ML20042A841: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, VENDOR/MANUFACTURER TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, VENDOR/MANUFACTURER TO NRC
| page count = 1
| page count = 1
| project = TAC:46694, TAC:46695
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:-m
{{#Wiki_filter:-m
                                                                                      )
)
z     y v
y z
WestinghoUSB                                                       law Department Electric Corporation westinghouse Building Gateway Center Pittsburg!1 Pennsylvania 15222 P. 0. Box 355 Pittsburgh, PA                 15230 Mr. Harold R. Denton, Director                                 (412) 373-4558 Office of Nuclear Reactor Regulation                           March 19,1982 U. S. Nuclear Regulatory Commission                                                                       -
v WestinghoUSB law Department Electric Corporation westinghouse Building Gateway Center Pittsburg!1 Pennsylvania 15222 P. 0. Box 355 Pittsburgh, PA 15230 (412) 373-4558 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation March 19,1982 U. S. Nuclear Regulatory Commission Washington, D.C.
Washington, D.C.         20555                                                   g         N Attention: Mr. R. A. Clark, Chief Operating Reactors, Branch 3 Re: Wisconsin Electric Power Company y
20555 N
d
g Attention: Mr. R. A. Clark, Chief
[f      . #.
[f
                                                                                              <.w
_6 c.3 Operating Reactors, Branch 3 y
_6 3-c.3 Docket Nos. 50-266 and 50-301                                 dgk        qi,@           .%    $
<.w Re: Wisconsin Electric Power Company d
Steam Generator Sleeving Repair Report, Rev. 1                           g Point Beach Nuclear Plant, Units 1 and 2                           f                         ff Gentlemen:                                                                                     @
3-Docket Nos. 50-266 and 50-301 d
The material proprietary to the Westinghouse Electric Corporation (Westinghouse) in the Westinghouse report entitled " Point Beach Steam Generator Sleeving Report, WCAP-9960, Retision 1 (Proprietary), WCAP-9960, Rev.1," 10 copies of which were sent to you on March 11, 1982, by Mr. C. W. Fay, the Assistant Vice President of Wisconsin Electric Power Company was marked incompletely.         This resulted from an effort to complete the report in time for the hearings which were pending when this report was being prepared, but which have now been canceled. Please make no public disclosure of the contents of this report, whether marked as proprietary or not.
qi,@
4          A correctly marked version is being prepared, and should be printed and delivered sometime the week of March 22, 1982. Its substantive contents are the same as the report the regulatory staff is now reviewing. We see no reason that the staff's technical review cannot continue pending
Steam Generator Sleeving Repair Report, Rev. 1 gk g
:          delivery of the correctly marked version.                         -
Point Beach Nuclear Plant, Units 1 and 2 f
cerely,
ff Gentlemen:
                                                                      -                      t
The material proprietary to the Westinghouse Electric Corporation (Westinghouse) in the Westinghouse report entitled " Point Beach Steam Generator Sleeving Report, WCAP-9960, Retision 1 (Proprietary), WCAP-9960, Rev.1," 10 copies of which were sent to you on March 11, 1982, by Mr. C. W. Fay, the Assistant Vice President of Wisconsin Electric Power Company was marked incompletely.
                                                                  ,} w)   -        Wl Francis X. Davis                             00 cc: Judge Bloch                                   Attorney                                       5 Judge Kline
This resulted from an effort to complete the report in time for the hearings which were pending when this report was being prepared, but which have now been canceled.
;                  Judge Paxton                                                                             sO S. Treby, Esq.
Please make no public disclosure of the contents of this report, whether marked as proprietary or not.
A correctly marked version is being prepared, and should be printed and 4
delivered sometime the week of March 22, 1982.
Its substantive contents are the same as the report the regulatory staff is now reviewing. We see no reason that the staff's technical review cannot continue pending delivery of the correctly marked version.
: cerely, t
,} w)
Wl Francis X. Davis 00 cc: Judge Bloch Attorney 5
Judge Kline Judge Paxton sO S. Treby, Esq.
R. Bachmann, Esq.
R. Bachmann, Esq.
B. Churchill, Esq.                                                                                   -
B. Churchill, Esq.
K. Falk, Esq.
K. Falk, Esq.
Atomic Safety & Licensing Board Panel Atomic Safety & Licensing Appeal Board Panel Office of the Secretary, Docketing & Service Section 8203240188 820319 PDR ADOCK 05000266 P                     PDR}}
Atomic Safety & Licensing Board Panel Atomic Safety & Licensing Appeal Board Panel Office of the Secretary, Docketing & Service Section 8203240188 820319 PDR ADOCK 05000266 P
PDR}}

Latest revision as of 18:43, 19 December 2024

Informs That Westinghouse Rept, Point Beach Steam Generator Sleeving Rept,WCAP-9960,Revision 1 (Proprietary),WCAP-9960, Revision 1, Was Incorrectly Marked.Entire Rept Should Be Considered Proprietary.Corrected Version to Be Sent 820322
ML20042A841
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/19/1982
From: Davis F
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
References
TAC-46694, TAC-46695, NUDOCS 8203240188
Download: ML20042A841 (1)


Text

-m

)

y z

v WestinghoUSB law Department Electric Corporation westinghouse Building Gateway Center Pittsburg!1 Pennsylvania 15222 P. 0. Box 355 Pittsburgh, PA 15230 (412) 373-4558 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation March 19,1982 U. S. Nuclear Regulatory Commission Washington, D.C.

20555 N

g Attention: Mr. R. A. Clark, Chief

[f

_6 c.3 Operating Reactors, Branch 3 y

<.w Re: Wisconsin Electric Power Company d

3-Docket Nos. 50-266 and 50-301 d

qi,@

Steam Generator Sleeving Repair Report, Rev. 1 gk g

Point Beach Nuclear Plant, Units 1 and 2 f

ff Gentlemen:

The material proprietary to the Westinghouse Electric Corporation (Westinghouse) in the Westinghouse report entitled " Point Beach Steam Generator Sleeving Report, WCAP-9960, Retision 1 (Proprietary), WCAP-9960, Rev.1," 10 copies of which were sent to you on March 11, 1982, by Mr. C. W. Fay, the Assistant Vice President of Wisconsin Electric Power Company was marked incompletely.

This resulted from an effort to complete the report in time for the hearings which were pending when this report was being prepared, but which have now been canceled.

Please make no public disclosure of the contents of this report, whether marked as proprietary or not.

A correctly marked version is being prepared, and should be printed and 4

delivered sometime the week of March 22, 1982.

Its substantive contents are the same as the report the regulatory staff is now reviewing. We see no reason that the staff's technical review cannot continue pending delivery of the correctly marked version.

cerely, t

,} w)

Wl Francis X. Davis 00 cc: Judge Bloch Attorney 5

Judge Kline Judge Paxton sO S. Treby, Esq.

R. Bachmann, Esq.

B. Churchill, Esq.

K. Falk, Esq.

Atomic Safety & Licensing Board Panel Atomic Safety & Licensing Appeal Board Panel Office of the Secretary, Docketing & Service Section 8203240188 820319 PDR ADOCK 05000266 P

PDR