         associated block valves are OPERABLE (except as specified in 3.1.A.2.c(l)(b) below).
: 1) modes 1m  
(b)         Tr)ii &#xfd; n :&#xfd; Tn   n   =A         'nfEr =0=nV f1'   VI\I'ITf 7%          o nv cxc -       I71 LC03.4.11            the following conditions of inopcrability may exist for each unit.               If OPERABILITY is not restored within the time Cond D, G            specified or the required action cannot be completed, be in at least -VMODE           310T SHUTDO. within the next 6 hours and MODE           ducc reactor coolant system average temperature                                 O8 holow 3SG0 F-*-
, 2t and g  
within 12the following 6 hours.
,Reactor Coolant System average E
: 1.       With one or both PORVs inoperable because of excessive                                       A C034. 11                    seat leakage, within one hour either restore the PORV(cs)
temperature greater than or equal to 35.00F JLCQ&#xfd; 4.l 11 LC03.4.11 Cond D, G (a) In MODES 1, 2,
:ond A                      to OPERPABLE status or close the associated block valve(s) with power maintained to the block valve(s).
and 3Reactor coolant system average 3
: 2.       With one PORV inoperable due to causes other than                                         3 LC03.4.*11                excessive seat leakage, within one hour either restor-A "4-49 the PORV to OPEP-hBLE status or close and remove power Cond B from the associated block valve.                           Restore the PORV to OPERABLE status within the following 72 hours.
8 tcmpralture shall not oxcccd --342 F-*u*leees two power operated relief valves (PORVs) and their associated block valves are OPERABLE (except as specified in 3.1.A.2.c(l)(b) below).
: 3. With both PORVs inoperable due to causes other than excessive seat leakage, within one hour either restore                               o     A3.4-49 ILC03 .4. 11                at least           one PORV to OPERABLE status or close and remove Cond E                  power from the associated block valves and be in at least MODE 3. T SHUTDO       ..        .within the next 6 hours and MODE 4A3.4-08 r.duc           react.r
(b)
                                                      .          coolant       system average       te..pratur*.
Tr)ii  
&#xfd;
:&#xfd; O
n Tn n  
=A  
'nfEr =0=nV 7%
f1' VI\\I'ITf o nv cxc -
I71 the following conditions of inopcrability may exist for each unit.
If OPERABILITY is not restored within the time specified or the required action cannot be completed, be in at least  
-VMODE 310T SHUTDO. within the next 6 hours and MODE ducc reactor coolant system average temperature holow 3SG0 F-*-
O8 C034. 11
:ond A LC03.4.*11 Cond B ILC03.4. 11 Cond E within 12the following 6 hours.
: 1.
With one or both PORVs inoperable because of excessive A
seat leakage, within one hour either restore the PORV(cs) to OPERPABLE status or close the associated block valve(s) with power maintained to the block valve(s).
: 2.
With one PORV inoperable due to causes other than excessive seat leakage, within one hour either restor-A3 "4-49 the PORV to OPEP-hBLE status or close and remove power from the associated block valve.
Restore the PORV to OPERABLE status within the following 72 hours.
: 3.
With both PORVs inoperable due to causes other than excessive seat leakage, within one hour either restore o
A3.4-49 at least one PORV to OPERABLE status or close and remove power from the associated block valves and be in at least MODE 3.
T SHUTDO  
.within the next 6 hours and MODE 4A3.4-08 r.duc react.r coolant system average te..pratur*.
below 350F*
below 350F*
within 12tho following 6 hours.                                                           A3.4-39 4      With one blo. k valve inoporab-..,                     within one hour .either restore the block valve to.PEPA.LE                             .tatu. or place its ILC3.4.11 Cond C                  associated PORV in manual control.                             Restore the block valve to OPERABLE status within the following 72 hours.
within 12tho following 6 hours.
ILC03 .4. 11        Required Actions 0.1. an&d 02 du not a.pply when-i block valve is Cond C            inoperable solely as a restult of com~plying with R~equired Actions Note                  B,2 adE.2.,
4 A3.4-39 With one blo. k valve inoporab-..,
JA3.4 -11(
within one hour.either ILC3.4.11 Cond C ILC03.4. 11 Cond C Note restore the block valve to.PEPA.LE  
R-9 PI Current TS                                            9 of 30                             Markup for PI ITS Part C
.tatu. or place its associated PORV in manual control.
Restore the block valve to OPERABLE status within the following 72 hours.
Required Actions 0.1. an&d 02 du not a.pply when-i block valve is inoperable solely as a restult of com~plying with R~equired Actions B,2 adE.2.,
Markup for PI ITS Part C R-9 PI Current TS JA3.4 -11(
9 of 30


REV 135 5/4,198 LC03.4.11 5. With both block valves inoperable, within two hours*le Cond F      hour either restore the block valves to OPERAELE status or place the
REV 135 5/4,198 LC03.4.11 Cond F
                                            -Restore at least one block valve to OPERABLE status within the next hour.                 A3.4-49 LCO3.4. 11
: 5.
                                                    ~y~rUcIjviir   I Cond F                                        co'mpl.ying with Pequired Note R-9 P! Current TS                10 of 30                  Markup for P1 ITS Part C
With both block valves inoperable, within two hours*le hour either restore the block valves to OPERAELE status or place the to OPERABLE status within LCO3.4. 11 Cond F Note P! Current TS 10 of 30
-Restore at least one block valve the next hour.
A3.4-49  
~y~rUcIjviir I co'mpl.ying with Pequired R-9 Markup for P1 ITS Part C


(2) Reactor Coolant System average temperature greater than or equal to the temperature specified in the PTLR for
(2) 4LCO3
    .4.
.4.
4LCO3    12      disabling both safety injection pumps and below the Over Pressure Protection System Enable Temperature specified in             the PTLR With Reactor Coolant System temperature greater than or equal to the temperature specified in the PTLR for disabling both safety injection pumps and less than the JLC03.4.12        Over Pressure Protection System Enable Temperature specified in the PTLR; ,.         maXimum f       6o ' p-)ump capable of injec~thin-to7L  ~the- R--CS anidthe ECCS
12 Reactor Coolant System average temperature greater than or equal to the temperature specified in the PTLR for disabling both safety injection pumps and below the Over Pressure Protection System Enable Temperature specified in the PTLR JLC03.4.12 With Reactor Coolant System temperature greater than or equal to the temperature specified in the PTLR for disabling both safety injection pumps and less than the Over Pressure Protection System Enable Temperature specified in the PTLR;,.
                                *iso'at, accumulators**            both pressurizer power operated relief   valves (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c. (2) . (a) and 3.1.A.2.c.(2).(b) below) with the Over Pressure Protection System enabled, the associatod M3 .4-53    I block valve opcn, and th .       .iatd hkup air supply chargod.
maXimum f
If both SI pum,-ps are capable of injecting into the RCS, JLC03.
6o ' p-)ump capable of injec~thin-to7 L
Cond A  4.12 prompt action shall be taken to make one incapable of injecting into the RCS.
~the-R--CS anidthe ECCS accumulators**
ILC03 .4 .12 Cond B, C R-9 ILC03. 4.12 NOTE 2 M3 .4 -52 M3.4-54 SR3 . 4 . 12 . 1 SR3. 4. 12.2 SR3.4.12.3
*iso'at, both pressurizer power operated relief valves (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c. (2)  
                                                                                                        ,R-9 PI Current TS                             11 of 30                     Markup for PI ITS Part C
. (a) and 3.1.A.2.c.(2).(b) below) with the Over Pressure Protection System enabled, the associatod block valve opcn, and th.
.iatd hkup air supply chargod.
JLC03. 4.12 Cond A ILC03.4.12 Cond B, C ILC03. 4.12 NOTE 2 SR3. 4. 12. 1 SR3. 4. 12.2 SR3.4.12.3 If both SI pum,-ps are capable of injecting into the RCS, prompt action shall be taken to make one incapable of injecting into the RCS.
R-9 M3.4 -52 M3.4-54
,R-9 Markup for PI ITS Part C M3.4-53 I PI Current TS 11 of 30


                                                                                    ]
TRs. 3.11  
TRs. 3.11     2s REV -141l   -12,417/98 3.1.A.2.C. (2)   .
]
(a)   One PORV may be inoperable for 7 days.
2s REV -141l  
ILC03.
-12,417/98 3.1.A.2.C. (2)
Cond D 4.12 ILCO3.4.12                  If   these conditions cannot be met, be in. MODE 5 withiin 8 hours and depressurize and vent the reactor coolant Cond E                        system through at least a 3 square inch vent within -h-e net 12-& hours.
ILC03. 4.12 Cond D ILCO3.4.12 Cond E ILCO3.4. 12 Cond E (3)
JLC03.4-.13 ILC03.4.13]l ILC03.4.13 Cond D ILCO3.4.13 Cond E ILC03.4. 13I Cond E ILCO3. 4.13I Cond A LC03. 4.13 Cond B SR3.4. 13. 1 SR3.4.13.2 SR3.4.13.3 SR3.4.13.4 (a)
(b)
Rea spe One PORV may be inoperable for 7 days.
If these conditions cannot be met, be in. MODE 5 withiin 8 hours and depressurize and vent the reactor coolant system through at least a 3 square inch vent within  
-h-e net 12-& hours.
113.4-5E]
113.4-5E]
ILCO3.4. 12 (b)    With both PORVs inoperable, be in MODE 5 within 8 hours Cond E                      and complete depressurization and venting of the RCS through at least a 3 square inch vent within 12a hours.
With both PORVs inoperable, be in MODE 5 within 8 hours and complete depressurization and venting of the RCS through at least a 3 square inch vent within 12a hours.
(3)    Rea ctor Coolant System average temperature below the temperature JLC03 .4-.13        spe cified in the PTLR for disabling both safety injection pumps With Reactor Coolant System temperature less than the temperature specified in the PTLR for disabling both safety ILC03.4.13]l injection pumps, when the head is on the reactor vessel and the reactor coolant system is not vented through a 3 square inch or larger vent; withboth SI pumps inap of injecting into the RCS and thle FCCS accunralators**                 .
ctor Coolant System average temperature below the temperature cified in the PTLR for disabling both safety injection pumps With Reactor Coolant System temperature less than the temperature specified in the PTLR for disabling both safety injection pumps, when the head is on the reactor vessel and the reactor coolant system is not vented through a 3 square inch or larger vent; withboth SI pumps inap of injecting into the RCS and thle FCCS accunralators**
isolatedboth Pressurizer power operated relief valves                   M3452 (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c.(3). (a) and 3.1.A.2.c. (3). (b) below) with the Over Pressure Protection System enabled, the asseciated block     e       ]y the associated backup air supply charged.
isolatedboth Pressurizer power operated relief valves M3452 (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c.(3). (a) and 3.1.A.2.c. (3). (b) below) with the Over Pressure Protection System enabled, the asseciated block e  
ILC03.4.13 Cond D          (a)   One PORV may be inoperable for 24 hours.
]y the associated backup air supply charged.
ILCO3 .4.13 If these conditions cannot be met, depressurize and vent the Cond E                reactor coolant system through at least a 3 square inch vent within 8 hours.
(a) One PORV may be inoperable for 24 hours.
ILC03 .4. 13I    (b)   With both PORVs inoperable, complete depressurization and Cond E                  venting of the RCS through at least a 3 square inch vent within 8 hours.
If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within 8 hours.
ILCO3. 4.13I if Cond A            th LC03. 4.13      if S52 Cond B          4sc inc ten der prE                                                               d ~in thE SR3.4. 13. 1        Ne,,                                                             very SR3.4.13.2          212                                                                yonce SR3.4.13.3          wit                                                                R~CS SR3.4.13.4          ve-r
(b)
                                                                                              -52     ,R M3. 44 *-54 *1 - - - -
With both PORVs inoperable, complete depressurization and venting of the RCS through at least a 3 square inch vent within 8 hours.
M3.
if th if 4 sc inc ten der prE thE Ne,,
PI Current TS                               12 of 30                 Markup for PI ITS Part C
212 wit ve-r M3. 4 M3. 4 S52 d ~in very yonce R~CS  
:3 .. A.3 Raer     Geen     ven   Syte
-52  
: a. A roactor shall not be made or maintained critical nor shall reactor coolant S.. system
,R
                                        .. . .average
*-54
                                                ....... temperature excoed
* 1 Markup for PI ITS Part C PI Current TS 12 of 30
                                                                        .. 200.
:3..
                                                                            ... F    R .4 5 6 unless Reactor Coolant Vent System paths froem both tho reactor vessel head and pressurizer steam space are OPEPABLE and closed (except as specified in 3.l:.A.3.b and 3.lI.A.3.c belo'w).
A.3 PI Current TS 13 of 30 Markup for PI ITS Part C Raer Geen ven Syte
: b. During STARTUP OPERAT-ION and POWER OPERATIONl, any ono of the following cenditions of inoperability may exist fer each unit provided START-UP OPERATION is discontinued until ODE-'A~3ILT-Y is restored.     If any one of these conditions is not restored to an OPEPQ.LE status within 30 days, be in at least HOT SHUT-DOWN within the nexEt 6 hours and in COLD) SIWUTDOWN within the following 30 hours:
: a. A roactor shall not be made or maintained critical nor shall reactor coolant system average temperature excoed 200. F S....
(1) Both of the parallel       vent valves in   the reactor vessel head vent path inoperable, or (2) Beth of the parallel vent valves in the pressurizr             en path inoperable, or (3) The vent valve to the pressurizer relief tank discharg-e line inoperable,     or (4) The vent valve to the containment         atmospheric discharge line inoperable.
R.4 5 6 unless Reactor Coolant Vent System paths froem both tho reactor vessel head and pressurizer steam space are OPEPABLE and closed (except as specified in 3.l:.A.3.b and 3.lI.A.3.c belo'w).
: c. With no Reactor Colant Vent System path OPEBLE, r.estor.           e at least one vent path to ODER-z&#xfd;LB status within 72 hours or be in at least HOT- SHUTDOEWN within the nextz 6 hours and COLD SHUTDOE)WN within the following 30 hours.
: b.
PI Current TS                            13 of 30                  Markup for PI ITS Part C
During STARTUP OPERAT-ION and POWER OPERATIONl, any ono of the following cenditions of inoperability may exist fer each unit provided START-UP OPERATION is discontinued until ODE-'A~3ILT-Y is restored.
If any one of these conditions is not restored to an OPEPQ.LE status within 30 days, be in at least HOT SHUT-DOWN within the nexEt 6 hours and in COLD) SIWUTDOWN within the following 30 hours:
(1) Both of the parallel vent valves in the reactor vessel head vent path inoperable, or (2) Beth of the parallel vent valves in the pressurizr en path inoperable, or (3) The vent valve to the pressurizer relief tank discharg-e line inoperable, or (4) The vent valve to the containment atmospheric discharge line inoperable.
: c.
With no Reactor Colant Vent System path OPEBLE, r.estor.
e at least one vent path to ODER-z&#xfd;LB status within 72 hours or be in at least HOT-SHUTDOEWN within the nextz 6 hours and COLD SHUTDOE)WN within the following 30 hours.


PXV  1  ;  q,/4./9 ILCO3.42          New Specification       3.4.2, RCS Minimum Temperature for SR3. 4.2 .I  I                                                                                      57 Criticality 3.1.B. Pressure/Temperature       Limits
New Specification 3.4.2, RCS Minimum Temperature for Criticality 3.1.B.
: 1. Reactor Coolant System
Pressure/Temperature Limits
: a. The Unit 1 and Unit 2 Reactor Coolant Systems (except the LCO4.3 pressurizer) temperature, pressure heatup rates, and cooldown rates shall be maintained within the limits specified in the Pressure and Temperature Limits report (PTLR) .
: 1. Reactor Coolant System LCO4.3 Cond A LCO3.4.-3 Cond C
: b. If these conditions cannot be satisfied       in modes*3.4  1, 2,            ,
: a.
3, and 4, restore the temperature and/or pressure to within the limits within 30 m inut e s; p erf erm an             v~a~o         odtrie_wni~on    IIhe-effects of .the ... ut of limit             n.       t3-4-r621 Cond A            i-ntnjrity of the Reaeter Coo lant -Gyn-torn; within 72 houry determine that the Reactor Coolant System remains acceptable,-.
The Unit 1 and Unit 2 Reactor Coolant Systems (except the pressurizer) temperature, pressure heatup rates, and cooldown rates shall be maintained within the limits specified in the Pressure and Temperature Limits report (PTLR).
for continued operation or be in at least MODE 34*4-T                         R-9 SQUTDOWN within the next 6 hours and MODE Sroduco th                     A3.4-08 reactor coolant system average 0emperature and pressure to less than 200 0 F and 500 psig, respectively, within 3.. A4-39j following 30 hours.
: b.
LCO3.4.-3 Cond C            If these conditions cannot be satisfied in other than                   [777 7 7 Mode 1, 2, 3, or 4, promptly initiate action to restore parameters to within limits and determine if the RCS is acceptable for continued operation prior to entering MODE 4.
If these conditions cannot be satisfied in modes 1, 2,  
SR3.4.3.j       New SR, Verify pressure, temperature,       heatup, cooldown               m    64 rates within PTLR limits 2.w   Pressurizer
*3.4 3, and 4, restore the temperature and/or pressure to within the limits within 30 m inut e s; p er f erm an wni~on v~a~o odtrie_
: a. The pressurizer temperature shall be limited to:
IIhe-effects of the ut of limit
: 1. A maximum heatup of 190 0 F in any 1 heur peried.
: n.
: 2. A maximum eo.ld.wn of 200OF in   any ! h*ur period.
t3-4-r621 i-ntnjrity of the Reaeter Coo lant -Gyn-torn; within 72 houry determine that the Reactor Coolant System remains acceptable,-.
: b. The pressurizer spray shall not be used if         the temperature difference between the pressurizer and the spray fluid is 0
for continued operation or be in at least MODE 34*4-T R-9 SQUTDOWN within the next 6 hours and MODE Sroduco th A3.4-08 reactor coolant system average 0emperature and pressure to less than 2000 F and 500 psig, respectively, within 3.. A4-39j following 30 hours.
greater than 3220   P.
If these conditions cannot be satisfied in other than
: e. it tn050 eenait+/- ens cannot be satisfied, r-store t he eemperanure se wina~n tne +/-+/-mies wienin 30 minutes-;
[777 Mode 1, 2, 3, or 4, promptly initiate action to restore 7 7 parameters to within limits and determine if the RCS is acceptable for continued operation prior to entering MODE 4.
perform an engineering evaluation to determine the effects of the out of limit eonditien en the structural integrity of the pressurizer, determine that the pressurizer remains acceptable for . ontinued operation or be in at least       HOT pressurizer pressu re to less than 500 psig within the following 30 hours.
SR3.4.3.j New SR, Verify pressure, temperature, heatup, cooldown rates within PTLR limits 2.w Pressurizer
P! Current TS                             14 of 30                 Markup for P1 ITS Part C
: a.
The pressurizer temperature shall be limited to:
: 1. A maximum heatup of 1900F in any 1 heur peried.
: 2. A maximum eo.ld.wn of 200OF in any ! h*ur period.
: b. The pressurizer spray shall not be used if the temperature difference between the pressurizer and the spray fluid is greater than 3220 0P.
: e. it tn050 eenait+/-ens cannot be satisfied, r-store t eemperanure se wina~n tne +/-+/-mies wienin 30 minutes-;
perform an engineering evaluation to determine the effects of the out of limit eonditien en the structural integrity of the pressurizer, determine that the pressurizer remains acceptable for ontinued operation or be in at least HOT pressurizer pressu following 30 hours.
re to less than 500 psig within the Markup for P1 ITS Part C PXV 1 q,/4./9
57 m
64 he ILCO3.42 SR3. 4.2.I I
P! Current TS 14 of 30


Ts 3 A1 "7 REV 91 10/27/89
Ts 3 A1 "7 REV 91 10/27/89
: a. Toe seconaary side of the steam goncrator MUSt nOtE0 nrvssurised at ee200 psi 3 if the temperalturer ofth           stm goncrator is b A- - -fl0r
: a.
: b. If these conditions cannot ho satisfied,       rodueo the steam generator pressure to loss than or ogua! to 200 psig within 30 minutes; perform an cgincring evaluation to determine theceffocts of the overpressurization on t structural integrity     of the stcam generator; determine that thc steam g.n.rator remains acceptable for continu*d operation prior to inereasing its   temperature above 200 0 F.
Toe seconaary nrvssurised at goncrator is b
P1 Current TS                       15 of 30                   Markup for PI ITS Part C
side of the steam goncrator ee200 psi 3 if the temperal
-fl0r MUSt nOtE0 turer ofth stm
: b. If these conditions cannot ho satisfied, rodueo the steam generator pressure to loss than or ogua! to 200 psig within 30 minutes; perform an cgincring evaluation to determine theceffocts of the overpressurization on t structural integrity of the stcam generator; determine that thc steam g.n.rator remains acceptable for continu*d operation prior to inereasing its temperature above 200 0 F.
Markup for PI ITS Part C A
P1 Current TS 15 of 30


Tro ". .1 REV 91     10/27/89 3.1.C. REACTOR COOLANT SYSTEM LEAKAGE 1.Leakage Detection A. 71 LCO 3.0.4 does not apply.
Tro  
In Modes 1,     2, 3 and 4The   reactor     coolant system average               A:
"..1 REV 91 10/27/89 3.1.C.
temperaturc shall not oxcood 2002F unless at least               two means of reactor coolant system leakage detection shall be OPERABLE, one of which must depend on the detection of radionuclides in the containment.       The other means is the containment sump A pump run LCO3 .4.16        time instrumentation. one means of leakage detection may be Cond A          inoperable for 30 days prov,,ided daily RCS water balance Cond B            inventories are performed and,. if radionuclide detection L',
REACTOR COOLANT SYSTEM LEAKAGE 1.Leakage Detection LCO 3.0.4 does not apply.
Cond C            inoperable, daily compensatory sampling shall be performed. if these conditions cannot be met, be in MODE 3 in 6 hours and MODE 5 in 36 hours.
A.
ILC03.4. 16      If   these conditions   cannot be satisfied       (all required monitorsA3.4-71 Send D          inoperable),     immediately enter LCO       3.0.3 within one hour initiate     the action necessary to place the affected unit in HOT SHUTDOWN, and be in at least HOT sHuT...O.w within the neflout S orsand in COLD SH-UTDOWN withi:n the following 30 hou~rs.
71 In Modes 1, 2, 3 and 4The reactor coolant system average LCO3.4.16 Cond A Cond B Cond C ILC03.4. 16 Send D SR3. 4. 16.1 SR3.4. 16.3 SR3.4. 16.4 temperaturc shall not oxcood 2002F unless at least two means of reactor coolant system leakage detection shall be OPERABLE, one of which must depend on the detection of radionuclides in the containment.
SR3. 4. 16.1    New- SRs, Channel Check,       COT and Calibration of containment                   72 SR3.4. 16.3    radionuclide instrumentation and Calibration of sump pump SR3.4. 16.4    run time instrumentation.
The other means is the containment sump A pump run time instrumentation.
: 2. Leakage Limitations The following leakage limitations are applicable whenever in                       08 ILC03 .4 .14      Modes 1, 2, 3 and 4the reactor coolant system average tompcraturo- Hc eoods 04F.
one means of leakage detection may be inoperable for 30 days prov,,ided daily RCS water balance inventories are performed and,. if radionuclide detection L',
LCO3.4.14 If the LEAKAGGlea]age   rate,     from other than controe!!d4-34 Cond A Ia.      eakage sources,   suh as     the reactoer eelan-t   pump
inoperable, daily compensatory sampling shall be performed. if these conditions cannot be met, be in MODE 3 in 6 hours and MODE 5 in 36 hours.
                                                                                  -een*qe leakage seals, exceeds 1 gpm and the source of the leakage is not identified within 4 hours of leak detection, CnLC03 .4. 14 I       be in at least MODE 34--T-T SUJTDOWN within the next 6 hours. ITA If the source of leakage is not identified within 54an 1I additional 18 hours, be in MODE 5C-COLD SHUTDOWN within 84#---e A34-39 following 30 hours.
If these conditions cannot be satisfied (all required monitorsA3.4-71 inoperable), immediately enter LCO 3.0.3 within one hour initiate the action necessary to place the affected unit in HOT
: b.     If the sources of leakage are identified and the results                 of I       the evaluations are that   ..      ntinued operation is safe, operation of the reactor with a total           leakage, other than leakage from controlled sources, not exceeding 10 gpm shall be permitted (except as specified in 3.1.C.2.c below).
: SHUTDOWN, and be in at least HOT sHuT...O.w within the neflout S orsand in COLD SH-UTDOWN withi:n the following 30 hou~rs.
If it is determined that leakage exists through a fault LCO3.4.14            which has developed in a Reactor Coolant System component body, pipe wall, vessel wall, or pipe weld, and that the                       IM3 .4-42 ]
New-SRs, Channel Check, COT and Calibration of containment radionuclide instrumentation and Calibration of sump pump run time instrumentation.
fault cannot be isolated, within one hour initiate             action to place the unit in HOT SHJTDOWNR and be in at least                 i+ODE3 IA3.4-08 ]
72
HGT- SHUTDO-WN within the next 6 hours and be in MODE 5......
: 2.
Leakage Limitations ILC03.4.14 LCO3.4.14 Cond A CnLC03.4.
14 LCO3.4.14 The following leakage limitations are applicable whenever in Modes 1, 2, 3 and 4the reactor coolant system average tompcraturo-Hc eoods 04F.
08
: a.
If the LEAKAGGlea]age rate, from other than controe!!d4-34 I
eakage sources, suh as the reactoer eelan-t pump  
-een*qe leakage seals, exceeds 1 gpm and the source of the leakage is not identified within 4 hours of leak detection, I
be in at least MODE 34--T-T SUJTDOWN within the next 6 hours.
ITA 1 I If the source of leakage is not identified within 54an additional 18 hours, be in MODE 5C-COLD SHUTDOWN within 84#---e A34-39 following 30 hours.
: b.
If the sources of leakage are identified and the results of I
the evaluations are that ntinued operation is
: safe, operation of the reactor with a total leakage, other than leakage from controlled sources, not exceeding 10 gpm shall be permitted (except as specified in 3.1.C.2.c below).
If it is determined that leakage exists through a fault which has developed in a Reactor Coolant System component body, pipe wall, vessel wall, or pipe weld, and that the fault cannot be isolated, within one hour initiate action to place the unit in HOT SHJTDOWNR and be in at least i+ODE3 HGT-SHUTDO-WN within the next 6 hours and be in MODE 5......
S4HUTDOWN within 36the next 30 hours and take corrective action prior to resumption of unit operation.
S4HUTDOWN within 36the next 30 hours and take corrective action prior to resumption of unit operation.
P1 Current TS                           16 of 30                       Markup for PI ITS Part C
IM3.4-42 ]
IA3.4-08 ]
Markup for PI ITS Part C P1 Current TS A:
16 of 30


Overf lew
Overf lew LC03.4.14on Cond C
: d. If the total                   other than Icakago fromA
: d.
                                            !EAKAGEleakage   i controlled sources, exceeds 10 gpm, within one hour LC03.4.14on          initiate action to place thh unit in HOT SHUTDOWN and b Cond C              in at least MODE 3 !!(T GITDOWN within t he next 6 hours.         If the   IA3.4-08]
If the total  
condition is not corrected within l14an additional 8 hours, be in MODE 5OLD SWHUT ?DOWN within .- the following A       39 8hours and remain in COLD SHUTDOWN until   the e ondition ic        A    _
!EAKAGEleakage controlled sources, exceeds initiate action to place thh in at least MODE 3 !!(T GITDOWN within t condition is not corrected hours, be in MODE 5OLD SWHUT 8 hours other than Icakago fromA 10 gpm, within one hour unit in HOT SHUTDOWN and b he next 6 hours.
eorreoted.
If the IA3.4-08]
P1 Current TS                       17 of 30                  Markup for PI ITS Part C
within l14an additional 8  
?DOWN within.- the following A 39 and remain in COLD SHUTDOWN until the e eorreoted.
P1 Current TS ondition ic A
Markup for PI ITS Part C i
17 of 30


REV 133   11!/1Q97
REV 133 11!/1Q97 I
: e.       If the total     reactor coolant system to secondary coolant system leakage through any one steam generator of a unit                 42 exceeds 150 gallons per day (GPD),         within one hour LCO3.4.14 Cond D I                    aieti*n to place the unit in HOT SHUTDOWN and be in at least MODE 3 HO!T S1FTDOW be inMODE 5 COLD SHUTDOWN within the next 6 hours and         . 8 within   36t-he fellowing   30 hours and perform an inservice steam generator tube inspection ISR34.14.21                  in accordance with Steam Generator Program Teeie-a-[
ISR34.14.21
: e.
If the total reactor coolant system to secondary coolant system leakage through any one steam generator of a unit exceeds 150 gallons per day (GPD),
within one hour
42 aieti*n to place the unit in HOT SHUTDOWN and be in at least MODE 3 HO!T S1FTDOW within the next 6 hours and 8
be inMODE 5 COLD SHUTDOWN within 36t-he fellowing 30 hours and perform an inservice steam generator tube inspection in accordance with Steam Generator Program Teeie-a-[
Specificatioen 4.12.
Specificatioen 4.12.
: 3. Pressure       Isolation Valve Leakage LCO3.4.15 ]         Leakage through the pressure isolation valves shall not exceed i   the maximum allowable leakage specified in Specification 4.3 when in MODES 1, 2, 3, and 4 reactor coolant cyotcm average ILCO3.4.15         If   the maximum allowable       leakage is exceeded, isolate the high         79 C       A       pressure portion of -the system in           4 hours and restore the Ply to jj           within limits in         72 hours. Valves used to isolate the Ply flow path must meet SR 3.4.15.1 leakage limits.             within one hoauri initiate       the action necessary to place the unit in       HOT SHUTDOWN, nd If these requirements can not be met, be in at           least     MODE 3'
: 3.
[LCO3.4.15 ConB           IHOT SHUTDOWN within the next 6 hours and in MODE 5               COLD SHUTDOWN I                    within 36tthe follewi- g-3-3       hours.                                     39 PI Current TS                                18 of 30                  Markup for PI ITS Part C
Pressure Isolation Valve Leakage LCO3.4.15 ] Leakage through the pressure isolation valves shall not exceed i
the maximum allowable leakage specified in Specification 4.3 when in MODES 1, 2, 3, and 4 reactor coolant cyotcm average ILCO3.4.15 If the maximum allowable leakage is exceeded, isolate the high C
A pressure portion of -the system in 4 hours and restore the Ply to jj within limits in 72 hours. Valves used to isolate the Ply flow path must meet SR 3.4.15.1 leakage limits. within one hoauri initiate the action necessary to place the unit in HOT SHUTDOWN, LCO3.4.15 nd If these requirements can not be met, be in at least MODE 3' ConB IHOT SHUTDOWN within the next 6 hours and in MODE 5 COLD SHUTDOWN within 36tthe follewi-g-3-3 hours.
79
39 Markup for PI ITS Part C LCO3.4.14 Cond D
[
18 of 30 I
PI Current TS


T-S. 3.1 4,/
T-S. 3.1 4,/
REUJ 147 12,1:7,98
REUJ 147 12,1:7,98
    -3.1 DCS     Spe 1      -ifi         MD, NAXIHUNR           C0OL- 4-T-ACTIVITY
-3.1 DCS 1Spe
: 1. The specific activity                         of the primary coolant                     (except as specified LC03.4.17 I        in 3.1.B.2 and 3 heelw) shall be limited-t-e:
-ifi MD, NAXIHUNR C0OL-4-T-ACTIVITY LC03.4.17 I
SR3.4-17-21          a. Less than or equal to 1.0 microcuries per gram DOSE EQUIVALENT 1-131, and
SR3.4-17-21 SR3-4.17.-
: b.     Less than or equal to 100/E microcuries per gram of gross SR3-4.17.-                      radioactivity.
ILC03.4. 17 Cond A 1
Cond C LC03.4.17 Cond B
: 1. The specific activity of the primary coolant (except as specified in 3.1.B.2 and 3 heelw) shall be limited-t-e:
: a. Less than or equal to 1.0 microcuries per gram DOSE EQUIVALENT 1-131, and
: b.
Less than or equal to 100/E microcuries per gram of gross radioactivity.
R-9
R-9
: 2. If a reactor is in Mode*s
: 2.
* and 2 or critical                                         =)4=. the or Modes     @3&#xfd;Jqwith reactor coolant system average                                     temperature i-s--greater than or equal to 500'F:
If a reactor is in Mode*s
: a.       With the specific activity                     of the primary coolant greater than               1.0 microcurie per gram DOSE EQUIVALENT ILC03.4. 17                I 1*31, verify olnce per 4 hours to b1e -<ithin t Cond A      1              a ccaeptable region of Figuire TS.3.1-3,, for more than 48 hours during one continuous time interval                                         or exceeding the limit line shown on Figure TS.3.1-3, the reactor shall be in-MODE 3 with shutdown and reactorA                                             08 Cond C                    coolant system average temperature cooled to below 500'F within 6 hours.
* and 2 or critical or the
: b.     With the gross specific activity                         of the primary coolant iA    8 LC03.4.17      Sgreater               than 100/E microcurie per gram, the reactor Cond B I        shall be in NODE 3 with shutdoewn and reactor coolant system average temperature cooled to below 500'F within 6 hours.
=) 4=.
: 3. If     a reactor       is     at   or above rGLD                   ue',     jrI' WIspu-:t-per
Modes  
                                                                                                                                  .  *-* I activity           of the primary             coolant greater than 1.0 miecreuric gram DOSE EQ&#xfd;GTIVALENT *'                    131 or greater           than I n/E microcuries           per
@3&#xfd;Jqwith reactor coolant system average temperature i-s--greater than or equal to 500'F:
                                                    &#xfd;-h   s a-inp;     nndq   analvsis reqesirements of item 47a of Table 4.1 2B until                       the spec 4ific activity                  of th e primary
: a.
                                                                              *,    Lii    L__ J.
With the specific activity of the primary coolant greater than 1.0 microcurie per gram DOSE EQUIVALENT I 1*31, verify olnce per 4 hours to b1e -<ithin t a ccaeptable region of Figuire TS.3.1-3,, for more than 48 hours during one continuous time interval or exceeding the limit line shown on Figure TS.3.1-3, the reactor shall be in-MODE 3 with shutdown and reactorA 08 coolant system average temperature cooled to below 500'F within 6 hours.
                            ~olantis rest-'r-'d                 t" wi:t   ;q    i- il  ++-S- C H .
: b.
Next   pages are Figure TS.3.1 3 and TS.3.1 12.
With the gross specific activity of the primary coolant Sgreater than 100/E microcurie per gram, the reactor iA 8
PI Current TS                                             19 of 30                                 Markup for P1 ITS Part C
shall be in NODE 3 with shutdoewn and reactor coolant system average temperature cooled to below 500'F within 6 hours.
I
: 3.
If a
reactor is at or above rGLD jrI' ue',
WIspu-:t-activity of the primary coolant greater than 1.0 miecreuric per gram DOSE EQ&#xfd;GTIVALENT 131 or greater than I n/E microcuries per  
&#xfd;-h s a-inp; nndq analvsis reqesirements of item 47a of Table 4.1 2B until the  
~olantis rest-'r-'d t" wi:t spec 4ific activity of th Lii L__ J.
primary Markup for P1 ITS Part C Next pages are Figure TS.3.1 3 and TS.3.1 12.
PI Current TS 19 of 30 e
;q i-
++-S-il H
C  
*-* I


4 (D (D r-4      (no0 H
r-4 H
(DC                 DOSE EQUIVALENT 1-131 PRIMARY COOLANT SPECIFIC ACTIVITY LIMIT (/.CI/gm)
4
      )  0    '4
)
            >0
J n
          -im        rj J mm          H hi I-jC          -u n                  m 0
A)
z A-   t-I I Im N)
N) 0 o7 (D (D (no0 (DC 0
:    0 0
'4
A)                                                                                    .
>0
H o7                  -4   m    ]  H..  .    ..  .    .  ...
-im m m I-jC Im cl)
H p) m "74 (t
'-4 DOSE EQUIVALENT 1-131 PRIMARY COOLANT SPECIFIC ACTIVITY LIMIT (/.CI/gm)
H   0 m
A-t-I I 0
0   ;u H
]
cl)
H..
                '-4 cl0
rj H
-0 0I)
hi H  
: 3. A maximum of one safety injection pump shall be capable of injecting into the RCS whenever in MODE 4 with RCS                     A3 .4-83 JLCO3.4.12       temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR except that both SI pumps may be run for up to one hour while conducting the integrated SI test** when either of the ILC03. 4. 13 LC03.4. 12    following conditions is met:
-4 H
NOTE I (a) There is a steam or gas bubble in the pressurizer and an isolation valve between the SI pump and the RCS is shut, or (b) The reaetor vessel head is remoevd                     IA.217
p)  
: 4. No safety injection pumps*** shall be capable of injecting                   R-9 into the RCS whenever in 4MODE 4 with RCS temperature is less than the temperature specified in the PTLR for disabling iA3.4-83 both safety injection pumps, MODE 5 when the SC primary system manways and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the EG primar-y systemu manways and pressurizer manway are closed and secured in position. (except one or both pumpsL may be run as specified in 3.3.A.3 and 3.1.A.l.d. (2)).                   IR-9 LC03.4.[12          Both reactor coolant system accumulators shall be isolated*
"74 (t
LC03.4.13          whenever RCS temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR.
H 0
LC03.4.12 NOTE 2 LC03.4.13          *This specification does not apply whenever the reactor coolant system NOTE 3                  accumulators   are depressurized or the reactor vessel         head is removed.
H
LC03.4. 12 LCO3. 4. 13      **Other SI system tests     and operations may also be conducted under these NOTE 1                      conditions.
-u m
                  ***This specification       does not apply whenever the reactor vessel head is 1LC03.4. 13 removed.
0 z
PI Current TS                          21 of 30                Markup for PI ITS Part C
m m
0 m
;u cl0  
-0 0I)
: 3.
A maximum of one safety injection pump shall be capable of injecting into the RCS whenever in MODE 4 with RCS JLCO3.4.12 temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR ILC03. 4. 12 LC03.4. 13 NOTE I LC03.4.[12 LC03.4.13 LC03.4.12 NOTE 2 LC03.4.13 NOTE 3 LC03.4. 12 LCO3. 4. 13 NOTE 1 1LC03.4. 13 except that both SI pumps may be run for up to one hour while conducting the integrated SI test** when either of the following conditions is met:
(a) There is a steam or gas bubble in the pressurizer and an isolation valve between the SI pump and the RCS is shut, or (b) The reaetor vessel head is remoevd IA.217
: 4.
No safety injection pumps*** shall be capable of injecting R-9 into the RCS whenever in 4MODE 4 with RCS temperature is less than the temperature specified in the PTLR for disabling iA3.4-83 both safety injection pumps, MODE 5 when the SC primary system manways and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the EG primar-y systemu manways and pressurizer manway are closed and secured in position. (except one or both pumpsL may be run as specified in 3.3.A.3 and 3.1.A.l.d. (2)).
IR-9 Both reactor coolant system accumulators shall be isolated*
whenever RCS temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR.  
*This specification does not apply whenever the reactor coolant system accumulators are depressurized or the reactor vessel head is removed.
**Other SI system tests and operations may also be conducted under these conditions.  
***This specification does not apply whenever the reactor vessel head is removed.
Markup for PI ITS Part C A3.4-83 21 of 30 PI Current TS


Addressed Elsewhere I R..................
R..................
i R-2 1SR3.4.12.I SR3 .4, 12. 5 SR3 .4.13.5                                                                           84 SR3 .4e 13M 6i
i R - 2 Addressed Elsewhere I 1SR3.4.12.I SR3.4, 12. 5 SR3.4.13.5 SR3.4e 13M 6i ao
: 25. Overpressure mitigation ao    N.A. R         N.A.             4(38)       5 Adresed Elsehere I t
: 25.
PI Current TS                    22 of 30                         Markup for PI ITS Part C
Overpressure mitigation Adresed Elsehere I t
Markup for PI ITS Part C N.A.
R N.A.
4(38) 5
84 22 of 30 PI Current TS


TABLE TS.4.1-1C (Page 4 of 4)
TABLE TS.4.1-1C (Page 4 of 4)
TABLE NOTATIONS FREQUENCY NOTATION NOTATION                 FREQUENCY S                       Shift D                       Daily W                       Weekly M                       Monthly Q                       Quarterly S/U                     Prior to each startup Y                       Yearly R                       Each refueling shutdoi N.A.                     Not applicable ROver Pressure Protection System Enable Temperature specified in the PTLR.
TABLE NOTATIONS FREQUENCY NOTATION NOTATION FREQUENCY S
                                                                            -    oPTAINNtrINTtlRrJ    ;            IIeee t
Shift D
                                                                                                                  }f Fr (38)   Within 1i2 hours ot When the reactor coolant system average temperature is less than the PI Current TS                                    23 of 30                                      Markup for PI ITS Part C
Daily W
Weekly M
Monthly Q
Quarterly S/U Prior to each startup Y
Yearly R
Each refueling shutdoi N.A.
Not applicable ROver Pressure Protection System Enable Temperature specified in the PTLR.
(38)
Within 1i2 hours ot When the reactor coolant system average temperature is less than the Ieee oPTAINNtrINTtlRrJ I
}f Markup for PI ITS Part C Fr t 23 of 30 PI Current TS


E-34-00 I
Table TS.4.1 2A (Page ! ef 2)
                                                                                                                          ..........    .. A d d r e s s e d Table TS.4.1 2A (Page  ! ef 2)
: 3.
IElsewherel
Pressurizer Safety mSR3.4.
: 3. Pressurizer Safety          Verify OPERABLE in accordance     Per ASME Code,   Section XI Inservice Testing with the Inservice Testing         Program
: 0.
: 0.        V*valves mSR3.4.                                    Program (+ 3%). Following testing, lift   settings shall                                                                     Addressed be within +1%                                                                                       Elsewhere
V*valves E-34-00 I  
                                                                                                                                                              -i 3
.. A d d r e s s e d IElsewherel Verify OPERABLE in accordance Per ASME Code, Section XI Inservice Testing with the Inservice Testing Program Program (+ 3%).
: 6. Pressurizer PORV           Functional                           Quarterly, unless the block valve has Block Valves                                                      been closed per Specification 3.1.A.2.c. (1). (b) .2 ISR3.4. 11711                                                                      or 3.1.A.2.c. ( ) .(b) .3.
Following testing, lift settings shall be within +1%
Functional                            Every ...      onths SR3  .  .*      Pressurizer PORVs                                                                        ~   ~ ~~~F
Addressed Elsewhere
                                                                                                  ~
-i 3
24~                             3   - 4_____________8_______
: 6.
No", t&#xfd;    ~On)- required to be performed in Modes 1 and 2..
Pressurizer PORV Functional Block Valves ISR3.4. 11711 SR3 Pressurizer PORVs No", t&#xfd;
R-9 IEA3.4-I14]A3"4-I13             I and 3.4.11.2 PI Current TS                                        24 of 30                                        Markup for PI ITS Part C
~On)-
required and 3.4.11.2 Quarterly, unless the block valve has been closed per Specification 3.1.A.2.c. (1). (b).2 or 3.1.A.2.c. ( ).(b)  
.3.
Every onths 24~  
~  
~  
~  
~~~F 3  
- 4_____________8_______
Functional to be performed in Modes 1 and 2..
R-9 IEA3.4-I14]A3"4-I13 I Markup for PI ITS Part C 24 of 30 PI Current TS


Table T   . 2A (       o 2)
Table T 2A (
o 2)
MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR Sect.
MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR Sect.
Reference Test                          Frequency Equipment
Reference Frequency
: 8. Deleted 5R3ES 41 t                       Evaluate Daily 1121
: 8.
: 9. Primary System Leakage                                                         JA.
Deleted 5R3ES 41 t
I             R9 IAddressedl Elsewhere C 3 25 of 30                    Markup for PI ITS Part C PI Current rTS
: 9.
Primary System Leakage Evaluate Daily JA.
1121 I
R 9 IAddressedl Elsewhere C
3 Markup for PI ITS Part C PI Current r TS Equipment Test 25 of 30


TAb.     of Te-1   2)
TAb.
RhEY 147 12,4/98 TABLE TS.4.1-2B     R-2 MINIMUM FREQUENCIES FOR SAMPLING TESTS TEST                                                FREQUENCY               JL3.4-88 TEST                                            I    -s,/
Te-1 of
wee k              ]A 3 .4 I 2 : ]
: 2)
ISR3.4.17-I     1.     RCS Gross Activity Determination ISR3"4"17"2I 2.                                                             1/14 days      (when *t  power)
RhEY 147 12,4/98 TABLE TS.4.1-2B R-2 MINIMUM FREQUENCIES FOR SAMPLING TESTS FREQUENCY JL3.4-88 ISR3.4.17-I
RCS Isotopic Analysis for DOSE and Note              EQUIVALENT 1-131 Concentration on]-y require ~d to be performed         in Mode 1 ISR3.4.17.3] 3.                                                            !/6-menthrs 184 days(l) -(when -at RCS Radiocheministry E determination peweor) 2EFPD. anjd 2
: 1.
fr
ISR3"4"17"2I 2.
                                                                          --he ~reactor was                         4 20 la                                                                                                  R-9 a) Once per 4 hours, whenever JLO34.l      4.        RCS Isotopic Analysis for Iodine                      the specific activity           ex Including 1-131, 1-133, and 1-135                      ceeds 1.0 uCi/gram DOSE EQUIVALENT 1-131 or 100/E uCi/gram               "L.2L1 (at or above       500 'F cold shutdown) ,       and b)   One sample between 2 and 6 SR3 .4 .17 .2      _                                                        hours following THERMAL POWER change exceeding 15 percent of the RATED THERMAL POWER within a one hour period (above hot shutdown)
and Note ISR3.4.17.3] 3.
S. R*C Radiochomistry     (2)                                           hl                 3 4-94
pe fr 20 l a JLO34.l 4.
                                                                        -Weekly        *
RCS Gross Activity Determination RCS Isotopic Analysis for DOSE EQUIVALENT 1-131 Concentration on]
: 6. RCC Tritium Activit-y
RCS Radiocheministry E determination weor)
: 7.     DeIeted Reg Doron Gene ent ratio~~---                     2/We, k   (4) 8.
-y require RCS Isotopic Analysis for Iodine Including 1-131, 1-133, and 1-135 I
essed Elehere
-s,/
* Required at   oll tmc PI Current TS                           26 of 30                           Markup for PI ITS Part C
w e e k
]A 3.4 I 2 : ]
1/14 days (when *t power)
~d to be performed in Mode 1  
!/6-menthrs 184 days(l) -(when -at 2
2EFPD. anjd he ~reactor was 4
R-9 a)
Once per 4 hours, whenever the specific activity ex ceeds 1.0 uCi/gram DOSE EQUIVALENT 1-131 or 100/E uCi/gram "L.2L1 (at or above 500 'F cold shutdown), and b)
One sample between 2 and 6 hours following THERMAL POWER change exceeding 15 percent of the RATED THERMAL POWER within a one hour period (above hot shutdown)
SR3.4.17.2 S.
R*C Radiochomistry (2) 3 hl 4-94
: 6.
RCC Tritium Activit-y
-Weekly
: 7.
DeIeted
: 8.
Reg Doron Gene ent ratio~~---
2/We, k (4) essed Elehere
* Required at oll tmc Markup for PI ITS Part C PI Current TS TEST TEST 26 of 30


Table TG.4.1 2B (Page 2 of 2)
TABLE &#xb6;1784.1 2B Table TG.4.1 2B (Page 2 of 2)
REV 129   6/12/97 Adressed TABLE &#xb6;1784.1 2B Notes:
REV 129 6/12/97 Adressed SR3.4.17.3
a minimum SR3.4.17.3 1. Lample to be taken Not requiredtc be performed untl 31 davs after Note                        and 20 days of DOWER ODERTIONhode   I have elapsed since reactor was of 2 EFPD last   subcritical for 48 hours or longer.                             IM3"4-I17 I R-9
: 1.
: 2. To determine     activity ef   corresion products having a half life     greater than 30 minutos.                                                                       I     94 net emeed5   day-s   JLR3.4-96
Note Lample to be taken Not requiredtc be performed untl 31 davs after a minimum of 2 EFPD and 20 days of DOWER ODERTIONhode I have elapsed since reactor was last subcritical for 48 hours or longer.
: 4. Thsi maximaum  interval  between analyses    shall Addressed P! Current TS                          27 of 30                    Markup for P1 ITS Part C
IM3"4-I17 I R-9
: 2. To determine activity ef corresion products having a half life greater than 30 minutos.
I 94
: 4. Thsi maximaum interval between analyses shall net emeed5 day-s JLR3.4-96 Addressed Markup for P1 ITS Part C Notes:
27 of 30 P! Current TS


                                                                                                                        .4.3 !:
.4.3 j116 3/110/195 IA3. 4- 00 1 RET R-2 4-,  
IA3. 4- 00 1
-%PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES Applicability Appicsto ho.....~nc porf...mod on tho primary.oolant systcom pressure Applies to the su -_&#xfd;rilla..
                                                                                          ............    ........RET j116      3/110/195 R-2 4-,-%PRIMARY     COOLANT SYSTEM PRESSURE ISOLATION VALVES                               .............................
n isolation valves to verify oporability.  
Applicability Appicstoho.....~nc             porf...mod   on tho primary .oolant                           systcom pressure Applies       to the     su -_&#xfd;rilla. n.    .                                  .. . .
-03 Objective T-e increase the reliability of qprimary coolant sytom prescure isolation valves thereby roducing the potontia! of an intorcystom loss of coolant accident.
isolation valves to verify oporability.                                                                                               -03 Objective T-e increase the reliability of                   qprimary coolant sytom prescure isolation valves thereby roducing the potontia!                   of an intorcystom loss of coolant accident.
Specification Periodic leakage testing of each of the following valves shall be individually accomplished every 24mon.ths, prior to resuming power operation after each time the plant is placed in the cold shutdown condition for refueling, each time the plant is placed in MODE 5 aed 3.4-08 shutdom condition for 7 days or more if testing has not been accomplished in the preceding 9 months, and prior to returning the valve to service after maintenance, repair, or replacement work is performed:
Specification Periodic leakage testing of each of the following to                      valves shall be every   24mon.ths,     prior       resuming power individually          accomplished operation after             each time the plant is placed in the cold shutdown                                                         3.4-08 in MODE 5 aed condition for refueling, each time the plant is placed shutdom condition for 7 days or more if testing has not been accomplished in the preceding 9 months, and prior to returning the valve to service after       maintenance, repair, or replacement work is performed:
Valvo Number Allowable M;ax(imum Unit No 1 Unit No 2
Valvo Number                                         M;ax(imum Allowable Unit   No   1 Unit     No       2 Lew Pressure S! te                   S! 9 6           2S! 9 6                                       S gpm       97 Upper PlondmSfn4                                     219                                                 p CI 5         2S!   9 5                                     5 gpm RR       -t Loopr  B Accumulator         Inj Line         SIl6 2           2S1   4 2
Lew Pressure S! te S! 9 6 2S! 9 6 S gpm Upper PlondmSfn4 219 p
* 5 gpm To satisfy         ALARA requirements, leakage may be measured indir"etly (as from the performance ef prossuro indi.at.r.)                     if a         ..
CI 5 2S! 9 5 5 gpm RR  
mplish.d     in oc..rdanc                             .with approved procedures and supported                 by   computations   showing     that     the       m.thd*                 is     capable of domoenstrating valve complianec with the leakage criteri-a.
-t r
Loop B
Accumulator Inj Line SIl6 2 2S1 4 2
* 5 gpm
97 To satisfy ALARA requirements, leakage may be measured indir"etly (as from the performance ef prossuro indi.at.r.)
if a mplish.d in oc..rdanc  
.with approved procedures and supported by computations showing that the m.thd* is capable of domoenstrating valve complianec with the leakage criteri-a.
NOTES:
NOTES:
: 1. Leakage rates less than or equal to O**5 e-e-gpm per nominal inch of valve size- are acceptable-at           an RCS pressure       of   22*1* psig                         -nd*2255 p"sig.
: 1.
                                                                                                                                  ,II87
Leakage rates less than or equal to O**5 e-e-gpm per nominal inch of valve size-are acceptable-at an RCS pressure of 22*1*
: 2. Loeakage     rates greater than one, but             loss th an or equal to five gpm arc cons ido --A aeeental--h         if the latest     measure d race hoc not                                      to eedd th previous mc .sur.d rate by an amount               which r" oducoes the margin to f ive gpm                                     by 4-4-r-4-cnccccotablo.
psig  
                                  -- I-    " - &#xfd; 1, 1PRk;ic4p  ral-e i    &#xfd;Wil&#xfd;i-de-red-unaeeentab 3--.- Leakage rates greater than five gpm are considered unacceptable.
-nd *2255 p"sig.  
S.     ILR3. 4-971
, II87
      *  *- * -    Aos                         orossurO   sIal     net be less05      :-aizi                           p PI Current TS                                      28 of 30                                         Markup for PI ITS Part C
: 2.
Loeakage cons ido rates greater than one, but loss th  
--A aeeental--h if the latest measure previous mc.sur.d rate by an amount which an or equal to five gpm arc d race hoc not to eedd th oducoes the margin to f ive gpm by 4-4-r-4-cnccccotablo.
3--.- Leakage rates greater than five gpm are considered unacceptable.
S.
ILR3. 4-971 Markup for PI ITS Part C Aos orossurO sIal net be 05 less :-aizi p
28 of 30 PI Current TS r"
-- I-
&#xfd; 1, 1PRk;ic4p ral-e i
&#xfd;Wil&#xfd;i-de-red-unaeeentab


IA3.4-00]     REV 91   10,27/189 R2               Addressed El sewhe re 4.6.
IA3.4-00]
C. Pressurizer Heater Emergency Power Supply demonstrated OPERABLE at ISR3.4.9.21 The emergency pressurizer heater supply shall be JL3.4-86 least once every 2414-& months "B from its normal bus   to its sa         suarbus by transfcrring Backup Heater Craup and encrgizing the heaters.                                             JLR3-4-98 29 of 30                    Markup for PI ITS Part C P1 Current TS
REV 91 10,27/189 R2 Addressed El sewhe re C. Pressurizer Heater Emergency Power Supply ISR3.4.9.21 The emergency pressurizer heater supply shall be demonstrated OPERABLE at JL3.4-86 least once every 2414-& months by transfcrring Backup Heater Craup "B
from its normal bus to its sa suar bus and encrgizing the heaters.
JLR3-4-98 Markup for PI ITS Part C P1 Current TS 4.6.
29 of 30


T-S.4.8   1 REV 91     10/27/89 4.18     REACTOR COOLANT VENT SYSTEM                 PAT..S                                         R.4-56 A-pp& i:eab-i-it on thc     Reaetor   Coolant Vont     System paths     to Applies to the surveillanco performod verify     OPERABPILITY.
T-S.4.8 1 REV 91 10/27/89 4.18 REACTOR COOLANT VENT SYSTEM PAT..
Ob&#xfd;Jeetive To assure     that     the capability       exists     to vent non*cndensi.ble gases from the Reactor     Coolant System         that-   culd     inhibit   natural   circulation"    core cooling.
S R.4-56 A-pp& i:eab-i-it Applies to the surveillanco performod on thc Reaetor Coolant Vont System paths to verify OPERABPILITY.
Spcci.i1catieo A.       Vent   Path     Oper-abil shall to demonstrated        OPEPLE      prior Each Reactor Coolant Vont System path to commencing STRT P                 OPERATION after         each refueli.ng by:
Ob&#xfd;Jeetive To assure that the capability exists to vent non*cndens i.ble gases from the Reactor Coolant System that-culd inhibit natural circulation core cooling.
manual     isolation     valves in   each   vent path   arc   blocked
Spcci.i1catieo A.
: 1.        Verifying      all and tagged in         the open     position.
Vent Path Oper-abil Each Reactor Coolant Vont System path shall to demonstrated OPEPLE prior to commencing STRT P OPERATION after each refueli.ng by:
at
: 1.
: 2.       Cycling each solenoid operated valve in the vent paths through one complete       cycle     of full     travel from   the   control   room.
Verifying all manual isolation valves in each vent path arc blocked and tagged in the open position.
least Flow shall be verified through each Reactor Coolant Vent                             System   path following each         refueling-.
: 2.
PI Current TS                                        30 of 30                          Markup for PI ITS Part C
Cycling each solenoid operated valve in the vent paths through at least one complete cycle of full travel from the control room.
Flow shall be verified through each Reactor Coolant Vent System path following each refueling-.
Markup for PI ITS Part C 30 of 30 PI Current TS


Part D                                                                   Package 3.4 NSHD        Change Number                          Discussion of Change Category 3.4 A            08 CTS 3.1.A.1.a(2), 3.1.A.1.b(1), 3.1.A.1.b (2), 3.1.A.1.c, 3.1 .A.I .d, 3.1 .A.2.a(1), 3.1 .A.2.a(2), 3.1 .A.2.a(3), 3.1 .A.2.b(1),
Part D NSHD Category A
3.1.A.2.c(1), 3.1.A.2.c(1)(a), 3.1.A.2.c(1)(b), 3.1.A.2.c(1)(b)3, 3.1.B.1.b, 3.1.C.1,3.1.C.2,3.1.C.3, 3.1.D.2, 3.1 .D.2.a, 3.1.D.2.b, 3.10.J and 4.3. The CTS contain prose descriptions of the modes of applicability and conditions in which the plant must be placed or remain when equipment is inoperable.
Change Number Package 3.4 Discussion of Change 3.4 08 CTS 3.1.A.1.a(2), 3.1.A.1.b(1), 3.1.A.1.b (2), 3.1.A.1.c, 3.1.A.I.d, 3.1.A.2.a(1), 3.1.A.2.a(2), 3.1.A.2.a(3), 3.1.A.2.b(1),
3.1.A.2.c(1), 3.1.A.2.c(1)(a), 3.1.A.2.c(1)(b), 3.1.A.2.c(1)(b)3, 3.1.B.1.b, 3.1.C.1,3.1.C.2,3.1.C.3, 3.1.D.2, 3.1.D.2.a, 3.1.D.2.b, 3.10.J and 4.3. The CTS contain prose descriptions of the modes of applicability and conditions in which the plant must be placed or remain when equipment is inoperable.
These descriptions have been replaced with the equivalent MODES of applicability for the ITS. Since the modes of applicability and plant conditions in which the plant is placed or remains have not changed this is an administrative change.
These descriptions have been replaced with the equivalent MODES of applicability for the ITS. Since the modes of applicability and plant conditions in which the plant is placed or remains have not changed this is an administrative change.
9 Not used.
9 Not used.
10 Not used.
10 Not used.
M             11 A new SR, 3.4.4.1, is included in conformance with ISTS which requires verification of each RCS loop in operation while at power.
M 11 A new SR, 3.4.4.1, is included in conformance with ISTS which requires verification of each RCS loop in operation while at power.
This is more restrictive since PI CTS do not require this surveillance. This more restrictive change is included to make the PI ITS complete.
This is more restrictive since PI CTS do not require this surveillance. This more restrictive change is included to make the PI ITS complete.
Prairie Island Units 1 and 2                             5                                          1/2/02
Prairie Island Units 1 and 2 1/2/02 5


Part D                                                                  Package 3.4 Par      D NSHD           Change Category        Number                         Discussion of Change 3.4-M              21 Three new SRs, 3.4.5.1, 3.4.5.2 and 3.4.5.3, have been added in conformance with the guidance of NUREG-1431. These SRs will require verification that the required RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RCP that is not operating. The SR requirement for verifying the SG is capable of decay heat removal is consistent with WOG-155, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.
Package 3.4 NSHD Category M
A Change Number 3.4-Discussion of Change 21 Three new SRs, 3.4.5.1, 3.4.5.2 and 3.4.5.3, have been added in conformance with the guidance of NUREG-1431. These SRs will require verification that the required RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RCP that is not operating. The SR requirement for verifying the SG is capable of decay heat removal is consistent with WOG-155, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.
These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant conditions.
These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant conditions.
A            22 CTS 3.1 .A.l.b(3). CTS requires the plant to shut down to MODE 4 if the Action Statement requirements are not met. These requirements are not included in the ITS, since once the Action Statement requirements are not met, the plant will enter LCO 3.0.3 which essentially requires the same actions as CTS.
22 CTS 3.1.A.l.b(3). CTS requires the plant to shut down to MODE 4 if the Action Statement requirements are not met. These requirements are not included in the ITS, since once the Action Statement requirements are not met, the plant will enter LCO 3.0.3 which essentially requires the same actions as CTS.
Prairie Island Units 1 and 2                             9                                    1/2/02
Prairie Island Units 1 and 2 1/2/02 Part D Par D
9


Part D                                                                  Package 3.4 P rt D NSHD       Change Category    Number                         Discussion of Change 3.4-23 Not used.
Package 3.4 NSHD Category Change Number 3.4-Discussion of Change 23 Not used.
LR            24 CTS 3.1 .A.1 .c(1), 3.1 .A.l .c(2), 3.1 .A.1 .d(1) and 3.1 .A.2.a(1).
24 CTS 3.1.A.1.c(1), 3.1.A.l.c(2), 3.1.A.1.d(1) and 3.1.A.2.a(1).
The CTS description of equipment required for system operability has been relocated to the Bases which is consistent with the format and guidance of NUREG-1431. As an example, the CTS refers to a reactor coolant pump (RCP) and associated steam generator (SG) as needing to be OPERABLE during specific plant conditions. The ITS Bases defines that a RCS loop consists of the RCP and associated SG. Therefore, the CTS has been revised to state RCS loop instead of listing specific components that make up the system. The individual components making up the system are considered to be details placed in the Bases Section. This change is acceptable since the system is required to be operable in accordance with the definition of OPERABILITY and details of the specific equipment are unnecessary in the specification. Since the Bases are under licensee control, this is a less restrictive change.
The CTS description of equipment required for system operability has been relocated to the Bases which is consistent with the format and guidance of NUREG-1431. As an example, the CTS refers to a reactor coolant pump (RCP) and associated steam generator (SG) as needing to be OPERABLE during specific plant conditions. The ITS Bases defines that a RCS loop consists of the RCP and associated SG. Therefore, the CTS has been revised to state RCS loop instead of listing specific components that make up the system. The individual components making up the system are considered to be details placed in the Bases Section. This change is acceptable since the system is required to be operable in accordance with the definition of OPERABILITY and details of the specific equipment are unnecessary in the specification. Since the Bases are under licensee control, this is a less restrictive change.
Prairie Island Units I and 2                           10                                          1/2/02
Prairie Island Units I and 2 1/2/02 Part D LR P rt D 10


Part 0                                                              Package 3.4 P rt D NSHD       Change Category    Number                         Discussion of Change 3.4-25 Not used.
Package 3.4 NSHD Category Change Number 3.4-Discussion of Change 25 Not used.
M            26  CTS 3.1.A.l.c. CTS has been revised to require that the SG is capable of decay heat removal. This change is a more restrictive change since it is a new requirement by providing specific operability requirements on the SG that were not in the CTS. This change is acceptable since it specifically requires the SG to maintain sufficient secondary water inventory to provide a heat sink for decay heat removal in the event the RHR loop is inoperable and not in operation. This change is consistent with NUREG-1431.
CTS 3.1.A.l.c. CTS has been revised to require that the SG is capable of decay heat removal. This change is a more restrictive change since it is a new requirement by providing specific operability requirements on the SG that were not in the CTS. This change is acceptable since it specifically requires the SG to maintain sufficient secondary water inventory to provide a heat sink for decay heat removal in the event the RHR loop is inoperable and not in operation. This change is consistent with NUREG-1431.
27   Not used.
27 Not used.
Prairie Island Units I and 2                           11                                    1/2/02
Prairie Island Units I and 2 1/2/02 Part 0 M
26 P rt D 11


Part D                                                             Package 3.4 NSHID       Change Number                       Discussion of Change Category 3.4-A            28 CTS 3.1 .A.l.c. CTS has a single specification which requires two methods of cooling the RCS to be operable with one in operation when in MODE 4 and MODE 5, loops filled. This can be any combination of RCS loops or RHR trains. During plant heatup from MODE 5 to MODE 4, one RCS loop may be in operation with one or both RHR loops operable but not operating. NUREG-1431 splits MODE 4 and MODE 5, loops filled into two specifications, LCO 3.4.6 and LCO 3.4.7. Because these MODES or other specified conditions of applicability have been split into two Specifications, LCO Note 4 in 3.4.7 is required to allow one RCS loop in operation with one or both RHR loops operable but not operating. This configuration is required to allow a smooth transition to MODE 4. Since the configuration allowed by Note 4 currently is allowed by CTS, explicit statement of this Note is an administrative change. This change is consistent with the ISTS.
Part D NSHID Category A
29 Not used.
Change Number 3.4-28 Package 3.4 Discussion of Change CTS 3.1.A.l.c. CTS has a single specification which requires two methods of cooling the RCS to be operable with one in operation when in MODE 4 and MODE 5, loops filled. This can be any combination of RCS loops or RHR trains. During plant heatup from MODE 5 to MODE 4, one RCS loop may be in operation with one or both RHR loops operable but not operating. NUREG-1431 splits MODE 4 and MODE 5, loops filled into two specifications, LCO 3.4.6 and LCO 3.4.7. Because these MODES or other specified conditions of applicability have been split into two Specifications, LCO Note 4 in 3.4.7 is required to allow one RCS loop in operation with one or both RHR loops operable but not operating. This configuration is required to allow a smooth transition to MODE 4. Since the configuration allowed by Note 4 currently is allowed by CTS, explicit statement of this Note is an administrative change. This change is consistent with the ISTS.
30 Not used.
29 Not used.
Prairie Island Units 1 and 2                         12                                    12/11/00
30 Not used.
Prairie Island Units 1 and 2 12/11/00 12


Part D                                                             Package 3.4 P rt D NSHD         Change Category     Number                         Discussion of Change 3.4 M             31 Three new SRs, 3.4.6.1, 3.4.6.2, 3.4.6.3, have been added in conformance with NUREG-1431. These SRs will require verification that the required RHR or RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the required RHR or RCP that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF-1 14, and the intent of the CTS.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M
31 Three new SRs, 3.4.6.1, 3.4.6.2, 3.4.6.3, have been added in conformance with NUREG-1431. These SRs will require verification that the required RHR or RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the required RHR or RCP that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF-1 14, and the intent of the CTS.
This is more restrictive since PI CTS does not specifically require these surveillances. These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant operations.
This is more restrictive since PI CTS does not specifically require these surveillances. These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant operations.
M           32 Three new SRs, 3.4.7.1, 3.4.7.2, 3.4.7.3, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RHR pump that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.
M 32 Three new SRs, 3.4.7.1, 3.4.7.2, 3.4.7.3, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RHR pump that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.
These more restrictive changes are included to make the PI ITS complete and they do not introduce any unsafe plant operations.
These more restrictive changes are included to make the PI ITS complete and they do not introduce any unsafe plant operations.
Prairie Island Units 1 and 2                           13                                   1/2/02
Prairie Island Units 1 and 2 13 1/2/02 P rt D


Part D                                                                Package 3.4 NSHD         Change Category      Number                         Discussion of Change 3.4-M            33 CTS 3.1.A.l.d. An additional required action has been included in the action statement when both RHR loops are inoperable to suspend operations involving reduction in RCS boron concentration. This change is included to make the ITS complete and may improve plant safety. Since this change places additional restrictions on plant operations it is more restrictive. This change is also consistent with the guidance of NUREG-1431.
Package 3.4 NSHD Category M
M            34 CTS 3.1.A.l.d. CTS allows the pumps to be shutdown for 1 hour. To be consistent with NUREG-1431, this is further restricted to 1 hour in an 8 hour period. In addition, the CTS Note is modified by addition of a restriction that, in MODE 5 with the loops not filled, no RCS draining operations are permitted when all pumps are shutdown. Restrictions on boron concentration changes have also been included. These changes were made for consistency with the guidance of NUREG-1431 as modified by approved TSTF-286, Revision 2.
M Change Number 3.4-Discussion of Change 33 CTS 3.1.A.l.d. An additional required action has been included in the action statement when both RHR loops are inoperable to suspend operations involving reduction in RCS boron concentration. This change is included to make the ITS complete and may improve plant safety. Since this change places additional restrictions on plant operations it is more restrictive. This change is also consistent with the guidance of NUREG-1431.
34 CTS 3.1.A.l.d. CTS allows the pumps to be shutdown for 1 hour. To be consistent with NUREG-1431, this is further restricted to 1 hour in an 8 hour period. In addition, the CTS Note is modified by addition of a restriction that, in MODE 5 with the loops not filled, no RCS draining operations are permitted when all pumps are shutdown.
Restrictions on boron concentration changes have also been included. These changes were made for consistency with the guidance of NUREG-1431 as modified by approved TSTF-286, Revision 2.
These changes are more restrictive since they impose requirements on plant operations that are not in the CTS.
These changes are more restrictive since they impose requirements on plant operations that are not in the CTS.
These changes are acceptable since they may improve plant safety.
These changes are acceptable since they may improve plant safety.
35 Not used.
35 Not used.
Prairie Island Units 1 and 2                           14                                      1/2/02
Prairie Island Units 1 and 2 1/2/02 Part D 14


Part D                                                                Package 3.4 NSHD       Change Category    Number                         Discussion of Change 3.4-L            36 CTS 3.1 .A.l.d. One RHR loop may be made inoperable for surveillance testing while the other RHR loop is OPERABLE and in operation. This change is made for consistency with NUREG 1431. This is acceptable since the operating RHR loop provides sufficient heat removal capability and the loss of the operating RHR loop in the two hours allowed for testing is unlikely. This is less restrictive since this provision is not contained in the CTS.
Package 3.4 NSHD Category L
M            37 Two new SRs, 3.4.8.1 and 3.4.8.2, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation and verify power is available to the RHR pump that is not operating. This is more restrictive since PI CTS do not require these surveillances. These more restrictive changes are included to make the PI ITS complete. These changes do not place the plant in any unsafe operating conditions.
M M
M            38 CTS 3.1 .A.1 .d. CTS allows the pumps to be shutdown for 1 hour.
Change Number 3.4-36 Discussion of Change CTS 3.1.A.l.d. One RHR loop may be made inoperable for surveillance testing while the other RHR loop is OPERABLE and in operation. This change is made for consistency with NUREG 1431. This is acceptable since the operating RHR loop provides sufficient heat removal capability and the loss of the operating RHR loop in the two hours allowed for testing is unlikely. This is less restrictive since this provision is not contained in the CTS.
37 Two new SRs, 3.4.8.1 and 3.4.8.2, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation and verify power is available to the RHR pump that is not operating. This is more restrictive since PI CTS do not require these surveillances. These more restrictive changes are included to make the PI ITS complete. These changes do not place the plant in any unsafe operating conditions.
38 CTS 3.1.A.1.d. CTS allows the pumps to be shutdown for 1 hour.
To be consistent with NUREG-1431, this is further restricted to 1 hour in an 8 hour period. Since this imposes additional restrictions on plant operations, this is a more restrictive change. This change is acceptable because this change may limit the time that all pumps are not operating and improve plant safety.
To be consistent with NUREG-1431, this is further restricted to 1 hour in an 8 hour period. Since this imposes additional restrictions on plant operations, this is a more restrictive change. This change is acceptable because this change may limit the time that all pumps are not operating and improve plant safety.
Prairie Island Units 1 and 2                           15                                    12/11/00
Prairie Island Units 1 and 2 12/11/00 Part D 15


Part D                                                               Package 3.4 Part D NSHID      Change Category    Number                        Discussion of Change 3.4 A            39 CTS 3.1 .A.2.a, 3.1 .A.2.c.(1), 3.1 .B.1 .b and 3.1.C.2. The format for CTS and ITS fundamentally differ in the presentation of shutdown tracks but the Completion Time requirements are the same. The CTS format has been changed to the ITS format.
Part D NSHID Category A
Change Number Package 3.4 Discussion of Change 3.4 39 CTS 3.1.A.2.a, 3.1.A.2.c.(1), 3.1.B.1.b and 3.1.C.2. The format for CTS and ITS fundamentally differ in the presentation of shutdown tracks but the Completion Time requirements are the same. The CTS format has been changed to the ITS format.
Since there is no net change in plant operations, this is an administrative change.
Since there is no net change in plant operations, this is an administrative change.
40 Not used.
40 M
M            41 CTS 3.1 .A.2.a(1). CTS for pressurizer OPERABILITY require a steam bubble in the pressurizer and group A and B heaters operable. The ITS will require pressurizer level less than or equal to the pressurizer high water level Allowable Value and two heater groups capable of being powered from an emergency power supply. Since the pressurizer high water level Allowable Value is significantly below the level required to assure that there is a steam bubble in the pressurizer, this is a more restrictive change.
Not used.
41 CTS 3.1.A.2.a(1). CTS for pressurizer OPERABILITY require a steam bubble in the pressurizer and group A and B heaters operable. The ITS will require pressurizer level less than or equal to the pressurizer high water level Allowable Value and two heater groups capable of being powered from an emergency power supply. Since the pressurizer high water level Allowable Value is significantly below the level required to assure that there is a steam bubble in the pressurizer, this is a more restrictive change.
This change has been made to be consistent with NUREG-1431 and current NRC guidance. This change is acceptable since it will not introduce any unsafe plant operating or test conditions.
This change has been made to be consistent with NUREG-1431 and current NRC guidance. This change is acceptable since it will not introduce any unsafe plant operating or test conditions.
Prairie Island Units 1 and 2                           16                                    12/11/00
Prairie Island Units 1 and 2 12/11/00 Part D 16


Part D                                                               Package 3.4 NSHD        Change Category    Number                        Discussion of Change 3.4 M            42 CTS 3.1.A.2.a(3), 3.1.C.2.c, 3.1.C.2.d and 3.1.C.2.e. For consistency with NUREG-1431, the one hour to initiate actions necessary for shutdown has been deleted. This is more restrictive since the plant has one less hour prior to placing the plant in MODE 3. The time provided in the ITS is adequate to plan for and implement an orderly shutdown if required; thus this change is acceptable. This change does not place the plant in any unsafe operating conditions.
Part D NSHD Category M
M            43 CTS 3.1.A.2.a(3). New Required Actions have been provided for the possibility that the pressurizer is inoperable. These actions incorporate proposed TSTF-87, Rev. 1. This is more restrictive since PI CTS do not require these actions. This more restrictive change is included to make the PI ITS complete.
M M
M            44 A new SR, 3.4.9.1, has been added in conformance with the guidance of NUREG-1431. This SR will require periodic verification that the pressurizer water level is < 90%. This is more restrictive since PI CTS do not require this surveillance.
Change Number Package 3.4 Discussion of Change 3.4 42 CTS 3.1.A.2.a(3), 3.1.C.2.c, 3.1.C.2.d and 3.1.C.2.e. For consistency with NUREG-1431, the one hour to initiate actions necessary for shutdown has been deleted. This is more restrictive since the plant has one less hour prior to placing the plant in MODE 3. The time provided in the ITS is adequate to plan for and implement an orderly shutdown if required; thus this change is acceptable. This change does not place the plant in any unsafe operating conditions.
43 CTS 3.1.A.2.a(3). New Required Actions have been provided for the possibility that the pressurizer is inoperable. These actions incorporate proposed TSTF-87, Rev. 1. This is more restrictive since PI CTS do not require these actions. This more restrictive change is included to make the PI ITS complete.
44 A new SR, 3.4.9.1, has been added in conformance with the guidance of NUREG-1431. This SR will require periodic verification that the pressurizer water level is < 90%. This is more restrictive since PI CTS do not require this surveillance.
This more restrictive change is included to make the P1 ITS complete.
This more restrictive change is included to make the P1 ITS complete.
Prairie Island Units 1 and 2                           17                                    1/2/02
Prairie Island Units 1 and 2 1/2/02 17


Part D                                                               Package 3.4 NSHD       Change Category     Number                         Discussion of Change 3.4 M             45 CTS 3.1.A.2.b(1). CTS 3.1.A.2.b(1) requires two RCS pressurizer safety valves (PSVs) to be operable when the RCS temperature is > 350'F. This change will require two RCS PSVs to be operable whenever both RCS cold leg temperatures are greater than the OPPS enable temperature specified in the PTLR. This change is consistent with the guidance of NUREG-1431 and will provide additional overpressure protection when the RCS is between 350'F and the OPPS enable temperature. Since this change will require more components to be operable for more plant conditions, this is a more restrictive change. This change is acceptable because it does not cause any unsafe plant operating or testing conditions.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M
A           46 CTS 3.1.A.2.b(1). PI CTS License Amendment 123 allows pressurizer safety valves to be 2485 psig +/-3% when tested for operability. However, because of the particular wording in Specification 3.1 .A.2.b(1 ), it was not revised. The- intent of Amendment 123 was that if the operators were aware the setting was outside 2485 psig +/-1 % then they would not continue with their startup. CTS Table 4.1-2A, Item 3 requires verification that the settings are within +3. Thus, the change in LCO 3.4.10 is not a technical change since CTS already allow +3% tolerance on the valve settings and this is simply an administrative change.
45 CTS 3.1.A.2.b(1). CTS 3.1.A.2.b(1) requires two RCS pressurizer safety valves (PSVs) to be operable when the RCS temperature is > 350'F. This change will require two RCS PSVs to be operable whenever both RCS cold leg temperatures are greater than the OPPS enable temperature specified in the PTLR. This change is consistent with the guidance of NUREG-1431 and will provide additional overpressure protection when the RCS is between 350'F and the OPPS enable temperature. Since this change will require more components to be operable for more plant conditions, this is a more restrictive change. This change is acceptable because it does not cause any unsafe plant operating or testing conditions.
Prairie Island Units 1 and 2                           18                                       1/2/02
A 46 CTS 3.1.A.2.b(1). PI CTS License Amendment 123 allows pressurizer safety valves to be 2485 psig +/-3% when tested for operability. However, because of the particular wording in Specification 3.1.A.2.b(1 ), it was not revised. The-intent of Amendment 123 was that if the operators were aware the setting was outside 2485 psig +/- 1 % then they would not continue with their startup. CTS Table 4.1-2A, Item 3 requires verification that the settings are within +3. Thus, the change in LCO 3.4.10 is not a technical change since CTS already allow +3% tolerance on the valve settings and this is simply an administrative change.
Prairie Island Units 1 and 2 18 1/2/02


Part D                                                               Package 3.4 NSHD        Change Category    Number                        Discussion of Change 3.4-L            47 CTS 3.1.A.2.b(2). In conformance with NUREG-1431 guidance, this specification which requires one pressurizer safety valve operable when the head is on the reactor vessel has been not been retained. Since the pressurizer safety valves do not provide overpressurization protection when the RCS temperature is below the LTOP enable temperature, this specification serves no purpose. NUREG-1431 requires PSVs to be operable when the RCS temperature exceeds the LTOP enable temperature. Below the LTOP enable temperature, NUREG-1431 requires redundant PORVs to be OPERABLE at the LTOP lift settings or the RCS to be vented. Thus, this specification has not been retained. This change results in less restrictions on plant operation.
Part D NSHD Category L
Prairie Island Units 1 and 2                           19                                  12/11/00
Change Number 3.4-Package 3.4 Discussion of Change 47 CTS 3.1.A.2.b(2). In conformance with NUREG-1431 guidance, this specification which requires one pressurizer safety valve operable when the head is on the reactor vessel has been not been retained. Since the pressurizer safety valves do not provide overpressurization protection when the RCS temperature is below the LTOP enable temperature, this specification serves no purpose. NUREG-1431 requires PSVs to be operable when the RCS temperature exceeds the LTOP enable temperature. Below the LTOP enable temperature, NUREG-1431 requires redundant PORVs to be OPERABLE at the LTOP lift settings or the RCS to be vented. Thus, this specification has not been retained. This change results in less restrictions on plant operation.
Prairie Island Units 1 and 2 12/11/00 19


Part D                                                               Package 3.4 NSHD       Change Category     Number                         Discussion of Change 3.4 L           48 CTS 3.1.A.2.b(1). CTS requires the pressurizer safety valves (PSVs) to be operable in MODES 1, 2, and 3. A new Applicability Note has been included to be consistent with the guidance of NUREG-1431. This Note does not require the PSVs to meet the LCO lift setting limits in MODE 3, when the plant is started up, to allow adjusting the settings under hot conditions. Because this Note allows the PSVs to be potentially inoperable in MODE 3 until the PSVs can be tested and set, this change is less restrictive.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 L
48 CTS 3.1.A.2.b(1). CTS requires the pressurizer safety valves (PSVs) to be operable in MODES 1, 2, and 3. A new Applicability Note has been included to be consistent with the guidance of NUREG-1431. This Note does not require the PSVs to meet the LCO lift setting limits in MODE 3, when the plant is started up, to allow adjusting the settings under hot conditions. Because this Note allows the PSVs to be potentially inoperable in MODE 3 until the PSVs can be tested and set, this change is less restrictive.
This change is acceptable since the Note also requires preliminary lift settings under cold conditions prior to heatup which is consistent with current plant practices and the time during which the valves are potentially inoperable for valve setting adjustments is limited to 36 hours by the Note. The Note may improve plant safety by allowing more accurate settings under hot conditions.
This change is acceptable since the Note also requires preliminary lift settings under cold conditions prior to heatup which is consistent with current plant practices and the time during which the valves are potentially inoperable for valve setting adjustments is limited to 36 hours by the Note. The Note may improve plant safety by allowing more accurate settings under hot conditions.
A             49 CTS 3.1.A.2.c(1)(b). CTS required action explicitly requires the operators to "either restore the PORV to OPERABLE status or" take other appropriate actions. The option to restore equipment to operable status is always an available means of exiting the ITS Required Actions and, under the Writers Guide, this option should not be stated unless there are no other actions which should be taken. Thus this statement and similar statements within this CTS paragraph are not included in the ITS. Since it is understood that these are viable operator actions, this is an administrative change.
A 49 CTS 3.1.A.2.c(1)(b). CTS required action explicitly requires the operators to "either restore the PORV to OPERABLE status or" take other appropriate actions. The option to restore equipment to operable status is always an available means of exiting the ITS Required Actions and, under the Writers Guide, this option should not be stated unless there are no other actions which should be taken. Thus this statement and similar statements within this CTS paragraph are not included in the ITS. Since it is understood that these are viable operator actions, this is an administrative change.
Prairie Island Units l and 2                           20                                   12/11/00
Prairie Island Units l and 2 20 12/11/00


Part D                                                               Package 3.4 NSHID       Change Category      Number                         Discussion of Change 3.4-L            50 CTS 3.1 .A.2.c.(2). When the RCS temperature is greater than the Sl pump disable temperature and less than the OPPS enable temperature, CTS requires the plant to be in MODE 5 with the RCS depressurized and vented through at least a 3 square inch vent within 8 hours when a PORV is not restored within the allowed outage time or both PORVs are inoperable.
Part D NSHID Category L
Change Number 3.4-50 Discussion of Change CTS 3.1.A.2.c.(2). When the RCS temperature is greater than the Sl pump disable temperature and less than the OPPS enable temperature, CTS requires the plant to be in MODE 5 with the RCS depressurized and vented through at least a 3 square inch vent within 8 hours when a PORV is not restored within the allowed outage time or both PORVs are inoperable.
This change will allow 12 hours to place the plant in MODE 5, depressurize and vent the RCS under these conditions. This change is acceptable because 8 hours is considered by the industry to be insufficient time to perform an orderly shutdown.
This change will allow 12 hours to place the plant in MODE 5, depressurize and vent the RCS under these conditions. This change is acceptable because 8 hours is considered by the industry to be insufficient time to perform an orderly shutdown.
In addition, the requirement to place the unit in MODE 5 is consistent with the intent of the CTS. The additional time will maintain plant safety by allowing the operators to plan the shutdown and prevent challenges to plant systems which may initiate an overpressure event which the shutdown intends to prevent. This change is consistent with the guidance of NUREG-1431 as modified by approved TSTF-352, Revision 1.
In addition, the requirement to place the unit in MODE 5 is consistent with the intent of the CTS. The additional time will maintain plant safety by allowing the operators to plan the shutdown and prevent challenges to plant systems which may initiate an overpressure event which the shutdown intends to prevent. This change is consistent with the guidance of NUREG-1431 as modified by approved TSTF-352, Revision 1.
Since this change allows more time to fully implement remedial action, this is a less restrictive change.
Since this change allows more time to fully implement remedial action, this is a less restrictive change.
Prairie Island Units I and 2                           21                                    1/2/02
Prairie Island Units I and 2 1/2/02 Package 3.4 21


Part D                                                               Package 3.4 NSHD         Change Category     Number                       Discussion of Change 3.4 M             51 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). Restrictions on SI pump operability isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. New Action Statements are included for the possibility one (Specification 3.4.13) or two (Specification 3.4.12) SI pumps are capable of injecting into the RCS. CTS does not contain these action statement requirements; thus in this event CTS LCO 3.0.C (equivalent to PI ITS 3.0.3) would be entered which would allow 1 hour for action to be taken. Under these circumstances, 1 hour would be an inappropriate response time. The new Action Statements require immediate action which is more restrictive than CTS. This more restrictive change is included to make the PI ITS complete.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M
M             52 CTS 3.1 .A.2.c(2) and 3.1.A.2.c(3). Restrictions on ECCS accumulator isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. Associated action statements, clarifying notes for exceptions and applicability, and surveillance requirements, SRs 3.4.12.2 and 3.4.13.2, have been added. Adding LCO 3.4.12 and 3.4.13, Required Action C also added a 12 hour Completion Time that was not previously in the CTS. The 12 hour Completion Time is acceptable to PI since it is based on operating experience that the associated activities of Condition C can be accomplished in this time period and the low probability of an event requiring LTOP during the allowed times. Since these are added requirements they are more restrictive on plant operations.
51 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). Restrictions on SI pump operability isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. New Action Statements are included for the possibility one (Specification 3.4.13) or two (Specification 3.4.12) SI pumps are capable of injecting into the RCS. CTS does not contain these action statement requirements; thus in this event CTS LCO 3.0.C (equivalent to PI ITS 3.0.3) would be entered which would allow 1 hour for action to be taken. Under these circumstances, 1 hour would be an inappropriate response time. The new Action Statements require immediate action which is more restrictive than CTS. This more restrictive change is included to make the PI ITS complete.
M 52 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). Restrictions on ECCS accumulator isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. Associated action statements, clarifying notes for exceptions and applicability, and surveillance requirements, SRs 3.4.12.2 and 3.4.13.2, have been added. Adding LCO 3.4.12 and 3.4.13, Required Action C also added a 12 hour Completion Time that was not previously in the CTS. The 12 hour Completion Time is acceptable to PI since it is based on operating experience that the associated activities of Condition C can be accomplished in this time period and the low probability of an event requiring LTOP during the allowed times. Since these are added requirements they are more restrictive on plant operations.
These requirements have been included to make the P1 ITS complete and consistent with the guidance of NUREG-1431.
These requirements have been included to make the P1 ITS complete and consistent with the guidance of NUREG-1431.
Prairie Island Units I and 2                           22                                       1/2/02
Prairie Island Units I and 2 22 1/2/02


i      m      A  m Part D                                                             Package 3.4 NSHD       Change Category     Number                       Discussion of Change 3.4 LR           53 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). The specific status of associated equipment has been relocated to the Bases for consistency with NUREG-1431. These provisions are assumed to be part of the OPERABILITY requirement for the PORVs. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, relocation of CTS requirements to the Bases is a less restrictive change.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 LR 53 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). The specific status of associated equipment has been relocated to the Bases for consistency with NUREG-1431. These provisions are assumed to be part of the OPERABILITY requirement for the PORVs. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, relocation of CTS requirements to the Bases is a less restrictive change.
M           54 New SRs, 3.4.12.1, 3.4.12.2, 3.4.12.3, 3.4.13.1, 3.4.13.2, 3.4.13.3, and 3.4.13.4, have been added in conformance with NUREG-1431. These SRs require verification that only one (or no) SI pump capable of injecting, RCS is vented and PORV block valves are open as applicable for the MODES of operation and the method of providing overpressurization protection. Adding these SRs also added new Frequencies that are not in the CTS. Evaluating these new Frequencies, PI believes them to be applicable to our plant. The new Frequencies provide adequate times considering administrative controls available to the operator, using other indications and alarms available to the operator in the control room to verify required status of the equipment, and the unlikelyhood of a low temperature overpressure event occurring during this time.
M 54 New SRs, 3.4.12.1, 3.4.12.2, 3.4.12.3, 3.4.13.1, 3.4.13.2, 3.4.13.3, and 3.4.13.4, have been added in conformance with NUREG-1431. These SRs require verification that only one (or no) SI pump capable of injecting, RCS is vented and PORV block valves are open as applicable for the MODES of operation and the method of providing overpressurization protection.
Adding these SRs also added new Frequencies that are not in the CTS. Evaluating these new Frequencies, PI believes them to be applicable to our plant. The new Frequencies provide adequate times considering administrative controls available to the operator, using other indications and alarms available to the operator in the control room to verify required status of the equipment, and the unlikelyhood of a low temperature overpressure event occurring during this time.
These SRs are more restrictive on plant operations since CTS do not require these surveillances. This is consistent with the guidance of NUREG-1431. These more restrictive changes are included to make the PI ITS complete.
These SRs are more restrictive on plant operations since CTS do not require these surveillances. This is consistent with the guidance of NUREG-1431. These more restrictive changes are included to make the PI ITS complete.
55 Not used.
55 Not used.
Prairie Island Units 1 and 2                         23                                     1/2/02
Prairie Island Units 1 and 2 23 1/2/02 i
m A
m


Part D                                                                 Package 3.4 NSHD       Change Category     Number                         Discussion of Change 3.4 R             56 CTS 3.1.A.3 and 4.18. The reactor vessel head vent system specifications, CTS 3.1.A.3 and associated surveillance requirements in TS 4.18, are not included in the PI ITS since this system does not meet the 10CFR50.36 Technical Specification Selection Criteria. These vents are designed to exhaust noncondensable gases and steam from the RCS which could inhibit natural circulation following an accident with an extended loss of offsite power. Credit for this vent system is not assumed in the safety analyses nor in the PI IPE. Therefore, the reactor vessel head vent does not meet the TSSC and these requirements have been relocated to the TRM which is maintained under the regulatory controls of 10CFR50.59. This is consistent with the guidance of NUREG-1431 which does not include specifications for the reactor vessel head vent system.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R
56 CTS 3.1.A.3 and 4.18. The reactor vessel head vent system specifications, CTS 3.1.A.3 and associated surveillance requirements in TS 4.18, are not included in the PI ITS since this system does not meet the 1 OCFR50.36 Technical Specification Selection Criteria. These vents are designed to exhaust noncondensable gases and steam from the RCS which could inhibit natural circulation following an accident with an extended loss of offsite power. Credit for this vent system is not assumed in the safety analyses nor in the PI IPE. Therefore, the reactor vessel head vent does not meet the TSSC and these requirements have been relocated to the TRM which is maintained under the regulatory controls of 10CFR50.59. This is consistent with the guidance of NUREG-1431 which does not include specifications for the reactor vessel head vent system.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
The reactor coolant head vents are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the reactor coolant head vents do not meet criterion 1.
The reactor coolant head vents are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the reactor coolant head vents do not meet criterion 1.
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
The reactor head vents are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a Prairie Island Units I and 2                           24                                       1/2/02
The reactor head vents are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a Prairie Island Units I and 2 24 1/2/02


Part D                                                               Package 3.4 NSHD         Change Category     Number                         Discussion of Change 3.4 R           56 (continued) challenge to the integrity of a fission product barrier. PI does not take any credit for the reactor head vents in any accident analysis.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R
56 (continued) challenge to the integrity of a fission product barrier. PI does not take any credit for the reactor head vents in any accident analysis.
Therefore, the reactor head vents do not meet the criterion 2.
Therefore, the reactor head vents do not meet the criterion 2.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Line 1,287: Line 1,976:
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
The reactor head vents are not considered in the plant IPE and is not a system which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. Therefore, the reactor head vents do not meet criterion 4.
The reactor head vents are not considered in the plant IPE and is not a system which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. Therefore, the reactor head vents do not meet criterion 4.
Therefore, since the screening criteria have not been satisfied, the reactor head vent LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The reactor head vents will be relocated to the TRM which is controlled by the provisions of 10CFR50.59.
Therefore, since the screening criteria have not been satisfied, the reactor head vent LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The reactor head vents will be relocated to the TRM which is controlled by the provisions of 1 OCFR50.59.
Prairie Island Units I and 2                           25                                         1/2/02
Prairie Island Units I and 2 25 1/2/02


Part D                                                               Package 3.4 NSHD        Change Category    Number                          Discussion of Change 3.4-M            57 New Specification. In conformance with the guidance of NUREG 1431, a new specification, RCS Minimum Temperature for Criticality, is included in the PI ITS. CTS Figure 3.1-1 does include a line labeled "Criticality Limit"; however there are no action statements or applicability associated with this line on the curve.
Part D NSHD Category M
Change Number 3.4-Package 3.4 Discussion of Change 57 New Specification. In conformance with the guidance of NUREG 1431, a new specification, RCS Minimum Temperature for Criticality, is included in the PI ITS. CTS Figure 3.1-1 does include a line labeled "Criticality Limit"; however there are no action statements or applicability associated with this line on the curve.
The Bases for this new specification provide four considerations which the minimum temperature for criticality should satisfy.
The Bases for this new specification provide four considerations which the minimum temperature for criticality should satisfy.
Based on PI calculations and consistency with the Low-Low Tave setpoint, this LCO will specify 540&deg;F as the minimum allowable temperature. Compliance with this specification will assure that plant conditions are conservative with respect to the initial conditions assumed in the safety analyses. Since this is a new specification, it does place additional restrictions on plant operations and is thus categorized as more restrictive. This more restrictive change is included to make the P1 ITS complete.
Based on PI calculations and consistency with the Low-Low Tave setpoint, this LCO will specify 540&deg;F as the minimum allowable temperature. Compliance with this specification will assure that plant conditions are conservative with respect to the initial conditions assumed in the safety analyses. Since this is a new specification, it does place additional restrictions on plant operations and is thus categorized as more restrictive. This more restrictive change is included to make the P1 ITS complete.
58 Not used.
58 Not used.
59 Not used.
59 Not used.
60 Not used.
60 Not used.
Prairie Island Units 1 and 2                             26                                  12/11/00
Prairie Island Units 1 and 2 12/11/00 26


Part D                                                             Package 3.4 NSHD       Change Category     Number                         Discussion of Change 3.4 A             61 CTS 3.1.B.1.b. The requirements for maintaining RCS pressure and temperature limits has been broken into two sets of action statements, for conditions above 200&deg;F and for conditions below 200'F. This is a logical split since the CTS action is to reduce the temperature below 2000F which would be meaningless ifthe pressure and temperature limits were violated and the temperature were already below 200'F. Since the new action statement is addressed below, this change is considered administrative. This change also includes changing to the NUREG-1431 use of MODES to define plant conditions rather than use of prose descriptions. Since use of MODES does not change any plant operations, this is also an administrative change.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 A
M           62 CTS 3.1.8.1 .b. CTS do not specify a time frame for evaluating the integrity of the RCS following an out-of-limit condition. For consistency with NUREG-1431, a limit of 72 hours is included.
61 CTS 3.1.B.1.b. The requirements for maintaining RCS pressure and temperature limits has been broken into two sets of action statements, for conditions above 200&deg;F and for conditions below 200'F. This is a logical split since the CTS action is to reduce the temperature below 2000F which would be meaningless if the pressure and temperature limits were violated and the temperature were already below 200'F. Since the new action statement is addressed below, this change is considered administrative. This change also includes changing to the NUREG-1431 use of MODES to define plant conditions rather than use of prose descriptions. Since use of MODES does not change any plant operations, this is also an administrative change.
M 62 CTS 3.1.8.1.b. CTS do not specify a time frame for evaluating the integrity of the RCS following an out-of-limit condition. For consistency with NUREG-1431, a limit of 72 hours is included.
The 72 hour Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. The evaluation will determine whether the RCS structural integrity remains acceptable for continued operation. Since this is a new limit it is more restrictive on plant operation. This more restrictive change is included to make the P1 ITS complete.
The 72 hour Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. The evaluation will determine whether the RCS structural integrity remains acceptable for continued operation. Since this is a new limit it is more restrictive on plant operation. This more restrictive change is included to make the P1 ITS complete.
Prairie Island Units 1 and 2                           27                                     1/2/02
Prairie Island Units 1 and 2 27 1/2/02


Part D                                                              Package 3.4 NSHD       Change Category    Number                         Discussion of Change 3.4-M            63 CTS3.1.B.1.b. For consistency with NUREG-1431, new action statements have been included for out-of-limit conditions when the RCS is below 200 0 F. PI CTS do not address this condition. Since these are new requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.
Package 3.4 NSHD Category M
M            64 A new surveillance requirement, SR 3.4.3.1, has been included for consistency with NUREG-1431 which requires verification that RCS pressure, temperature and heatup and cooldown rates are within the specified limits. Plant operators currently monitor these variables for compliance with Specification 3.1 .B.1 .b although it is not explicitly written as a TS SR. Since these are new TS requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.
M Change Number 3.4-Discussion of Change 63 CTS3.1.B.1.b. For consistency with NUREG-1431, new action statements have been included for out-of-limit conditions when the RCS is below 200 0F. PI CTS do not address this condition. Since these are new requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.
65   Not used.
64 A new surveillance requirement, SR 3.4.3.1, has been included for consistency with NUREG-1431 which requires verification that RCS pressure, temperature and heatup and cooldown rates are within the specified limits. Plant operators currently monitor these variables for compliance with Specification 3.1.B.1.b although it is not explicitly written as a TS SR. Since these are new TS requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.
Prairie Island Units 1 and 2                           28                                  12/11/00
65 Not used.
Prairie Island Units 1 and 2 12/11/00 Part D 28


Part D                                                                   Package 3.4 NSHID       Change Category    Number                           Discussion of Change 3.4-R            66 CTS 3.1.B.2. In conformance with the guidance of NUREG-1431, the pressurizer heatup and cooldown specifications have been relocated from the TS to the PTLR. This change is acceptable since the Bases for Specification 3.4.3 state that the reactor pressure vessel is the most limiting component for brittle fracture; thus the requirements for the pressurizer have not been included in the ITS. The shutdown requirements associated with pressurizer heatup and cooldown limitations have been relocated to the TRM.
Part D NSHID Category R
Change Number 3.4-66 Package 3.4 Discussion of Change CTS 3.1.B.2. In conformance with the guidance of NUREG-1431, the pressurizer heatup and cooldown specifications have been relocated from the TS to the PTLR. This change is acceptable since the Bases for Specification 3.4.3 state that the reactor pressure vessel is the most limiting component for brittle fracture; thus the requirements for the pressurizer have not been included in the ITS. The shutdown requirements associated with pressurizer heatup and cooldown limitations have been relocated to the TRM.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
The Pressurizer Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 1.
The Pressurizer Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 1.
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Prairie Island Units 1 and 2                             29                                        1/2/02
Prairie Island Units 1 and 2 1/2/02 29


Part D                                                               Package 3.4 NSHD       Change Category     Number                       Discussion of Change 3.4 R           66 (continued)
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R
66 (continued)
The Pressurizer Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Pressurizer Pressure/Temperature Limits in any accident analysis. Therefore the Pressurizer Pressure/Temperature Limits do not meet the criterion 2.
The Pressurizer Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Pressurizer Pressure/Temperature Limits in any accident analysis. Therefore the Pressurizer Pressure/Temperature Limits do not meet the criterion 2.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Line 1,321: Line 2,015:
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
The Pressurizer Pressure/Temperature Limits are a structure, system or component. Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 4.
The Pressurizer Pressure/Temperature Limits are a structure, system or component. Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 4.
Prairie Island Units I and 2                          30                                         1/2/02
Prairie Island 30 1/2/02 Units I and 2


Part D                                                               Package 3.4 NSHD       Change Category     Number                         Discussion of Change 3.4 R           66 (continued)
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R
66 (continued)
Therefore, since the screening criteria have not been satisfied, the Pressurizer Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Pressurizer Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.
Therefore, since the screening criteria have not been satisfied, the Pressurizer Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Pressurizer Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.
R           67 CTS 3.1..B.3. In conformance with the guidance of NUREG 1431, the Steam Generator pressure/temperature limits have been relocated to the PTLR. This operating restriction does not present a challenge to the integrity of a fission product barrier and this limit is not required for safe operation. These specifications do not meet the Technical Specification Selection Criteria defined in 10CFR50.36. The shutdown requirements associated with this pressure/temperature limit have been relocated to the TRM.
R 67 CTS 3.1..B.3. In conformance with the guidance of NUREG 1431, the Steam Generator pressure/temperature limits have been relocated to the PTLR. This operating restriction does not present a challenge to the integrity of a fission product barrier and this limit is not required for safe operation. These specifications do not meet the Technical Specification Selection Criteria defined in 10CFR50.36. The shutdown requirements associated with this pressure/temperature limit have been relocated to the TRM.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
The Steam Generator Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 1.
The Steam Generator Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 1.
Prairie Island Units 1 and 2                           31                                     1/2/02
Prairie Island Units 1 and 2 31 1/2/02


Part D                                                                 Package 3.4 NSHD         Change Category     Number                         Discussion of Change 3.4 R           67 (continued)
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R
67 (continued)
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
The Steam Generator Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Steam Generator Pressure/Temperature Limits in any accident analysis. Therefore, the Steam Generator Pressure/Temperature Limits do not meet the criterion 2.
The Steam Generator Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Steam Generator Pressure/Temperature Limits in any accident analysis. Therefore, the Steam Generator Pressure/Temperature Limits do not meet the criterion 2.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
The Steam Generator Pressure/Temperature Limits are not structures, systems or components that are part of the primary success path which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 3.
The Steam Generator Pressure/Temperature Limits are not structures, systems or components that are part of the primary success path which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 3.
Prairie Island Units I and 2                           32                                       1/2/02
Prairie Island Units I and 2 32 1/2/02


Part D                                                             Package 3.4 NSHD       Change Category    Number                         Discussion of Change 3.4-R            67 (continued)
Part D NSHD Category R
Change Number 3.4-Discussion of Change 67 (continued)
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
The Steam Generator Pressure/Temperature Limits are not a structure, system or component. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 4.
The Steam Generator Pressure/Temperature Limits are not a structure, system or component. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 4.
Therefore, since the screening criteria have not been satisfied, the Steam Generator Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Steam Generator Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.
Therefore, since the screening criteria have not been satisfied, the Steam Generator Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Steam Generator Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.
Prairie Island Units 1 and 2                           33                                    31/2/02
Prairie Island Units 1 and 2 31/2/02 Package 3.4 33


Part D                                                                  Package 3.4 NSHD         Change Category      Number                         Discussion of Change 3.4-L            68 CTS 3.1.C.1. CTS requires two means of leakage detection. One of those means is specified as the radionuclide detection instrumentation, the other means is not specified. For consistency with the guidance of NUREG-1431, a second means of detecting RCS leakage, containment sump A pump run time, has been specified. This is a more restrictive change which is acceptable since it is consistent with CTS Bases and USAR.
Package 3.4 NSHD Category L
Change Number 3.4-Discussion of Change 68 CTS 3.1.C.1. CTS requires two means of leakage detection. One of those means is specified as the radionuclide detection instrumentation, the other means is not specified. For consistency with the guidance of NUREG-1431, a second means of detecting RCS leakage, containment sump A pump run time, has been specified. This is a more restrictive change which is acceptable since it is consistent with CTS Bases and USAR.
Also in conformance with the guidance of NUREG-1431, action statements and remedial actions, in the event one or both means of leakage detection are inoperable, have been provided. The CTS are unnecessarily restrictive in that inoperability of one means of leakage detection requires shutdown of the plant. There are remedial measures which can be implemented to compensate for an inoperable leakage detection channel as allowed by NUREG 1431. The PI ITS includes provisions for compensatory sampling and surveillance testing if leakage detection channels are inoperable. Implementation of this change will provide increased plant operational flexibility and thus this is a less restrictive change.
Also in conformance with the guidance of NUREG-1431, action statements and remedial actions, in the event one or both means of leakage detection are inoperable, have been provided. The CTS are unnecessarily restrictive in that inoperability of one means of leakage detection requires shutdown of the plant. There are remedial measures which can be implemented to compensate for an inoperable leakage detection channel as allowed by NUREG 1431. The PI ITS includes provisions for compensatory sampling and surveillance testing if leakage detection channels are inoperable. Implementation of this change will provide increased plant operational flexibility and thus this is a less restrictive change.
69 Not used.
69 Not used.
70 Not used.
70 Not used.
Prairie Island Units I and 2                           34                                      12/11/00
Prairie Island Units I and 2 12/11/00 Part D 34


Part D                                                             Package 3.4 NSHID      Change Category    Number                          Discussion of Change 3.4 A            71 CTS 3.1.C.1. The CTS requirements described here are the same as ITS LCO 3.0.3 (CTS LCO 3.0.c) which is the appropriate action if no leakage detection instrumentation is operable. Thus this is rewritten to require immediate entry into LCO 3.0.3. The change of applicability of this requirement is addressed in L3.4-68. The time and the implications of the use of the time are the same; therefore this is an administrative change.
Part D NSHID Category A
M            72 Four new SRs, 3.4.16.1, 3.4.16.2, 3.4.16.3 and 3.4.16.4, have been included to perform Channel Checks, COTs and Calibrations of containment radiation monitors and Calibration of sump pump run time instrumentation. Since these requirements are new to the PI TS they are considered more restrictive to plant operation.
M A
Change Number Package 3.4 Discussion of Change 3.4 71 CTS 3.1.C.1. The CTS requirements described here are the same as ITS LCO 3.0.3 (CTS LCO 3.0.c) which is the appropriate action if no leakage detection instrumentation is operable. Thus this is rewritten to require immediate entry into LCO 3.0.3. The change of applicability of this requirement is addressed in L3.4-68. The time and the implications of the use of the time are the same; therefore this is an administrative change.
72 Four new SRs, 3.4.16.1, 3.4.16.2, 3.4.16.3 and 3.4.16.4, have been included to perform Channel Checks, COTs and Calibrations of containment radiation monitors and Calibration of sump pump run time instrumentation. Since these requirements are new to the PI TS they are considered more restrictive to plant operation.
These SRs have been included for consistency with NUREG-1431.
These SRs have been included for consistency with NUREG-1431.
These more restrictive changes are included to make the PI ITS complete.
These more restrictive changes are included to make the PI ITS complete.
A            73 CTS 3.1 .C.2.a. The CTS specifics of where leakage is not originating from have not been included in ITS LCO 3.4.14. The ITS definition of LEAKAGE includes the required details of what is considered leakage; thus these details are not necessary in the specification. Since this change does not change any plant operations, this is an administrative change.
73 CTS 3.1.C.2.a. The CTS specifics of where leakage is not originating from have not been included in ITS LCO 3.4.14. The ITS definition of LEAKAGE includes the required details of what is considered leakage; thus these details are not necessary in the specification. Since this change does not change any plant operations, this is an administrative change.
Prairie Island Units 1 and 2                           35                                12/11/00
Prairie Island Units 1 and 2 12/11/00 35


Part D                                                               Package 3.4 NSHD       Change Category    Number                         Discussion of Change 3.4-LR            74 CTS 3.1.C.2.b. The requirement to evaluate the leakage for continued safe operation is a level of detail beyond that contained within NUREG-1 431. Therefore this requirement has been relocated to the Bases. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, this change is less restrictive.
Part D NSHD Category LR Change Number 3.4-74 Package 3.4 Discussion of Change CTS 3.1.C.2.b. The requirement to evaluate the leakage for continued safe operation is a level of detail beyond that contained within NUREG-1 431. Therefore this requirement has been relocated to the Bases. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, this change is less restrictive.
75 Not used.
75 Not used.
76 Not used.
76 Not used.
A           77 CTS 3.1.C.2.d. The CTS requirement to remain in COLD SHUTDOWN until the condition is corrected is not included in ITS specification 3.4.14. The rules of ITS use in LCO 3.0.4 require ITS LCOs to be met prior to resumption of power operation. Thus, it is unnecessary to include these requirements in ITS LCO 3.4.14.
A 77 CTS 3.1.C.2.d. The CTS requirement to remain in COLD SHUTDOWN until the condition is corrected is not included in ITS specification 3.4.14. The rules of ITS use in LCO 3.0.4 require ITS LCOs to be met prior to resumption of power operation. Thus, it is unnecessary to include these requirements in ITS LCO 3.4.14.
Since the change does not involve any changes to plant operations, this is an administrative change.
Since the change does not involve any changes to plant operations, this is an administrative change.
Prairie Island Units 1 and 2                           36                                  12/11/00
Prairie Island Units 1 and 2 12/11/00 36


Part D                                                                   Package 3.4 NSHD         Change Category     Number                         Discussion of Change 3.4 A           78 CTS 3.1.C.2.e. CTS requires inservice steam generator tube inspection in accordance with TS 4.12. Since this TS has been relocated to the Steam Generator Program in ITS Section 5.5, no technical changes are associated with this change; therefore, this is an administrative change.
Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 A
L           79 CTS 3.1 .C.3. A new action statement is included in the ITS which allows 4 hours to isolate the flow path of a PIV with leakage outside the allowed limits and 72 hours to restore the PIV to within limits. CTS allows one hour to initiate shutdown. These changes are consistent with the guidance of NUREG-1431. These changes are acceptable since the safety function of the PIV is met once the PIV flow path is isolated. Furthermore, the isolation valve is also required to meet the same leakage limits as the PIV, in accordance with the additional new requirement for isolation valve leakage limits. An additional three hours to take action is acceptable since these leakage limits are very conservative and it is very unlikely that these valves will suffer complete failure during this limited time. When the PIV flow path is isolated, this may cause some other system, such as RHR, to be inoperable and require entry into an Action Statement for another Specification which would require completion of required actions within 72 hours. Thus this change is consistent with other allowed outage times for significant safety features. Since this change allows additional plant operational flexibility, this is a less restrictive change.
78 CTS 3.1.C.2.e. CTS requires inservice steam generator tube inspection in accordance with TS 4.12. Since this TS has been relocated to the Steam Generator Program in ITS Section 5.5, no technical changes are associated with this change; therefore, this is an administrative change.
Prairie Island Units 1 and 2                           37                                       12/11/00}}
L 79 CTS 3.1.C.3. A new action statement is included in the ITS which allows 4 hours to isolate the flow path of a PIV with leakage outside the allowed limits and 72 hours to restore the PIV to within limits. CTS allows one hour to initiate shutdown. These changes are consistent with the guidance of NUREG-1431. These changes are acceptable since the safety function of the PIV is met once the PIV flow path is isolated. Furthermore, the isolation valve is also required to meet the same leakage limits as the PIV, in accordance with the additional new requirement for isolation valve leakage limits. An additional three hours to take action is acceptable since these leakage limits are very conservative and it is very unlikely that these valves will suffer complete failure during this limited time. When the PIV flow path is isolated, this may cause some other system, such as RHR, to be inoperable and require entry into an Action Statement for another Specification which would require completion of required actions within 72 hours. Thus this change is consistent with other allowed outage times for significant safety features. Since this change allows additional plant operational flexibility, this is a less restrictive change.
Prairie Island Units 1 and 2 37 12/11/00}}

Latest revision as of 17:49, 16 January 2025

Attachment 3 to Supplement Dated 02/15/2002 to License Amendment Request Dated 12/11/2000 Conversion to Improved Technical Specification Revision 9 Change Pages
ML021900574
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/15/2002
From: Nazar M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021900574 (150)


Text

Prairie Island Nuclear Generating Plant to Supplement dated February 15, 2002 to License Amendment Request dated December 11, 2000 Conversion to Improved Technical Specifications (ITS)

Revision 9 Change Pages

Remove 3.4.1-2 3.4.5-1 3.4.5-4 3.4.6-1 3.4.6-2 3.4.6-3 3.4.7-1 3.4.7-2 3.4.7-3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.,4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 improved Technical Specifications Supplement dated 2/1 5/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 3.4.8-1 3.4.8-2 3.4.8-3 3.4.10-2 3.4.12-1 3.4.12-2 3.4.12-3 3.4.12-4 3.4.13-1 3.4.13-2 3.4.13-3 3.4.13-4 3.4.13-5 3.4.14-3 3.4.17-1 3.4.17-2 3.4.17-3 B 3.4.1-5 B 3.4.3-5 B 3.4.5-3 Insert 12/11/00 9/4/01 12111/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12fl11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/ 00 12111/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 9/4/01 1 of 13

Remove 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 Insert 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/1100 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B B

B Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 12/11/00 12/11/00 12/11/00 S12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 1 0........0...

12/11/00 12/11/00 1211/ I00 12/11/00 12/11/00 12/111100

...z.......................

12/11/00 i12/11/00 i12/11/00 B 3.4.5-4 B 3.4.5-7 B 3.4.5-8 B 3.4.6-2 B 3.4.6-3 B 3.4.6-4 B 3.4.6-5 B 3.4.6-6 B 3.4.7-2 B 3.4.7-4 B 3.4.7-5 B 3.4.7-6 B 3.4.8-2 B 3.4.8-3 B 3.4.8-4 B 3.4.12-1 B 3.4.12-2 B 3.4.12-3 B 3.4.12-4 B 3.4.12-5 B 3.4.12-6 B 3.4.12-7 B 3.4.12-8 B 3.4.12-9 B 3.4.12-10 B 3.4.12-11 B 3.4.13-1 B 3.4.13-2 2 of 13

Remove B 3.4.13-3 B 3.4.13-4 S 3........

1....3.-.......

B 3.4.13-5 1 3 -7 B 3.4.13-6 B 3.4.13-7 B 3.4.13-1 B 3.4.13-1 B 3...........4............13

-12 B 3.4.13-13 B 3.4.13-17 B 3.4.13-11 B 3.4.13-12 B 3.4.14-7 B 3.4.17-3 B 3.4.17-4 B 3.4.17-5 Cover Page 1 of 28 S2of 28 3 of 28 4 of 28 5 of 28 6 of 28 7 of 28 Insert 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 2

2 8 of 28 9 of 28 10 of 28 11 of 28 12 of 28 13 of 28 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 B

B B

B B

B B

B B

B B

B B

B B

3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 C

C C

C C

C C

C C

C C

C C

C 3 of 13

Remove Insert Chapter/

Revision/

Chapterl Section Part Page Date Section 3.4 C

14 of 28 3A.

3.4 C

15 of 28 3.4

~~~~~~~~~~~~~~~~.

3.4 C

16of28 3.4 3.4 C

17 of 28 3A4

~~~~~~~~~~~~~~~~~--

3.4 C

18 of 28 34

-~~~~~~~~~~~~~~~~ ~~~~~~~~

....................N } *...................

3.4 C

19 of 28 2

3.4 3.4 C

20 of 28 2

3.4

.....4..............

.................. -*.i 3.4 C

21 of 28 3

3.4

. C 2 of 28 34

% 4.........

i%

4o *.......

.2........

i!

3.4 C

24 of 28 2

3.4 S.....3 14 c................

o i *......

. 2.....

..........i :

3.4 C

235of 28 34

-3 4....

......... i c.......

2.

3.4 C

246of 28 2

3.4 C

3.4 C

257of 28

.23-4 3.4 C

2-of28 23 3.4 C

i C

3.4 C

27o 823.4 3.4 D

5 12/11/00 34 3.4........

3.4 D

11 12/11/003 3.4 D

12

'*12/11/00 3

3.4 D

13 12/11/00

34.

3.4 D

14 12/11/00 34 3.4 D

15 12/11/00 34

.3 4

D 2

./00.3 4.*

t

.."..3.

3.4 D

17 12/11/00 34 3.4 D

18 12/11/00 34 3.4 D

19 12/11/00 3.4 4 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS

00!/ [IL 00!1 V IZ!

001 !-I1!

0014 IZý 0014 Iz 00/1* I/Z L 001 1 VIZ!

00/ 1 /Z I 001 * -IzL 00/ V Z!

00!L /IOZ 0011,11Z!

001/,1.1* 1 00/* ý 1/

00/* LIZ 00/* 1 /zL lpesul Cl (3

S...........

Ci ci c3 ci ci Cl S..

ci (3

ci ci ci ci ci ci ci ci Cl Cl

{3 G

ci ci ci Cl ci ci ci Gi Ci eAO WON

£CL JO 9 "t7" C tic*

V "£ tic*

ti'c ti'c ti7" "ti'c ti c Vic ti'c

..........i......

Zc 9c ge cc 6Z BZ LC 9Z 6ZZ 0*

SNOIIoflU.LSNI!SNIIVCdfl Ii-a e5ej e5ueqO 6 UO!S!AG~1 Zog / palep iueweiddns SUf2o!JeipoadS IBOIULIOGI_ paAodwj

Remove D

D D

D D

D D

D D

D D

D D

E E

E E

E E

E E

E E

E E

E E

E E

Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Insert 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 2

4 1

3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4.1-3 3.4.5-1 3.4.5-4 3.4.6-1 3........

6 3.4.6-2 i3.4.6-3 3.4.6-4 3.4.7-1 3.4.7-2 3.4.7-3 3.4.7-4 3.4.8-1

=...............................

3.4.8-2 3.4.8-3 3.4.10-2 3.4.12-1 6 of 13 S...

S.

4.

Remove Insert Chapter/

Revision/

Chapter!

Section Part Page Date

,Section 3.4 E

3.4.12-2 3.4

-3

4

~~~

~ ~~

i E......

3.4 E

3.4.12-4 34 A

3.4 E

3.4.12-5 3.4 3.4 E

3.4.12-7 2

,4

3.

F3.4.13-1.

3.4 E

3.4.13-3 63.4 3.4 E

3.4.13-4 A

3.4 E

3.4.13-5 34;:

3.4 E

3.4.13-6 i

A*,

3.4 E

3.4.14-3 2

3.4 3.4 E

3.4.17-1 3.4E 3.4.17-2 3.4 3.4 E

3.4.17-3 3.4 E

B3.4.1-7 3.4 3.4 E

B 3.4.3-6 3.4 3.4 E

B 3.4.5-3 34,

3.4 E

B 3.4.5-5 3.4 3.4 F

B 3.4.5-8 3.4 E

B 3.4.5-9 3ý4 3.4 E

B3.4.67-2 3.4 3.4 E

B 3.4.6-4 3 4 3.4 ~

~

B 3..65....

A 3.4 E

B 3.4.-7 3.4

................... 3 1 4

i*

"*i 3.4 E

B 3.4.36-3.4 4

S......

14

-B ----

4 ----

3.4 E

B 3.4.7-2 3.4 3.4 E

B 334.7-3 A

7 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS

Remove Chapter/

Section Part 3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E S........

3.4 E

3.4 E

3.4 E

3.4 E

3............4

.E 3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 E

3.4 iE Insert B 3.4.7-4 B 3.4.7-5 B 3.4.7-6 B 3.4.7-7 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS B 3.4.8-2 B 3.4.8-3 B 3.4.8-4 B 3.4.8-5 B 3.4.12-1 B 3.4.12-2 B 3.4.12-3 B 3.4.12-4 B 3.4.12-5 B 3.4.12-6 B 3.4.12-7 B 3.4.12-8 B 3.4.12-9 B 3.4.12-10 B 3.4.12-11 B 3.4.12-12 B 3.4.12-13 B 3.4.12-14 B 3.4.12-15 B 3.4.12-16 B 3.4.12-17 B 3.4.12-18 B 3.4.12-19 B 3.4.12-15 S.......1........

B 3.4.12-16 B 3.4.12-17 B 3.4.12-18 B 3.4.12-19 B 3.4.12-20 B 3.4.12-21 2

8 of 13

Remove Chapter/

Revisioi Section Part Page Date 3.4 E

B 3.4.12-22 3.4 E

B 3.4.13-1 3.4 E

B 3.4.13-2 3.4 E

B 3.4.13-3 3.4 E

B 3.4.13-4 3...........

B 3. 4 5

3.4 E

B 3.4.13-2 3.4 E

iB 3.4.13-7 3.4 E

B 3 3.4 E

B 3.4.13-9 3.4 E

B 3.4.13-1 3.4 E

B 3.4.13-11 3.4

.E B 3.4.13-1 3.4 E

B 3.4.13-13 3.4 E

B 3.4.13-14 3.4 E

B 3.4.14-93 3.4 E

B 3.4.13-5 3.4 E

B 3.4.17-6 3.4 E

B 3.4.17-7 3.4 E

B 3.4.17-8 3.4 F

2 12/11/00 3.4 F

3 5/1/01 3.4 F

4 12/1 1100 3.4 F

5 941401 3.4 F

6 12/1 1/00 3.4 F

7 12/111/00 3.4 F

8 12/11/00 3.4 EF 9

12/11/00 3.4 F

10 12/11/00 improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS Insert 9 of 13

Remove Insert Chapter/

Revision!

Chapter!

Section Part Page Date Section 3.4 F

11 12/11/00 3.4 3.4 F

212/11/00 34 3.4 F

13 12/11/00 3.4 iF 14 12/11100 34*

.......... 4.

3.4 F

16 12/11/00 3.4 3.4 F

18 12/11/00 3.4 3.4 F

012/11/00 3.4 3.4 F

22 12/11/00 34

......................i; i o.........

3.4 F

21 12/11/00 34

...4........

..............-F

  • i D.............

3.4 F

412/11/00 34 3.4 F

25 12/11/00 i3 0......

3...........

3.4 F

27 12/11/00 3.4 3.4F 2802110 3.4 3.4 F

912/11/0034 3.4 F21 12/11/00

~

3.4 S.....................

..........7

.i;

~ i 0......

3.4 F

33 12/11/00 3.4 3.4 F

23 12/11/00 34 3.4 F

38 12/11/00 3.4 3.4 F23 12/11/00 3.4 3.4 F

40 12/11/00 34 10 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS

Remove Chapter/

Section Part 3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

3.4 F

G G

G G

G G

G G

G G

G G

G 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.6 3.6 3.6 3.6 3.6 B

B B

B B

Insert 41 42 43 44 45 46 1

3 7

13 14 34 37 3.6.3-2 3.6.8-1 3.6.8-2 3.6.8-3 3.6.8-4 2/20/01 12.11/ 00 12/11/00 12/11/00 12/11/00 9/4/01 5/1/01 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 12/11/00 5/1/01 5/1/01 5/1/0 1 5/1/01 5/1/01 11 of 13 improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS

CLb J0 Z 9C 9

6-V'919 9

D 9T 9

6-CV9T S Bl 9T i.....

.. i......

$9TK 9

9-V9'9T8 B9'C i....................-.....

z-

-8*9T 3

9T 9

.B 3

9C z9-8'9 3

9T 9"C 9

-9'9'"

9'C

~~.

/.£ z

C z

C'9C3 K

Lo0/L./

99 oi 9.9 i7.............

i i -...............%

i * *

7.........

7 !.......

7 o G................

'*K.

K0 fKIS 9 '

a 9 "C 4< *

[ *[/4/9 6

s 9"£ C

Sti!

[0IL/S

-'9"9 0

i Tc St[/L/S Cc G09 0 ~

9*

WWVZS CS

~~~~~~~

......Ol...9...9

~~~~~~~~~~.....

!i:

9'C.1 999 9'C M4/9 99[/S V-9'9TS a

9TS 39 9c

[4/V9 9-9*9T9 S

NO9 9_ C NLOWS V-'9C 9L9 9,C

i.

.9 001

/Z 99 D

9 9*

  • [p/S O[-9'p 9u 9dn u o 9

L*/ /zIu

-9'9 9p d

9.9 K9 9

9T

[O/[ý/z L-9*9'95 a

K,

[0/U [/5 9*9*93 5

e 9*C

!R9 59*

[O/[Z-6-'9 95 8

99C ci 00/~

uo/Oe eie9 Sono9T sua eozd 9e*

uoe p/LsAO-9dWI 9

Remove Insert Rhpemov Revision!

Chapter!

Section Part Page Dat Section

!ii*!!**

3.6 E

B 3.6.8-1 3.6 E

B 3.6.8-4 2

6 3.6 E

B 3.6.8-5 2,36 i

3.6 E

B 3.6.8-6 1 2 3.6 E

B 3.6.8-7 2

S.

3.6 F

5 12/1/01 36 3.6 F

20 5/1/01 3 6 3.6 F

21 5/1/01 3.6

...................[.................................

3.6 F

23 5/1/01 3.6 3.6 F

29 5/1/01 3.6 3.6 G

1 5/1/01 3,6 3.6 G

3 5/11/01 3.6 3.6 G

34 5/1/01 36 3.6 G

35 5/1/01 3.6 13 of 13 Improved Technical Specifications Supplement dated 2/15/02 Revision 9 Change Page List UPDATING INSTRUCTIONS

RCS Pressure, Temperature, and Flow - DNB Limits 3.4.1 CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure is greater than or equal 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to the limit specified in the COLR.

SR 3.4.1.2 Verify RCS average temperature is less than or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> equal to the limit specified in the COLR.

SR 3.4.1.3 Verify RCS total flow rate is within the limit 24 months specified in the COLR.

Prairie Island Units 1 and 2 3.4.1-2 1/2/02

RCS Loops - MODE 3 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Loops-MODE 3 LCO 3.4.5 Two RCS loops shall be OPERABLE, and either:

a. Two RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or
b. One RCS loop shall be in operation when the Rod Control System is not capable of rod withdrawal.

N O TE --------------------------------------

Both reactor coolant pumps may be de-energized for _< 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to perform preplanned work activities provided:

a.

No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and

b.

Core outlet temperature is maintained at least 10°F below saturation temperature.

APPLICABILITY:

MODE 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One RCS loop A.1 Restore inoperable RCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable, loop to OPERABLE status.

Prairie Island Units 1 and 2 3.4.5-1 1/2/02

RCS Loops - MODE 3 3.4.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify required RCS loops are in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.5.2 Verify required steam generator capable of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> removing decay heat.

SR 3.4.5.3 NOTE ------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a required pump is not in operation.

Verify correct breaker alignment and indicated 7 days power are available to each required pump.

Prairie Island Units 1 and 2 3.4.5-4 1/2/02

RCS Loops-MODE 4 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Loops - MODE 4 LCO 3.4.6 Two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and one loop shall be in operation.

NOTES -------------------------------------

1.

All reactor coolant pumps (RCPs) and RHR pumps may be de energized for _< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and

b.

Core outlet temperature is maintained at least 10'F below saturation temperature.

2.

No RCP shall be started with any RCS cold leg temperature < the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:

a.

The secondary side water temperature of each steam generator (SG) is _< 50'F above each of the RCS cold leg temperatures; or

b.

There is a steam or gas bubble in the pressurizer.

APPLICABILITY:

MODE 4.

Prairie Island Units 1 and 2 3.4.6-1 1/2/02

RCS Loops - MODE 4 3.4.6 ACTIONS CONDITION A.

One required loop inoperable.

B.

Both loops inoperable.

OR Required loop not in operation.

REQUIRED ACTION COMPLETION TIME A. 1 Initiate action to restore a second loop to OPERABLE status.

AND A.2 ----------

NOTE------

Only required if RHR loop is OPERABLE.

Be in MODE 5.

-I-F B. 1 Suspend operations that would cause introduction into the RCS, coolant with boron concentration less than required to meet SDM of LCO 3.1.1.

AND B.2 Initiate action to restore one loop to OPERABLE status and operation.

Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Immediately Immediately Prairie Island Units 1 and 2 3.4.6-2 1/2/02

RCS Loops - MODE 4 3.4.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify required RHR or RCS loop is in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> operation.

SR 3.4.6.2 Verify required SG capable of removing decay 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> heat.

SR 3.4.6.3 NOTE -------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a required pump is not in operation.

Verify correct breaker alignment and indicated 7 days power are available to each required pump.

Prairie Island Units 1 and 2 3.4.6-3 1/2/02

RCS Loops - MODE 5, Loops Filled 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Loops-MODE 5, Loops Filled LCO 3.4.7 One residual heat removal (RUR) loop shall be OPERABLE and in operation, and either:

a. One additional RHR loop shall be OPERABLE; or
b. One steam generator (SG) shall be capable of removing decay heat.

N OTES ------------------------------------

1.

The RHR pump of the loop in operation may be de-energized for *< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1; and

b.

Core outlet temperature is maintained at least 10°F below saturation temperature.

2.

One required RHR loop may be inoperable for _< 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RI-R loop is OPERABLE and in operation.

3.

No reactor coolant pump shall be started with one or more RCS cold leg temperatures _< the Over Pressure Protection System (OPPS) enable temperature specified in the PTLR unless:

a. The secondary side water temperature of each SG is _< 50'F above each of the RCS cold leg temperatures; or
b. There is a steam or gas bubble in the pressurizer.
4.

Both RHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.

Prairie Island Units 1 and 2 3.4.7-1 1/2/02

RCS Loops - MODE 5, Loops Filled

3.4.7 APPLICABILITY

MODE 5 with RCS loops filled.

A CTIONS, A__________________________________________________

TI N CONDITION A.

One required RHR loop inoperable.

AND One RHR loop OPERABLE.

B. One or more SGs not capable of decay heat removal.

AND One RHR loop OPERABLE.

REQUIRED ACTION A. 1 Initiate action to restore a second RHR loop to OPERABLE status.

OR A.2 Initiate action to restore required SG capable to remove decay heat.

r B. 1 Initiate action to restore a second RHR loop to OPERABLE status.

OR B.2 Initiate action to restore a required SG capable to remove decay heat.

L _______________________________

a COMPLETION TIME Immediately Immediately Immediately Immediately Prairie Island Units 1 and 2 3.4.7-2 1/2/02

RCS Loops - MODE 5, Loops Filled 3.4.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. No required RHR loops C.1 Suspend operations that Immediately OPERABLE.

would cause introduction into the RCS, coolant with AND boron concentration less than required to meet SDM Required RHR loop not of LCO 3.1.1.

in operation.

AND C.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.

Prairie Island Units 1 and 2 3 4.7-3 1/2/02

RCS Loops - MODE 5, Loops Filled 3.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 Verify required RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.7.2 Verify required SG capable of removing decay 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> heat.

SR 3.4.7.3 NOTE Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a required pump is not in operation.

Verify correct breaker alignment and indicated 7 days power are available to each required RHR pump.

Prairie Island Units I and 2 3.4.7-4 1/2/02

RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops - MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.

NOTES --------------------------------------

1.

All RHR pumps may be de-energized for s< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a.

No operations are permitted that would cause introduction into the RCS, coolant with boron concentration less than required to meet the SDM of LCO 3.1.1;

b.

The core outlet temperature is maintained > 10°F below saturation temperature; and

c.

No draining operations to further reduce the RCS water volume are permitted.

2.

One RHR loop may be inoperable for _< 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

APPLICABILITY:

MODE 5 with RCS loops not filled.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required RHR loop A. I Initiate action to restore Immediately inoperable.

RHR loop to OPERABLE status.

Prairie Island Units 1 and 2 3.4.8-1 1/2/02

RCS Loops - MODE 5, Loops Not Filled 3.4.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. No required RHR loop B.1 Suspend operations that Immediately OPERABLE.

would cause introduction into the RCS, coolant with OR boron concentration less than required to meet SDM Required RHR loop not in of LCO 3.1.1.

operation.

AND NOTE A Safety Injection pump may be run as required to maintain adequate core cooling and RCS inventory.

B.2 Initiate action to restore one Immediately RHR loop to OPERABLE status and operation.

Prairie Island Units 1 and 2 3.4.8-2 1/2/02

RCS Loops - MODE 5, Loops Not Filled 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify required RHR loop is in operation.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.8.2 NOTE ---------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a required pump is not in operation.

Verify correct breaker alignment and indicated 7 days power are available to each required RHR pump.

Prairie Island Units 1 and 2 3.4.8-3 1/2/02

Pressurizer Safety Valves 3.4.10 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Required Action and B.l Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND OR B.2 Be in MODE 4 with any 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RCS cold leg temperature Both pressurizer safety

_* the OPPS enable valves inoperable, temperature specified in the PTLR.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify each pressurizer safety valve is In accordance OPERABLE in accordance with the Inservice with the Testing Program. Following testing, lift settings Inservice Testing shall be within 1% (2460 to 2510 psig).

Program Prairie Island Units 1 and 2 3.4.10-2 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature LCO 3.4.12 LTOP shall be provided with:

a.

a maximum of one SI pump capable of injecting into the RCS;

b.

the emergency core cooling system (ECCS) accumulators isolated;

c.

an OPERABLE Over Pressure Protection System (OPPS); and

d.

two OPERABLE pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR.

NOTES --------------------------------------

1.

Both SI pumps may be run for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> while conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.

2.

ECCS accumulator may be unisolated when accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.

APPLICABILITY:

MODE 4 when any RCS cold leg temperature is _* the OPPS enable temperature specified in the PTLR and > the SI pump disable temperature specified in the PTLR.

Prairie Island Units I and 2 3.4.12-1 I

1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Two SI pumps capable of A.1 Initiate action to assure a Immediately injecting into the RCS.

maximum of one SI pump is capable of injecting into the RCS.

B. An ECCS accumulator B.1 Isolate affected ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not isolated when the accumulator.

ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

C. Required Action and C.1 Increase RCS cold leg 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion temperature to > the OPPS Time of Condition B not enable temperature met.

specified in the PTLR.

OR C.2 Depressurize affected 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ECCS accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

D. One required PORV D.1 Restore required PORV to 7 days inoperable.

OPERABLE status.

Prairie Island Units 1 and 2 3.4.12-2 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two PORVs inoperable.

E.1 Be in MODE 5.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> OR AND Required Action and E.2 Depressurize RCS and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion establish RCS vent of> 3 Time of Condition A, C, square inches.

or D not met.

OR OPPS inoperable.

Prairie Island Units I and 2 3.4.12-3 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature 3.4.12 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify a maximum of one SI pump is capable of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> injecting into the RCS.

SR 3.4.12.2 NOTE Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.

Verify each ECCS accumulator is isolated.

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter SR 3.4.12.3 Verify PORV block valve is open for each 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> required PORV.

SR 3.4.12.4 NOTE--.

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing RCS cold leg temperature to < the OPPS enable temperature specified in the PTLR.

Perform a COT on OPPS.

31 days SR 3.4.12.5 Perform CHANNEL CALIBRATION for each 24 months OPPS actuation channel.

Prairie Island Units 1 and 2 3.4.12-4 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) _* Safety Injection (SI) Pump Disable Temperature LCO 3.4.13 LTOP shall be provided with: 1) no SI Pumps capable of injecting into the RCS; 2) the emergency core cooling system (ECCS) accumulators isolated; and 3) one of the following pressure relief capabilities:

a.

An Over Pressure Protection System (OPPS) shall be OPERABLE with two pressurizer power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR; or

b.

The RCS depressurized and an RCS vent of > 3 square inches.

NOTES -------------------------------------

1.

Both safety injection (SI) pumps may be run for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> while conducting SI system testing provided there is a steam or gas bubble in the pressurizer, the reactor vessel head is on, and at least one isolation valve between the SI pump and the RCS is shut.

2.

During reduced inventory conditions an SI pump may be run as required to maintain adequate core cooling and RCS inventory.

3.

ECCS accumulator may be unisolated when ECCS accumulator pressure is less than the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.

APPLICABIIJTY:

MODE 4 when any RCS cold leg temperature is < the SI Pump disable temperature specified in the PTLR, MODE 5 when the steam generator (SG) primary system manway and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the SG primary system manway and pressurizer manways are closed and secured in position.

Prairie Island Units 1 and 2 3.4.13-1 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both SI pump(s)

A.1 Initiate action to verify no SI Immediately capable of injecting into pump is capable of injecting the RCS.

into the RCS.

B. An ECCS accumulator B.1 Isolate affected ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not isolated when the accumulator.

ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

C. Required Action and C.l Increase RCS cold leg 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion temperature to > the OPPS Time of Condition B not enable temperature specified met.

in the PTLR.

OR C.2 Depressurize affected ECCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed in the PTLR.

Prairie Island Units 1 and 2 3.4.13-2 1/2/02

LTOP - RCSCLT

  • SI Pump Disable Temperature 3.4.13 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. ------- NOTE ---------

D.1 Restore required PORV to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Only applicable in LCO OPERABLE status.

3.4.13.a.

One required PORV inoperable.

E. Two required PORVs E. I Depressurize RCS and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for LCO establish RCS vent of> 3 3.4.13.a.

square inches.

OR Required Action and associated Completion Time of Condition A, C, or D not met.

OR OPPS inoperable.

Prairie Island Units 1 and 2 3.4-13-3 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 Verify no SI pumps are capable of injecting into 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the RCS.

SR 3.4.13.2 NOTE -------------------------

Only required to be performed when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.

Verify each ECCS accumulator is isolated.

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter SR 3.4.13.3 NOTE ----------------------------

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Only required to be performed when complying unlocked open with LCO 3.4.13.b.Verify required RCS vent- >_ 3 vent valve(s) square inches open.


. A N D Verify required RCS vent > 3 square inches open.

31 days for other vent path(s)

SR 3.4.13.4 Verify PORV block valve is open for each 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> required PORV.

Prairie Island Units I and 2 3.4.13-4 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature 3.4.13 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.4.13.5 NOTE

1. Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing RCS cold leg temperature to

< the OPPS enable temperature specified in the PTLR.

2. Only required to be performed when complying with LCO 3.4.13.a.

Perform a COT on OPPS.

FREQUENCY 31 days SR 3.4.13.6 Perform CHANNEL CALIBRATION for OPPS 24 months actuation channel.

Prairie Island Units 1 and 2 3.4.13-5 i

1/2/02

RCS Operational LEAKAGE 3,4.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.14.1 NOTE Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

Verify RCS operational leakage within limits by 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> performance of RCS water inventory balance.

SR 3.4.14.2 Verify steam generator tube integrity is in In accordance accordance with the Steam Generator Program.

with the Steam Generator Program Prairie Island Units 1 and 2 3.4.14-3 1/2/02

RCS Specific Activity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 RCS Specific Activity LCO 3.4.17 The specific activity of the reactor coolant shall be within limits:

APPLICABILITY:

MODES I and 2, MODE 3 with RCS average temperature (Tavg) 2! 500'F.

ACTIONS

-T CONDITION A.

DOSE EQUIVALENT 1-131 > 1.0 bLCi/gm.

REQUIRED ACTION N ote ----------------

LCO 3.0.4 is not applicable.

A.1 Verify DOSE EQUIVALENT 1-131 within the acceptable region of Figure 3.4.17-1.

AND A.2 Restore DOSE EQUIVALENT 1-131 to within limit.

COMPLETION TIME Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 48 hours Prairie Island Units 1 and 2 3.4.17-1 1/2/02

RCS Specific Activity 3.4.17 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Gross specific activity B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the reactor coolant Tavg < 5000 F.

not within limit.

C.

Required Action and C.l Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Tavg < 500'F.

Time of Condition A not met.

OR DOSE EQUIVALENT 1-131 in the unacceptable region of Figure 3.4.17-1.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify reactor coolant gross specific activity 7 days

  • 100/2,MCi/gm.

Prairie Island Units 1 and 2 3.4.17-2 1/2/02

RCS Specific Activity 3.4.17 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.4.17.2 SR 3.4.17.3 N OTE -------------------------

Only required to be performed in MODE 1.

Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity _* 1.0 ktCi/gm.

N O TE -------------

Not required to be performed until 31 days after a minimum of 2 effective full power days and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for >_ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Determine L from a sample taken in MODE 1 after a minimum of 2 effective full power days and 20 days of MODE I operation have elapsed since the reactor was last subcritical for >_ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Prairie Island Units 1 and 2 FREQUENCY 14 days AND Between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERMAL POWER change of >_ 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period 184 days 3.4.17-3 1/2/02

RCS Pressure, Temperature, and Flow - DNB Limits B 3.4.1 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.4.1.2 Since Required Action A. 1 allows a Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to restore parameters that are not within limits, the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Surveillance Frequency for RCS average temperature is sufficient to ensure the temperature can be restored to a normal operation, steady state condition following load changes and other expected transient operations. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval has been shown by operating practice to be sufficient to regularly assess for potential degradation and to verify operation is within safety analysis assumptions.

SR 3.4.1.3 Measurement of RCS total flow rate once every 24 months allows the installed RCS flow instrumentation to be calibrated and verifies the actual RCS flow rate is greater than or equal to the minimum required RCS flow rate. This verification may be performed via a precision calorimetric heat balance or other means.

The Frequency of 24 months reflects the importance of verifying flow after a refueling outage when the core has been altered, which may have caused an alteration of flow resistance.

REFERENCES

1.

USAR, Section 14.

Prairie Island Units 1 and 2 B 3.4.1-5 1/2/02

RCS P/T Limits B 3.4.3 BASES (continued)

ACTIONS A.l and A.2 Operation outside the P/T limits during MODE 1, 2, 3, or 4 must be corrected so that the RCPB is returned to a condition that has been verified by stress analyses.

The 30 minute Completion Time reflects the urgency of restoring the parameters to within the analyzed range. Most violations will not be severe, and the activity can be accomplished in this time in a controlled manner.

Besides restoring operation within limits, an evaluation is required to determine if RCS operation can continue. The evaluation must verify the RCPB integrity remains acceptable and must be completed before continuing operation. Several methods may be used, including an engineering evaluation to determine effects of the out of-limit condition on the structural integrity of the RCS, a comparison with pre-analyzed transients in the stress analyses, new analyses, or inspection of the components.

ASME Code,Section XI, Appendix E, may be used to support the evaluation. However, its use is restricted to evaluation of the vessel beltline.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. A favorable evaluation must be completed before continuing to operate.

Condition A is modified by a Note requiring that Required Action A.2 to be completed whenever the Condition is entered. The Note emphasizes the need to perform the evaluation of the effects of the excursion outside the allowable limits. Restoration alone per Required Action A. 1 is insufficient because higher than analyzed stresses may have occurred and may have affected the RCPB integrity.

Prairie Island Units 1 and 2 B 3.4.3-5 1/2/02

RCS Loops - MODE 3 B 3.4.5 BASES LCO The Note permits both RCPs to be de-energized for (continued)

_< 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to perform preplanned work activities.

One purpose of the Note is to allow performance of tests that are designed to validate various accident analyses values. One of these tests is validation of the pump coastdown curve used as input to a number of accident analyses including a loss of flow accident. This test was performed during the initial startup testing program, and would normally only be performed once. If, however, changes are made to the RCS that would cause a change to the flow characteristics of the RCS, the input values of the coastdown curve must be revalidated by conducting the test again. Another test performed during the startup testing program was the validation of rod drop times, both with and without flow. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values.

Another purpose of the Note is to allow stopping of both RCP's for a sufficient time to perform station electrical lineup changes without transition to MODE 4. During these evolutions both RCP's may be inoperable. Transition to MODE 4 would put the plant through unnecessary cooldown and heatup transients. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> time period specified is adequate to perform the necessary load shedding, switching and load restoration activities and restart an RCP without requiring transition to MODE 4.

Utilization of the Note is permitted provided the following conditions are met:

Prairie Island Units 1 and 2 B 3.4.5-3 1/2/02

RCS Loops - MODE 3 B 3.4.5 BASES LCO (continued)

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, thereby maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM is maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and

b.

Core outlet temperature is maintained at least 10°F below saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

An OPERABLE RCS loop consists of one OPERABLE RCP and one OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.5.2. An RCP is OPERABLE if it is capable of being powered and is able to provide forced flow if required.

APPLICABILITY In MODE 3, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. The most stringent condition of the LCO, that is, two RCS loops OPERABLE and two RCS loops in operation, applies to MODE 3 with the Rod Control System capable of rod withdrawal.

The least stringent condition, that is, two RCS loops OPERABLE and one RCS loop in operation, applies to Mode 3 with the Rod Control System not capable of rod withdrawal.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.6, "RCS Loops-MODE 4";

LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";

LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled";

Prairie Island Units 1 and 2 B 3.4.5-4 1/2/02

RCS Loops - MODE 3 B 3.4.5 BASES ACTIONS D.1, D.2, and D.3 (continued) coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Time reflects the importance of maintaining operation for heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.5.1 REQUIREMEN'S This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loops are in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS loop performance.

SR 3.4.5.2 SR 3.4.5.2 requires verification that the SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of the SG to remove decay heat.

Prairie Island Units I and 2 B 3.4.5-7 1/2/02

RCS Loops - MODE 3 B 3.4.5 BASES SURPVEILLANCE REQUIREMENTS (continued)

SR 3.4.5.3 Verification that each required RCP is OPERABLE ensures that an additional RCP can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power availability to each required RCP. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability.

This SR is modified by a Note that states the SR is not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a pump is not in operation.

REFERENCES

1. License Amendment Request Dated November 19, 1999.

(Approved by License Amendment 152/143, July 14, 2000.)

2.

NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation."

Prairie Island Units I and 2 B 3.4.5-8 1/2/02

RCS Loops - MODE 4 B 3.4.6 BASES (continued)

LCO The purpose of this LCO is to require that at least two loops be OPERABLE in MODE 4 and that one of these loops be in operation.

The LCO allows the two loops that are required to be OPERABLE to consist of any combination of RCS loops and RHR loops. Any one loop in operation provides enough flow to remove the decay heat from the core with forced circulation. An additional loop is required to be OPERABLE to provide redundancy for heat removal.

Note 1 permits all RCPs or RHR pumps to be de-energized for

  • < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The purpose of the Note is to permit tests that are designed to validate various accident analyses values.

One of the LCO tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating experience has shown that boron stratification is not a problem during this short period with no forced flow.

Utilization of Note 1 is permitted provided the following conditions are met along with any other conditions imposed by startup test procedures:

a.

No operations are permitted that would dilute the RCS boron concentration with coolant with boron concentration less than required to meet SDM of LCO 3.1.1, therefore maintaining the margin to criticality. Boron reduction with coolant at boron concentrations less than required to assure SDM in maintained is prohibited to preclude the need for a boration, due to the time required to achieve a uniform distribution when in natural circulation (Ref. 1); and Prairie Island Units 1 and 2 B 3.4.6-2 1/2/02

RCS Loops - MODE 4 B 3.4.6 BASES LCO

b.

Core outlet temperature is maintained at least 10°F below (continued) saturation temperature, so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Note 2 requires a steam or gas bubble in the pressurizer or that the secondary side water temperature of each SG be _* 50TF above each of the RCS cold leg temperatures before the start of an RCP with any RCS cold leg temperature < the OPPS enable temperature specified in the PTLR. A steam or gas bubble ensures that the pressurizer will accommodate the swell resulting from an RCP start. Either of these restraints prevents a low temperature overpressure event due to a thermal transient when an RCP is started.

An OPERABLE RCS loop consists of an OPERABLE RCP and an OPERABLE SG which is capable of removing decay heat as specified in SR 3.4.6.2.

Similarly for the RHR System, an OPERABLE RHR loop consists of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RCPs and RHR pumps are OPERABLE if they are capable of being powered and are able to provide forced flow if required.

,AYPLICABILITY In MODE 4, this LCO ensures forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.5, "RCS Loops-MODE 3";

LCO 3.4.7, "RCS Loops - MODE 5, Loops Filled";

LCO 3.4.8, "RCS Loops - MODE 5, Loops Not Filled";

LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation - High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level" (MODE 6).

Prairie Island Units I and 2 B 3.4.6-3 1/2/02

RCS Loops - MODE 4 B 3.4.6 BASES (continued)

ACTIONS A. I If one required loop is inoperable, redundancy for heat removal is lost. Action must be initiated to restore a second RCS or RHR loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal. Entry to a reduced MODE (MODE 5 or 6) requires RHR availability for long term decay heat removal. Remaining in MODE 4, with RCS loop operation, is conservative.

If restoration is not accomplished and an RHR Loop is OPERABLE, the unit must be brought to MODE 5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Bringing the unit to MODE 5 is a conservative action with regard to decay heat removal. With only one RHR loop OPERABLE, redundancy for decay heat removal is lost and, in the event of a loss of the remaining RUR loop, it would be safer to initiate that loss from MODE 5 rather than MODE 4. The Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a reasonable time, based on operating experience, to reach MODE 5 from MODE 4 in an orderly manner and without challenging plant systems.

The Required Action is modified by a Note which indicates that the unit must be placed in MODE 5 only if a RHR loop is OPERABLE.

With no RHR loop OPERABLE, the unit is in a condition with only limited cooldown capabilities. Therefore, the actions are to be concentrated on the restoration of a RHR loop, rather than a cooldown of extended duration.

Prairie Island Units I and 2 B 3.4.6-4 1/2/02

RCS Loops-MODE 4 B 3.4.6 BASES ACTIONS B. I and B.2 (continued)

If both loops are inoperable or a required loop not in operation, except during conditions permitted by Note 1 in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RCS or RIHR loop to OPERABLE status and operation must be initiated. The margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for decay heat removal. The action to restore must be continued until one loop is restored to OPERABLE status and operation.

SURVEILLANCE SR 3.4.6.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required RCS or RHR loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RCS and RHR loop performance.

Prairie Island Units 1 and 2 B 3.4.6-5 1/2/02

RCS Loops - MODE 4 B 3.4.6 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.4.6.2 SR 3.4.6.2 requires verification that the required SG has the capability to remove decay heat. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater (Ref. 2). The ability of the SG to provide an adequate heat sink for decay heat removal further ensures that the SG tubes remain covered. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of the other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.

SR 3.4.6.3 Verification that each required pump is OPERABLE ensures that an additional RCS or RHR pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.

Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

This SR is modified by a Note that states the SR is not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a pump is not in operation.

Prairie Island Units 1 and 2 B 3.4.6-6 1/2/02

RCS Loops - MODE 4 B 3.4.6 BASES (continued)

REFERENCES

1. License Amendment Request Dated November 19, 1999.

(Approved by License Amendment 152/143, July 14, 2000.)

2.

NRC Information Notice 95-35, "Degraded Ability of Steam Generator to Remove Decay Heat by Natural Circulation."

Prairie Island Units 1 and 2 B 3-.46-7 1/2/02

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES BACKGROUND OPERABLE RHR loop or maintaining a SG capable of removing (continued) decay heat to provide an alternate method for decay heat removal via natural circulation.

APPLICABLE In MODE 5, RCS circulation increases the time available for SAFETY mitigation of an accidental boron dilution event. The RHR ANALYSES loops provide this circulation.

RCS Loops - MODE 5 (Loops Filled) satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii).

LCO The purpose of this LCO is to require that at least one RHR loop be OPERABLE and in operation with an additional RHR loop OPERABLE or a SG capable of removing decay heat via natural circulation. One RHR loop provides sufficient forced circulation to perform the safety functions of the reactor coolant under these conditions. An additional RHR loop is required to be OPERABLE to provide redundancy. However, if the standby RHR loop is not OPERABLE, an acceptable alternate method is a SG. Should the operating RHR loop fail, the SG could be used to remove decay heat via natural circulation.

Note 1 permits all RHR pumps to be de-energized _* 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The purpose of the Note is to permit tests designed to validate various accident analyses values. One of the tests performed during the startup testing program was validation of rod drop times during cold conditions, both with and without flow. If changes are made to the RCS that would cause a change in flow characteristics of the RCS, the input values must be revalidated by conducting the test again. Any future no flow test may be performed in MODE 3, 4, or 5 and requires that the pumps be stopped for a short period of time. The Note permits stopping the pumps in order to perform this test and validate the assumed analysis values. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period is adequate to perform the test, and operating Prairie Island Units 1 and 2 B 3.4.7-2 1/2/02

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES LCO (continued)

APPLICABILITY Note 4 provides for an orderly transition from MODE 5 to MODE 4 during a planned heatup by permitting removal of RHR loops from operation when at least one RCS loop is in operation. This Note provides for the transition to MODE 4 where an RCS loop is permitted to be in operation and replaces the RCS circulation function provided by the RHR loops.

RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required. A SG is capable of removing decay heat via natural circulation when: 1) there is the ability to pressurize and control pressure in the RCS; 2) there is sufficient secondary side water level in the SG relied on for decay heat removal; and 3) there is an available supply of feedwater (Ref.

1). An OPERABLE SG can perform as a heat sink via natural circulation when it has the capability to remove decay heat as specified in SR 3.4.7.2.

In MODE 5 with RCS loops filled, this LCO requires forced circulation of the reactor coolant to remove decay heat from the core and to provide proper boron mixing. One loop of RHR provides sufficient circulation for these purposes. However, one additional RHR loop is required to be OPERABLE, or a SG is capable of removing decay heat.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.5, "RCS Loops-MODE 3";

LCO 3.4.6, "RCS Loops-MODE 4";

LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled";

LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level" (MODE 6).

Prairie Island Units 1 and 2 B 3.4.7-4 1/2/02

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)

ACTIONS A. 1, A.2, B. 1 and B.2 If one RHR loop is OPERABLE and the SGs are not capable of removing decay heat, redundancy, for heat removal is lost. Action must be initiated immediately to restore a second RIHR loop to OPERABLE status or to restore the required SG capability to remove decay heat. Either Required Action will restore redundant heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

C.1 and C.2 If a required RHR loop is not in operation, except during conditions permitted by Note 1, or if no loop is OPERABLE, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action to restore one RHR loop to OPERABLE status and operation must be initiated. Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Times reflect the importance of maintaining operation for heat removal.

Prairie Island Units 1 and 2 B 3.4.7-5 1/2/02

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES (continued)

SURVEILLANCE SR 3.4.7.1 REQUIREMENTS This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RUR loop performance.

SR 3.4.7.2 SR 3.4.7.2 requires verification that the required SG has the capability to remove decay heat via natural circulation. This provides an alternate decay heat removal method in the event that the second RHR loop is not OPERABLE. The ability to remove decay heat requires the ability to pressurize and control pressure in the RCS, sufficient secondary side water level in the SG relied on for decay heat removal, and an available supply of feedwater(Ref. 1).

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room to alert the operator to a loss of capability of the SG to remove decay heat.

SR 3.4.7.3 Verification that each required RHR pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation.

Verification is performed by verifying proper breaker alignment and power available to each required RHR pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. If at least one SG is capable of decay heat removal, this Surveillance is not needed. The Frequency Prairie Island Units I and 2 B 3.4.7-6 1/2/02

RCS Loops - MODE 5, Loops Filled B 3.4.7 BASES SUIRVEILLANCE REQUIREMENTS SR 3.4.7.3 (continued) of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

This SR is modified by a Note that states the SR is not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a pump is not in operation.

REFERENCES

1. NRC Information Notice 95-35, "Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation".
2.

License Amendment Request Dated November 19, 1999.

(Approved by License Amendment 152/143, July 14, 2000.)

Prairie Island Units 1 and 2 B 3.4.7-7 1/2/02

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES LCO (continued)

Note 1 permits all RHR pumps to be de-energized _< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. The circumstances for stopping both RHR pumps are to be limited to situations when the outage time is short and core outlet temperature is maintained > 10 F below saturation temperature. The Note prohibits boron dilution with coolant at boron concentrations less than required to assure SDM is maintained or draining operations when RHR forced flow is stopped.

Note 2 allows one RHR loop to be inoperable for a period of

< 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, provided that the other loop is OPERABLE and in operation. This permits periodic surveillance tests to be performed on the inoperable loop during the only time when these tests are safe and possible.

An OPERABLE RHR loop is comprised of an OPERABLE RHR pump capable of providing forced flow to an OPERABLE RHR heat exchanger. RHR pumps are OPERABLE if they are capable of being powered and are able to provide flow if required.

APPLICABILITY In MODE 5 with loops not filled, this LCO requires core heat removal and coolant circulation by the RHR System.

Operation in other MODES is covered by:

LCO 3.4.4, "RCS Loops-MODES 1 and 2";

LCO 3.4.5, "RCS Loops-MODE 3";

LCO 3.4.6, "RCS Loops-MODE 4";

LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled";

LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level" (MODE 6); and LCO 3.9.6, "Residual Heat Removal (RIHR) and Coolant Circulation-Low Water Level" (MODE 6).

Prairie Island Units 1 and 2 B 3.4.8-2 1/2/02

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)

ACTIONS A. I If one required RHR loop is inoperable, redundancy for RHR is lost.

Action must be initiated to restore a second loop to OPERABLE status. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

B. I and B.2 If no required loop is OPERABLE or the required loop is not in operation, except during conditions permitted by Note 1, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 must be suspended and action must be initiated immediately to restore an RHR loop to OPERABLE status and operation. The margin to criticality must not be reduced in this type of operation.

Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core; however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations. The immediate Completion Time reflects the importance of maintaining operation for heat removal.

The action to restore must continue until one loop is restored to OPERABLE status and operation.

The Note in Required Action B.2 allows the use of one safety injection pump to provide heat removal in the event of a loss of RHR system cooling during reduced RCS inventory conditions.

Prairie Island Units 1 and 2 B 3.4.8-3 1/2/02

RCS Loops - MODE 5, Loops Not Filled B 3.4.8 BASES (continued)

SURVEILLANCE REQUIREMENTS REFERENCES SR 3.4.8.1 This SR requires verification every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that the required loop is in operation. Verification may include flow rate, temperature, or pump status monitoring, which helps ensure that forced flow is providing heat removal. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient considering other indications and alarms available to the operator in the control room to monitor RHR loop performance.

SR 3.4.8.2 Verification that each required pump is OPERABLE ensures that an additional pump can be placed in operation, if needed, to maintain decay heat removal and reactor coolant circulation. Verification is performed by verifying proper breaker alignment and power available to each required pump. Alternatively, verification that a pump is in operation also verifies proper breaker alignment and power availability. The Frequency of 7 days is considered reasonable in view of other administrative controls available and has been shown to be acceptable by operating experience.

This SR is modified by a Note that states the SR is not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a pump is not in operation.

None.

Prairie Island Units 1 and 2 B 3.4.8-4 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.12 Low Temperature Overpressure Protection (LTOP) - Reactor Coolant System Cold Leg Temperature (RCSCLT) > Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) and the pressurizer power operated relief valves (PORVs) provide the LTOP function (Ref. 2).

The PTLR provides the maximum allowable OPPS actuation setpoints for the PORVs and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.

The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.

LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.

This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, above the safety injection (SI) pump disable temperature, limiting coolant input capability requires one (SI) pump incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. In MODE 4, above the SI Prairie Island Units 1 and 2 B 3.4.12-1 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES BACKGROUND (continued)

APPLICABLE SAFE-Y ANALYSES pump disable temperature, one PORV is the overpressure protection device that acts to terminate an increasing pressure event.

Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of more than one SI pump for makeup in the event of loss of inventory, then pumps can be made available through manual actions.

In MODE 4, above the SI pump disable temperature, pressure relief consists of two PORVs with reduced lift settings. Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.

As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS.

The PTLR presents the OPPS setpoints for LTOP.

Safety analyses (Ref. 2) demonstrate that the reactor vessel is adequately protected against exceeding the Reference 1 P/T limits.

In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference I limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized Prairie Island Units 1 and 2 B 3.4.12-2 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE RCS and a sufficiently sized RCS vent. Each of these means has a SAFETY limited overpressure relief capability. LCO 3.4.13, "LTOP

  • SI ANALYSES Pump Disable Temperature," provides the requirements for (continued) overpressure prevention at the lower temperatures.

The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method.

The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.

Transients that are capable of overpressurizing the RCS are categorized as either mass or heat input transients. The bounding mass input transient is inadvertent safety injection with injection from one SI pump and three charging pumps, and letdown isolated.

The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.

The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:

a.

Rendering one SI pump incapable of injection;

b.

Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and

c.

Disallowing start of an RCP if secondary temperature is more than 50TF above primary temperature in any one loop.

LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.

Prairie Island IJnits I and 2 B, 3_4 12-3 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE The Reference 2 analyses demonstrate that one PORV can maintain SAFETY RCS pressure below limits when only one SI pump and all charging ANALYSES pumps are actuated. Thus, the LCO allows only one SI pump (continued)

OPERABLE during the Applicability of this specification.

Since one PORV cannot handle the pressure transient resulting from ECCS accumulator injection, when RCS temperature is low, the LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR.

The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.

Fracture mechanics analyses established the temperature of LTOP Applicability at the OPPS enable temperature specified in the PTLR.

The consequences of a small break loss of coolant accident (LOCA) in LTOP MODE 4 above the SI Pump disable temperature conform to 10 CFR 50.46 and 10 CFR 50, Appendix K, requirements by having a maximum of one SI pump OPERABLE and SI actuation enabled.

The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of one SI pump and all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times. The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.

The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are Prairie Island Units 1 and 2 B 3.4.12-4 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES APPLICABLE periodically modified as the reactor vessel material toughness SAFETY decreases due to neutron embrittlement caused by neutron ANALYSES irradiation. Revised limits are determined using neutron fluence (continued) projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.

The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).

LCO This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference I limits as a result of an operational transient.

To limit the coolant input capability, the LCO requires that a maximum of one SI pump be capable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).

The LCO is modified by two Notes. Note 1 allows operation of both SI pumps for _< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut. The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODE 4. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS. This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.

Prairie Island Units 1 and 2 B 3.4.12-5 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES LCO (continued)

Note 2 states that ECCS accumulator isolation is only required when the ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.

To provide low temperature overpressure mitigation through pressure relief, the LCO requires an OPERABLE OPPS with two pressurizer PORVs. A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.

APPLICABILITY This LCO is applicable in MODE 4 when any RCS cold leg temperature is _< the OPPS enable temperature specified in the PTLR and > the SI Pump disable temperature specified in the PTLR. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR.

LCO 3.4.3 provides the operational P/T limits for all MODES.

LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.13 provides the LTOP requirements in MODE 4 _< SI pump disable temperature and in MODES 5 and 6.

Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.

Prairie Island Units 1 and 2 B 3.4.12-6 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES (continued)

ACTIONS A.I With two SI pumps capable of injecting into the RCS, RCS overpressurization is possible.

To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.

B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This is only required when the ECCS accumulator pressure is at or more than the maximum RCS pressure for the existing temperature allowed by the P/T limit curves.

If isolation is needed and cannot be accomplished in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Required Action C.1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. By increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.

The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.

D.1 In MODE 4 when any RCS cold leg temperature is -< the OPPS enable temperature specified in the PTLR, with one required PORV Prairie Island Units 1 and 2 B 3.4.12-7 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS D.1 (continued) inoperable, the PORV must be restored to OPERABLE status within a Completion Time of 7 days. Two PORVs are required to provide low temperature overpressure mitigation while withstanding a single failure of an active component.

The Completion Time considers the facts that only one of the PORVs is required to mitigate an overpressure transient and that the likelihood of an active failure of the remaining valve path during this time period is very low.

E.I MODE 5 must be entered, the RCS must be depressurized and a vent must be established within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when:

a.

Both PORVs are inoperable; or

b.

A Required Action and associated Completion Time of Condition A, C, or D is not met; or

c.

The OPPS is inoperable.

The vent must be sized _> 3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.

Prairie Island Ilnits I and 2 B 3.4.12-8 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES ACTIONS E.I (continued)

The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.

SURVEILLANCE SR 3.4.12.1 and SR 3.4.12.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, one SI pump is verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.

The SI pump is rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.

The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.

SR 3.4.12.2 is modified by a Note specifying that this verification is only required when the ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. If ECCS accumulator pressure is less than this limit, no verification is required since the ECCS accumulator cannot pressurize the RCS to or above the OPPS setpoint.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.

Prairie Island Units 1 and2 B 3.4.12-9 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE SR 3.4.12.3 REQUIREMENTS (continued)

The PORV block valve must be verified open every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room.

The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.

Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Frequency is considered adequate in view of other administrative controls available to the operator in the control room, such as valve position indication, that verify that the PORV block valve remains open.

SR 3.4.12.4 Performance of a COT is required every 31 days on OPPS to verify and, as necessary, adjust the PORV lift setpoints. A successful test of the required contact(s) of a channel relay may be performed by the verification of the change of state of a single contact of the relay.

This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.

PORV actuation during this testing could depressurize the RCS and is not required.

Prairie Island Units 1 and 2 B 3.4.12-10 1/2/02

LTOP - RCSCLT > SI Pump Disable Temperature B 3.4.12 BASES SURVEILLANCE REQUIREMENTS SR 3.4.12.4 (continued)

A Note has been added indicating that this SR is required to be performed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing RCS cold leg temperature to

_< the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> initial time considers the unlikehood of a low temperature overpressure event during this time.

SR 3.4.12.5 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.

REFERENCES

1.

10 CFR 50, Appendix G.

2.

USAR, Section 4.4.

3.

ASME, Boiler and Pressure Vessel Code,Section XI, Appendix G, with ASME Code Case N-514.

Prairie Island Units I and 2 B 3.4.12-11 1/2/02

LTOP - RCSCLT < SI Pump Disable Temperature B 3.4.13 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.13 Low Temperature Overpressure Protection (LTOP) Reactor Coolant System Cold Leg Temperature (RCSCLT) _< Safety Injection (SI) Pump Disable Temperature BASES BACKGROUND The LTOP function limits RCS pressure at low temperatures so the integrity of the reactor coolant pressure boundary (RCPB) is not compromised by violating the pressure and temperature (P/T) limits of 10 CFR 50, Appendix G (Ref. 1). The reactor vessel is the limiting RCPB component for demonstrating such protection. The Over Pressure Protection System (OPPS) provides the actuation setpoints for the pressurizer power operated relief valves (PORVs) for the LTOP function (Ref. 2). The PTLR provides the maximum allowable OPPS actuation setpoints and the maximum RCS pressure for the existing RCS cold leg temperature during cooldown, shutdown, and heatup to meet the Reference 1 requirements during the LTOP MODES. The LTOP MODES are the MODES as defined in the Applicability statement of LCO 3.4.12 and LCO 3.4.13.

The pressurizer safety valves and PORVs at their normal setpoints do not provide overpressure protection for certain low temperature operational transients. Inadvertent pressurization of the RCS at temperatures below the OPPS enable temperature specified in the PTLR could result in exceeding the ASME Appendix G (Ref. 3) brittle fracture P/T limits. Exceeding the RCS P/T limits by a significant amount could cause brittle cracking of the reactor vessel.

LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," requires administrative control of RCS pressure and temperature during heatup and cooldown to prevent exceeding the PTLR limits.

This LCO provides RCS overpressure protection by restricting coolant input capability and ensuring adequate pressure relief capacity. In MODE 4, at or below the safety injection (SI) pump disable temperature, limiting coolant input capability requires both SI pumps incapable of injection into the RCS and isolating the emergency core cooling system (ECCS) accumulators. The pressure Prairie Island Units 1 and 2 B 3.4-13-112 1/2/02

LTOP - RCSCLT _* SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND relief capacity requires either two redundant RCS relief valves or a (continued) depressurized RCS and an RCS vent of sufficient size. One PORV or the open RCS vent is the overpressure protection device that acts to terminate an increasing pressure event.

Limiting coolant input capability reduces the ability to provide core coolant addition. The LCO does not require the makeup control system deactivated or the safety injection SI actuation circuits blocked. Due to the lower pressures in the LTOP MODES and the expected core decay heat levels, the charging system can provide adequate flow. If conditions require the use of an SI pump for makeup in the event of loss of inventory, the pump can be made available through manual actions.

The LTOP pressure relief consists of two PORVs with reduced lift settings or a depressurized RCS and an RCS vent of sufficient size.

Two PORVs are required for redundancy. One PORV has adequate relieving capability to prevent overpressurization for the required coolant input capability.

OPPS and PORV Requirements As designed for the LTOP function, each PORV is signaled to open by OPPS if the RCS pressure approaches the lift setpoint provided when OPPS is enabled. The OPPS monitors both RCS temperature and RCS pressure and indicates when a condition not acceptable in the PTLR limits is approached. The wide range RCS temperature setpoints indicate conditions requiring enabling OPPS. The PTLR presents the OPPS setpoints for LTOP.

RCS Vent Requirements Once the RCS is depressurized, a vent exposed to the containment atmosphere will maintain the RCS at containment ambient pressure Prairie Island Units 1 and 2 B 3.4.13-2 1/2/02

LTOP - RCSCLT *< SI Pump Disable Temperature B 3.4.13 BASES BACKGROUND RCS Vent Requirements (continued) in an RCS overpressure transient, if the relieving requirements of the transient do not exceed the capabilities of the vent. Thus, the vent path must be capable of relieving the flow resulting from the limiting LTOP mass or heat input transient, and maintaining pressure below the P/T limits. The required vent capacity may be provided by one or more vent paths.

APPLICABLE SAFETY ANALYSES Safety analyses (Ref. 2) demonstrate that the reactor vessel is adequately protected against exceeding the Reference I P/T limits.

In MODES 1, 2, and 3, and in MODE 4 with RCS cold leg temperature exceeding the OPPS enable temperature specified in the PTLR, the pressurizer safety valves will prevent RCS pressure from exceeding the Reference 1 limits. At about the OPPS enable temperature specified in the PTLR and below, overpressure prevention falls to two OPERABLE PORVs or to a depressurized RCS and a sufficiently sized RCS vent. Each of these means has a limited overpressure relief capability. LCO 3.4.12, "LTOP > SI Pump Disable Temperature," provides the requirements for overpressure prevention at temperatures above the SIP disable temperature.

The actual temperature at which the pressure in the P/T limit curve falls below the pressurizer safety valve setpoint increases as the reactor vessel material toughness decreases due to neutron embrittlement. Each time the PTLR curves are revised, LTOP must be re-evaluated to ensure its functional requirements can still be met using the PORV method or the depressurized and vented RCS condition.

The PTLR contains the acceptance limits that define the LTOP requirements. Any change to the RCS must be evaluated against the Reference 2 analyses to determine the impact of the change on the LTOP acceptance limits.

Prairie Island Units I and 2 B 3.4.13-3 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE Transients that are capable of overpressurizing the RCS are SAFETY categorized as either mass or heat input transients. The bounding ANALYSES mass input transient is inadvertent safety injection with injection (continued) from one SI pump and three charging pumps, and letdown isolated.

The bounding heat input transient is reactor coolant pump (RCP) startup with temperature asymmetry within the RCS or between the RCS and steam generators.

The following limitations are required during the Applicability of this specification to ensure that mass and heat input transients in excess of analysis assumptions do not occur:

a.

Rendering both SI pumps incapable of injection;

b.

Deactivating the ECCS accumulator discharge isolation valves in their closed positions; and

c.

Disallowing start of an RCP if secondary temperature is more than 50'F above primary temperature in any one loop.

LCO 3.4.6, "RCS Loops - MODE 4," provides this protection.

The Reference 2 analyses demonstrate that either one PORV or the depressurized RCS and RCS vent can maintain RCS pressure below limits when all charging pumps are actuated. Neither one PORV nor the RCS vent can handle the pressure transient resulting from inadvertent SI pump or ECCS accumulator injection when the RCS is below the SI Pump disable temperature. Thus, the LCO requires both SI pumps to be disabled below the temperature specified in the PTLR.

The LCO also requires ECCS accumulator isolation when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. The isolated ECCS accumulators must have their discharge valves closed and the valve power supply breakers fixed in their open positions.

Prairie Island Units 1 and 2 B 3.4.13-4 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABLE SAFETY ANALYSES (continued)

Fracture mechanics analyses established the temperature of LTOP Applicability at the OPPS enable temperature specified in the PTLR.

The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the limit shown in the PTLR. The OPPS setpoints are derived by analyses that model the performance of the system, assuming the limiting LTOP transient of all charging pumps injecting into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times.

The OPPS setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.

The OPPS setpoints in the PTLR will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are periodically modified as the reactor vessel material toughness decreases due to neutron embrittlement caused by neutron irradiation. Revised limits are determined using neutron fluence projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.

With the RCS depressurized, analyses show a vent size equivalent to the cross sectional flow area of a PORV is capable of mitigating the allowed LTOP overpressure transient. The capacity of a vent this size is greater than the flow of the limiting transient for the LTOP configuration, both SI pumps disabled and all charging pumps OPERABLE when the RCS is below the SI Pump disable temperature, maintaining RCS pressure less than the maximum pressure on the P/T limit curve.

The RCS vent is passive and is not subject to active failure.

The LTOP function satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).

Prairie Island Units 1 and 2 B 3.4.13-5 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES (continued)

LCO This LCO requires that LTOP be provided, by limiting coolant input capability and by OPERABLE pressure relief capability. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference 1 limits as a result of an operational transient.

To limit the coolant input capability, the LCO requires both SI pumps be incapable of injecting into the RCS, and all ECCS accumulator discharge isolation valves be closed and deenergized (when ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR).

The LCO is modified by three Notes. Note 1 allows operation of both SI pumps for _* 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for conducting SI system testing providing there is a steam or gas bubble in the pressurizer and at least one isolation valve between the SI pump and the RCS is shut.

The purpose of this note is to permit the conduct of the integrated SI test and other SI system tests and operations that may be performed in MODES 4, 5 or 6. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection to the RCS.

This isolation is accomplished by either a closed manual valve or motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur.

Note 2 allows operation of an SI pump during reduced inventory conditions as required to maintain adequate core cooling and RCS inventory. The purpose of this note is to allow use of an SI pump in the event of a loss of other injection capability (e.g., loss of Residual Heat Removal System cooling while in reduced inventory conditions). The operation of an SI pump under such conditions would be controlled by an approved emergency operating procedure.

Prairie Island Units I and 2 B 3.4.13-6 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES LCO (continued)

APPLICABILITY Note 3 states that ECCS accumulator isolation is only required when ECCS accumulator pressure is more than or at the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR (less allowance for instrument uncertainty). This Note permits the ECCS accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.

The elements of the LCO that provide low temperature overpressure mitigation through pressure relief are:

a.

An OPERABLE OPPS with two PORVs; or A PORV is OPERABLE for LTOP when its block valve is open, its low pressure lift setpoint has been selected (OPPS enabled), and the backup air supply is charged.

b.

A depressurized RCS and an RCS vent.

An RCS vent is OPERABLE when open with an area of

_> 3.0 square inches. Because the RCS vent opening specification is based on the flow capacity of a PORV, a PORV maintained in the open position may be utilized to meet the RCS vent requirement.

Each of these methods of overpressure prevention is capable of mitigating the limiting LTOP transient.

This LCO is applicable in MODE 4 when any RCS cold leg temperature is _* the SI Pump disable temperature specified in the PTLR, in MODE 5, and in MODE 6 when the reactor vessel head is on and the SG primary system manways and pressurizer manway are closed and secured. The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above the OPPS enable temperature specified in the PTLR. When the reactor vessel head is off, overpressurization cannot occur.

Prairie Island Units 1 and 2 B 3.4.13-7 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES APPLICABILITY (continued)

LCO 3.4.3 provides the operational P/T limits for all MODES.

LCO 3.4.10, "Pressurizer Safety Valves," requires the OPERABILITY of the pressurizer safety valves that provide overpressure protection during MODES 1, 2, and 3, and MODE 4 above the OPPS enable temperature specified in the PTLR. LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) _< Safety Injection Pump (SI) Pump Disable Temperature," provides the requirements for MODE 4 below the OPPS enable temperature and above the SI Pump disable temperature.

Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase in RCS pressure when little or no time allows operator action to mitigate the event.

ACTIONS A.1 With one or more SI pumps capable of injecting into the RCS, RCS overpressurization is possible.

To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.

B.1, C.1, and C.2 An unisolated ECCS accumulator requires isolation within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This is only required when the ECCS accumulator pressure is at or more than the maximum RCS pressure for the existing temperature allowed by the P/T limit curves.

If isolation is needed and cannot be accomplished in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Required Action C. 1 and Required Action C.2 provide two options, either of which must be performed in the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. By Prairie Island Units 1 and 2 B 3.4.13-8 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES ACTIONS B.1, C.1, and C.2 (continued) increasing the RCS temperature to > the OPPS enable temperature specified in the PTLR, an ECCS accumulator pressure of 800 psig cannot exceed the LTOP analysis limits if the ECCS accumulators are fully injected. Depressurizing the ECCS accumulators below the LTOP limit from the PTLR also gives this protection.

The Completion Times are based on operating experience that these activities can be accomplished in these time periods and on engineering evaluations indicating that an event requiring LTOP is not likely in the allowed times.

D.1 The consequences of operational events that will overpressunize the RCS are more severe at lower temperature. Thus, with one PORV inoperable in MODE 4 when any RCS cold leg temperature is _< the SI Pump disable temperature specified in the PTLR, MODE 5 or in MODE 6 with the head on, the Completion Time to restore two valves to OPERABLE status is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A Note clarifies that Condition D is only applicable when the OPPS and PORVs are being used to satisfy the pressure relief requirements of LCO 3.4.13.a.

The Completion Time represents a reasonable time to investigate and repair several types of relief valve failures without exposure to a lengthy period with only one OPERABLE PORV to protect against overpressure events.

E.1 The RCS must be depressurized and a vent must be established within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when:

Prairie Island Units 1 and 2 B 3.4.13-9 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES ACTIONS E. 1 (continued)

a.

Both required PORVs are inoperable; or

b.

A Required Action and associated Completion Time of Condition A, C, or D is not met; or

c.

The OPPS is inoperable.

The vent must be sized Ž_ 3 square inches to ensure that the flow capacity is greater than that required for the worst case mass input transient reasonable during the applicable MODES. The vent opening is based on the cross sectional flow area of a PORV. A PORV maintained in the open position satisfies the vent requirement. This action is needed to protect the RCPB from a low temperature overpressure event and a possible brittle failure of the reactor vessel.

The Completion Time considers the time required to place the plant in this Condition and the relatively low probability of an overpressure event during this time period due to increased operator awareness of administrative control requirements.

SUPVPILLANCE SR 3.4.13.1 and SR 3.4.13.2 REQUIREMENTS To minimize the potential for a low temperature overpressure event by limiting the mass input capability, both SI pumps are verified incapable of injecting into the RCS and the ECCS accumulator discharge isolation valves are verified closed and deenergized.

The SI pumps are rendered incapable of injecting into the RCS by employing at least two independent means to prevent a pump start such that a single failure or single action will not result in an injection into the RCS. This may be accomplished through the Prairie Island Units 1 and 2 B 3.4.13-10 1/2/02

LTOP - RCSCLT _< SI Pump Disable Temperature B 3.4.13 BASES SURVEILLANCE SR 3.4.13.1 and SR 3.4.13.2 (continued)

REQUIREMENTS pump control switch being placed in pullout with a blocking device installed over the control switch that would prevent an unplanned pump start.

The ECCS accumulator motor operated isolation valves can be verified closed and deenergized by use of control board indication.

SR 3.4.13.2 is modified by a Note specifying that this verification is only required when the ECCS accumulator pressure is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in the PTLR. If ECCS accumulator pressure is less than this limit, no verification is required since the ECCS accumulator cannot pressurize the RCS to or above the OPPS setpoint.

The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering other indications and alarms available to the operator in the control room, to verify the required status of the equipment.

SR 3.4.13.3 The RCS vent of >_ 3 square inches is proven OPERABLE by verifying its open condition either:

a.

Once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for a valve that is not locked, sealed, or secured in the open position.

b.

Once every 31 days for other vent path(s) (e.g., a vent valve that is locked, sealed, or secured in position). A removed pressurizer safety valve or open manway also fits this category.

The passive vent path arrangement must only be open when required to be OPERABLE. This Surveillance is required if the vent is being used to satisfy the pressure relief requirements of LCO 3.4.13b.

Prairie Island Units 1 and 2 B 3.4.13-11 1/2/02

LTOP - RCSCLT _* SI Pump Disable Temperature B 3.4.13 BASES SLUPVEILLANCE SR 3.4.13.4 REQUIREMENTS (continued)

The PORV block valve must be verified open every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to provide the flow path for each required PORV to perform its function when actuated. The valve may be remotely verified open in the main control room. This Surveillance is performed if the PORV satisfies the LCO.

The block valve is a remotely controlled, motor operated valve. The power to the valve operator is not required to be removed, and the manual operator is not required to be locked in the inactive position.

Thus, the block valve can be closed in the event the PORV develops excessive leakage or does not close (sticks open) after relieving an overpressure situation.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Frequency is considered adequate in view of other administrative controls available to the operator in the control room, such as valve position indication, that verify that the PORV block valve remains open.

SR 3.4.13.5 Performance of a COT is required every 31 days on OPPS to verify and, as necessary, adjust the PORV lift setpoints. A successful test of the required contact(s) of a channel relay may be performed by the verification of the change of state of a single contact of the relay.

This clarifies what is an acceptable CHANNEL OPERATIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests at least once per refueling interval with applicable extensions. The COT will verify the setpoints are within the PTLR allowed maximum limits in the PTLR.

PORV actuation during this testing could depressurize the RCS and is not required.

Prairie Island Units 1 and 2 B 3.4.13-12 1/2/02

LTOP - RCSCLT *< SI Pump Disable Temperature B 3.4.13 BASES SU JRVEILLANCE REQUIREMES SR 3.4.13.5 (continued)

Note I has been added indicating that this SR is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing RCS cold leg temperature to _< the OPPS enable temperature specified in the PTLR. The COT may not have been performed before entry into the LTOP MODES.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> initial time considers the unlikehood of a low temperature overpressure event during this time.

Note 2 has been added to specify that this SR is only required to be performed when OPPS and PORVs are providing the LTOP function per LCO 3.4.13.a.

SR 3.4.13.6 Performance of a CHANNEL CALIBRATION on OPPS is required every 24 months to adjust the whole channel so that it responds and the valve opens within the required range and accuracy to known input.

REFERENCES

1.

10 CFR 50, Appendix G.

2.

USAR, Section 4.4.

3.

ASME, Boiler and Pressure Vessel Code,Section XI, Appendix G, with ASME Code Case N-514.

Prairie Island Units 1 and 2 B 3.4.13-13 1/2/02

RCS Operational LEAKAGE B 3.4.14 BASES SURVEILLANCE SR 3.4.14.1 (continued)

REQUIREMENTS The RCS water inventory balance must be met with the reactor at steady state operating condition (stable temperature, power level, equilibrium xenon, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows). Therefore, a Note is added allowing that this SR is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishing steady state operation. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance provides sufficient time to collect and process all necessary data after stable plant conditions are established.

Steady state operation is required to perform a proper inventory balance since calculations during maneuvering are not useful. For RCS operational LEAKAGE determination by water inventory balance, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows.

An early warning of pressure boundary LEAKAGE or unidentified LEAKAGE is provided by monitoring containment atmosphere radioactivity. It should be noted that LEAKAGE past seals and gaskets is not pressure boundary LEAKAGE. These leakage detection systems are specified in LCO 3.4.16, "RCS Leakage Detection Instrumentation."

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency is a reasonable interval to trend LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents.

SR 3.4.14.2 This SR provides the means necessary to determine SG OPERABILITY in an operational MODE. The requirement to demonstrate SG tube integrity in accordance with the Steam Prairie Island Units 1 and 2 B 3.4.14-7 1/2/02

RCS Specific Activity B 3.4.17 BASES APPIICABILITY For operation in MODE 3 with RCS average temperature < 500'F, (continued) and in MODES 4 and 5, the release of radioactivity in the event of a SGTR is unlikely since the saturation pressure of the reactor coolant is below the lift pressure settings of the main steam safety valves.

ACTIONS A.1 and A.2 With the DOSE EQUIVALENT 1-131 greater than the LCO limit, samples at intervals of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> must be taken to demonstrate that the limits of Figure 3.4.17-1 are not exceeded. The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is required to obtain and analyze a sample. Sampling is done to continue to provide a trend.

The DOSE EQUIVALENT 1-131 must be restored to within limits within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. The Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is required, if the limit violation resulted from normal iodine spiking.

Permitting POWER OPERATION to continue for limited time periods with the primary coolant's specific activity greater than 1.0 jiCi/gm DOSE EQUIVALENT 1-131, but within the allowable limit shown on Figure 3.4.17-1, accommodates the possible iodine spiking phenomenon which may occur following changes in THERMAL POWER. Operation with specific activity levels exceeding 1.0 ýtCi/gm DOSE EQUIVALENT 1-131 but within the limits shown on Figure 3.4.17-1 should be minimized since the activity levels allowed by the figure increase the dose at the site boundary following a postulated steam generator tube rupture.

A Note to the ACTIONS excludes the MODE change restriction of LCO 3.0.4. This exception allows entry into the applicable MODE(S) while relying on the ACTIONS even though the ACTIONS may eventually require plant shutdown. This exception is acceptable due to the significant conservatism incorporated into the specific activity limit, the low probability of an event which is Prairie Island Units 1 and 2 B 3.4.17-3 1/2/02

RCS Specific Activity B 3.4.17 BASES ACTIONS A.1 and A.2 (continued) limiting due to exceeding this limit, and the ability to restore transient specific activity excursions while the plant remains at, or proceeds to power operation.

B.1 With the gross specific activity in excess of the allowed limit, the reactor must be placed in a MODE in which the requirement does not apply. The change within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to MODE 3 and RCS average temperature < 500'F lowers the saturation pressure of the reactor coolant below the setpoints of the main steam safety valves and prevents venting the SG to the environment in a SGTR event. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.

C.1 If a Required Action and the associated Completion Time of Condition A is not met or if the DOSE EQUIVALENT 1-131 is in the unacceptable region of Figure 3.4.17-1, the reactor must be brought to MODE 3 with RCS average temperature < 500'F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 below 500'F from full power conditions in an orderly manner without challenging plant systems.

Prairie Island Units 1 and 2 B 3.4.17-4 1/2/02

RCS Specific Activity B 3.4.17 BASES (continued)

SURVEILLANCE SR 3.4.17.1 REQUREMENTS SR 3.4.17.1 requires performing a gamma isotopic analysis as a measure of the gross specific activity of the reactor coolant at least once every 7 days. While basically a quantitative measure of radionuclides with half lives longer than 15 minutes, excluding iodines, this measurement is the sum of the degassed gamma activities and the gaseous gamma activities in the sample taken.

This Surveillance provides an indication of any increase in gross specific activity.

Trending the results of this Surveillance allows proper remedial action to be taken before reaching the LCO limit under normal operating conditions. The Surveillance is applicable in MODES 1 and 2, and in MODE 3 with T,,, at least 500'F. The 7 day Frequency considers the unlikelihood of a gross fuel failure during the time.

SR 3.4.17.2 This Surveillance is performed in MODE 1 only to ensure iodine remains within limit during normal operation and following fast power changes when fuel failure is more apt to occur. The 14 day Frequency is adequate to trend changes in the iodine activity level, considering gross activity is monitored every 7 days. The Frequency, between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a power change > 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, is established because the iodine levels peak during this time following fuel failure; samples at other times would provide inaccurate results.

Prairie Island Units I and 2 B 3.4.17-5 1/2/02

PACKAGE 3.4 REACTOR COOLANT SYSTEM (RCS)

PART C MARKUP OF PRAIRIE ISLAND CURRENT TECHNICAL SPECIFICATIONS List of Pages Current Technical Specifications Page TS.3-10-8 TS.3.1 -1 TS.3.1-1 Overflow TS.3.1-2 TS.3.1-2 Overflow TS.3.1-2 Overflow (C TS.3.1-3 TS.3.1-3 Overflow TS.3.1-4 TS.3.1-4 Overflow TS.3.1-4 Overflow ((

TS.3.1-5 TS.3.1-5 Overflow TS.3.1-6 TS.3.1-7 TS.3.1-8 TS.3.1-8 Overflow Part C Page ont.)

18 19 20 21 22 23 24 25 26 27 28 29 30 ont.)

Current Technical Specifications Page TS.3.1-9 TS.3.1 -10 Figure TS.3.1-3 TS.3.3-3 Table TS.4.1-1C(Page 3 of 4)

Table TS.4.1-1C(Page 4 of 4)

Table TS.4.1-2A(Page 1 of 2)

Table TS.4.1-2A(Page 2 of 2)

Table TS.4.1-2B(Page 1 of 2)

Table TS.4.1-2B(Page 2 of 2)

TS.4.3-1 TS.4.6-3 TS.4.18-1 PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 Improved Technical Specifications Conversion Submittal Part C Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17

AF 4-00

  • TS.30 8 REV 92 3/13/90 R 2 Addressed w..........

[ s where J-C rssrTmprtr adFo DNB Liis Parametera LCO

4.

1 1

The following DNB related parameters limits shall be maintained R-9 during POWER OPERATION:

a Reactor Coolant System Tavg *!limit specified in the COLRP-Aii

b.

Pressurizer Pressure

c.

Reactor Coolant Flow

> limit specified in the COLP 222

>the value specified in the CORE OPERATING LIMITS REPORT

4.1

4.l With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to MOIDE 2 less than 5% of RATED ThERMAL the net hours.

L3.4-05 within the next 4hus Compliance with a.

and b.

is demonstrated by verifying that each of the parameters is within its limits at least once each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

.1.I Compliance with c.

is d,,*nntr ated by verify4-ng RCS total flow rate

.1.3 that the parameter is within 4ýt limit specified in the COLR after each refueling cycle.

L R-9 134.1---

  • Limit not applicable during either a THERMAL POWER ramp ner-ease in excess oT (5%)

RATED THERMAL POWER per minute or a THERMAL POWER step inerease in excess of (10%)

RATED THERMAL POWER Markup for PI ITS Part C

.7.1 SR3.4 SR3.4 SR3. 4 LC PI Current TS 1 of 30

TS. 3.l1-4 4R T 17 ;7 7/.14 4/0A0 3.-41 REACTOR COOLANT SYSTEM A3.4-00 I

i...........

Applies to the operating status of the reactor coolant system when ir -adiatod fu!l is in the containment.

Objecti-e e s*c.ifyn theso himiting bo me t4o ens--fer sae n tr operation.

eoolant system which must be m~et to assure safe reactor operation.

Specification A.

Operational Components

1. Reactor Coolant Loops and Coolant Circulation
a.

Reactor Critical LC03.4.4 SR3.4.18.2 LC034.4 1 (1)

A reactor shall not be in MODE 2;nade or maintained eritieal unless both reactor coolant loops (with their associated steam generator and reactor coolant pump) are in operation, eexeept 4*-

with thermal power <P-7 (if power >P-7, open Reactor Trip Breaker) during low power PHYSICS TESTS New SP., Verify power <zP-7 and perform COT on P-7, power (low setpoint) and intermzediate range neutron flux channels.

(2)

I --

L R-9 or 2) as specified in 3.l.A.l.a.

(2) below.

With less than the above required reactor coolant loops in operation, be in at least

,ODE 3HGT SIRUTDOW within 6

hours.

NewA SR, Verify each RCS loop in operation

b.

Reactor Coolant System MODE

-5 /4Ve FaG 1erv RM:R:1c Abeo e 3 E0o-F 77 1LC03.4.5 1 (1)

Reactor coolant system averago temperature shall not be in MODE 3eXeeed Ounless both reactor coolant loops (with their associated steam generator and reactor coolant pump) are OPERABLE and both RCS loops shall be in operation when the Rod Control System is capable of rod withdrawal; or Markup for PI ITS Part C

-_ -- ý: :A7 2 of 30 PI Current TS

with--at least one reactor coolant loop in

[M3 operation when the Rod Control System isE not capable of rod withdrawal.

(except as specified in 3.l.A.l.b(2) and 3.l.A.I.b.

(3) below).

LC03.4.5 cond A (2)

A reactor coolant loop may be inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided STARTUP OPERATI*N sT dis..nt.i.nud*

until GDEPRmAILITY is restored. If OPERABILITY is not restored within the time specified, be in MODE 4rcduc riactorh4 colant s, cstm average temperature bc....

35Q0 within the next 12 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

b.

(3)

With both reactor coolant pumps inoperable or not in operat Cond D (a)

(b)

JLC 3o*..4.5 (c)

LCO Note LCO3.4.5 (c)

Cond D ion immediately:

IL3"4-I18 I DC energizc all Place the control rod drive system in a condition incapable of rod withdrawal me-h-anisms, Suspend all operations involving a reduction of RCSý ------

,R-9 boron concentration, Establish and maintain the core outlet temperature at least 10 OF below saturation temperature, and Initiate action to restore one reactor coolant pump to OPERABLE status and operation.*

OP E---ILITY 1--,

  • 7-*-------° 3igOr next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

While applicablc, this specification cupercodes 3.1.A.I.b(2).

If the RCP shutdown or inoperability was due to preplanned work

. activities such as testing, switching, or maintenance, immediate restoration action is not required, but if at least one reactor coolant pump is not restored to operability and operation within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, CoLC03. 4. 5 Cod C SR3

.4. 5. 1 SR3. 4.5. 2 SR3o4o5.3 reauc reacuor cooiano systom averagc tcmpcrature t-e If one RCS loop is not in operation with Rod Control System capable of rod withdrawal, within one hour restore the loop to operation, or render the Rod Control System inoperable.

R-9 I

3 New SRs, Verify RCS loops operating, verify SG cap~able of~2 removing decay heat, verify breaker alignment for non R-9

-j__

Markup for P1 ITS Part C operat I*

I PI Current TS 3 of 30 LC03 NOTE

-.1.A.I.c.

Reactor Coolant System Mode 4, loops fillet 3so F kanau T6. 3. 12 REV 135S F5/

A3.'08 I.Arvee-e Temperature Beloý Reacter Vesl-lnq

_*a#*.9*....I*

.4.

6 350 0F, eme.pt during R.FU.EINC. at

.eaiscoMTode 4, two loops consisting of any combination of methods for romoving d..ay he shall be OPERABLE with one in operation* (except as specified in 3.I.A.

,7 67,)07 below).

(2)

Accoptable mothods for r.m.ving dccay heot arc at least one reEW3I1.-24 coolant system loop pump and its (3) -a s sia steam gon.rat.r; er and residual heat removal loop JA3.4-I03 1 I

3.-1. A. I.e.-

ILC03.4.7 LCO3.4.61 Cond AI Reactor Coolant System Mode 5, loops filledAverage Tempe-rý c

e4-ew 3SOF R-(and Reactor Coolant LolAe-thke-RatrVslFano 3S02F, except during REUELINC t last two methods for n

deeay heatMode 5 with loops filled, one RHR loop shall be OPERABLE with -neand in operation* (.x..pt. as specif id in 3..

A.-.c. (2) hbow);

. Accoptable methods for romoving d..ay hoot ar.and at least one r.a.

coolant pump and its asso.iat.* steam generator capable of decay heat removal; or a residual heat removal loop including a pump and its assoeiatcd heat oxchang3c

3.

]M3.4-26 JLR3.4-241 I

26.42 IO 5

(2) Wit4h only one required loop inoperable OPERABLE method of rI zoving deeay heat, immediately initiate p-empt-action to restore a second loop to two OPERABLE methods of r.m.ving.

de.ay lRl.4-2l (2) Wi.th'..e.-l. one required R.R loop inoperable and one RH? loop ICond A OPERABLE method of romoving d...

hot, immediately initiate p.emp-.

action to restore a second

-wR loop to twe OPERABLE or initiate action to restore required SG capable to e-f-removeing decay heat. ILR3.4-24J

.I-A201 ILC03.4.7 Cond B I Cond A Note (2) With enly one or more SGs not caipable OPERABLE methed of removing decay heat and one ERR loop OPERABLE, immediately initiate peeemp action to restore a second ERR loop to twe OPERABLE or initiate action or restore required SGs capable to remove methods of removing deca heat.

.4-24 Onlyv required If the remaining RH 0

loop is operable method is an

-eep, be in MODE SCOLD £I. TDOWN within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I R-.9 Markup for PI ITS Part C a pump and its assee-ated heaat eHelianger ineluding PI Current TS 4 of 30

REV 13i SI/9s ILC03.4 Cond B I

(3) Wih no QPPEzýLE moetheds of reimoving docay

-hoot Both loops IiF inoperable or required loop not in operation, suspend a144 operations that would cause introduction into RCS coolant with involving a roeducti*n in boron concentration less than required to meet SDM of LCO 3,1.

I4 of the r...t.

r e..lant system and i*mmediately Cond C I

LC03.4. 6 NOTE 2 LC03.4.7 NOTE 3 initiate preompt action to restore one loop OPERABLE and in operation method of rcmoving decay heat.

(3)

With no.P.P..LE motheod ef removing decay heot required RHR loops OPERABLE or required RHR loop not in operation, suspend a-l operations that would cause introduction into RCS coolant... with involving a roduction in boron concentration less than required to meet SDM of LCO 3.1.1 of the re..t.r eoolant sy.to. and immediately initiate prempt action to restore one loop OPERABLE and in operation mIthod of romoving doay heat.

I 22 (4)

A reactor coolant pump may be started at RCS temperature less than the Over Pressure Protection System Enable Temperature specified in the PTLR, only if either of the following conditions is met:

There is a steam or gas bubble in the pressurizer, or The (steam generator minus RCS) temperature difference for the steam generator in that loop is less than 50 0 F.

NOTLCO3

.4. 7 NOTET 4TT SR3.4. 6. 1 SR3.4.6.22 SR3.4.76.3 SR3. 4. 7.SR.

27 SR3. 4. 7. 3 Both RHR loops may be removed from operation for planned heatup to 1NODE 4 when at least one RCS loop is in operation.

New SRs, Verify one RHR or RCS loop in operation, verify SG capable of removing decay heat, -verify pump breaker alignment New SRs, Verify one RHR loop in capable of removing decay heat, alignment operation, verify SG verify pump breaker R-9 Markup for PI ITS Part C PI Current TS i

1 i

I

,R-9 i

I R-9 5 of 30

TS 42L d--Reactor Coolant System, Mode 5, loops noct filledý.e-vel Bele;w (1)

Both residual heat removal loops, each consisting of a assceiated heat exchanger, shall be OPERABLE with one operation* (except as specified in 3.l.A.l.d.

(2)

ILCO3. 4. 8 Cond A Cond3.4.B8 LCO3.4.13 Notes below).

With one required e-beth residual heat removal loop(s) prempUimmediately action shall be taken to restore the residual heat removal loop=-(s to an OPERABLE status.

and, if no ERR loops operable, or required R-HR Loop not in operation, immediately suspend all operations involving reduction in RCS boron concentration and initiate action to restore one RHR Loop to OPERATýBLE status and in operation.

During reduced inventory conditions, a safety injection pump may be run as required to maintain adequate core cooling and RCS inventory in the event of a loss of Residual Heat Removal System cooling.

ILR3.4-24 pump ane at in inoperable, inoperable ib 433 R-9 LC03.4. 6 LCO3. 4.7 NOTE 1 All pumps may be shutdown for up to one hour per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided the reactor is subcritical, no operations are permitted that would cause dilution of the reactor coolant boron concentration and core outlet temperature is main tained at least lOoF below saturation temperature.

LCO.

4 7 nerequired RI-IF loop may be inoperable for < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for LC03.4.

surveillance provided that the other ERR loop is OPERABLE and in LCO3T

4. 8 N O T E 2 u o p e r a t i o n.

]

] t

.4.8.1

.4.8.2 1

New S~s, Verify required ERR loop in operation, verify breaker alignment for RHR pump not operating R-9 I

6 3-9 Markup for P1 ITS Part C ELC03.4.8

38 i=-

+-L*

P **rt'".**-

F'1...q.-sP, PI Current TS 03.4.8 6 of 30

PG9.3.i REV 91 10/27/89 3.1.A.2 Roactor Coolant....

Proesr*_- Control

a.

L C 3.. 9 I Pressurizer I

o8 (1) When A reactor is in MODE 1, " and 3, the pressurizer shall be OPERABLE withsahll not be mado 'or mont...n.d criti.al n.r shall reactor coolant system average temperature exceed 350 0F dnlo-es pressurizer level

  • 90 there is a steam bubble in tho pr.ssur.z. r and two heater groups A-and-B are operable I

and capable of being powered. from an emergency power Low.

supply'/.

(except as specified in 3.l.A.2.a.2 and 3.l.A.2.a.3 below).

IA3.4-08I (2)During Modes 1, 2,

and 3STARTUP OPERATION

".ICondB,C Croup A or B one pressurizer heater group for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> may be inoperable provided is restored.

If OPERABILITY is not restored within the time specified, be in at least MODE 3HOT SHUJTDCW within the next 6 A3.4TT8J hours and MODE 4r...du......

ro.act.r coolant system average temperature b.lw 3502-F within l2the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

(3)

With the pressurizer otherwise inoperable, within one

_hea initiate the action necessary to place the unit in LCO3. 4. 9 Cond A HOT SIIUTDOWN, and be in a*.*east-MODE 3490T 9UUTDO.

Within the necxt G he-urs, AND fully insert all rods AND render Control Rod F

-.-3 system incapable of rod withdrawal in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, R---

and be in MODE 4rodueo roacter coolant averaegoF34-0 tornooraturo below 3SOF within ltho fellew4-ieg-6 hours.

ISR3..9.1 New SR, Verify water level is

< 90W-in pressurizer.

R-9 Markup for P1 ITS Part C


- -I,

I - I PI Current TS 7 of 30

TS.3.i 3 GAvorflo-w

b. Pressurizer Safety Valves

.l1)eReactor Coolant System modes 1, 2, 3-and 4 with LCl.cll dleg ave..aretemperaLures greater than OPPS enable temperature specified in the-PTLRzrequeal

.to 3500 JLC03.4.10 I

LC03.4.10 Cond A Cond B LCo3.4.10 NOTE When A reactor is in MODE 1c rt 3t and 4 with all sal ea net be made or maintained criticealno sehealreactor coolant system cold leg ave-*eraqe temperaturesý >exeeed OPPS enable tempera Iture, specified in the PTLR, 3 u4-e-uns--two pressurizer safety valves shall beare OPERABLE, with lift settings of 2485 psig +"J -I%

If these conditions cannot be satisfied, discontinue STA:RTUP OPERATION and within 15 minutes restore valve to OPERABLE statusinitiate the action neccessary to place the unit in HOT S-UTD*

O

, and be in at least MO0DE 3I!OT SHJTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and re*-eer-be in MODE 41 with any reactor coolant system cold leg F-erage-temperature below the OPPS enable temperature specified in the PTLR

-848-F--within 24the follewing 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

I IA3.4-08 IA3.-4-* 4!

IA3.4-08 IL3-4-I09 R-9 l

Jl3.4 l

2)

IRoacter Coolant System Average-T-empe rat~r-e-belo w 350 0 -F At least one proesurizer safety valve shall be OPEPLALE, with a lift sctting of 2485 psig +/-1%, whenever the head is en the reactEr vessel, except during hydroctatie testo.

With no pressurizer saf ety valve OPERABLE, promptly place an OPEP--ALE residual heat removal loop into operation.

Markup for P1 ITS Part C

08 8 of 30 P1 Current TS

REV 135 5,/4/98 3.*.A.2.O Pressurizer Power Operated Relief Valves L0.

1i

1) modes 1m

, 2t and g

,Reactor Coolant System average E

temperature greater than or equal to 35.00F JLCQý 4.l 11 LC03.4.11 Cond D, G (a) In MODES 1, 2,

and 3Reactor coolant system average 3

8 tcmpralture shall not oxcccd --342 F-*u*leees two power operated relief valves (PORVs) and their associated block valves are OPERABLE (except as specified in 3.1.A.2.c(l)(b) below).

(b)

Tr)ii

ý

ý O

n Tn n

=A

'nfEr =0=nV 7%

f1' VI\\I'ITf o nv cxc -

I71 the following conditions of inopcrability may exist for each unit.

If OPERABILITY is not restored within the time specified or the required action cannot be completed, be in at least

-VMODE 310T SHUTDO. within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE ducc reactor coolant system average temperature holow 3SG0 F-*-

O8 C034. 11

ond A LC03.4.*11 Cond B ILC03.4. 11 Cond E within 12the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
1.

With one or both PORVs inoperable because of excessive A

seat leakage, within one hour either restore the PORV(cs) to OPERPABLE status or close the associated block valve(s) with power maintained to the block valve(s).

2.

With one PORV inoperable due to causes other than excessive seat leakage, within one hour either restor-A3 "4-49 the PORV to OPEP-hBLE status or close and remove power from the associated block valve.

Restore the PORV to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

3.

With both PORVs inoperable due to causes other than excessive seat leakage, within one hour either restore o

A3.4-49 at least one PORV to OPERABLE status or close and remove power from the associated block valves and be in at least MODE 3.

T SHUTDO

.within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4A3.4-08 r.duc react.r coolant system average te..pratur*.

below 350F*

within 12tho following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

4 A3.4-39 With one blo. k valve inoporab-..,

within one hour.either ILC3.4.11 Cond C ILC03.4. 11 Cond C Note restore the block valve to.PEPA.LE

.tatu. or place its associated PORV in manual control.

Restore the block valve to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Required Actions 0.1. an&d 02 du not a.pply when-i block valve is inoperable solely as a restult of com~plying with R~equired Actions B,2 adE.2.,

Markup for PI ITS Part C R-9 PI Current TS JA3.4 -11(

9 of 30

REV 135 5/4,198 LC03.4.11 Cond F

5.

With both block valves inoperable, within two hours*le hour either restore the block valves to OPERAELE status or place the to OPERABLE status within LCO3.4. 11 Cond F Note P! Current TS 10 of 30

-Restore at least one block valve the next hour.

A3.4-49

~y~rUcIjviir I co'mpl.ying with Pequired R-9 Markup for P1 ITS Part C

(2) 4LCO3

.4.

12 Reactor Coolant System average temperature greater than or equal to the temperature specified in the PTLR for disabling both safety injection pumps and below the Over Pressure Protection System Enable Temperature specified in the PTLR JLC03.4.12 With Reactor Coolant System temperature greater than or equal to the temperature specified in the PTLR for disabling both safety injection pumps and less than the Over Pressure Protection System Enable Temperature specified in the PTLR;,.

maXimum f

6o ' p-)ump capable of injec~thin-to7 L

~the-R--CS anidthe ECCS accumulators**

  • iso'at, both pressurizer power operated relief valves (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c. (2)

. (a) and 3.1.A.2.c.(2).(b) below) with the Over Pressure Protection System enabled, the associatod block valve opcn, and th.

.iatd hkup air supply chargod.

JLC03. 4.12 Cond A ILC03.4.12 Cond B, C ILC03. 4.12 NOTE 2 SR3. 4. 12. 1 SR3. 4. 12.2 SR3.4.12.3 If both SI pum,-ps are capable of injecting into the RCS, prompt action shall be taken to make one incapable of injecting into the RCS.

R-9 M3.4 -52 M3.4-54

,R-9 Markup for PI ITS Part C M3.4-53 I PI Current TS 11 of 30

TRs. 3.11

]

2s REV -141l

-12,417/98 3.1.A.2.C. (2)

ILC03. 4.12 Cond D ILCO3.4.12 Cond E ILCO3.4. 12 Cond E (3)

JLC03.4-.13 ILC03.4.13]l ILC03.4.13 Cond D ILCO3.4.13 Cond E ILC03.4. 13I Cond E ILCO3. 4.13I Cond A LC03. 4.13 Cond B SR3.4. 13. 1 SR3.4.13.2 SR3.4.13.3 SR3.4.13.4 (a)

(b)

Rea spe One PORV may be inoperable for 7 days.

If these conditions cannot be met, be in. MODE 5 withiin 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and depressurize and vent the reactor coolant system through at least a 3 square inch vent within

-h-e net 12-& hours.

113.4-5E]

With both PORVs inoperable, be in MODE 5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and complete depressurization and venting of the RCS through at least a 3 square inch vent within 12a hours.

ctor Coolant System average temperature below the temperature cified in the PTLR for disabling both safety injection pumps With Reactor Coolant System temperature less than the temperature specified in the PTLR for disabling both safety injection pumps, when the head is on the reactor vessel and the reactor coolant system is not vented through a 3 square inch or larger vent; withboth SI pumps inap of injecting into the RCS and thle FCCS accunralators**

isolatedboth Pressurizer power operated relief valves M3452 (PORVs) shall be OPERABLE (except as specified in 3.1.A.2.c.(3). (a) and 3.1.A.2.c. (3). (b) below) with the Over Pressure Protection System enabled, the asseciated block e

]y the associated backup air supply charged.

(a) One PORV may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

(b)

With both PORVs inoperable, complete depressurization and venting of the RCS through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

if th if 4 sc inc ten der prE thE Ne,,

212 wit ve-r M3. 4 M3. 4 S52 d ~in very yonce R~CS

-52

,R

  • -54
  • 1 Markup for PI ITS Part C PI Current TS 12 of 30
3..

A.3 PI Current TS 13 of 30 Markup for PI ITS Part C Raer Geen ven Syte

a. A roactor shall not be made or maintained critical nor shall reactor coolant system average temperature excoed 200. F S....

R.4 5 6 unless Reactor Coolant Vent System paths froem both tho reactor vessel head and pressurizer steam space are OPEPABLE and closed (except as specified in 3.l:.A.3.b and 3.lI.A.3.c belo'w).

b.

During STARTUP OPERAT-ION and POWER OPERATIONl, any ono of the following cenditions of inoperability may exist fer each unit provided START-UP OPERATION is discontinued until ODE-'A~3ILT-Y is restored.

If any one of these conditions is not restored to an OPEPQ.LE status within 30 days, be in at least HOT SHUT-DOWN within the nexEt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD) SIWUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s:

(1) Both of the parallel vent valves in the reactor vessel head vent path inoperable, or (2) Beth of the parallel vent valves in the pressurizr en path inoperable, or (3) The vent valve to the pressurizer relief tank discharg-e line inoperable, or (4) The vent valve to the containment atmospheric discharge line inoperable.

c.

With no Reactor Colant Vent System path OPEBLE, r.estor.

e at least one vent path to ODER-zýLB status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT-SHUTDOEWN within the nextz 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOE)WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

New Specification 3.4.2, RCS Minimum Temperature for Criticality 3.1.B.

Pressure/Temperature Limits

1. Reactor Coolant System LCO4.3 Cond A LCO3.4.-3 Cond C
a.

The Unit 1 and Unit 2 Reactor Coolant Systems (except the pressurizer) temperature, pressure heatup rates, and cooldown rates shall be maintained within the limits specified in the Pressure and Temperature Limits report (PTLR).

b.

If these conditions cannot be satisfied in modes 1, 2,

  • 3.4 3, and 4, restore the temperature and/or pressure to within the limits within 30 m inut e s; p er f erm an wni~on v~a~o odtrie_

IIhe-effects of the ut of limit

n.

t3-4-r621 i-ntnjrity of the Reaeter Coo lant -Gyn-torn; within 72 houry determine that the Reactor Coolant System remains acceptable,-.

for continued operation or be in at least MODE 34*4-T R-9 SQUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE Sroduco th A3.4-08 reactor coolant system average 0emperature and pressure to less than 2000 F and 500 psig, respectively, within 3.. A4-39j following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

If these conditions cannot be satisfied in other than

[777 Mode 1, 2, 3, or 4, promptly initiate action to restore 7 7 parameters to within limits and determine if the RCS is acceptable for continued operation prior to entering MODE 4.

SR3.4.3.j New SR, Verify pressure, temperature, heatup, cooldown rates within PTLR limits 2.w Pressurizer

a.

The pressurizer temperature shall be limited to:

1. A maximum heatup of 1900F in any 1 heur peried.
2. A maximum eo.ld.wn of 200OF in any ! h*ur period.
b. The pressurizer spray shall not be used if the temperature difference between the pressurizer and the spray fluid is greater than 3220 0P.
e. it tn050 eenait+/-ens cannot be satisfied, r-store t eemperanure se wina~n tne +/-+/-mies wienin 30 minutes-;

perform an engineering evaluation to determine the effects of the out of limit eonditien en the structural integrity of the pressurizer, determine that the pressurizer remains acceptable for ontinued operation or be in at least HOT pressurizer pressu following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

re to less than 500 psig within the Markup for P1 ITS Part C PXV 1 q,/4./9

57 m

64 he ILCO3.42 SR3. 4.2.I I

P! Current TS 14 of 30

Ts 3 A1 "7 REV 91 10/27/89

a.

Toe seconaary nrvssurised at goncrator is b

side of the steam goncrator ee200 psi 3 if the temperal

-fl0r MUSt nOtE0 turer ofth stm

b. If these conditions cannot ho satisfied, rodueo the steam generator pressure to loss than or ogua! to 200 psig within 30 minutes; perform an cgincring evaluation to determine theceffocts of the overpressurization on t structural integrity of the stcam generator; determine that thc steam g.n.rator remains acceptable for continu*d operation prior to inereasing its temperature above 200 0 F.

Markup for PI ITS Part C A

P1 Current TS 15 of 30

Tro

"..1 REV 91 10/27/89 3.1.C.

REACTOR COOLANT SYSTEM LEAKAGE 1.Leakage Detection LCO 3.0.4 does not apply.

A.

71 In Modes 1, 2, 3 and 4The reactor coolant system average LCO3.4.16 Cond A Cond B Cond C ILC03.4. 16 Send D SR3. 4. 16.1 SR3.4. 16.3 SR3.4. 16.4 temperaturc shall not oxcood 2002F unless at least two means of reactor coolant system leakage detection shall be OPERABLE, one of which must depend on the detection of radionuclides in the containment.

The other means is the containment sump A pump run time instrumentation.

one means of leakage detection may be inoperable for 30 days prov,,ided daily RCS water balance inventories are performed and,. if radionuclide detection L',

inoperable, daily compensatory sampling shall be performed. if these conditions cannot be met, be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

If these conditions cannot be satisfied (all required monitorsA3.4-71 inoperable), immediately enter LCO 3.0.3 within one hour initiate the action necessary to place the affected unit in HOT

SHUTDOWN, and be in at least HOT sHuT...O.w within the neflout S orsand in COLD SH-UTDOWN withi:n the following 30 hou~rs.

New-SRs, Channel Check, COT and Calibration of containment radionuclide instrumentation and Calibration of sump pump run time instrumentation.

72

2.

Leakage Limitations ILC03.4.14 LCO3.4.14 Cond A CnLC03.4.

14 LCO3.4.14 The following leakage limitations are applicable whenever in Modes 1, 2, 3 and 4the reactor coolant system average tompcraturo-Hc eoods 04F.

08

a.

If the LEAKAGGlea]age rate, from other than controe!!d4-34 I

eakage sources, suh as the reactoer eelan-t pump

-een*qe leakage seals, exceeds 1 gpm and the source of the leakage is not identified within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of leak detection, I

be in at least MODE 34--T-T SUJTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ITA 1 I If the source of leakage is not identified within 54an additional 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />, be in MODE 5C-COLD SHUTDOWN within 84#---e A34-39 following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

If the sources of leakage are identified and the results of I

the evaluations are that ntinued operation is

safe, operation of the reactor with a total leakage, other than leakage from controlled sources, not exceeding 10 gpm shall be permitted (except as specified in 3.1.C.2.c below).

If it is determined that leakage exists through a fault which has developed in a Reactor Coolant System component body, pipe wall, vessel wall, or pipe weld, and that the fault cannot be isolated, within one hour initiate action to place the unit in HOT SHJTDOWNR and be in at least i+ODE3 HGT-SHUTDO-WN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and be in MODE 5......

S4HUTDOWN within 36the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> and take corrective action prior to resumption of unit operation.

IM3.4-42 ]

IA3.4-08 ]

Markup for PI ITS Part C P1 Current TS A:

16 of 30

Overf lew LC03.4.14on Cond C

d.

If the total

!EAKAGEleakage controlled sources, exceeds initiate action to place thh in at least MODE 3 !!(T GITDOWN within t condition is not corrected hours, be in MODE 5OLD SWHUT 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> other than Icakago fromA 10 gpm, within one hour unit in HOT SHUTDOWN and b he next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

If the IA3.4-08]

within l14an additional 8

?DOWN within.- the following A 39 and remain in COLD SHUTDOWN until the e eorreoted.

P1 Current TS ondition ic A

Markup for PI ITS Part C i

17 of 30

REV 133 11!/1Q97 I

ISR34.14.21

e.

If the total reactor coolant system to secondary coolant system leakage through any one steam generator of a unit exceeds 150 gallons per day (GPD),

within one hour

42 aieti*n to place the unit in HOT SHUTDOWN and be in at least MODE 3 HO!T S1FTDOW within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and 8

be inMODE 5 COLD SHUTDOWN within 36t-he fellowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> and perform an inservice steam generator tube inspection in accordance with Steam Generator Program Teeie-a-[

Specificatioen 4.12.

3.

Pressure Isolation Valve Leakage LCO3.4.15 ] Leakage through the pressure isolation valves shall not exceed i

the maximum allowable leakage specified in Specification 4.3 when in MODES 1, 2, 3, and 4 reactor coolant cyotcm average ILCO3.4.15 If the maximum allowable leakage is exceeded, isolate the high C

A pressure portion of -the system in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and restore the Ply to jj within limits in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Valves used to isolate the Ply flow path must meet SR 3.4.15.1 leakage limits. within one hoauri initiate the action necessary to place the unit in HOT SHUTDOWN, LCO3.4.15 nd If these requirements can not be met, be in at least MODE 3' ConB IHOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 COLD SHUTDOWN within 36tthe follewi-g-3-3 hours.

79

39 Markup for PI ITS Part C LCO3.4.14 Cond D

[

18 of 30 I

PI Current TS

T-S. 3.1 4,/

REUJ 147 12,1:7,98

-3.1 DCS 1Spe

-ifi MD, NAXIHUNR C0OL-4-T-ACTIVITY LC03.4.17 I

SR3.4-17-21 SR3-4.17.-

ILC03.4. 17 Cond A 1

Cond C LC03.4.17 Cond B

1. The specific activity of the primary coolant (except as specified in 3.1.B.2 and 3 heelw) shall be limited-t-e:
a. Less than or equal to 1.0 microcuries per gram DOSE EQUIVALENT 1-131, and
b.

Less than or equal to 100/E microcuries per gram of gross radioactivity.

R-9

2.

If a reactor is in Mode*s

  • and 2 or critical or the

=) 4=.

Modes

@3ýJqwith reactor coolant system average temperature i-s--greater than or equal to 500'F:

a.

With the specific activity of the primary coolant greater than 1.0 microcurie per gram DOSE EQUIVALENT I 1*31, verify olnce per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to b1e -<ithin t a ccaeptable region of Figuire TS.3.1-3,, for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding the limit line shown on Figure TS.3.1-3, the reactor shall be in-MODE 3 with shutdown and reactorA 08 coolant system average temperature cooled to below 500'F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With the gross specific activity of the primary coolant Sgreater than 100/E microcurie per gram, the reactor iA 8

shall be in NODE 3 with shutdoewn and reactor coolant system average temperature cooled to below 500'F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

I

3.

If a

reactor is at or above rGLD jrI' ue',

WIspu-:t-activity of the primary coolant greater than 1.0 miecreuric per gram DOSE EQýGTIVALENT 131 or greater than I n/E microcuries per

ý-h s a-inp; nndq analvsis reqesirements of item 47a of Table 4.1 2B until the

~olantis rest-'r-'d t" wi:t spec 4ific activity of th Lii L__ J.

primary Markup for P1 ITS Part C Next pages are Figure TS.3.1 3 and TS.3.1 12.

PI Current TS 19 of 30 e

q i-

++-S-il H

C

  • -* I

r-4 H

4

)

J n

A)

N) 0 o7 (D (D (no0 (DC 0

'4

>0

-im m m I-jC Im cl)

'-4 DOSE EQUIVALENT 1-131 PRIMARY COOLANT SPECIFIC ACTIVITY LIMIT (/.CI/gm)

A-t-I I 0

]

H..

rj H

hi H

-4 H

p)

"74 (t

H 0

H

-u m

0 z

m m

0 m

u cl0

-0 0I)

3.

A maximum of one safety injection pump shall be capable of injecting into the RCS whenever in MODE 4 with RCS JLCO3.4.12 temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR ILC03. 4. 12 LC03.4. 13 NOTE I LC03.4.[12 LC03.4.13 LC03.4.12 NOTE 2 LC03.4.13 NOTE 3 LC03.4. 12 LCO3. 4. 13 NOTE 1 1LC03.4. 13 except that both SI pumps may be run for up to one hour while conducting the integrated SI test** when either of the following conditions is met:

(a) There is a steam or gas bubble in the pressurizer and an isolation valve between the SI pump and the RCS is shut, or (b) The reaetor vessel head is remoevd IA.217

4.

No safety injection pumps*** shall be capable of injecting R-9 into the RCS whenever in 4MODE 4 with RCS temperature is less than the temperature specified in the PTLR for disabling iA3.4-83 both safety injection pumps, MODE 5 when the SC primary system manways and pressurizer manway are closed and secured in position, MODE 6 when the reactor vessel head is on and the EG primar-y systemu manways and pressurizer manway are closed and secured in position. (except one or both pumpsL may be run as specified in 3.3.A.3 and 3.1.A.l.d. (2)).

IR-9 Both reactor coolant system accumulators shall be isolated*

whenever RCS temperature is less than the Over Pressure Protection System Enable Temperature specified in the PTLR.

    • Other SI system tests and operations may also be conducted under these conditions.
      • This specification does not apply whenever the reactor vessel head is removed.

Markup for PI ITS Part C A3.4-83 21 of 30 PI Current TS

R..................

i R - 2 Addressed Elsewhere I 1SR3.4.12.I SR3.4, 12. 5 SR3.4.13.5 SR3.4e 13M 6i ao

25.

Overpressure mitigation Adresed Elsehere I t

Markup for PI ITS Part C N.A.

R N.A.

4(38) 5

84 22 of 30 PI Current TS

TABLE TS.4.1-1C (Page 4 of 4)

TABLE NOTATIONS FREQUENCY NOTATION NOTATION FREQUENCY S

Shift D

Daily W

Weekly M

Monthly Q

Quarterly S/U Prior to each startup Y

Yearly R

Each refueling shutdoi N.A.

Not applicable ROver Pressure Protection System Enable Temperature specified in the PTLR.

(38)

Within 1i2 hours ot When the reactor coolant system average temperature is less than the Ieee oPTAINNtrINTtlRrJ I

}f Markup for PI ITS Part C Fr t 23 of 30 PI Current TS

Table TS.4.1 2A (Page ! ef 2)

3.

Pressurizer Safety mSR3.4.

0.

V*valves E-34-00 I

.. A d d r e s s e d IElsewherel Verify OPERABLE in accordance Per ASME Code,Section XI Inservice Testing with the Inservice Testing Program Program (+ 3%).

Following testing, lift settings shall be within +1%

Addressed Elsewhere

-i 3

6.

Pressurizer PORV Functional Block Valves ISR3.4. 11711 SR3 Pressurizer PORVs No", tý

~On)-

required and 3.4.11.2 Quarterly, unless the block valve has been closed per Specification 3.1.A.2.c. (1). (b).2 or 3.1.A.2.c. ( ).(b)

.3.

Every onths 24~

~

~

~

~~~F 3

- 4_____________8_______

Functional to be performed in Modes 1 and 2..

R-9 IEA3.4-I14]A3"4-I13 I Markup for PI ITS Part C 24 of 30 PI Current TS

Table T 2A (

o 2)

MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR Sect.

Reference Frequency

8.

Deleted 5R3ES 41 t

9.

Primary System Leakage Evaluate Daily JA.

1121 I

R 9 IAddressedl Elsewhere C

3 Markup for PI ITS Part C PI Current r TS Equipment Test 25 of 30

TAb.

Te-1 of

2)

RhEY 147 12,4/98 TABLE TS.4.1-2B R-2 MINIMUM FREQUENCIES FOR SAMPLING TESTS FREQUENCY JL3.4-88 ISR3.4.17-I

1.

ISR3"4"17"2I 2.

and Note ISR3.4.17.3] 3.

pe fr 20 l a JLO34.l 4.

RCS Gross Activity Determination RCS Isotopic Analysis for DOSE EQUIVALENT 1-131 Concentration on]

RCS Radiocheministry E determination weor)

-y require RCS Isotopic Analysis for Iodine Including 1-131, 1-133, and 1-135 I

-s,/

w e e k

]A 3.4 I 2 : ]

1/14 days (when *t power)

~d to be performed in Mode 1

!/6-menthrs 184 days(l) -(when -at 2

2EFPD. anjd he ~reactor was 4

R-9 a)

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, whenever the specific activity ex ceeds 1.0 uCi/gram DOSE EQUIVALENT 1-131 or 100/E uCi/gram "L.2L1 (at or above 500 'F cold shutdown), and b)

One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following THERMAL POWER change exceeding 15 percent of the RATED THERMAL POWER within a one hour period (above hot shutdown)

SR3.4.17.2 S.

R*C Radiochomistry (2) 3 hl 4-94

6.

RCC Tritium Activit-y

-Weekly

7.

DeIeted

8.

Reg Doron Gene ent ratio~~---

2/We, k (4) essed Elehere

  • Required at oll tmc Markup for PI ITS Part C PI Current TS TEST TEST 26 of 30

TABLE ¶1784.1 2B Table TG.4.1 2B (Page 2 of 2)

REV 129 6/12/97 Adressed SR3.4.17.3

1.

Note Lample to be taken Not requiredtc be performed untl 31 davs after a minimum of 2 EFPD and 20 days of DOWER ODERTIONhode I have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.

IM3"4-I17 I R-9

2. To determine activity ef corresion products having a half life greater than 30 minutos.

I 94

4. Thsi maximaum interval between analyses shall net emeed5 day-s JLR3.4-96 Addressed Markup for P1 ITS Part C Notes:

27 of 30 P! Current TS

.4.3 j116 3/110/195 IA3. 4- 00 1 RET R-2 4-,

-%PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES Applicability Appicsto ho.....~nc porf...mod on tho primary.oolant systcom pressure Applies to the su -_ýrilla..

n isolation valves to verify oporability.

-03 Objective T-e increase the reliability of qprimary coolant sytom prescure isolation valves thereby roducing the potontia! of an intorcystom loss of coolant accident.

Specification Periodic leakage testing of each of the following valves shall be individually accomplished every 24mon.ths, prior to resuming power operation after each time the plant is placed in the cold shutdown condition for refueling, each time the plant is placed in MODE 5 aed 3.4-08 shutdom condition for 7 days or more if testing has not been accomplished in the preceding 9 months, and prior to returning the valve to service after maintenance, repair, or replacement work is performed:

Valvo Number Allowable M;ax(imum Unit No 1 Unit No 2

Lew Pressure S! te S! 9 6 2S! 9 6 S gpm Upper PlondmSfn4 219 p

CI 5 2S! 9 5 5 gpm RR

-t r

Loop B

Accumulator Inj Line SIl6 2 2S1 4 2

  • 5 gpm

97 To satisfy ALARA requirements, leakage may be measured indir"etly (as from the performance ef prossuro indi.at.r.)

if a mplish.d in oc..rdanc

.with approved procedures and supported by computations showing that the m.thd* is capable of domoenstrating valve complianec with the leakage criteri-a.

NOTES:

1.

Leakage rates less than or equal to O**5 e-e-gpm per nominal inch of valve size-are acceptable-at an RCS pressure of 22*1*

psig

-nd *2255 p"sig.

, II87

2.

Loeakage cons ido rates greater than one, but loss th

--A aeeental--h if the latest measure previous mc.sur.d rate by an amount which an or equal to five gpm arc d race hoc not to eedd th oducoes the margin to f ive gpm by 4-4-r-4-cnccccotablo.

3--.- Leakage rates greater than five gpm are considered unacceptable.

S.

ILR3. 4-971 Markup for PI ITS Part C Aos orossurO sIal net be 05 less :-aizi p

28 of 30 PI Current TS r"

-- I-

ý 1, 1PRk;ic4p ral-e i

ýWilýi-de-red-unaeeentab

IA3.4-00]

REV 91 10,27/189 R2 Addressed El sewhe re C. Pressurizer Heater Emergency Power Supply ISR3.4.9.21 The emergency pressurizer heater supply shall be demonstrated OPERABLE at JL3.4-86 least once every 2414-& months by transfcrring Backup Heater Craup "B

from its normal bus to its sa suar bus and encrgizing the heaters.

JLR3-4-98 Markup for PI ITS Part C P1 Current TS 4.6.

29 of 30

T-S.4.8 1 REV 91 10/27/89 4.18 REACTOR COOLANT VENT SYSTEM PAT..

S R.4-56 A-pp& i:eab-i-it Applies to the surveillanco performod on thc Reaetor Coolant Vont System paths to verify OPERABPILITY.

ObýJeetive To assure that the capability exists to vent non*cndens i.ble gases from the Reactor Coolant System that-culd inhibit natural circulation core cooling.

Spcci.i1catieo A.

Vent Path Oper-abil Each Reactor Coolant Vont System path shall to demonstrated OPEPLE prior to commencing STRT P OPERATION after each refueli.ng by:

1.

Verifying all manual isolation valves in each vent path arc blocked and tagged in the open position.

2.

Cycling each solenoid operated valve in the vent paths through at least one complete cycle of full travel from the control room.

Flow shall be verified through each Reactor Coolant Vent System path following each refueling-.

Markup for PI ITS Part C 30 of 30 PI Current TS

Part D NSHD Category A

Change Number Package 3.4 Discussion of Change 3.4 08 CTS 3.1.A.1.a(2), 3.1.A.1.b(1), 3.1.A.1.b (2), 3.1.A.1.c, 3.1.A.I.d, 3.1.A.2.a(1), 3.1.A.2.a(2), 3.1.A.2.a(3), 3.1.A.2.b(1),

3.1.A.2.c(1), 3.1.A.2.c(1)(a), 3.1.A.2.c(1)(b), 3.1.A.2.c(1)(b)3, 3.1.B.1.b, 3.1.C.1,3.1.C.2,3.1.C.3, 3.1.D.2, 3.1.D.2.a, 3.1.D.2.b, 3.10.J and 4.3. The CTS contain prose descriptions of the modes of applicability and conditions in which the plant must be placed or remain when equipment is inoperable.

These descriptions have been replaced with the equivalent MODES of applicability for the ITS. Since the modes of applicability and plant conditions in which the plant is placed or remains have not changed this is an administrative change.

9 Not used.

10 Not used.

M 11 A new SR, 3.4.4.1, is included in conformance with ISTS which requires verification of each RCS loop in operation while at power.

This is more restrictive since PI CTS do not require this surveillance. This more restrictive change is included to make the PI ITS complete.

Prairie Island Units 1 and 2 1/2/02 5

Package 3.4 NSHD Category M

A Change Number 3.4-Discussion of Change 21 Three new SRs, 3.4.5.1, 3.4.5.2 and 3.4.5.3, have been added in conformance with the guidance of NUREG-1431. These SRs will require verification that the required RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RCP that is not operating. The SR requirement for verifying the SG is capable of decay heat removal is consistent with WOG-155, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.

These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant conditions.

22 CTS 3.1.A.l.b(3). CTS requires the plant to shut down to MODE 4 if the Action Statement requirements are not met. These requirements are not included in the ITS, since once the Action Statement requirements are not met, the plant will enter LCO 3.0.3 which essentially requires the same actions as CTS.

Prairie Island Units 1 and 2 1/2/02 Part D Par D

9

Package 3.4 NSHD Category Change Number 3.4-Discussion of Change 23 Not used.

24 CTS 3.1.A.1.c(1), 3.1.A.l.c(2), 3.1.A.1.d(1) and 3.1.A.2.a(1).

The CTS description of equipment required for system operability has been relocated to the Bases which is consistent with the format and guidance of NUREG-1431. As an example, the CTS refers to a reactor coolant pump (RCP) and associated steam generator (SG) as needing to be OPERABLE during specific plant conditions. The ITS Bases defines that a RCS loop consists of the RCP and associated SG. Therefore, the CTS has been revised to state RCS loop instead of listing specific components that make up the system. The individual components making up the system are considered to be details placed in the Bases Section. This change is acceptable since the system is required to be operable in accordance with the definition of OPERABILITY and details of the specific equipment are unnecessary in the specification. Since the Bases are under licensee control, this is a less restrictive change.

Prairie Island Units I and 2 1/2/02 Part D LR P rt D 10

Package 3.4 NSHD Category Change Number 3.4-Discussion of Change 25 Not used.

CTS 3.1.A.l.c. CTS has been revised to require that the SG is capable of decay heat removal. This change is a more restrictive change since it is a new requirement by providing specific operability requirements on the SG that were not in the CTS. This change is acceptable since it specifically requires the SG to maintain sufficient secondary water inventory to provide a heat sink for decay heat removal in the event the RHR loop is inoperable and not in operation. This change is consistent with NUREG-1431.

27 Not used.

Prairie Island Units I and 2 1/2/02 Part 0 M

26 P rt D 11

Part D NSHID Category A

Change Number 3.4-28 Package 3.4 Discussion of Change CTS 3.1.A.l.c. CTS has a single specification which requires two methods of cooling the RCS to be operable with one in operation when in MODE 4 and MODE 5, loops filled. This can be any combination of RCS loops or RHR trains. During plant heatup from MODE 5 to MODE 4, one RCS loop may be in operation with one or both RHR loops operable but not operating. NUREG-1431 splits MODE 4 and MODE 5, loops filled into two specifications, LCO 3.4.6 and LCO 3.4.7. Because these MODES or other specified conditions of applicability have been split into two Specifications, LCO Note 4 in 3.4.7 is required to allow one RCS loop in operation with one or both RHR loops operable but not operating. This configuration is required to allow a smooth transition to MODE 4. Since the configuration allowed by Note 4 currently is allowed by CTS, explicit statement of this Note is an administrative change. This change is consistent with the ISTS.

29 Not used.

30 Not used.

Prairie Island Units 1 and 2 12/11/00 12

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M

31 Three new SRs, 3.4.6.1, 3.4.6.2, 3.4.6.3, have been added in conformance with NUREG-1431. These SRs will require verification that the required RHR or RCS loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the required RHR or RCP that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF-1 14, and the intent of the CTS.

This is more restrictive since PI CTS does not specifically require these surveillances. These more restrictive changes are included to make the P1 ITS complete and do not introduce any unsafe plant operations.

M 32 Three new SRs, 3.4.7.1, 3.4.7.2, 3.4.7.3, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation, verify the SG is capable of decay heat removal, and verify power is available to the RHR pump that is not operating. The SR requirements for verifying that the SG is capable of decay heat removal is consistent with WOG-1 55, Information Notice 95-35, TSTF 114, and the intent of the CTS. This is more restrictive since PI CTS does not specifically require these surveillances.

These more restrictive changes are included to make the PI ITS complete and they do not introduce any unsafe plant operations.

Prairie Island Units 1 and 2 13 1/2/02 P rt D

Package 3.4 NSHD Category M

M Change Number 3.4-Discussion of Change 33 CTS 3.1.A.l.d. An additional required action has been included in the action statement when both RHR loops are inoperable to suspend operations involving reduction in RCS boron concentration. This change is included to make the ITS complete and may improve plant safety. Since this change places additional restrictions on plant operations it is more restrictive. This change is also consistent with the guidance of NUREG-1431.

34 CTS 3.1.A.l.d. CTS allows the pumps to be shutdown for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. To be consistent with NUREG-1431, this is further restricted to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. In addition, the CTS Note is modified by addition of a restriction that, in MODE 5 with the loops not filled, no RCS draining operations are permitted when all pumps are shutdown.

Restrictions on boron concentration changes have also been included. These changes were made for consistency with the guidance of NUREG-1431 as modified by approved TSTF-286, Revision 2.

These changes are more restrictive since they impose requirements on plant operations that are not in the CTS.

These changes are acceptable since they may improve plant safety.

35 Not used.

Prairie Island Units 1 and 2 1/2/02 Part D 14

Package 3.4 NSHD Category L

M M

Change Number 3.4-36 Discussion of Change CTS 3.1.A.l.d. One RHR loop may be made inoperable for surveillance testing while the other RHR loop is OPERABLE and in operation. This change is made for consistency with NUREG 1431. This is acceptable since the operating RHR loop provides sufficient heat removal capability and the loss of the operating RHR loop in the two hours allowed for testing is unlikely. This is less restrictive since this provision is not contained in the CTS.

37 Two new SRs, 3.4.8.1 and 3.4.8.2, have been added in conformance with NUREG-1431. These SRs will require verification that one RHR loop is in operation and verify power is available to the RHR pump that is not operating. This is more restrictive since PI CTS do not require these surveillances. These more restrictive changes are included to make the PI ITS complete. These changes do not place the plant in any unsafe operating conditions.

38 CTS 3.1.A.1.d. CTS allows the pumps to be shutdown for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

To be consistent with NUREG-1431, this is further restricted to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. Since this imposes additional restrictions on plant operations, this is a more restrictive change. This change is acceptable because this change may limit the time that all pumps are not operating and improve plant safety.

Prairie Island Units 1 and 2 12/11/00 Part D 15

Part D NSHID Category A

Change Number Package 3.4 Discussion of Change 3.4 39 CTS 3.1.A.2.a, 3.1.A.2.c.(1), 3.1.B.1.b and 3.1.C.2. The format for CTS and ITS fundamentally differ in the presentation of shutdown tracks but the Completion Time requirements are the same. The CTS format has been changed to the ITS format.

Since there is no net change in plant operations, this is an administrative change.

40 M

Not used.

41 CTS 3.1.A.2.a(1). CTS for pressurizer OPERABILITY require a steam bubble in the pressurizer and group A and B heaters operable. The ITS will require pressurizer level less than or equal to the pressurizer high water level Allowable Value and two heater groups capable of being powered from an emergency power supply. Since the pressurizer high water level Allowable Value is significantly below the level required to assure that there is a steam bubble in the pressurizer, this is a more restrictive change.

This change has been made to be consistent with NUREG-1431 and current NRC guidance. This change is acceptable since it will not introduce any unsafe plant operating or test conditions.

Prairie Island Units 1 and 2 12/11/00 Part D 16

Part D NSHD Category M

M M

Change Number Package 3.4 Discussion of Change 3.4 42 CTS 3.1.A.2.a(3), 3.1.C.2.c, 3.1.C.2.d and 3.1.C.2.e. For consistency with NUREG-1431, the one hour to initiate actions necessary for shutdown has been deleted. This is more restrictive since the plant has one less hour prior to placing the plant in MODE 3. The time provided in the ITS is adequate to plan for and implement an orderly shutdown if required; thus this change is acceptable. This change does not place the plant in any unsafe operating conditions.

43 CTS 3.1.A.2.a(3). New Required Actions have been provided for the possibility that the pressurizer is inoperable. These actions incorporate proposed TSTF-87, Rev. 1. This is more restrictive since PI CTS do not require these actions. This more restrictive change is included to make the PI ITS complete.

44 A new SR, 3.4.9.1, has been added in conformance with the guidance of NUREG-1431. This SR will require periodic verification that the pressurizer water level is < 90%. This is more restrictive since PI CTS do not require this surveillance.

This more restrictive change is included to make the P1 ITS complete.

Prairie Island Units 1 and 2 1/2/02 17

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M

45 CTS 3.1.A.2.b(1). CTS 3.1.A.2.b(1) requires two RCS pressurizer safety valves (PSVs) to be operable when the RCS temperature is > 350'F. This change will require two RCS PSVs to be operable whenever both RCS cold leg temperatures are greater than the OPPS enable temperature specified in the PTLR. This change is consistent with the guidance of NUREG-1431 and will provide additional overpressure protection when the RCS is between 350'F and the OPPS enable temperature. Since this change will require more components to be operable for more plant conditions, this is a more restrictive change. This change is acceptable because it does not cause any unsafe plant operating or testing conditions.

A 46 CTS 3.1.A.2.b(1). PI CTS License Amendment 123 allows pressurizer safety valves to be 2485 psig +/-3% when tested for operability. However, because of the particular wording in Specification 3.1.A.2.b(1 ), it was not revised. The-intent of Amendment 123 was that if the operators were aware the setting was outside 2485 psig +/- 1 % then they would not continue with their startup. CTS Table 4.1-2A, Item 3 requires verification that the settings are within +3. Thus, the change in LCO 3.4.10 is not a technical change since CTS already allow +3% tolerance on the valve settings and this is simply an administrative change.

Prairie Island Units 1 and 2 18 1/2/02

Part D NSHD Category L

Change Number 3.4-Package 3.4 Discussion of Change 47 CTS 3.1.A.2.b(2). In conformance with NUREG-1431 guidance, this specification which requires one pressurizer safety valve operable when the head is on the reactor vessel has been not been retained. Since the pressurizer safety valves do not provide overpressurization protection when the RCS temperature is below the LTOP enable temperature, this specification serves no purpose. NUREG-1431 requires PSVs to be operable when the RCS temperature exceeds the LTOP enable temperature. Below the LTOP enable temperature, NUREG-1431 requires redundant PORVs to be OPERABLE at the LTOP lift settings or the RCS to be vented. Thus, this specification has not been retained. This change results in less restrictions on plant operation.

Prairie Island Units 1 and 2 12/11/00 19

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 L

48 CTS 3.1.A.2.b(1). CTS requires the pressurizer safety valves (PSVs) to be operable in MODES 1, 2, and 3. A new Applicability Note has been included to be consistent with the guidance of NUREG-1431. This Note does not require the PSVs to meet the LCO lift setting limits in MODE 3, when the plant is started up, to allow adjusting the settings under hot conditions. Because this Note allows the PSVs to be potentially inoperable in MODE 3 until the PSVs can be tested and set, this change is less restrictive.

This change is acceptable since the Note also requires preliminary lift settings under cold conditions prior to heatup which is consistent with current plant practices and the time during which the valves are potentially inoperable for valve setting adjustments is limited to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> by the Note. The Note may improve plant safety by allowing more accurate settings under hot conditions.

A 49 CTS 3.1.A.2.c(1)(b). CTS required action explicitly requires the operators to "either restore the PORV to OPERABLE status or" take other appropriate actions. The option to restore equipment to operable status is always an available means of exiting the ITS Required Actions and, under the Writers Guide, this option should not be stated unless there are no other actions which should be taken. Thus this statement and similar statements within this CTS paragraph are not included in the ITS. Since it is understood that these are viable operator actions, this is an administrative change.

Prairie Island Units l and 2 20 12/11/00

Part D NSHID Category L

Change Number 3.4-50 Discussion of Change CTS 3.1.A.2.c.(2). When the RCS temperature is greater than the Sl pump disable temperature and less than the OPPS enable temperature, CTS requires the plant to be in MODE 5 with the RCS depressurized and vented through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when a PORV is not restored within the allowed outage time or both PORVs are inoperable.

This change will allow 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to place the plant in MODE 5, depressurize and vent the RCS under these conditions. This change is acceptable because 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is considered by the industry to be insufficient time to perform an orderly shutdown.

In addition, the requirement to place the unit in MODE 5 is consistent with the intent of the CTS. The additional time will maintain plant safety by allowing the operators to plan the shutdown and prevent challenges to plant systems which may initiate an overpressure event which the shutdown intends to prevent. This change is consistent with the guidance of NUREG-1431 as modified by approved TSTF-352, Revision 1.

Since this change allows more time to fully implement remedial action, this is a less restrictive change.

Prairie Island Units I and 2 1/2/02 Package 3.4 21

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 M

51 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). Restrictions on SI pump operability isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. New Action Statements are included for the possibility one (Specification 3.4.13) or two (Specification 3.4.12) SI pumps are capable of injecting into the RCS. CTS does not contain these action statement requirements; thus in this event CTS LCO 3.0.C (equivalent to PI ITS 3.0.3) would be entered which would allow 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for action to be taken. Under these circumstances, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> would be an inappropriate response time. The new Action Statements require immediate action which is more restrictive than CTS. This more restrictive change is included to make the PI ITS complete.

M 52 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). Restrictions on ECCS accumulator isolation have been included for clarity. These requirements are specified in CTS LCO 3.3. Associated action statements, clarifying notes for exceptions and applicability, and surveillance requirements, SRs 3.4.12.2 and 3.4.13.2, have been added. Adding LCO 3.4.12 and 3.4.13, Required Action C also added a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time that was not previously in the CTS. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is acceptable to PI since it is based on operating experience that the associated activities of Condition C can be accomplished in this time period and the low probability of an event requiring LTOP during the allowed times. Since these are added requirements they are more restrictive on plant operations.

These requirements have been included to make the P1 ITS complete and consistent with the guidance of NUREG-1431.

Prairie Island Units I and 2 22 1/2/02

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 LR 53 CTS 3.1.A.2.c(2) and 3.1.A.2.c(3). The specific status of associated equipment has been relocated to the Bases for consistency with NUREG-1431. These provisions are assumed to be part of the OPERABILITY requirement for the PORVs. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, relocation of CTS requirements to the Bases is a less restrictive change.

M 54 New SRs, 3.4.12.1, 3.4.12.2, 3.4.12.3, 3.4.13.1, 3.4.13.2, 3.4.13.3, and 3.4.13.4, have been added in conformance with NUREG-1431. These SRs require verification that only one (or no) SI pump capable of injecting, RCS is vented and PORV block valves are open as applicable for the MODES of operation and the method of providing overpressurization protection.

Adding these SRs also added new Frequencies that are not in the CTS. Evaluating these new Frequencies, PI believes them to be applicable to our plant. The new Frequencies provide adequate times considering administrative controls available to the operator, using other indications and alarms available to the operator in the control room to verify required status of the equipment, and the unlikelyhood of a low temperature overpressure event occurring during this time.

These SRs are more restrictive on plant operations since CTS do not require these surveillances. This is consistent with the guidance of NUREG-1431. These more restrictive changes are included to make the PI ITS complete.

55 Not used.

Prairie Island Units 1 and 2 23 1/2/02 i

m A

m

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R

56 CTS 3.1.A.3 and 4.18. The reactor vessel head vent system specifications, CTS 3.1.A.3 and associated surveillance requirements in TS 4.18, are not included in the PI ITS since this system does not meet the 1 OCFR50.36 Technical Specification Selection Criteria. These vents are designed to exhaust noncondensable gases and steam from the RCS which could inhibit natural circulation following an accident with an extended loss of offsite power. Credit for this vent system is not assumed in the safety analyses nor in the PI IPE. Therefore, the reactor vessel head vent does not meet the TSSC and these requirements have been relocated to the TRM which is maintained under the regulatory controls of 10CFR50.59. This is consistent with the guidance of NUREG-1431 which does not include specifications for the reactor vessel head vent system.

Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.

The reactor coolant head vents are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the reactor coolant head vents do not meet criterion 1.

Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

The reactor head vents are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a Prairie Island Units I and 2 24 1/2/02

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R

56 (continued) challenge to the integrity of a fission product barrier. PI does not take any credit for the reactor head vents in any accident analysis.

Therefore, the reactor head vents do not meet the criterion 2.

Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

The reactor head vents are not structures, systems or components that are part of the primary success path which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Therefore, the reactor head vents do not meet criterion 3.

Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.

The reactor head vents are not considered in the plant IPE and is not a system which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. Therefore, the reactor head vents do not meet criterion 4.

Therefore, since the screening criteria have not been satisfied, the reactor head vent LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The reactor head vents will be relocated to the TRM which is controlled by the provisions of 1 OCFR50.59.

Prairie Island Units I and 2 25 1/2/02

Part D NSHD Category M

Change Number 3.4-Package 3.4 Discussion of Change 57 New Specification. In conformance with the guidance of NUREG 1431, a new specification, RCS Minimum Temperature for Criticality, is included in the PI ITS. CTS Figure 3.1-1 does include a line labeled "Criticality Limit"; however there are no action statements or applicability associated with this line on the curve.

The Bases for this new specification provide four considerations which the minimum temperature for criticality should satisfy.

Based on PI calculations and consistency with the Low-Low Tave setpoint, this LCO will specify 540°F as the minimum allowable temperature. Compliance with this specification will assure that plant conditions are conservative with respect to the initial conditions assumed in the safety analyses. Since this is a new specification, it does place additional restrictions on plant operations and is thus categorized as more restrictive. This more restrictive change is included to make the P1 ITS complete.

58 Not used.

59 Not used.

60 Not used.

Prairie Island Units 1 and 2 12/11/00 26

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 A

61 CTS 3.1.B.1.b. The requirements for maintaining RCS pressure and temperature limits has been broken into two sets of action statements, for conditions above 200°F and for conditions below 200'F. This is a logical split since the CTS action is to reduce the temperature below 2000F which would be meaningless if the pressure and temperature limits were violated and the temperature were already below 200'F. Since the new action statement is addressed below, this change is considered administrative. This change also includes changing to the NUREG-1431 use of MODES to define plant conditions rather than use of prose descriptions. Since use of MODES does not change any plant operations, this is also an administrative change.

M 62 CTS 3.1.8.1.b. CTS do not specify a time frame for evaluating the integrity of the RCS following an out-of-limit condition. For consistency with NUREG-1431, a limit of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is included.

The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable to accomplish the evaluation. The evaluation for a mild violation is possible within this time, but more severe violations may require special, event specific stress analyses or inspections. The evaluation will determine whether the RCS structural integrity remains acceptable for continued operation. Since this is a new limit it is more restrictive on plant operation. This more restrictive change is included to make the P1 ITS complete.

Prairie Island Units 1 and 2 27 1/2/02

Package 3.4 NSHD Category M

M Change Number 3.4-Discussion of Change 63 CTS3.1.B.1.b. For consistency with NUREG-1431, new action statements have been included for out-of-limit conditions when the RCS is below 200 0F. PI CTS do not address this condition. Since these are new requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.

64 A new surveillance requirement, SR 3.4.3.1, has been included for consistency with NUREG-1431 which requires verification that RCS pressure, temperature and heatup and cooldown rates are within the specified limits. Plant operators currently monitor these variables for compliance with Specification 3.1.B.1.b although it is not explicitly written as a TS SR. Since these are new TS requirements they are considered more restrictive on plant operations. This more restrictive change is included to make the PI ITS complete.

65 Not used.

Prairie Island Units 1 and 2 12/11/00 Part D 28

Part D NSHID Category R

Change Number 3.4-66 Package 3.4 Discussion of Change CTS 3.1.B.2. In conformance with the guidance of NUREG-1431, the pressurizer heatup and cooldown specifications have been relocated from the TS to the PTLR. This change is acceptable since the Bases for Specification 3.4.3 state that the reactor pressure vessel is the most limiting component for brittle fracture; thus the requirements for the pressurizer have not been included in the ITS. The shutdown requirements associated with pressurizer heatup and cooldown limitations have been relocated to the TRM.

Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.

The Pressurizer Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 1.

Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

Prairie Island Units 1 and 2 1/2/02 29

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R

66 (continued)

The Pressurizer Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Pressurizer Pressure/Temperature Limits in any accident analysis. Therefore the Pressurizer Pressure/Temperature Limits do not meet the criterion 2.

Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

The Pressurizer Pressure/Temperature Limits are not structures, systems or components that are part of the primary success path which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 3.

Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.

The Pressurizer Pressure/Temperature Limits are a structure, system or component. Therefore, the Pressurizer Pressure/Temperature Limits do not meet criterion 4.

Prairie Island 30 1/2/02 Units I and 2

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R

66 (continued)

Therefore, since the screening criteria have not been satisfied, the Pressurizer Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Pressurizer Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.

R 67 CTS 3.1..B.3. In conformance with the guidance of NUREG 1431, the Steam Generator pressure/temperature limits have been relocated to the PTLR. This operating restriction does not present a challenge to the integrity of a fission product barrier and this limit is not required for safe operation. These specifications do not meet the Technical Specification Selection Criteria defined in 10CFR50.36. The shutdown requirements associated with this pressure/temperature limit have been relocated to the TRM.

Criterion 1: Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.

The Steam Generator Pressure/Temperature Limits are not installed instrumentation, nor are they used for, nor capable of, detecting a significant abnormal degradation of the reactor coolant pressure boundary prior to a Design Basis Accident (DBA). Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 1.

Prairie Island Units 1 and 2 31 1/2/02

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 R

67 (continued)

Criterion 2: A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

The Steam Generator Pressure/Temperature Limits are not process variables, design features, or operating restrictions that are initial conditions of a DBA or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. PI does not take any credit for the Steam Generator Pressure/Temperature Limits in any accident analysis. Therefore, the Steam Generator Pressure/Temperature Limits do not meet the criterion 2.

Criterion 3: A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

The Steam Generator Pressure/Temperature Limits are not structures, systems or components that are part of the primary success path which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 3.

Prairie Island Units I and 2 32 1/2/02

Part D NSHD Category R

Change Number 3.4-Discussion of Change 67 (continued)

Criterion 4: A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.

The Steam Generator Pressure/Temperature Limits are not a structure, system or component. Therefore, the Steam Generator Pressure/Temperature Limits do not meet criterion 4.

Therefore, since the screening criteria have not been satisfied, the Steam Generator Pressure/Temperature Limit LCO and Surveillances may be relocated to other plant controlled documents outside the Technical Specifications. The Steam Generator Pressure/Temperature Limits are being relocated to the PTLR and the associated shutdown requirements are being relocated to the TRM.

Prairie Island Units 1 and 2 31/2/02 Package 3.4 33

Package 3.4 NSHD Category L

Change Number 3.4-Discussion of Change 68 CTS 3.1.C.1. CTS requires two means of leakage detection. One of those means is specified as the radionuclide detection instrumentation, the other means is not specified. For consistency with the guidance of NUREG-1431, a second means of detecting RCS leakage, containment sump A pump run time, has been specified. This is a more restrictive change which is acceptable since it is consistent with CTS Bases and USAR.

Also in conformance with the guidance of NUREG-1431, action statements and remedial actions, in the event one or both means of leakage detection are inoperable, have been provided. The CTS are unnecessarily restrictive in that inoperability of one means of leakage detection requires shutdown of the plant. There are remedial measures which can be implemented to compensate for an inoperable leakage detection channel as allowed by NUREG 1431. The PI ITS includes provisions for compensatory sampling and surveillance testing if leakage detection channels are inoperable. Implementation of this change will provide increased plant operational flexibility and thus this is a less restrictive change.

69 Not used.

70 Not used.

Prairie Island Units I and 2 12/11/00 Part D 34

Part D NSHID Category A

M A

Change Number Package 3.4 Discussion of Change 3.4 71 CTS 3.1.C.1. The CTS requirements described here are the same as ITS LCO 3.0.3 (CTS LCO 3.0.c) which is the appropriate action if no leakage detection instrumentation is operable. Thus this is rewritten to require immediate entry into LCO 3.0.3. The change of applicability of this requirement is addressed in L3.4-68. The time and the implications of the use of the time are the same; therefore this is an administrative change.

72 Four new SRs, 3.4.16.1, 3.4.16.2, 3.4.16.3 and 3.4.16.4, have been included to perform Channel Checks, COTs and Calibrations of containment radiation monitors and Calibration of sump pump run time instrumentation. Since these requirements are new to the PI TS they are considered more restrictive to plant operation.

These SRs have been included for consistency with NUREG-1431.

These more restrictive changes are included to make the PI ITS complete.

73 CTS 3.1.C.2.a. The CTS specifics of where leakage is not originating from have not been included in ITS LCO 3.4.14. The ITS definition of LEAKAGE includes the required details of what is considered leakage; thus these details are not necessary in the specification. Since this change does not change any plant operations, this is an administrative change.

Prairie Island Units 1 and 2 12/11/00 35

Part D NSHD Category LR Change Number 3.4-74 Package 3.4 Discussion of Change CTS 3.1.C.2.b. The requirement to evaluate the leakage for continued safe operation is a level of detail beyond that contained within NUREG-1 431. Therefore this requirement has been relocated to the Bases. Since ITS Bases (under the Bases Control Program in Section 5.5 of the ITS) is licensee controlled, this change is less restrictive.

75 Not used.

76 Not used.

A 77 CTS 3.1.C.2.d. The CTS requirement to remain in COLD SHUTDOWN until the condition is corrected is not included in ITS specification 3.4.14. The rules of ITS use in LCO 3.0.4 require ITS LCOs to be met prior to resumption of power operation. Thus, it is unnecessary to include these requirements in ITS LCO 3.4.14.

Since the change does not involve any changes to plant operations, this is an administrative change.

Prairie Island Units 1 and 2 12/11/00 36

Part D Package 3.4 NSHD Change Category Number Discussion of Change 3.4 A

78 CTS 3.1.C.2.e. CTS requires inservice steam generator tube inspection in accordance with TS 4.12. Since this TS has been relocated to the Steam Generator Program in ITS Section 5.5, no technical changes are associated with this change; therefore, this is an administrative change.

L 79 CTS 3.1.C.3. A new action statement is included in the ITS which allows 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to isolate the flow path of a PIV with leakage outside the allowed limits and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore the PIV to within limits. CTS allows one hour to initiate shutdown. These changes are consistent with the guidance of NUREG-1431. These changes are acceptable since the safety function of the PIV is met once the PIV flow path is isolated. Furthermore, the isolation valve is also required to meet the same leakage limits as the PIV, in accordance with the additional new requirement for isolation valve leakage limits. An additional three hours to take action is acceptable since these leakage limits are very conservative and it is very unlikely that these valves will suffer complete failure during this limited time. When the PIV flow path is isolated, this may cause some other system, such as RHR, to be inoperable and require entry into an Action Statement for another Specification which would require completion of required actions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Thus this change is consistent with other allowed outage times for significant safety features. Since this change allows additional plant operational flexibility, this is a less restrictive change.

Prairie Island Units 1 and 2 37 12/11/00