{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES


NUCLEAR REGULATORY COMMISSION
===NUCLEAR REGULATORY COMMISSION===
OFFICE OF NUCLEAR REACTOR REGULATION


OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C.  20555-0001


WASHINGTON, D.C. 20555-0001 February 14, 2005 NRC INFORMATION NOTICE 2005-04:               SINGLE-FAILURE AND FIRE VULNERABILITY
===February 14, 2005===
NRC INFORMATION NOTICE 2005-04:
SINGLE-FAILURE AND FIRE VULNERABILITY


OF REDUNDANT ELECTRICAL SAFETY BUSES
===OF REDUNDANT ELECTRICAL SAFETY BUSES===


==ADDRESSEES==
==ADDRESSEES==
Line 36: Line 39:
addressees of a potential single-failure and fire vulnerability whereby a circuit failure could
addressees of a potential single-failure and fire vulnerability whereby a circuit failure could


result in bus lockouts and prevent the reenergization of the redundant electrical safety buses. It
result in bus lockouts and prevent the reenergization of the redundant electrical safety buses. It


is expected that recipients will review the information for applicability to their facilities and
is expected that recipients will review the information for applicability to their facilities and


consider appropriate actions to avoid similar problems. However, suggestions contained in this
consider appropriate actions to avoid similar problems. However, suggestions contained in this


information notice are not NRC requirements; therefore, no specific action or written response
information notice are not NRC requirements; therefore, no specific action or written response
Line 57: Line 60:
The power sources for the safety buses generally consist of two offsite power supplies, both of
The power sources for the safety buses generally consist of two offsite power supplies, both of


which are designed to supply power to each of the safety buses. The normal bus alignment
which are designed to supply power to each of the safety buses. The normal bus alignment


has one offsite power supply selected as the source for each safety bus. Each safety bus also
has one offsite power supply selected as the source for each safety bus. Each safety bus also


has one EDG as a standby power source. The electrical protection and metering system uses
has one EDG as a standby power source. The electrical protection and metering system uses


current transformers (CTs) for measuring power consumption and sensing overloads and
current transformers (CTs) for measuring power consumption and sensing overloads and


faulted conditions. At Crystal River, the electrical protection and metering circuit for each offsite
faulted conditions. At Crystal River, the electrical protection and metering circuit for each offsite


power supply included three CTs at the feeder breaker to each safety bus, phase overcurrent
power supply included three CTs at the feeder breaker to each safety bus, phase overcurrent


relays, and ground overcurrent relays, all connected in a basic residual scheme. The circuit
relays, and ground overcurrent relays, all connected in a basic residual scheme. The circuit


also included one watt-hour meter which would sum the power to both safety busses. This
also included one watt-hour meter which would sum the power to both safety busses. This


interconnection of a protection and metering circuit between two safety busses was identified by
interconnection of a protection and metering circuit between two safety busses was identified by


the inspectors as a common-mode failure vulnerability. A failure on this interconnected circuit
the inspectors as a common-mode failure vulnerability. A failure on this interconnected circuit


(e.g., a fire-induced cable fault or watt-hour meter failure) would be interpreted by the protection
(e.g., a fire-induced cable fault or watt-hour meter failure) would be interpreted by the protection


system as an electrical bus fault on both safety busses. Consequently, the relay logic would
system as an electrical bus fault on both safety busses. Consequently, the relay logic would


lock out both redundant safety buses and prevent reenergization from any power source.
lock out both redundant safety buses and prevent reenergization from any power source.
Line 85: Line 88:
The licensee has modified the wiring in the overcurrent protection circuits to align each
The licensee has modified the wiring in the overcurrent protection circuits to align each


monitoring circuit to one safety bus and to disconnect the watt-hour meters. In this corrected
monitoring circuit to one safety bus and to disconnect the watt-hour meters. In this corrected


configuration, each circuit is contained within one switchgear, a single fault will affect only one
configuration, each circuit is contained within one switchgear, a single fault will affect only one
Line 96: Line 99:
The design function (to prevent single- failure vulnerabilities) is implemented through train- specific metering, monitoring, and protection systems to limit the probability of worst case
The design function (to prevent single- failure vulnerabilities) is implemented through train- specific metering, monitoring, and protection systems to limit the probability of worst case


failures to a train. Whenever a signal is needed to the redundant train, the signal is electrically
failures to a train. Whenever a signal is needed to the redundant train, the signal is electrically


isolated (i.e., any potential failure or its deleterious effects cannot be transmitted to the
isolated (i.e., any potential failure or its deleterious effects cannot be transmitted to the
Line 104: Line 107:
The redundant safety buses are expected to be fully independent (i.e., neither component
The redundant safety buses are expected to be fully independent (i.e., neither component


failure, degradation of equipment, or electrical faults could disable both trains). NRC
failure, degradation of equipment, or electrical faults could disable both trains). NRC


regulations in Title 10, of the Code of Federal Regulations (CFR) Part 50.55a(h)(2), requires
regulations in Title 10, of the Code of Federal Regulations (CFR) Part 50.55a(h)(2), requires


protection systems to meet IEEE Std 279 -1971 Criteria for Protection Systems for Nuclear
protection systems to meet IEEE Std 279 -1971 Criteria for Protection Systems for Nuclear


Power Generating Stations. This standard requires all electric and mechanical components
Power Generating Stations. This standard requires all electric and mechanical components


(e.g., from sensors to actuation devices) to be free from single failure vulnerability. That is, no
(e.g., from sensors to actuation devices) to be free from single failure vulnerability. That is, no
Line 118: Line 121:
level.
level.


General Design Criterion (GDC)17, of 10 CFR Part 50 Appendix A, states that The onsite
General Design Criterion (GDC)17, of 10 CFR Part 50 Appendix A, states that The onsite


electric power supplies...and the onsite electric distribution system... shall have sufficient
electric power supplies...and the onsite electric distribution system... shall have sufficient
Line 135: Line 138:
buses were electrically connected to generate a selective tripping scheme to isolate overcurrent
buses were electrically connected to generate a selective tripping scheme to isolate overcurrent


and ground fault conditions on the bus. This design is economical but results in a common- mode failure vulnerability disabling two redundant trains of safety buses. Further, the CT
and ground fault conditions on the bus. This design is economical but results in a common- mode failure vulnerability disabling two redundant trains of safety buses. Further, the CT


outputs from redundant safety buses were also connected to the same watt-hour meter, resulting in the same vulnerability to common-mode failure.
outputs from redundant safety buses were also connected to the same watt-hour meter, resulting in the same vulnerability to common-mode failure.
Line 143: Line 146:
most of the accident mitigation/emergency core cooling systems, except the steam-driven
most of the accident mitigation/emergency core cooling systems, except the steam-driven


systems actuated by DC power. Such electrical failures cannot be isolated with a reasonable
systems actuated by DC power. Such electrical failures cannot be isolated with a reasonable


chance of system recovery without expert help because of the interdependent electrical
chance of system recovery without expert help because of the interdependent electrical


protection system. In most cases, manually closing the breaker will result in a prompt trip. This
protection system. In most cases, manually closing the breaker will result in a prompt trip. This


is because the logic is designed to prevent such operations when actual fault conditions persist. Similar problems could exist in the buses that supply related plant pumping systems (e.g.,
is because the logic is designed to prevent such operations when actual fault conditions persist. Similar problems could exist in the buses that supply related plant pumping systems (e.g.,
Line 162: Line 165:


==CONTACT==
==CONTACT==
This information notice requires no specific action or written response. Please direct any
This information notice requires no specific action or written response. Please direct any


questions about this matter to the technical contact listed below or the appropriate Office of
questions about this matter to the technical contact listed below or the appropriate Office of
Line 169: Line 172:


/RA/
/RA/
                                              Patrick L. Hiland, Chief


===Patrick L. Hiland, Chief===
Reactor Operations Branch
Reactor Operations Branch


Division of Inspection Program Management
===Division of Inspection Program Management===
 
Office of Nuclear Reactor Regulation
Office of Nuclear Reactor Regulation


Line 185: Line 187:


ML050400090
ML050400090
DOCUMENT NAME: E:\Filenet\ML050400090.wpd
DOCUMENT NAME: E:\\Filenet\\ML050400090.wpd
 
OFFICE
 
OES:IROB:DIPM
 
TECH EDITOR
 
EEIB:DE
 
RII
 
RIII
 
NAME
 
RSchmitt
 
Pkleene
 
TKoshy
 
R. Schin (via e-mail)
T. Kozak
 
DATE
 
02/09/2005
02/08/2005
02/09/2005
02/09/2005
02/09/2005 OFFICE
 
SC:EEIB:DE
 
SPLB:DSSA
 
BC:SPLB:DSSA
 
SC:OES:IROB:DIPM
 
C:IROB:DIPM
 
NAME
 
RJenkins


OFFICE    OES:IROB:DIPM  TECH EDITOR    EEIB:DE              RII                      RIII
===SDWeerakkody===
JNHannon


NAME      RSchmitt        Pkleene        TKoshy              R. Schin (via e-mail)    T. Kozak
TReis


DATE      02/09/2005      02/08/2005      02/09/2005          02/09/2005              02/09/2005 OFFICE    SC:EEIB:DE      SPLB:DSSA      BC:SPLB:DSSA      SC:OES:IROB:DIPM        C:IROB:DIPM
PLHiland


NAME      RJenkins        SDWeerakkody    JNHannon          TReis                  PLHiland
DATE


DATE      02/09/2005     02/10/2005     02/10/2005         02/14/2005             02/14/2005}}
02/09/2005
02/10/2005
02/10/2005
02/14/2005
02/14/2005}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Latest revision as of 22:29, 15 January 2025

Single-Failure and Fire Vulnerability of Redundant Electrical Safety Buses
ML050400090
Person / Time
Issue date: 02/14/2005
From: Hiland P
NRC/NRR/DIPM/IROB
To:
Koshy T, NRR/DE/EEIB, 415-1176
References
IN-05-004
Download: ML050400090 (4)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001

February 14, 2005

NRC INFORMATION NOTICE 2005-04:

SINGLE-FAILURE AND FIRE VULNERABILITY

OF REDUNDANT ELECTRICAL SAFETY BUSES

ADDRESSEES

All holders of operating licenses for nuclear reactors, except those who have permanently

ceased operations and have certified that fuel has been permanently removed from the reactor

vessel.

PURPOSE

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to inform

addressees of a potential single-failure and fire vulnerability whereby a circuit failure could

result in bus lockouts and prevent the reenergization of the redundant electrical safety buses. It

is expected that recipients will review the information for applicability to their facilities and

consider appropriate actions to avoid similar problems. However, suggestions contained in this

information notice are not NRC requirements; therefore, no specific action or written response

is required.

DESCRIPTION OF CIRCUMSTANCES

On January 27, 2005, during a triennial fire protection inspection of the Crystal River nuclear

station, NRC inspectors discovered an electrical protection and metering circuit which if

damaged, could electrically lock out redundant safety buses and prevent reenergization of the

buses both from offsite power sources and emergency diesel generators (EDGs).

The power sources for the safety buses generally consist of two offsite power supplies, both of

which are designed to supply power to each of the safety buses. The normal bus alignment

has one offsite power supply selected as the source for each safety bus. Each safety bus also

has one EDG as a standby power source. The electrical protection and metering system uses

current transformers (CTs) for measuring power consumption and sensing overloads and

faulted conditions. At Crystal River, the electrical protection and metering circuit for each offsite

power supply included three CTs at the feeder breaker to each safety bus, phase overcurrent

relays, and ground overcurrent relays, all connected in a basic residual scheme. The circuit

also included one watt-hour meter which would sum the power to both safety busses. This

interconnection of a protection and metering circuit between two safety busses was identified by

the inspectors as a common-mode failure vulnerability. A failure on this interconnected circuit

(e.g., a fire-induced cable fault or watt-hour meter failure) would be interpreted by the protection

system as an electrical bus fault on both safety busses. Consequently, the relay logic would

lock out both redundant safety buses and prevent reenergization from any power source.

The licensee has modified the wiring in the overcurrent protection circuits to align each

monitoring circuit to one safety bus and to disconnect the watt-hour meters. In this corrected

configuration, each circuit is contained within one switchgear, a single fault will affect only one

safety bus, and a fire in any area (e.g., at the watt-hour meters in the main control room) will not

affect safety busses that are relied upon for safe shutdown.

BACKGROUND

The design function (to prevent single- failure vulnerabilities) is implemented through train- specific metering, monitoring, and protection systems to limit the probability of worst case

failures to a train. Whenever a signal is needed to the redundant train, the signal is electrically

isolated (i.e., any potential failure or its deleterious effects cannot be transmitted to the

redundant train).

The redundant safety buses are expected to be fully independent (i.e., neither component

failure, degradation of equipment, or electrical faults could disable both trains). NRC

regulations in Title 10, of the Code of Federal Regulations (CFR) Part 50.55a(h)(2), requires

protection systems to meet IEEE Std 279 -1971 Criteria for Protection Systems for Nuclear

Power Generating Stations. This standard requires all electric and mechanical components

(e.g., from sensors to actuation devices) to be free from single failure vulnerability. That is, no

single failure in the protection system shall prevent proper protective actions at the system

level.

General Design Criterion (GDC)17, of 10 CFR Part 50 Appendix A, states that The onsite

electric power supplies...and the onsite electric distribution system... shall have sufficient

independence [and] redundancy ....to perform their safety functions assuming a single failure.

There may be other plant-specific commitments for keeping the plant configuration free of

single-failure vulnerability.

DISCUSSION

The design deficiency identified at Crystal River had a protection scheme that used CTs for

monitoring and metering power flow. The CTs installed on power feeders to redundant safety

buses were electrically connected to generate a selective tripping scheme to isolate overcurrent

and ground fault conditions on the bus. This design is economical but results in a common- mode failure vulnerability disabling two redundant trains of safety buses. Further, the CT

outputs from redundant safety buses were also connected to the same watt-hour meter, resulting in the same vulnerability to common-mode failure.

The significance of such a vulnerability is that the failure of redundant buses generally disables

most of the accident mitigation/emergency core cooling systems, except the steam-driven

systems actuated by DC power. Such electrical failures cannot be isolated with a reasonable

chance of system recovery without expert help because of the interdependent electrical

protection system. In most cases, manually closing the breaker will result in a prompt trip. This

is because the logic is designed to prevent such operations when actual fault conditions persist. Similar problems could exist in the buses that supply related plant pumping systems (e.g.,

reactor coolant pumps, circulating water pumps, service water pumps), where a single failure

could disable the full system of pumps connected to different buses.

Similar common-mode failure vulnerabilities were identified at Quad Cities, Dresden, LaSalle, Prairie Island, and Monticello.

GENERIC IMPLICATIONS

After reviewing the events at the six sites (10 units), the staff concludes that such deficiencies

are potentially wide-spread with varying levels of risk significance depending on plant-specific, unique design configurations.

CONTACT

This information notice requires no specific action or written response. Please direct any

questions about this matter to the technical contact listed below or the appropriate Office of

Nuclear Reactor Regulation (NRR) project manager.

/RA/

Patrick L. Hiland, Chief

Reactor Operations Branch

Division of Inspection Program Management

Office of Nuclear Reactor Regulation

Technical Contact:

Thomas Koshy, NRR/EEIB

301-415-1176 E-mail: txk@nrc.gov

Note: NRC generic communications may be found on the NRC public Website, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ML050400090

DOCUMENT NAME: E:\\Filenet\\ML050400090.wpd

OFFICE

OES:IROB:DIPM

TECH EDITOR

EEIB:DE

RII

RIII

NAME

RSchmitt

Pkleene

TKoshy

R. Schin (via e-mail)

T. Kozak

DATE

02/09/2005

02/08/2005

02/09/2005

02/09/2005

02/09/2005 OFFICE

SC:EEIB:DE

SPLB:DSSA

BC:SPLB:DSSA

SC:OES:IROB:DIPM

C:IROB:DIPM

NAME

RJenkins

SDWeerakkody

JNHannon

TReis

PLHiland

DATE

02/09/2005

02/10/2005

02/10/2005

02/14/2005

02/14/2005