ML18227D290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 49: Line 49:


FIGURE 1 Florida Power 5 Light Company REACTOR FUEL LOCATION TURKEY POINT PLANT UNIT NO. 4 CYCLE 4      (preliminary}
FIGURE 1 Florida Power 5 Light Company REACTOR FUEL LOCATION TURKEY POINT PLANT UNIT NO. 4 CYCLE 4      (preliminary}
M    L    K        J      H        G'. F    F  D        C l      I        l
M    L    K        J      H        G'. F    F  D        C l      I        l NFl              NFl NF2              NF2    NFl NF1    NF2                                      NF2 NF1 NFl NF1'F2 NF2 NF1                                                                        NF1 NFl    NF2                                                                        NF2 NF1 S
                                                                                !
NFl              NFl NF2              NF2    NFl NF1    NF2                                      NF2 NF1 NFl NF1'F2 NF2 NF1                                                                        NF1 NFl    NF2                                                                        NF2 NF1 S
NF2                                                                        NF2 NFl NF1                                                                        NF1 NF2                                                          NF2 NFl NFl  NF2                                      NF2  NF1 13 14 NFl    NF2              NF2  NFl NFl 15 235 NF1: New Fuel with 3.10 Weight Percent          U 235 NF2 .-=New Fuel with 2.90 Weight Percent          U
NF2                                                                        NF2 NFl NF1                                                                        NF1 NF2                                                          NF2 NFl NFl  NF2                                      NF2  NF1 13 14 NFl    NF2              NF2  NFl NFl 15 235 NF1: New Fuel with 3.10 Weight Percent          U 235 NF2 .-=New Fuel with 2.90 Weight Percent          U



Latest revision as of 19:21, 2 February 2020

Submit Refueling Information (Cycle 4) Which Will Not Involve Any Unreviewed Safety Questions
ML18227D290
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
L-77-8
Download: ML18227D290 (8)


Text

U.S. NUCLEAR REGULATORY Co ION DOCKET NUMBER NRC FORM 195 (2 76) ~O- K+y FILE NUMBER WRC DISTRIBUTION FoR PART 50 DOCI<ET MATERIAL FROM: DATE OF DOCUMENT Mr Stello Florida Power & Light Co 1-7-77 Miami, Fla DATE RECEIVED R E Uhrig ETTE R QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED

+ORIGINAL MNC LASS IF E D I

one signed OCOPY DESCRIPTION ENCLOSU RE Ltr trans the following: Cycle 04 Refueling information.........

lp 2p I

hCXÃOVZ,ZVGZD PLANT NAME. Turkey Point 04 SAFETY FOR ACTION/INFORMATION ehf ASSIGNED AD:

N MANAGER'-14-77 RO ECT MANA E PROJECT L C ASST v)$ LIC ASST IN TE R NAL D I ST R I BUTION BE SYSTEMS SAFETY PLANT SYSTEMS S TE SAFF.

I iNRC PDR HEINEMAN TEDESCO I&E 2- SCHROEDER OELD GOSSICK & STAFF ENGINEERING IPPOL TO E MIPC MACARRY ERNST CASE KNIGHT BALLARD HANAUER SIESKIL OPERATING REACTORS SPANGLER HARLESS PAW. CK STELLO SITE TECH PROJECT MANAGEMENT REACTOR SAFE OPERATING TECH GAMMILL BOYD ROSS EISENHUT STEPP PE COLLINS NOVAK HULMAN HOUSTON ROSZTOCZY PETERSON CHECK BUTLE SITE ANALYSIS MELTZ VOLLMER HELTEMES AT& I BUNCH SKOVHOLT SALTZMAN J COLLINS RUTHERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR~ ne CL NAT LAB B TIC: REG V IE ULRIKSON OR LA PDR NSIC'SLB:

CONSULTANTS:

ACRS CYS 4NL&XNCj' T > C NAC FORM 196 {2-76)

~ ~ ~ ~ ~ ~ ~ ~ ~

), >~%~ $ )t

($ ~, ))~

. O. BOX 013100, MIAMI, FL 33101

~y~V fair~

FLORIDA POWER & LIGHT COMPANY January 7), 1977 L-77-8 Office of Nuclear Reactor Regulation Attention: Mr. Victor Stello, Director Division of Operating Reactors Hl<~ II U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stello:

RE: Turkey Point Unit 4 Docket No. 50-251 Refuelin Information (C cle 4)

Attached herewith is refueling information applicable to Cycle 4 of Turkey Point Unit 4. If necessary, supplemental refueling information will be submitted upon completion of the detailed Cycle 4 design and accident analyses. The supplemental in-formation will be submitted at least 90 days before Cycle 4 startup if any such information is identified as requiring prior Commission review per the guidelines of 10 CFR 50.59.

The attached refueling information has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power and Light Company Nuclear Review Board., They have con-cluded, based uponthe preliminary information now available, that the refueling will not involve any unreviewed safety questions.

Very truly yours,

'Robert E. Uhrig Vice President DOC%1) lO ea)Ieg REU/MAS/pm JAiti 1 1197 Attachment Q, U,S. M)CLEAl lE COMM I 1S AT, $

h44I Sed cc: Mr. Norman C. Moseley, Region II Robert Lowenstein, Esquire PEOPLE .. ~ SERVING PEOPLE

4 \ E h

'4 1

C Wl l

v'l 0 aq>4 d

ik ii

FIGURE 1 Florida Power 5 Light Company REACTOR FUEL LOCATION TURKEY POINT PLANT UNIT NO. 4 CYCLE 4 (preliminary}

M L K J H G'. F F D C l I l NFl NFl NF2 NF2 NFl NF1 NF2 NF2 NF1 NFl NF1'F2 NF2 NF1 NF1 NFl NF2 NF2 NF1 S

NF2 NF2 NFl NF1 NF1 NF2 NF2 NFl NFl NF2 NF2 NF1 13 14 NFl NF2 NF2 NFl NFl 15 235 NF1: New Fuel with 3.10 Weight Percent U 235 NF2 .-=New Fuel with 2.90 Weight Percent U

~ ~

P

ATTACHMENT, Florida Power 6 Light Company Turkey Point Unit 4 C cle 4 Refuelin Information Turkey Point Unit 4 is in its third cycle of operation. It is expected that the Cycle 4 design will not cause previously acceptable safety limits for any incident to be exceeded, based on the assumptions that Cycle 3 operation is terminated after 7000 Mt'/MTU and there is adherence to plant operating limitations in the Technical Specifications.

The following refueling information is applicable to Cycle 4 of Turkey Point Unit 4:

1. Desi n Parameters Nominal design parameters for Cycle 4 are the same as for Cycle 3.
2. New Fuel
a. Number of assemblies 40 235

'b. Enrichment 24 assemblies with 3.1 weight percent U235 16 assemblies with 2.9 weight percent U

c. Preliminary loading pattern see Figure 1
3. Refuelin Ob'ective The objective of this refueling is to reload the reactor with sufficient reactivity to support Unit 4 operation at its licensed power level for a nominal 12 month cycle.
4. Refuelin Schedule Unit 4 is tentatively scheduled to shutdown in May, 1977 with Cycle 4 startup planned for June, 1977.
5. Plant Modification A modification to the Safety Injection accumulators is planned for the Spring 1977 refueling outage. The level instrumentation will be changed to allow an increase in the accumulator water volume. A corresponding Technical Specification amendment was proposed in our letter L-76-418 of December 9, 1976.,

A~ J aw,, l)

/