ML19208D295: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.s*$'1 Dunr@pWER COMPANY
{{#Wiki_filter:.
-' ' Mda Bamswo
s*
''422 Socin Cacacn Stazzi, CnAnwitz, N. C. as24a
                                                                    $
'9 /UC I6 A 9 928 August 10, T97 w w aw o maaaza.sa.
  '
Tg.g o.o % g an t a 7 4 ViC F Petticce , 2734:e?Stra= Peoosesio=
1
-                                  Dunr@pWER COMPANY
                                      ''
                                        ' ' Mda Bamswo 422 Socin Cacacn Stazzi, CnAnwitz, N. C. as24a w w aw o maaaza.sa.           '9August
                                        /UC I610,AT97 9 928                    Tg.g o.o % g an t a 7 4 ViC F Petticce ,                                                               2734:e?
Stra= Peoosesio=
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15


Line 29: Line 34:
As Please find attached our response to the Notice of Violation, Item B.
As Please find attached our response to the Notice of Violation, Item B.
stated in your letter, a response to Item A is not requested.
stated in your letter, a response to Item A is not requested.
/lVery truly yours j/'w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1 qmr  
            /               l Very truly yours       j
.*-DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested.
                              /           '
Itemj!As required by Technical Specification 6.4.1.b, procedures shall be followed during refueling operations.
w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1                   qmr
 
.
  *
-
DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested.
Itemj!
As required by Technical Specification 6.4.1.b, procedures shall be followed during refueling operations.
Contrary to the above, on or before May 24, 1979, valve 3LP-59 was opened without an approved procedure or an out of n.,rmal authorization and f ailure te properly control this valve contributed te a radioactive liquid spill.
Contrary to the above, on or before May 24, 1979, valve 3LP-59 was opened without an approved procedure or an out of n.,rmal authorization and f ailure te properly control this valve contributed te a radioactive liquid spill.
Response This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure.
 
===Response===
This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure.
In order to prevent recurrence of this event, several actions were 1::'tiated.
In order to prevent recurrence of this event, several actions were 1::'tiated.
Operators have been instructed to im=ediately secure any non-emergency trans-A modification fer of water when vaste inventories show a rapid increase.
Operators have been instructed to im=ediately secure any non-emergency   trans-fer of water when vaste inventories show a rapid increase. A modification request has been initiated which, when installed, will alleviate design defi-Full design ciencies which contributed to the occurrence of this event.
request has been initiated which, when installed, will alleviate design defi-Full design ciencies which contributed to the occurrence of this event.
details and schedule for completion are not available.
details and schedule for completion are not available.
1052 036}}
1052 036}}

Revision as of 14:08, 19 October 2019

Responds to NRC 790717 Ltr Re Violations Noted in IE Insp Repts 50-269/79-14,50-270/79-14 & 50-287/79-15.Corrective Actions:Valve 3LP-59 Closed During Refueling to Prevent Radioactive Liquid Spill
ML19208D295
Person / Time
Site: Oconee  
Issue date: 08/10/1979
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19208D285 List:
References
NUDOCS 7909280206
Download: ML19208D295 (2)


Text

.

s*

$

'

1

- Dunr@pWER COMPANY

' ' Mda Bamswo 422 Socin Cacacn Stazzi, CnAnwitz, N. C. as24a w w aw o maaaza.sa. '9August

/UC I610,AT97 9 928 Tg.g o.o % g an t a 7 4 ViC F Petticce , 2734:e?

Stra= Peoosesio=

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission F.egion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 RE: RII:FJ 50-269/79-14 50-270/79-14 50-287/79-15

Dear Mr. O'Reilly:

With regard to Mr. R. C. Lewis' letter of July 17, 1979, which transmitted IE Inspection Report 50-269/79-14, 50-270/79-14, and 50-287/79-15, Duke Power Company does not consi'er the information to be proprietary.

As Please find attached our response to the Notice of Violation, Item B.

stated in your letter, a response to Item A is not requested.

/ l Very truly yours j

/ '

w $. Parker,Jr.l William 0 RLG:scs Attachment 1052 035 7909280 1 qmr

.

-

DUKE POWER COMPANY OCONEE NUCLEAR STATION Response to IE Inspection Report 50-269/79-14, 50-270/79-14, 50-287/79-14 Item A No response requested.

Itemj!

As required by Technical Specification 6.4.1.b, procedures shall be followed during refueling operations.

Contrary to the above, on or before May 24, 1979, valve 3LP-59 was opened without an approved procedure or an out of n.,rmal authorization and f ailure te properly control this valve contributed te a radioactive liquid spill.

Response

This valve and similar valves on Units 1, 2 were closed or verified closed as required by the system procedure.

In order to prevent recurrence of this event, several actions were 1::'tiated.

Operators have been instructed to im=ediately secure any non-emergency trans-fer of water when vaste inventories show a rapid increase. A modification request has been initiated which, when installed, will alleviate design defi-Full design ciencies which contributed to the occurrence of this event.

details and schedule for completion are not available.

1052 036